8
James Michael Hayes 97 Hathorn Blvd. [email protected] Saratoga Springs, NY 12866 978-846-6694 Personal Cell 518-435-5306 Work Cell Objective: To obtain employment as a Project/Construction Manager, Quality Assurance Manager in the construction of process facilities managing Base build, Tool Installation, Commissioning, and Sustaining Operational functions. Summary: 15+ years’ experience in the construction field installing, commissioning, and sustaining fab and subfab support equipment. 2+ years as a Quality Assurance Supervisor. Project/Construction Management on multimillion dollar projects. Computer skills: Microsoft Excel, Word, Access, Power Point, and Video Tool Box Pro., Kinetics QADS (Quality Assurance Document System) Level 4 OEM Qualified Vacuum/Abatement/CMD Engineer. Certified on the GE FANUC PLC/SCADA monitoring/control system for BOC Edwards Chemical Delivery Systems. Certified on the BOC Edwards Chemfill 1000/1200/1500. SNT-TC-1A VT Level 2 Qualified Weld Inspector. Performed QCR duties on Vacuum pumps at the BOCE Tempe, AZ refurbish facility. Performed commissioning of the LSS/I&C for the ASML metrology tool sets, vacuum pumps, chemical delivery modules, abatement systems, and gas delivery systems during tool install. This was required for Safety Levels sign off. New Mexico State Certified Professional Firefighter Officer II/EMT-I. FEMA Certified Professional Emergency Manager. Certified HAZMAT Technician/Specialist. New Mexico State Certified Professional Firefighter Instructor. Work Experience GLOBALFOUNDRIES 11/2011 to Present Malta, NY FAB 8.1 Phases 1-3

James Michael Hayes Resume GF 12-2015

Embed Size (px)

Citation preview

Page 1: James Michael Hayes Resume GF 12-2015

James Michael Hayes97 Hathorn Blvd. [email protected] Springs, NY 12866 978-846-6694 Personal Cell

518-435-5306 Work Cell

Objective: To obtain employment as a Project/Construction Manager, Quality Assurance Manager in the construction of process facilities managing Base build, Tool Installation, Commissioning, and Sustaining Operational functions.

Summary:

15+ years’ experience in the construction field installing, commissioning, and sustaining fab and subfab support equipment.

2+ years as a Quality Assurance Supervisor. Project/Construction Management on multimillion dollar projects. Computer skills: Microsoft Excel, Word, Access, Power Point, and Video Tool Box

Pro., Kinetics QADS (Quality Assurance Document System) Level 4 OEM Qualified Vacuum/Abatement/CMD Engineer. Certified on the GE FANUC PLC/SCADA monitoring/control system for BOC Edwards

Chemical Delivery Systems. Certified on the BOC Edwards Chemfill 1000/1200/1500. SNT-TC-1A VT Level 2 Qualified Weld Inspector. Performed QCR duties on Vacuum pumps at the BOCE Tempe, AZ refurbish facility. Performed commissioning of the LSS/I&C for the ASML metrology tool sets, vacuum

pumps, chemical delivery modules, abatement systems, and gas delivery systems during tool install. This was required for Safety Levels sign off.

New Mexico State Certified Professional Firefighter Officer II/EMT-I. FEMA Certified Professional Emergency Manager. Certified HAZMAT Technician/Specialist. New Mexico State Certified Professional Firefighter Instructor.

WorkExperience

GLOBALFOUNDRIES 11/2011 to Present Malta, NY FAB 8.1 Phases 1-3

Section Manager/Principle Independent Contributor (IC)Facilities Fab Mechanical

Gather requirements, analyze scope of work, plan, manage day-to-day operations and project activities in support of Fab 8.1 construction and operational ramp-up.

Oversee/recommend modifications in plans and resource allocations to insure overall Integration, execution, and deadline adherence.

Lead all aspects of program schedule coordination and execution and own and update master program schedule database(s).

Facilitate team planning workshops to ensure alignment and timely goal accomplishment.

Set & maintain program management standards and practices. Manage lower-level team planning & progress reporting roll-ups to the macro

schedule.

Page 2: James Michael Hayes Resume GF 12-2015

Oversee and administer training/coaching in: planning and tracking methodology Critical Path methodology .Use of planning and tracking software. Reporting formats and procedures. Project/Program team management.

Responsible for developing/administering program review meetings and communicate needed information to executive staff and team participants.

Ensure initial and continuing understanding of GLOBALFOUNDRIES business strategy, program schedule/parameters and business changes related to global relationships.

Work with appropriate members of the global executive committee(s) and program team(s) to refine program schedule, budget, and resources requirements (i.e. confirms their level of dedication to the program and clarify performance expectations).

Troubleshoot selected problems and works with critical managers/individual contributors (IC) as necessary in order to maintain schedule, quality parameters, budget, and resource requirements.

Offer guidance and training to development teams in continuous improvement, solution enhancement and new solution activities.

Responsible for the development of Specifications and Standard Operating Procedures for the Facilities Fab Mechanical (Subfab Team) in corrective maintenance on utilities systems, tool support systems, and risk assessment of the Subfab and associated areas.

AM Technical Solutions 8/09 to 11/2011 B&D Pharmaceutical, NC/ Intel Ocotillo Campus, AZ Mechanical QC Supervisor/EH&S

Intel EH&S Fab 32 Safety Incident Prevention Program (SIPP) Construction Manager; technical consultant

to Intel PM/CC, General Contractor and Trade Contractors on matters pertaining to SIPP requirements.

Attend daily meetings, review SIPP permits for accuracy, compliance, safety and business impact using technical knowledge.

Audit, coach, and correct employees/contractors working with SIPP permits. Participate in investigations for SIPP related Safety ITP incidences, and perform SIPP and

Pre-Task plan audits for compliance to Customer’s requirements. B&D Pharmaceutical

Perform weld inspection on piping systems in accordance with the onsite Project Specifications, ASME B- 31.3, and ASME BPE-2007.

100% Bore scoping of the welds on all stainless steel piping systems, video and record the results to be included in the Customer Turn Over Package at the conclusion of the project.

Monitor contractors’ welders on a daily basis; insure all weld logs and ISOs are up to date and accurate. Inspect welders’ coupons prior to and after completion of shift.

Review Customer’s Specifications and Other’s Installation Procedures. Review installation procedures to assure level of quality is understood and achieve.

Review Contractor Prepared Weld Procedures. Review and retain WPS, PQR and WPQ records for final turnover package.

Witness Pressure Tests. Document and sign off on all hydro and pneumatic pressure tests for installed piping systems.

Turnover Packages. All original documentation and records will be included in three ring binders at the completion of the project. All weld videos will be downloaded on to external drives by system to be included in the turnover packages.

Page 3: James Michael Hayes Resume GF 12-2015

Perform all leak integrity and analytical testing on all installed high purity systems, to include Inboard Helium Leak Test to 1x10-9; Analytical Testing, O2, Moisture, and Particles per specification.

Quality Assurance Management (QAM) 8/08 to 7/09 Evergreen Solar, Devens, MA Mechanical QC Supervisor

Perform weld inspection on piping systems in accordance with the onsite Project Specifications, and ASME B 31.3/BPE 2007 Standards.

100% Bore scoping of the welds on all stainless steel piping systems, video and record the results to be included in the Customer Turn Over Package at the conclusion of the project.

Monitor contractors’ welders on a daily basis; insure all weld logs and ISOs are up to date and accurate. Inspect welders’ coupons prior to and after completion of shift.

Inspect all received high/low purity materials per the onsite Project Specifications. Review Customer’s Specifications and Other’s Installation Procedures. Review

installation procedures to assure level of quality is understood and achieve. Review Contractor Prepared Weld Procedures. Review and retain WPS, PQR and

WPQ records for final turnover package. Performed welder qualification per the SOP for new and annual certification. Document and sign off on all hydro and pneumatic pressure tests for installed

piping systems. Turnover Packages. All original documentation and records will be included in three

ring binders at the completion of the project. All weld videos will be downloaded on to external drives by system to be included in the turnover packages.

Perform all leak integrity and analytical testing on all installed high purity systems, to include Inboard Helium Leak Test to 1x10-9; Analytical Testing, O2, Moisture, and Particles per specification.

Attend project daily operations meeting, design reviews, and white board meetings as required by the customer.

AM Technical Solutions -12/06 to 8/08

Page 4: James Michael Hayes Resume GF 12-2015

Samsung F1/2, Austin, TXQAR/FSE III

FSE performing installation, commissioning, de-commission and relocation of the metrology tools for ASML. Twin Scan Series with Immersion.

Run, terminate, and verify all cable connections for the tool including the I&C/LSS signal cables.

Receive, inspect, and record information on tools arriving to the facility. Perform weld inspection on piping systems in accordance with the onsite Project

Specifications, and ASME B31.3. Perform weld inspection on PVDF piping in accordance with the onsite Project

Specifications. Verify pressure tests on all installed piping systems. Monitor contractors’ welders on a daily basis; insure all weld logs and ISOs are up to

date and accurate. Inspect welders’ coupons prior to and after completion of shift. Inspect all received high/low purity materials per the onsite Project Specifications. Clean Room Certification technical assistance with flow calibration and balancing.

BOC Edwards- 4/01 to 12/06 Intel Ocotillo Campus

FSE IV-Vacuum Pump/Abatement Specialist

Works from defined schedules and procedures to perform semi-routine preventative maintenance of BOC Edwards’s products and or competitor’s products.

Reads drawings and diagrams to install, maintain, and repair BOC Edwards and competitor’s products. Performs diagnostics testing on equipment and accessories.

Develops and maintains rapport with customers ensuring customer satisfaction. Maintains records of repairs and maintenance performed by customer equipment

serial number.(SAP) Maintains up-to-date knowledge of the proper operation and preventative

maintenance of BOC Edwards’s products and all accessories. Writes consolidated reports on quality defects and customer complaints to provide

feedback to service, product management, and technical department. Coordinates with manager, field service engineer, and technical personnel to

provide feedback on equipment performance, unusual problems, and other relevant information. Develops and maintains preventative maintenance schedule.

Start-up, certification and operation of BOC Edwards’s equipment and control systems. This includes the termination and testing of the LSS and I&C systems required for SL1/SL2. Troubleshoot and repair any issues as required.

Participates in Continuous Improvement Project (CIP). Fully participates in assigned training programs.

Praxair Inc. – 9/00 to 4/01Intel Fab 11X Rio Rancho, NM CampusSite Services FSE II

General site services, including line certifications on ultra pure gas systems, QAR work on installation of new gas system construction.

Site safety development and instruction on Hazardous Chemicals/Gases. Technical troubleshooting on analytical monitoring equipment and the proper

operation, maintenance, documentation, and calibration. Rounds and Reads of production facility; storage tank levels, pressures, and in some

cases temp.

Page 5: James Michael Hayes Resume GF 12-2015

The transfer and production of product into storage tanks. Gather data in order to generate technical reports on an as needed basis as

requested by management and/or the customer. Support for the Intel Corp. contract for the IQ team base build, and tool install of

FAB11 west, retrofit of FAB11 north/south, and C4 projects. Assist with functionality testing for LSS and I&C for Intel SL1/SL2 for VMBs and Gas

Cabinets. Troubleshoot and repair any issues as required. Develop, maintain, and update project punch lists on all gas delivery, chemical

delivery and vacuum systems. The decontamination and demo of chemical valve boxes, tool supply lines, and

chemical delivery equipment.

Education:

University of New Mexico - EMT Intermediate-Graduate 1998

Professional Emergency Manager FEMA Certified-EMI Professional Development Series in Emergency Management 1999

Certificate Haz-Mat Technician /SpecialistPalo Verde College-Certification 1994

Imperial Valley College - EMT Basic 1-Graduate 1992

Imperial Valley College- AA Social Science-Graduate 1982

Page 6: James Michael Hayes Resume GF 12-2015