January 2020 People with disabilities may request materials in alternate formats. Kirkland’s policy is to fully comply with Title VI of the Civil Rights Act by prohibiting discrimination against any person on the basis of race, color, national origin or sex in the provision of benefits and services resulting from its programs and activities. Any person who believes his/her Title VI protection has been violated, may file a complaint with the City. To request an alternate format, file a complaint or for questions about Kirkland’s Title VI Program, contact the Title VI Coordinator at 425.587.3831 (TTY Relay: 711) or [email protected]. Kirkland’s contractor will replace two essential systems that are under-capacity, aging and resulting in excessive maintenance WHAT: A City of Kirkland contractor begins the 10-month process in late February to upgrade an aging water and sewer main along 108th Avenue Northeast. Marshbank Construction is replacing the two systems—both more than five decades old—to increase their capacities to serve Kirkland’s growing population and to reduce the systems’ needs for maintenance. at need is most urgent in the sewer line, which runs from Northeast 68th Street to Northeast 53rd Street. Settling soil has created a sag in the sewer line, allowing sewage to accumulate there and requiring maintenance crews to periodically flush the line. e contractor is also replacing the water main between Northeast 68th and 60th streets. WHEN: Marshbank’s crews will work 9 a.m. to 3 p.m., Monday through Friday, starting in late February or early March. n Marshbank will work several nights in 108th Avenue Northeast’s intersection with Northeast 68th Street to connect the water and sewer mains and to pave. WHAT TO EXPECT: Marshbank will pave the entire width of 108th Avenue Northeast this fall between Northeast 68th and 60th streets. Between Northeast 60th and 53rd streets, the contractor will pave the center turn lane and southbound lane. Weather could force the contractor to delay its paving schedule until spring 2021. n King County Metro will re-route some buses around construction zones. n Marshbank will detour traffic around any closed sections of road and will shiſt travel lanes to accommodate construction zones. n e contractor will maintain access for local residents, mail, emergency responders and waste management. e contractor will establish a detour around closed sections of road. Will be lane closures. lane shiſts. VISIT: www.kirklandwa. gov/108thavewatersewer CONTACT: Senior Project Engineer Patrick Herbig, (425) 587-3841, [email protected]; or Senior Outreach Coordinator Christian Knight, [email protected], (425) 587-3831. Water, sewer upgrades begins March on 108th CARING FOR YOUR INFRASTRUCTURE TO KEEP KIRKLAND HEALTHY, SAFE AND VIBRANT PROJECT UPDATE Marshbank Construction is upgrading the water and sewer mains beneath 108th Avenue Northeast. 108TH AVE NE NE 68TH ST NE 60TH ST 106TH AVE NE NE 55TH ST NE 53RD ST NE 58TH ST NE 62ND ST 105TH AVE NE NE 65TH LN 111TH AVE NE 110TH AVE NE NE 64TH ST NE 60TH WAY 6TH ST NE 65TH PL NE 60TH LN NE 58TH ST NE 105TH AVE NE 106TH AVE NE 110TH AVE NE NE 59TH ST E 111TH AVE NE rillon Woods k Emerson High School Interna Kirkland Seventh Day Adventist School entary School Northwest University - 6710 Building Project staff meets with contractor to discuss specific construction schedules & methods AUGUST SEPTEMBER OCTOBER NOVEMBER DECEMBER JUNE JULY FEBRUARY MARCH APRIL MAY JANUARY Marshbank Construction upgrades water and sewer mains and repaves 108th Avenue Northeast LEGEND Upgrade sewer main Upgrade water main Utility connection (could require night work) Repave entire street width Repave southbound and center turn lane N

JANUARY FEBRUARY MARCH APRIL MAY JUNE …Project staff meets with contractor to discuss specific construction schedules & methods JANUARY FEBRUARY MARCH APRIL MAY JUNE JULY AUGUST

  • Upload
    others

  • View
    0

  • Download
    0

Embed Size (px)

Citation preview

Page 1: JANUARY FEBRUARY MARCH APRIL MAY JUNE …Project staff meets with contractor to discuss specific construction schedules & methods JANUARY FEBRUARY MARCH APRIL MAY JUNE JULY AUGUST

January2020

People with disabilities may request materials in alternate formats. Kirkland’s policy is to fully comply with Title VI of the Civil Rights Act by prohibiting discrimination against any person on the basis of race, color,

national origin or sex in the provision of benefits and services resulting from its programs and activities. Any person who believes his/her Title VI protection has been violated, may file a complaint with the City. To request an alternate format, file a complaint or for questions about Kirkland’s Title VI Program, contact the Title VI Coordinator at 425.587.3831 (TTY Relay: 711) or [email protected].

Kirkland’s contractor will replace two essential systems that are under-capacity, aging and resulting in excessive maintenanceWHAT: A City of Kirkland contractor begins the 10-month process in late February to upgrade an aging water and sewer main along 108th Avenue Northeast.

Marshbank Construction is replacing the two systems—both more than five decades old—to increase their capacities to serve Kirkland’s growing population and to reduce the systems’ needs for maintenance.

That need is most urgent in the sewer line, which runs from Northeast 68th Street to Northeast 53rd Street. Settling soil has created a sag in the sewer line, allowing sewage to accumulate there and requiring maintenance crews to periodically flush the line.

The contractor is also replacing the water main between Northeast 68th and 60th streets.WHEN: Marshbank’s crews will work 9 a.m. to 3 p.m., Monday through Friday, starting in late February or early March.

n Marshbank will work several nights in 108th Avenue Northeast’s intersection with Northeast 68th Street to connect the water and sewer mains and to pave.

WHAT TO EXPECT: Marshbank will pave the entire width of 108th Avenue Northeast this fall between Northeast 68th and 60th streets.

Between Northeast 60th and 53rd streets, the contractor will pave the center turn lane and southbound lane. Weather could force the contractor to delay its paving schedule until spring 2021.

n King County Metro will re-route some buses around construction zones.

n Marshbank will detour traffic around any closed sections of road and will shift travel lanes to accommodate construction zones.

n The contractor will maintain access for local residents, mail, emergency responders and waste management.

The contractor will establish a detour around closed sections of road. Will be lane closures. lane shifts.

VISIT: www.kirklandwa.gov/108thavewatersewer

CONTACT: Senior Project Engineer Patrick Herbig, (425) 587-3841, [email protected]; or Senior Outreach Coordinator Christian Knight, [email protected], (425) 587-3831.

Water, sewer upgrades begins March on 108th

CARING FOR YOUR INFRASTRUCTURE TO KEEP KIRKLAND HEALTHY, SAFE AND VIBRANT

PROJECTUPDATE

Marshbank Construction is upgrading the water and sewer mains beneath 108th Avenue Northeast.

108T

H A

VE

NE

NE 68TH ST

NE 60TH ST

106T

H A

VE

NE

NE 55TH ST

NE 53RD ST

CR

OSS

KIR

KLAN

D C

OR

RID

OR

NE 65TH ST

NE 55TH LN

112T

H A

VE

NE

110T

H W

AY

NE

103R

D A

VE N

E

NE 58TH ST

NE 62ND ST

112T

H P

L N

E

NE 67TH ST

104T

H A

VE

NE

NE 59TH ST

111T

H L

N N

E

111T

H P

L N

E

NE 61ST PL

105T

H A

VE N

E

NE 65TH LN

111T

H A

VE

NE

113T

H A

VE

NE

110T

H A

VE N

E

NE 64TH ST

111T

H W

AY N

E

NE 60TH WAY

6TH

ST

S

110T

H L

N N

E

NE 65TH PL

109T

H L

N N

E

104T

H P

L N

E

NE 58TH PL

102N

D P

L N

E

NE 60TH LN

NE 59TH PL

NE 61ST CT

NE 58TH ST

NE 64TH ST

NE 62ND ST10

5TH

AV

E N

E

106T

H A

VE

NE

110T

H A

VE

NE

NE 59TH ST

111T

H L

N N

E11

1TH

PL

NE

NE 53RD ST

104T

H A

VE N

E

111T

H A

VE

NE

Carillon Woods

Terrace Park

Northwest University

Emerson High School

International Community School

Kirkland Seventh Day Adventist School

Lakeview Elementary School

Northwest University - 6710 Building

Project staff meets with contractor to discuss specific construction schedules & methods

AUGUST SEPTEMBER OCTOBER NOVEMBER DECEMBERJUNE JULYFEBRUARY MARCH APRIL MAYJANUARY

Marshbank Construction upgrades water and sewer mains and repaves 108th Avenue Northeast

LEGENDUpgrade sewer main

Upgrade water main

Utility connection (could require night work)

Repave entire street width

Repave southbound and center turn lane

N

Page 2: JANUARY FEBRUARY MARCH APRIL MAY JUNE …Project staff meets with contractor to discuss specific construction schedules & methods JANUARY FEBRUARY MARCH APRIL MAY JUNE JULY AUGUST

Cierres de callesPara solicitar informacion en Español sobre el cierre de calles comuníquese con el Coordinador del Titulo VI, enviando un mensaje a [email protected] o al número telefónico (425) 587-3831.

道路封闭如果需要获取简体中文通告,请联系Title VI协调员。电邮:[email protected], 电话:(425)587-3831。

Закрытие улицЧтобы запросить этот документ на русском языке, пожалуйста, свяжитесь со старшим координатором по связям с общественностью Титул VI по адресу [email protected], (425) 587-3831.

City of KirklandPublic Works Department123 Fifth AvenueKirkland, WA 98033-6189

PROJECT UPDATE 108th Avenue Northeast water & sewerJanuary 2020

What to expect when Kirkland upgrades water, sewer and stormwater systems

SERVICE LINE CONNECTIONS

1POTHOLING/SAWCUTTING

TRENCHING

INSTALLING MAINS

MAINTENANCE HOLES

VALVES

6

PAVING/RESTORATION

7

2

3

4

5

UPGRADING UTILITIES

Construction begins 2020 on bike, ped bridgeKirkland’s leaders expect construction to begin in 2020 on the

Totem Lake Connector (pictured at right). During the first six months of the bridge’s two-year

construction process, Kirkland’s prospective contractor will be acquiring the materials—mainly steel—to build the bridge and piece sections of it together. That will take place off-site.

When complete in 2022, the Totem Lake Connector pedestrian and bicycle bridge will connect the two ends of the Cross Kirkland Corridor currently severed by Totem Lake Boulevard and Northeast 124th Street.   

The bridge will feature an overlook that will extend over the park from the bridge’s loop. The 20-long-foot overlook will taper in width as it extends toward a transparent end-panel.