CONTRACTOR SUNKOTA CONST. MIDWEST DEMOLITION ALL STATES CONCRETE CUTTING HCC Bid Bond Present? YES YES YES YES Addenda Noted: 12345 12345 12345 12345 Base Bid 100,000.00 $ 55,900.00 $ 79,323.86 $ 81,700.00 $ Modification (43,500.00) $ Total 56,500.00 $ Alt #1: Geothermal & Mechanical System Revisions 0 0 0 0 Modification 0 Total Alt #2: Stand Alone O2 Building 0 0 0 0 Modification 0 Total Alt #3: Polished Concrete Floor Finishes 0 0 0 0 Modification 0 Total SUMMARY / NOTES 756 PP BOND 1450 PP BOND 2400 PP BOND 735 PP BOND ***All bids received are subject to review and scope checks by Henry Carlson Construction, LLC and Office of State Engineer/ SD Dep't. of Corrections.*** Bid Package 1.2A - Interior Demolition Bid Date: Wednesday, April 15th, 2020 10:00 AM CT Jameson Annex, Medical Expansion SOUTH DAKOTA STATE PENITENTIARY - Sioux Falls, SD OSE Project #C1215-12X --- HCC Project #19040 Prepared by: James McMahon (Project Manager) - Henry Carlson Construction

Jameson Annex, Medical Expansion - South Dakota · 2020-04-15 · Bid Package 1.2A - Interior Demolition Bid Date: Wednesday, April 15th, 2020 10:00 AM CT Jameson Annex, Medical Expansion

  • Upload
    others

  • View
    2

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Jameson Annex, Medical Expansion - South Dakota · 2020-04-15 · Bid Package 1.2A - Interior Demolition Bid Date: Wednesday, April 15th, 2020 10:00 AM CT Jameson Annex, Medical Expansion

CONTRACTOR

SUNKOTA CONST. MIDWEST DEMOLITION ALL STATES CONCRETE CUTTINGHCC

Bid Bond Present? YES YES YES YES

Addenda Noted: 12345 12345 12345 12345

Base Bid 100,000.00$ 55,900.00$ 79,323.86$ 81,700.00$

Modification (43,500.00)$

Total 56,500.00$

Alt #1: Geothermal &

Mechanical System Revisions0 0 0 0

Modification 0

Total

Alt #2: Stand Alone O2

Building0 0 0 0

Modification 0

Total

Alt #3: Polished Concrete

Floor Finishes0 0 0 0

Modification 0

Total

SUMMARY / NOTES

756 PP BOND 1450 PP BOND 2400 PP BOND 735 PP BOND

***All bids received are subject to review and scope checks by Henry Carlson Construction, LLC and Office of State Engineer/ SD Dep't. of

Corrections.***

Bid Package 1.2A - Interior DemolitionBid Date: Wednesday, April 15th, 2020

10:00 AM CT

Jameson Annex, Medical ExpansionSOUTH DAKOTA STATE PENITENTIARY - Sioux Falls, SD

OSE Project #C1215-12X --- HCC Project #19040

Prepared by: James McMahon (Project Manager) - Henry Carlson Construction

Page 2: Jameson Annex, Medical Expansion - South Dakota · 2020-04-15 · Bid Package 1.2A - Interior Demolition Bid Date: Wednesday, April 15th, 2020 10:00 AM CT Jameson Annex, Medical Expansion

CONTRACTOR

RUNGE ENTERPRISES SUKUP CONSTRUCTION FIRST RATE EXCAVATE

Bid Bond Present? YES YES YES

Addenda Noted: 12345 12345 12345

Base Bid 198,000.00$ 595,700.00$ 340,000.00$

Modification 27,000.00$

Total 367,000.00$

Alt #1: Geothermal &

Mechanical System Revisions0 0 0

Modification

Total

Alt #2: Stand Alone O2

Building14,000.00$ 19,000.00$ 19,000.00$

Modification 1,600.00$

Total

Alt #3: Polished Concrete

Floor Finishes0 0 0

Modification 0

Total

SUMMARY / NOTES

1980 PP BOND 6147 PP BOND 7200 PP BOND ADD 550 IN MOD

***All bids received are subject to review and scope checks by Henry Carlson Construction, LLC and Office of State Engineer/ SD Dep't. of

Corrections.***

Bid Date: Wednesday, April 15th, 2020

10:00 AM CT

Jameson Annex, Medical ExpansionSOUTH DAKOTA STATE PENITENTIARY - Sioux Falls, SD

Prepared by: James McMahon (Project Manager) - Henry Carlson Construction

OSE Project #C1215-12X --- HCC Project #19040

Bid Package 1.2B - Sitework, Exterior Demolition, & Utilities

Page 3: Jameson Annex, Medical Expansion - South Dakota · 2020-04-15 · Bid Package 1.2A - Interior Demolition Bid Date: Wednesday, April 15th, 2020 10:00 AM CT Jameson Annex, Medical Expansion

CONTRACTOR

A PLUS CONCRETE D&G CONCRETE CONST. BIG AL'S CONCRETE A & S BECK & HOFER CONST.

Bid Bond Present? NO YES YES YES YES

Addenda Noted: 12345 12345 12345 12345 12345

Base Bid 45,000.00$ 94,298.00$ 108,878.45$ -$ 100,000.00$

Modification -$ -$

Total 100,000.00$

Alt #1: Geothermal &

Mechanical System Revisions0 0 0 100000

Modification 0 -100000

Total 0

Alt #2: Stand Alone O2

Building900.00$ 3,200.00$ 6,800.00$ 100,000.00$

Modification 2,800.00$ -100000

Total -$

Alt #3: Polished Concrete

Floor Finishes1,500.00$ -$ -$ 100,000.00$

Modification -$ -100000

Total -$

SUMMARY / NOTES

1150 PP BOND 800 PP BOND + 30 IN MOD 3000 PP BOND REJECTED 1000 PP BOND

***All bids received are subject to review and scope checks by Henry Carlson Construction, LLC and Office of State Engineer/ SD Dep't. of

Corrections.***

Bid Date: Wednesday, April 15th, 2020

10:00 AM CT

Jameson Annex, Medical ExpansionSOUTH DAKOTA STATE PENITENTIARY - Sioux Falls, SD

Prepared by: James McMahon (Project Manager) - Henry Carlson Construction

OSE Project #C1215-12X --- HCC Project #19040

Bid Package 1.2C - Site Concrete

Page 4: Jameson Annex, Medical Expansion - South Dakota · 2020-04-15 · Bid Package 1.2A - Interior Demolition Bid Date: Wednesday, April 15th, 2020 10:00 AM CT Jameson Annex, Medical Expansion

CONTRACTOR

AMERICAN FENCE CO DAKOTA FENCE CO

Bid Bond Present? YES YES

Addenda Noted: 12345 12345

Base Bid 37,427.00$ 106,393.00$

Modification

Total

Alt #1: Geothermal &

Mechanical System Revisions-$ -$

Modification

Total

Alt #2: Stand Alone O2

Building-$ -$

Modification

Total

Alt #3: Polished Concrete

Floor Finishes-$ -$

Modification

Total

SUMMARY / NOTES

475 PP BOND 873 PP BOND

***All bids received are subject to review and scope checks by Henry Carlson Construction, LLC and Office of State Engineer/ SD Dep't. of

Corrections.***

Bid Date: Wednesday, April 15th, 2020

10:00 AM CT

Jameson Annex, Medical ExpansionSOUTH DAKOTA STATE PENITENTIARY - Sioux Falls, SD

Prepared by: James McMahon (Project Manager) - Henry Carlson Construction

OSE Project #C1215-12X --- HCC Project #19040

Bid Package 1.2D - Temporary & Permanent Fencing & Razor Wire

Page 5: Jameson Annex, Medical Expansion - South Dakota · 2020-04-15 · Bid Package 1.2A - Interior Demolition Bid Date: Wednesday, April 15th, 2020 10:00 AM CT Jameson Annex, Medical Expansion

CONTRACTOR

ASCO

Bid Bond Present? YES

Addenda Noted: 12345

Base Bid 90,000.00$

Modification

Total

Alt #1: Geothermal &

Mechanical System Revisions-$

Modification

Total

Alt #2: Stand Alone O2

Building-$

Modification

Total

Alt #3: Polished Concrete

Floor Finishes-$

Modification

Total

SUMMARY / NOTES

900 PP BOND

***All bids received are subject to review and scope checks by Henry Carlson Construction, LLC and Office of State Engineer/ SD Dep't. of

Corrections.***

Bid Date: Wednesday, April 15th, 2020

10:00 AM CT

Jameson Annex, Medical ExpansionSOUTH DAKOTA STATE PENITENTIARY - Sioux Falls, SD

Prepared by: James McMahon (Project Manager) - Henry Carlson Construction

OSE Project #C1215-12X --- HCC Project #19040

Bid Package 1.2E - Slope Stabilization

Page 6: Jameson Annex, Medical Expansion - South Dakota · 2020-04-15 · Bid Package 1.2A - Interior Demolition Bid Date: Wednesday, April 15th, 2020 10:00 AM CT Jameson Annex, Medical Expansion

CONTRACTOR

BX CIVIL CONSTRUCTION

Bid Bond Present? NO

Addenda Noted: 12345

Base Bid 22,750.00$

Modification

Total

Alt #1: Geothermal &

Mechanical System Revisions-$

Modification

Total

Alt #2: Stand Alone O2

Building-$

Modification

Total

Alt #3: Polished Concrete

Floor Finishes-$

Modification

Total

SUMMARY / NOTES

225 PP BOND

***All bids received are subject to review and scope checks by Henry Carlson Construction, LLC and Office of State Engineer/ SD Dep't. of

Corrections.***

Bid Date: Wednesday, April 15th, 2020

10:00 AM CT

Jameson Annex, Medical ExpansionSOUTH DAKOTA STATE PENITENTIARY - Sioux Falls, SD

Prepared by: James McMahon (Project Manager) - Henry Carlson Construction

OSE Project #C1215-12X --- HCC Project #19040

Bid Package 1.2F - Guardrailing

Page 7: Jameson Annex, Medical Expansion - South Dakota · 2020-04-15 · Bid Package 1.2A - Interior Demolition Bid Date: Wednesday, April 15th, 2020 10:00 AM CT Jameson Annex, Medical Expansion

CONTRACTOR

LYNDE CONSTRUCTION APLUS CONSTRUCTION A&S CONCRETE HCC BECK & HOFER

Bid Bond Present? YES YES YES YES YES

Addenda Noted: 12345 12345 12345 12345 12345

Base Bid 182,200.00$ 132,750.00$ -$ 148,300.00$ 300,000.00$

Modification (180,000.00)$

Total 120,000.00$

Alt #1: Geothermal &

Mechanical System Revisions-$ -$ -$ 300,000.00$

Modification (300,000.00)$

Total -$

Alt #2: Stand Alone O2

Building9,200.00$ 9,500.00$ 10,129.00$ 300,000.00$

Modification (290,000.00)$

Total 10,000.00$

Alt #3: Polished Concrete

Floor Finishes-$ -$ -$ 300,000.00$

Modification (300,000.00)$

Total -$

SUMMARY / NOTES

3733 PP BOND 3000 PP BOND

REJECTED. DIDN’T USE BID

FORM 1335 PP BOND 3000 PP BOND MINUS 1800

***All bids received are subject to review and scope checks by Henry Carlson Construction, LLC and Office of State Engineer/ SD Dep't. of

Corrections.***

Bid Date: Wednesday, April 15th, 2020

10:00 AM CT

Jameson Annex, Medical ExpansionSOUTH DAKOTA STATE PENITENTIARY - Sioux Falls, SD

Prepared by: James McMahon (Project Manager) - Henry Carlson Construction

OSE Project #C1215-12X --- HCC Project #19040

Bid Package 1.3A - Concrete Foundations & Interior Slabs

Page 8: Jameson Annex, Medical Expansion - South Dakota · 2020-04-15 · Bid Package 1.2A - Interior Demolition Bid Date: Wednesday, April 15th, 2020 10:00 AM CT Jameson Annex, Medical Expansion

CONTRACTOR

DESIGN CRETE INC. DIAMOND FLOOR SOLUTIONS

Bid Bond Present? NO

Addenda Noted: 12345 123456 12345 12345 12345

Base Bid 34,770.00$ 30,000.00$

Modification

Total

Alt #1: Geothermal &

Mechanical System Revisions-$ -$

Modification

Total

Alt #2: Stand Alone O2

Building-$ -$

Modification

Total

Alt #3: Polished Concrete

Floor Finishes14,130.00$ 19,950.00$

Modification

Total

SUMMARY / NOTES

1043.10 PP BOND NO VALUE

***All bids received are subject to review and scope checks by Henry Carlson Construction, LLC and Office of State Engineer/ SD Dep't. of

Corrections.***

Bid Date: Wednesday, April 15th, 2020

10:00 AM CT

Jameson Annex, Medical ExpansionSOUTH DAKOTA STATE PENITENTIARY - Sioux Falls, SD

Prepared by: James McMahon (Project Manager) - Henry Carlson Construction

OSE Project #C1215-12X --- HCC Project #19040

Bid Package 1.3B - Burnished/ Polished Concrete

Page 9: Jameson Annex, Medical Expansion - South Dakota · 2020-04-15 · Bid Package 1.2A - Interior Demolition Bid Date: Wednesday, April 15th, 2020 10:00 AM CT Jameson Annex, Medical Expansion

CONTRACTOR

FABCON PRECAST HCC

Bid Bond Present? YES YES

Addenda Noted: 12345 12345 12345 12345

Base Bid 281,485.00$ 454,880.00$

Modification

Total

Alt #1: Geothermal &

Mechanical System Revisions-$ -$

Modification

Total

Alt #2: Stand Alone O2

Building-$ -$

Modification

Total

Alt #3: Polished Concrete

Floor Finishes-$ -$

Modification

Total

SUMMARY / NOTES EXCEPTIONS LISTED 3518 PP

BOND 4094 PP BOND

***All bids received are subject to review and scope checks by Henry Carlson Construction, LLC and Office of State Engineer/ SD Dep't. of

Corrections.***

Bid Date: Wednesday, April 15th, 2020

10:00 AM CT

Jameson Annex, Medical ExpansionSOUTH DAKOTA STATE PENITENTIARY - Sioux Falls, SD

Prepared by: James McMahon (Project Manager) - Henry Carlson Construction

OSE Project #C1215-12X --- HCC Project #19040

Bid Package 1.3C - Precast Structural Concrete

Page 10: Jameson Annex, Medical Expansion - South Dakota · 2020-04-15 · Bid Package 1.2A - Interior Demolition Bid Date: Wednesday, April 15th, 2020 10:00 AM CT Jameson Annex, Medical Expansion

CONTRACTOR

M&L MASONRY WALTER REE MASONRY

Bid Bond Present? YES YES

Addenda Noted: 12345 12345

Base Bid 81,900.00$ 114,473.00$

Modification

Total

Alt #1: Geothermal &

Mechanical System Revisions-$ -$

Modification

Total

Alt #2: Stand Alone O2

Building-$ -$

Modification

Total

Alt #3: Polished Concrete

Floor Finishes-$ -$

Modification

Total

SUMMARY / NOTES

2500 PP BOND

2290 PP BOND - EXCLUSIONS

NOTED

***All bids received are subject to review and scope checks by Henry Carlson Construction, LLC and Office of State Engineer/ SD Dep't. of

Corrections.***

Bid Date: Wednesday, April 15th, 2020

10:00 AM CT

Jameson Annex, Medical ExpansionSOUTH DAKOTA STATE PENITENTIARY - Sioux Falls, SD

Prepared by: James McMahon (Project Manager) - Henry Carlson Construction

OSE Project #C1215-12X --- HCC Project #19040

Bid Package 1.4 - Masonry

Page 11: Jameson Annex, Medical Expansion - South Dakota · 2020-04-15 · Bid Package 1.2A - Interior Demolition Bid Date: Wednesday, April 15th, 2020 10:00 AM CT Jameson Annex, Medical Expansion

CONTRACTOR

P&M STEEL EGGER STEEL CO INTEGRITY STEEL

Bid Bond Present? YES YES YES

Addenda Noted: 12345 12345 12345

Base Bid 100,177.10$ 102,453.00$ 95,939.00$

Modification

Total

Alt #1: Geothermal &

Mechanical System Revisions-$ -$ -$

Modification

Total

Alt #2: Stand Alone O2

Building100.11$ 365.00$ 225.00$

Modification

Total

Alt #3: Polished Concrete

Floor Finishes-$ -$ -$

Modification

Total

SUMMARY / NOTES

351 PP BOND

450 PP BOND - EXCLUSIONS

LISTED

691 PP BOND. LIST OF

INCLUSIONS AND EXCLUSIONS

***All bids received are subject to review and scope checks by Henry Carlson Construction, LLC and Office of State Engineer/ SD Dep't. of

Corrections.***

Bid Date: Wednesday, April 15th, 2020

10:00 AM CT

Jameson Annex, Medical ExpansionSOUTH DAKOTA STATE PENITENTIARY - Sioux Falls, SD

Prepared by: James McMahon (Project Manager) - Henry Carlson Construction

OSE Project #C1215-12X --- HCC Project #19040

Bid Package 1.5A - Structural & Miscellaneous Metals (Furnish)

Page 12: Jameson Annex, Medical Expansion - South Dakota · 2020-04-15 · Bid Package 1.2A - Interior Demolition Bid Date: Wednesday, April 15th, 2020 10:00 AM CT Jameson Annex, Medical Expansion

CONTRACTOR

HCC

Bid Bond Present? YES

Addenda Noted: 12345

Base Bid 80,762.00$

Modification

Total

Alt #1: Geothermal &

Mechanical System Revisions-$

Modification

Total

Alt #2: Stand Alone O2

Building-$

Modification

Total

Alt #3: Polished Concrete

Floor Finishes-$

Modification

Total

SUMMARY / NOTES

727 PP BOND

***All bids received are subject to review and scope checks by Henry Carlson Construction, LLC and Office of State Engineer/ SD Dep't. of

Corrections.***

Bid Date: Wednesday, April 15th, 2020

10:00 AM CT

Jameson Annex, Medical ExpansionSOUTH DAKOTA STATE PENITENTIARY - Sioux Falls, SD

Prepared by: James McMahon (Project Manager) - Henry Carlson Construction

OSE Project #C1215-12X --- HCC Project #19040

Bid Package 1.5B - Structural & Miscellaneous Metals (Install)

Page 13: Jameson Annex, Medical Expansion - South Dakota · 2020-04-15 · Bid Package 1.2A - Interior Demolition Bid Date: Wednesday, April 15th, 2020 10:00 AM CT Jameson Annex, Medical Expansion

CONTRACTOR

SUNKOTA CONST. VISIONS CONST HCC

Bid Bond Present? YES YES YES

Addenda Noted: 12345 12345 12345

Base Bid 300,000.00$ 500,000.00$ 113,400.00$

Modification (83,300.00)$ (416,700.00)$

Total 216,700.00$ 83,300.00$ 113,400.00$ -$

Alt #1: Geothermal &

Mechanical System Revisions-$ -$ -$

Modification -$ -$

Total

Alt #2: Stand Alone O2

Building-$ -$ -$

Modification -$ -$

Total

Alt #3: Polished Concrete

Floor Finishes-$ -$ -$

Modification -$ -$

Total

SUMMARY / NOTES 3240 PP BOND - 983 DEDUCT

IN MOD

15000 PP BOND - 13800 IN

MOD 1021 PP BOND

***All bids received are subject to review and scope checks by Henry Carlson Construction, LLC and Office of State Engineer/ SD Dep't. of

Corrections.***

Bid Date: Wednesday, April 15th, 2020

10:00 AM CT

Jameson Annex, Medical ExpansionSOUTH DAKOTA STATE PENITENTIARY - Sioux Falls, SD

Prepared by: James McMahon (Project Manager) - Henry Carlson Construction

OSE Project #C1215-12X --- HCC Project #19040

Bid Package 1.6A - Carpentry, OFCI Items, Lockers, Specialties Installation

Page 14: Jameson Annex, Medical Expansion - South Dakota · 2020-04-15 · Bid Package 1.2A - Interior Demolition Bid Date: Wednesday, April 15th, 2020 10:00 AM CT Jameson Annex, Medical Expansion

CONTRACTOR

HCC PATZER WOODWORKING MALONEY INC.

Bid Bond Present? NO NO NO

Addenda Noted: 12345 12345 12345

Base Bid 35,200.00$ 25,710.00$ 33,457.68$

Modification

Total

Alt #1: Geothermal &

Mechanical System Revisions-$ -$

Modification

Total

Alt #2: Stand Alone O2

Building-$ -$

Modification

Total

Alt #3: Polished Concrete

Floor Finishes-$ -$

Modification

Total

SUMMARY / NOTES

0 PP BOND

643 PP BOND -

INCLUSIONS/EXCLUSIONS

LIST OF INCLUSIONS AND

EXCLUSIONS. 1003.74 PP

BOND

***All bids received are subject to review and scope checks by Henry Carlson Construction, LLC and Office of State Engineer/ SD Dep't. of

Corrections.***

Bid Date: Wednesday, April 15th, 2020

10:00 AM CT

Jameson Annex, Medical ExpansionSOUTH DAKOTA STATE PENITENTIARY - Sioux Falls, SD

Prepared by: James McMahon (Project Manager) - Henry Carlson Construction

OSE Project #C1215-12X --- HCC Project #19040

Bid Package 1.6B - Casework & Countertops (Furnish)

Page 15: Jameson Annex, Medical Expansion - South Dakota · 2020-04-15 · Bid Package 1.2A - Interior Demolition Bid Date: Wednesday, April 15th, 2020 10:00 AM CT Jameson Annex, Medical Expansion

CONTRACTOR

ARS A TECTA AMERICA CO MJ DALSIN

GUARENTEE ROOFING &

SHEETMETAL

Bid Bond Present? YES YES YES

Addenda Noted: 12345 12345 12345

Base Bid 110,460.00$ 152,106.00$ 119,869.00$

Modification

Total

Alt #1: Geothermal &

Mechanical System Revisions-$ -$ -$

Modification

Total

Alt #2: Stand Alone O2

Building6,415.00$ 4,000.00$ 4,682.00$

Modification

Total

Alt #3: Polished Concrete

Floor Finishes-$ -$ -$

Modification

Total

SUMMARY / NOTES

1105 PP BOND 1521 PP BOND 1199 PP BOND

***All bids received are subject to review and scope checks by Henry Carlson Construction, LLC and Office of State Engineer/ SD Dep't. of

Corrections.***

Bid Date: Wednesday, April 15th, 2020

10:00 AM CT

Jameson Annex, Medical ExpansionSOUTH DAKOTA STATE PENITENTIARY - Sioux Falls, SD

Prepared by: James McMahon (Project Manager) - Henry Carlson Construction

OSE Project #C1215-12X --- HCC Project #19040

Bid Package 1.7A - Roofing, Sheetmetal, Gutters & Downspouts

Page 16: Jameson Annex, Medical Expansion - South Dakota · 2020-04-15 · Bid Package 1.2A - Interior Demolition Bid Date: Wednesday, April 15th, 2020 10:00 AM CT Jameson Annex, Medical Expansion

CONTRACTOR

JONES CAULKING

Bid Bond Present? NO

Addenda Noted: 12345

Base Bid 30,975.00$

Modification

Total

Alt #1: Geothermal &

Mechanical System Revisions-$

Modification

Total

Alt #2: Stand Alone O2

Building-$

Modification

Total

Alt #3: Polished Concrete

Floor Finishes-$

Modification

Total

SUMMARY / NOTES

0

***All bids received are subject to review and scope checks by Henry Carlson Construction, LLC and Office of State Engineer/ SD Dep't. of

Corrections.***

Bid Date: Wednesday, April 15th, 2020

10:00 AM CT

Jameson Annex, Medical ExpansionSOUTH DAKOTA STATE PENITENTIARY - Sioux Falls, SD

Prepared by: James McMahon (Project Manager) - Henry Carlson Construction

OSE Project #C1215-12X --- HCC Project #19040

Bid Package 1.7B - Joint Sealants

Page 17: Jameson Annex, Medical Expansion - South Dakota · 2020-04-15 · Bid Package 1.2A - Interior Demolition Bid Date: Wednesday, April 15th, 2020 10:00 AM CT Jameson Annex, Medical Expansion

CONTRACTOR

OLYMPIC CO. STRUCTURAL APPLICATORS

Bid Bond Present? YES YES

Addenda Noted: 12345 12345

Base Bid 74,840.00$ 69,990.00$

Modification

Total

Alt #1: Geothermal &

Mechanical System Revisions-$

Modification

Total

Alt #2: Stand Alone O2

Building-$

Modification

Total

Alt #3: Polished Concrete

Floor Finishes-$

Modification

Total

SUMMARY / NOTES

EXCLUSION LISTED 750 PP

BOND. VOLUNTARY

ALTERNATE DEDUCT 15100

FROM THIS BID IF GIVEN TWO

PACKAGES 1750 PP BOND

***All bids received are subject to review and scope checks by Henry Carlson Construction, LLC and Office of State Engineer/ SD Dep't. of

Corrections.***

Bid Date: Wednesday, April 15th, 2020

10:00 AM CT

Jameson Annex, Medical ExpansionSOUTH DAKOTA STATE PENITENTIARY - Sioux Falls, SD

Prepared by: James McMahon (Project Manager) - Henry Carlson Construction

OSE Project #C1215-12X --- HCC Project #19040

Bid Package 1.7C - Spray-Applied Fireproofing

Page 18: Jameson Annex, Medical Expansion - South Dakota · 2020-04-15 · Bid Package 1.2A - Interior Demolition Bid Date: Wednesday, April 15th, 2020 10:00 AM CT Jameson Annex, Medical Expansion

CONTRACTOR

BUILDERS SUPPLY CO

KENDELL DOOR AND

HARDWARE

Bid Bond Present? YES YES

Addenda Noted: 12345 12345

Base Bid 105,760.00$ 79,772.00$

Modification

Total

Alt #1: Geothermal &

Mechanical System Revisions-$ -$

Modification

Total

Alt #2: Stand Alone O2

Building-$ -$

Modification (745.00)$

Total (745.00)$

Alt #3: Polished Concrete

Floor Finishes-$ -$

Modification

Total

SUMMARY / NOTES LIST OF INCLUSIONS AND

EXCLUSIONS 370 PP BOND 200 PP BOND

***All bids received are subject to review and scope checks by Henry Carlson Construction, LLC and Office of State Engineer/ SD Dep't. of

Corrections.***

Bid Date: Wednesday, April 15th, 2020

10:00 AM CT

Jameson Annex, Medical ExpansionSOUTH DAKOTA STATE PENITENTIARY - Sioux Falls, SD

Prepared by: James McMahon (Project Manager) - Henry Carlson Construction

OSE Project #C1215-12X --- HCC Project #19040

Bid Package 1.8A - Doors, Frames, Hardware (Furnish)

Page 19: Jameson Annex, Medical Expansion - South Dakota · 2020-04-15 · Bid Package 1.2A - Interior Demolition Bid Date: Wednesday, April 15th, 2020 10:00 AM CT Jameson Annex, Medical Expansion

CONTRACTOR COMBIND BUILDING

SPECIALTIES

Bid Bond Present?

Addenda Noted: 12345

Base Bid

5640 NON FIRE RATED 18411

FIRE RATED

Modification

Total

Alt #1: Geothermal &

Mechanical System Revisions-$

Modification

Total

Alt #2: Stand Alone O2

Building-$

Modification

Total

Alt #3: Polished Concrete

Floor Finishes-$

Modification

Total

SUMMARY / NOTES

41 PP BOND 133 PP BOND

***All bids received are subject to review and scope checks by Henry Carlson Construction, LLC and Office of State Engineer/ SD Dep't. of

Corrections.***

Bid Date: Wednesday, April 15th, 2020

10:00 AM CT

Jameson Annex, Medical ExpansionSOUTH DAKOTA STATE PENITENTIARY - Sioux Falls, SD

Prepared by: James McMahon (Project Manager) - Henry Carlson Construction

OSE Project #C1215-12X --- HCC Project #19040

Bid Package 1.8B - Access Panel Doors & Frames (Furnish)

Page 20: Jameson Annex, Medical Expansion - South Dakota · 2020-04-15 · Bid Package 1.2A - Interior Demolition Bid Date: Wednesday, April 15th, 2020 10:00 AM CT Jameson Annex, Medical Expansion

CONTRACTOR SKOLD SPECIALTY

CONTRACTING OVERHEAD DOOR CO.

Bid Bond Present? NO

Addenda Noted: 12345

Base Bid 9,200.00$

Modification

Total

Alt #1: Geothermal &

Mechanical System Revisions-$

Modification

Total

Alt #2: Stand Alone O2

Building-$

Modification

Total

Alt #3: Polished Concrete

Floor Finishes-$

Modification

Total

SUMMARY / NOTES

0 PP BOND JAMES WILL VERIFY

***All bids received are subject to review and scope checks by Henry Carlson Construction, LLC and Office of State Engineer/ SD Dep't. of

Corrections.***

Bid Date: Wednesday, April 15th, 2020

10:00 AM CT

Jameson Annex, Medical ExpansionSOUTH DAKOTA STATE PENITENTIARY - Sioux Falls, SD

Prepared by: James McMahon (Project Manager) - Henry Carlson Construction

OSE Project #C1215-12X --- HCC Project #19040

Bid Package 1.8C - Overhead Coiling Door

Page 21: Jameson Annex, Medical Expansion - South Dakota · 2020-04-15 · Bid Package 1.2A - Interior Demolition Bid Date: Wednesday, April 15th, 2020 10:00 AM CT Jameson Annex, Medical Expansion

CONTRACTOR

HEARTLAND GLASS CO D&G VIKING GLASS

Bid Bond Present? NO YES

Addenda Noted: 1234 1234

Base Bid 36,330.00$ 81,750.00$

Modification

Total

Alt #1: Geothermal &

Mechanical System Revisions-$ -$

Modification

Total

Alt #2: Stand Alone O2

Building-$ -$

Modification

Total

Alt #3: Polished Concrete

Floor Finishes-$ -$

Modification

Total

SUMMARY / NOTES

425 PP BOND 1230 PP BOND

***All bids received are subject to review and scope checks by Henry Carlson Construction, LLC and Office of State Engineer/ SD Dep't. of

Corrections.***

Bid Date: Wednesday, April 15th, 2020

10:00 AM CT

Jameson Annex, Medical ExpansionSOUTH DAKOTA STATE PENITENTIARY - Sioux Falls, SD

Prepared by: James McMahon (Project Manager) - Henry Carlson Construction

OSE Project #C1215-12X --- HCC Project #19040

Bid Package 1.8D - Glass and Glazing Systems

Page 22: Jameson Annex, Medical Expansion - South Dakota · 2020-04-15 · Bid Package 1.2A - Interior Demolition Bid Date: Wednesday, April 15th, 2020 10:00 AM CT Jameson Annex, Medical Expansion

CONTRACTOR CORNERSTONE DETENTION

PRODUCTS

Bid Bond Present? YES

Addenda Noted: 12345

Base Bid 598,500.00$

Modification

Total

Alt #1: Geothermal &

Mechanical System Revisions-$

Modification

Total

Alt #2: Stand Alone O2

Building4,450.00$

Modification

Total

Alt #3: Polished Concrete

Floor Finishes-$

Modification

Total

SUMMARY / NOTES

7482 PP BOND

***All bids received are subject to review and scope checks by Henry Carlson Construction, LLC and Office of State Engineer/ SD Dep't. of

Corrections.***

Bid Date: Wednesday, April 15th, 2020

10:00 AM CT

Jameson Annex, Medical ExpansionSOUTH DAKOTA STATE PENITENTIARY - Sioux Falls, SD

Prepared by: James McMahon (Project Manager) - Henry Carlson Construction

OSE Project #C1215-12X --- HCC Project #19040

Bid Package 1.8E - Detention Doors, Frames, Hardware (Furnish and Install)

Page 23: Jameson Annex, Medical Expansion - South Dakota · 2020-04-15 · Bid Package 1.2A - Interior Demolition Bid Date: Wednesday, April 15th, 2020 10:00 AM CT Jameson Annex, Medical Expansion

CONTRACTOR

FOX DRYWALL AND PLASTER GJP OLYMPIC COMPANIES SANDS DRYWALL CORNERSTONE DRYWALL

Bid Bond Present? YES YES YES YES YES

Addenda Noted: 12345 12345 12345 12345 12345

Base Bid 500,000.00$ 400,000.00$ 216,400.00$ 500,000.00$ 598,656.00$

Modification (235,000.00)$ (81,350.00)$ (242,280.00)$

Total 265,000.00$ 318,650.00$ 216,400.00$ 257,720.00$ 598,656.00$

Alt #1: Geothermal &

Mechanical System Revisions-$ -$ -$ -$ -$

Modification -$ -$ -$ -$

Total -$ -$ -$

Alt #2: Stand Alone O2

Building1,000.00$ -$ 2,680.00$ 6,000.00$ 6,000.00$

Modification (2,500.00)$ -$ (1,310.00)$

Total (1,500.00)$ 2,680.00$ 4,690.00$

Alt #3: Polished Concrete

Floor Finishes-$ -$ -$ -$ -$

Modification -$ -$ -$ -$

Total 0 0 0 0

SUMMARY / NOTES 7200 PP BOND MINUS 3380

FROM MOD

5760 PP BOND. LIST OF

EXCLUSIONS MINUS 1165

FROM PP BOND

2170 PP BOND, LIST OF

CLARIFICATIONS

6080 PP BOND MINUS 2950 IN

MOD 8980 PP BOND

***All bids received are subject to review and scope checks by Henry Carlson Construction, LLC and Office of State Engineer/ SD Dep't. of

Corrections.***

Bid Date: Wednesday, April 15th, 2020

10:00 AM CT

Jameson Annex, Medical ExpansionSOUTH DAKOTA STATE PENITENTIARY - Sioux Falls, SD

Prepared by: James McMahon (Project Manager) - Henry Carlson Construction

OSE Project #C1215-12X --- HCC Project #19040

Bid Package 1.9A - Drywall Systems

Page 24: Jameson Annex, Medical Expansion - South Dakota · 2020-04-15 · Bid Package 1.2A - Interior Demolition Bid Date: Wednesday, April 15th, 2020 10:00 AM CT Jameson Annex, Medical Expansion

CONTRACTOR

ACCOUSTICAL TILE LLC

Bid Bond Present? NO

Addenda Noted: 12345

Base Bid 7,590.00$

Modification

Total

Alt #1: Geothermal &

Mechanical System Revisions-$

Modification

Total

Alt #2: Stand Alone O2

Building-$

Modification

Total

Alt #3: Polished Concrete

Floor Finishes-$

Modification

Total

SUMMARY / NOTES

227.70 PP BOND

***All bids received are subject to review and scope checks by Henry Carlson Construction, LLC and Office of State Engineer/ SD Dep't. of

Corrections.***

Bid Date: Wednesday, April 15th, 2020

10:00 AM CT

Jameson Annex, Medical ExpansionSOUTH DAKOTA STATE PENITENTIARY - Sioux Falls, SD

Prepared by: James McMahon (Project Manager) - Henry Carlson Construction

OSE Project #C1215-12X --- HCC Project #19040

Bid Package 1.9B - Acoustical Ceilings

Page 25: Jameson Annex, Medical Expansion - South Dakota · 2020-04-15 · Bid Package 1.2A - Interior Demolition Bid Date: Wednesday, April 15th, 2020 10:00 AM CT Jameson Annex, Medical Expansion

CONTRACTOR COMMERCIAL INTERIOR

DECORE

Bid Bond Present? NO

Addenda Noted: 12345

Base Bid 26,000.00$

Modification

Total

Alt #1: Geothermal &

Mechanical System Revisions-$

Modification

Total

Alt #2: Stand Alone O2

Building-$

Modification

Total

Alt #3: Polished Concrete

Floor Finishes-$

Modification

Total

SUMMARY / NOTES

195 PP BOND

***All bids received are subject to review and scope checks by Henry Carlson Construction, LLC and Office of State Engineer/ SD Dep't. of

Corrections.***

Bid Date: Wednesday, April 15th, 2020

10:00 AM CT

Jameson Annex, Medical ExpansionSOUTH DAKOTA STATE PENITENTIARY - Sioux Falls, SD

Prepared by: James McMahon (Project Manager) - Henry Carlson Construction

OSE Project #C1215-12X --- HCC Project #19040

Bid Package 1.9C - Stainless Steel Base (Furnish and Install)

Page 26: Jameson Annex, Medical Expansion - South Dakota · 2020-04-15 · Bid Package 1.2A - Interior Demolition Bid Date: Wednesday, April 15th, 2020 10:00 AM CT Jameson Annex, Medical Expansion

CONTRACTOR

PIVOT COMPANIES VALHALLA PAINTING LLC MOXIE SERVICES INC FISCHENICH PAINTING

Bid Bond Present? CASHIERS CHECK 5% CASHIERS CHECK 5% NOT REQUIRED CASHIERS CHECK 5%

Addenda Noted: 12345 12345 12345 12345

Base Bid 152,937.00$ 66,960.00$ 48,000.00$ 112,500.00$

Modification

Total

Alt #1: Geothermal &

Mechanical System Revisions-$ -$ -$ -$

Modification

Total

Alt #2: Stand Alone O2

Building-$ 1,400.00$ -$ -$

Modification

Total

Alt #3: Polished Concrete

Floor Finishes-$ -$ -$ -$

Modification

Total

SUMMARY / NOTES 0 PP BOND, LIST OF

INCLUSIONS 0 PP BOND,

1920 PP BOND. LIST OF

INCLUSIONS 3600 PP BOND

***All bids received are subject to review and scope checks by Henry Carlson Construction, LLC and Office of State Engineer/ SD Dep't. of

Corrections.***

Bid Date: Wednesday, April 15th, 2020

10:00 AM CT

Jameson Annex, Medical ExpansionSOUTH DAKOTA STATE PENITENTIARY - Sioux Falls, SD

Prepared by: James McMahon (Project Manager) - Henry Carlson Construction

OSE Project #C1215-12X --- HCC Project #19040

Bid Package 1.9D - Painting & Coatings

Page 27: Jameson Annex, Medical Expansion - South Dakota · 2020-04-15 · Bid Package 1.2A - Interior Demolition Bid Date: Wednesday, April 15th, 2020 10:00 AM CT Jameson Annex, Medical Expansion

CONTRACTOR

BUILDER SUPPLY CO

COMBIND BUILDING

SPECIALTIES

Bid Bond Present? NO NO

Addenda Noted: 12345 12345

Base Bid 6,842.63$ 7,823.00$

Modification

Total

Alt #1: Geothermal &

Mechanical System Revisions-$ -$

Modification

Total

Alt #2: Stand Alone O2

Building-$ -$

Modification

Total

Alt #3: Polished Concrete

Floor Finishes-$ -$

Modification

Total

SUMMARY / NOTES

0 PP BOND 57 PP BOND

***All bids received are subject to review and scope checks by Henry Carlson Construction, LLC and Office of State Engineer/ SD Dep't. of

Corrections.***

Bid Date: Wednesday, April 15th, 2020

10:00 AM CT

Jameson Annex, Medical ExpansionSOUTH DAKOTA STATE PENITENTIARY - Sioux Falls, SD

Prepared by: James McMahon (Project Manager) - Henry Carlson Construction

OSE Project #C1215-12X --- HCC Project #19040

Bid Package 1.10 - Specialties (Furnish)

Page 28: Jameson Annex, Medical Expansion - South Dakota · 2020-04-15 · Bid Package 1.2A - Interior Demolition Bid Date: Wednesday, April 15th, 2020 10:00 AM CT Jameson Annex, Medical Expansion

CONTRACTOR ABSOLUTE FIRE PROTECTION

LLC BUILDING SPRINKLER INC. HOWE FIRE PROTECTION SERVICE FIRST FIRE SPRINKLER TOTAL FIRE PROTECTION

MIDWESTERN MECH. FIRE

PROTECTION

Bid Bond Present? YES YES YES YES YES YES

Addenda Noted: 12345 12345 12345 12345 12345 12345

Base Bid 65,000.00$ 55,950.00$ 100,000.00$ 58,400.00$ 88,000.00$ 100,000.00$

Modification (55,580.00)$ (38,000.00)$

Total 44,420.00$

Alt #1: Geothermal &

Mechanical System Revisions-$ -$ -$ -$ -$

Modification

Total

Alt #2: Stand Alone O2

Building500.00$ 9,500.00$ 25,000.00$ 7,900.00$ 10,000.00$ 10,000.00$

Modification -$ (18,660.00)$

Total 6,340.00$

Alt #3: Polished Concrete

Floor Finishes-$ -$ -$ -$ -$ -$

Modification

Total

SUMMARY / NOTES

6500 PP BOND 966 PP BOND 1100 PP BOND DEDUCT 540 600 PP BOND 1000 PP BOND 1000 PP BOND

***All bids received are subject to review and scope checks by Henry Carlson Construction, LLC and Office of State Engineer/ SD Dep't. of

Corrections.***

Bid Date: Wednesday, April 15th, 2020

10:00 AM CT

Jameson Annex, Medical ExpansionSOUTH DAKOTA STATE PENITENTIARY - Sioux Falls, SD

Prepared by: James McMahon (Project Manager) - Henry Carlson Construction

OSE Project #C1215-12X --- HCC Project #19040

Bid Package 1.15A - Fire Protection

Page 29: Jameson Annex, Medical Expansion - South Dakota · 2020-04-15 · Bid Package 1.2A - Interior Demolition Bid Date: Wednesday, April 15th, 2020 10:00 AM CT Jameson Annex, Medical Expansion

CONTRACTOR

MIDWESTERN MECHANICAL HOWE INC. PRAIRIE SONS

HANDER PLUMBING AND

HEATING REDLINGER BROTHERS KRIER AND BLAIN

Bid Bond Present? YES YES YES YES YES YES

Addenda Noted: 12345 12345 12345 12345 12345 12345

Base Bid 500,000.00$ 1,000,000.00$ 1,000,000.00$ 1,500,000.00$ 1,500,000.00$ 1,500,000.00$

Modification 22,630.00$ (258,450.00)$ (458,400.00)$ (806,290.00)$ (768,000.00)$ (963,640.00)$

Total 522,630.00$ 741,550.00$ 541,600.00$ 693,710.00$ 732,000.00$ 536,360.00$ -$ -$

Alt #1: Geothermal &

Mechanical System Revisions100,000.00$ 500,000.00$ 500,000.00$ 500,000.00$ 400,000.00$ -$

Modification 104,280.00$ (129,900.00)$ (281,000.00)$ (335,000.00)$ (124,400.00)$ 282,300.00$

Total 204,280.00$ 370,100.00$ 219,000.00$ 165,000.00$ 275,600.00$ 282,300.00$ -$ -$

Alt #2: Stand Alone O2

Building100,000.00$ 200,000.00$ 10,000.00$ 50,000.00$ 100,000.00$ -$

Modification (79,400.00)$ (178,645.00)$ -$ (21,690.00)$ (81,250.00)$ 14,980.00$

Total 20,600.00$ 21,355.00$ 10,000.00$ 28,310.00$ 18,750.00$ 14,980.00$ -$ -$

Alt #3: Polished Concrete

Floor Finishes-$ -$ -$ -$ -$ -$

Modification -$ -$ -$ -$ -$ -$

Total

SUMMARY / NOTES

6000 PP BOND MINUS 1500 11000 PP BOND MINUS 2250

1.8% OF CONTRACT AMT. ADD

9930 PER MOD

14000 PP BOND MINUS 7000

PER MOD 12000 PP BOND MINUS 6000 15000 PP BOND MINUS 9630

***All bids received are subject to review and scope checks by Henry Carlson Construction, LLC and Office of State Engineer/ SD Dep't. of

Corrections.***

Bid Date: Wednesday, April 15th, 2020

10:00 AM CT

Jameson Annex, Medical ExpansionSOUTH DAKOTA STATE PENITENTIARY - Sioux Falls, SD

Prepared by: James McMahon (Project Manager) - Henry Carlson Construction

OSE Project #C1215-12X --- HCC Project #19040

Bid Package 1.15B - Plumbing

Page 30: Jameson Annex, Medical Expansion - South Dakota · 2020-04-15 · Bid Package 1.2A - Interior Demolition Bid Date: Wednesday, April 15th, 2020 10:00 AM CT Jameson Annex, Medical Expansion

CONTRACTOR

BAETE FORSETH KRIER AND BLAIN PRAIRIE SONS HVAC HOWE INC. HVAC TESSIERS INC.

Bid Bond Present? YES YES NO YES YES

Addenda Noted: 12345 12345 12345 12345 12345

Base Bid 500,000.00$ 1,500,000.00$ 1,000,000.00$ 500,000.00$ 800,000.00$

Modification 144,955.00$ (864,400.00)$ (358,050.00)$ 123,010.00$ (128,000.00)$

Total 644,955.00$ 635,600.00$ 641,950.00$ 623,010.00$ 672,000.00$ -$ -$ -$

Alt #1: Geothermal &

Mechanical System Revisions10,000.00$ -$ 100,000.00$ 500,000.00$ 100,000.00$

Modification 123,300.00$ 151,400.00$ 46,750.00$ (358,006.00)$ 71,500.00$

Total 133,300.00$ 151,400.00$ 146,750.00$ 141,994.00$ 171,500.00$ -$ -$ -$

Alt #2: Stand Alone O2

Building10,000.00$ -$ -$ 500,000.00$ -$

Modification 540.00$ 1,250.00$ 10,450.00$ (483,090.00)$ 27,300.00$

Total 10,540.00$ 1,250.00$ 10,450.00$ 16,910.00$ 27,300.00$ -$ -$ -$

Alt #3: Polished Concrete

Floor Finishes-$ -$ -$ -$ -$

Modification -$ -$ -$ -$ -$

Total -$ -$ -$ -$ -$ -$ -$ -$

SUMMARY / NOTES

5000 PP BOND ADD 1500 15000 PP BOND MINUS 8640

1.8% OF CONTRACT AMT ADD

11775 PER MOD 5500 PP BOND PLUS 730 4000 PP BOND MINUS 600

***All bids received are subject to review and scope checks by Henry Carlson Construction, LLC and Office of State Engineer/ SD Dep't. of

Corrections.***

Bid Date: Wednesday, April 15th, 2020

10:00 AM CT

Jameson Annex, Medical ExpansionSOUTH DAKOTA STATE PENITENTIARY - Sioux Falls, SD

Prepared by: James McMahon (Project Manager) - Henry Carlson Construction

OSE Project #C1215-12X --- HCC Project #19040

Bid Package 1.15C - HVAC

Page 31: Jameson Annex, Medical Expansion - South Dakota · 2020-04-15 · Bid Package 1.2A - Interior Demolition Bid Date: Wednesday, April 15th, 2020 10:00 AM CT Jameson Annex, Medical Expansion

CONTRACTOR

ELECTRIC CONSTRUCTION ELECTRIC SUPPLY CO. THOMPSON ELECTRIC MUTH ELECTRIC

Bid Bond Present? YES YES YES YES

Addenda Noted: 12345 12345 12345 12345

Base Bid 500,000.00$ 1,000,000.00$ 750,000.00$ 1,000,000.00$

Modification 32,080.00$ (276,000.00)$ (190,050.00)$ (374,744.00)$

Total 532,080.00$ 724,000.00$ 559,950.00$ 625,256.00$ -$ -$ -$ -$

Alt #1: Geothermal &

Mechanical System Revisions15,000.00$ 25,000.00$ 10,000.00$ 100,000.00$

Modification (4,559.00)$ (11,500.00)$ 375.00$ (87,548.00)$

Total 10,441.00$ 13,500.00$ 10,375.00$ 12,452.00$ -$ -$ -$ -$

Alt #2: Stand Alone O2

Building10,000.00$ 50,000.00$ 20,000.00$ 100,000.00$

Modification 3,624.00$ (30,000.00)$ (2,000.00)$ (85,435.00)$

Total 13,624.00$ 20,000.00$ 18,000.00$ 14,565.00$ -$ -$ -$ -$

Alt #3: Polished Concrete

Floor Finishes-$ -$ 10,000.00$ -$

Modification -$ -$ (7,000.00)$ -$

Total 3,000.00$

SUMMARY / NOTES 10% OF CONTRACT AMT ADD

3925 7650 PP BOND MINUS 1738 5000 PP BOND MINUS 914 10000 PP BOND MINUS 4623

***All bids received are subject to review and scope checks by Henry Carlson Construction, LLC and Office of State Engineer/ SD Dep't. of

Corrections.***

Bid Date: Wednesday, April 15th, 2020

10:00 AM CT

Jameson Annex, Medical ExpansionSOUTH DAKOTA STATE PENITENTIARY - Sioux Falls, SD

Prepared by: James McMahon (Project Manager) - Henry Carlson Construction

OSE Project #C1215-12X --- HCC Project #19040

Bid Package 1.16 - Electrical and Low Voltage