20
SAP ECC 5.00 June 2005 English J18: Product Cost Planning Building Block Configuration Guide

J18_BB_ConfigGuide_EN_US

  • Upload
    vaskar

  • View
    134

  • Download
    0

Embed Size (px)

Citation preview

Page 1: J18_BB_ConfigGuide_EN_US

SAP ECC 5.00

June 2005

English

J18: Product Cost Planning

SAP AGNeurottstr. 1669190 WalldorfGermany

Building Block Configuration Guide

Page 2: J18_BB_ConfigGuide_EN_US

SAP Best Practices Product Cost Planning (J18): Configuration Guide

Copyright

© Copyright 2005 SAP AG. All rights reserved.

No part of this publication may be reproduced or transmitted in any form or for any purpose without

the express permission of SAP AG. The information contained herein may be changed without prior notice.

Some software products marketed by SAP AG and its distributors contain proprietary software components of other software vendors.

Microsoft®, WINDOWS®, NT®, EXCEL®, Word®, PowerPoint® and SQL Server® are registered trademarks of Microsoft Corporation.

IBM®, DB2®, DB2 Universal Database, OS/2®, Parallel Sysplex®, MVS/ESA, AIX®, S/390®, AS/400®, OS/390®, OS/400®, iSeries, pSeries, xSeries, zSeries, z/OS, AFP, Intelligent Miner, WebSphere®, Netfinity®, Tivoli®, Informix and Informix® Dynamic Server™ are trademarks of IBM Corporation in USA and/or other countries.

ORACLE® is a registered trademark of ORACLE Corporation.

UNIX®, X/Open®, OSF/1®, and Motif® are registered trademarks of the Open Group.

Citrix®, the Citrix logo, ICA®, Program Neighborhood®, MetaFrame®, WinFrame®, VideoFrame®, MultiWin® and other Citrix product names referenced herein are trademarks of Citrix Systems, Inc.

HTML, DHTML, XML, XHTML are trademarks or registered trademarks of W3C®, World Wide Web Consortium, Massachusetts Institute of Technology.

JAVA® is a registered trademark of Sun Microsystems, Inc.

JAVASCRIPT® is a registered trademark of Sun Microsystems, Inc., used under license for technology invented and implemented by Netscape.

MarketSet and Enterprise Buyer are jointly owned trademarks of SAP AG and Commerce One.

SAP, R/3, mySAP, mySAP.com, xApps, xApp, and other SAP products and services mentioned herein as well as their respective logos are trademarks or registered trademarks of SAP AG in Germany and in several other countries all over the world. All other product and service names mentioned are the trademarks of their respective companies. Data contained in this document serves information purposes only. National product specifications may vary.

© SAP AG Page 2 of 15

Page 3: J18_BB_ConfigGuide_EN_US

SAP Best Practices Product Cost Planning (J18): Configuration Guide

Icons

Icon Meaning

Caution

Example

Note

Recommendation

Syntax

Typographic Conventions

Type Style Description

Example text Words or characters that appear on the screen. These include field names, screen titles, pushbuttons as well as menu names, paths and options.

Cross-references to other documentation.

Example text Emphasized words or phrases in body text, titles of graphics and tables.

EXAMPLE TEXT Names of elements in the system. These include report names, program names, transaction codes, table names, and individual key words of a programming language, when surrounded by body text, for example, SELECT and INCLUDE.

Example text Screen output. This includes file and directory names and their paths, messages, source code, names of variables and parameters as well as names of installation, upgrade and database tools.

EXAMPLE TEXT Keys on the keyboard, for example, function keys (such as F2) or the ENTER key.

Example text Exact user entry. These are words or characters that you enter in the system exactly as they appear in the documentation.

<Example text> Variable user entry. Pointed brackets indicate that you replace these words and characters with appropriate entries.

© SAP AG Page 3 of 15

Page 4: J18_BB_ConfigGuide_EN_US

SAP Best Practices Product Cost Planning (J18): Configuration Guide

ContentsProduct Cost Planning: Configuration Guide............................................................................5

1 Purpose.......................................................................................................................... 5

2 Preparation..................................................................................................................... 5

2.1 Prerequisites............................................................................................................5

3 Configuration..................................................................................................................5

3.1 Basic Settings for Material Costing..........................................................................5

3.1.1 Overhead Surcharge.......................................................................................5

3.1.1.1 Defining Calculation Bases.....................................................................6

3.1.1.2 Defining Percentage Overhead..............................................................7

3.1.1.3 Defining Credits......................................................................................8

3.1.1.4 Defining Costing Sheet...........................................................................9

3.1.2 Creating Cost Component Structure.............................................................10

3.2 Settings Cost Estimate with Qty Structure.............................................................11

3.2.1 Definition of Valuation Variant.......................................................................12

3.2.2 Defining Costing Variant................................................................................12

3.2.3 Activating Cross-Company Costing...............................................................13

3.3 Maintain Overhead Percentages...........................................................................14

3.4 Check Cost Component Structure Active Status...................................................14

© SAP AG Page 4 of 15

Page 5: J18_BB_ConfigGuide_EN_US

SAP Best Practices Product Cost Planning (J18): Configuration Guide

Product Cost Planning: Configuration Guide

1 PurposeThis configuration guide provides the information you need to set up the configuration of this building block manually.

If you do not want to configure manually and prefer to use an automated installation process using various tools, refer to the Baseline Quick Guide BL_Quick_Guide_EN_US.doc available on the Documentation DVD under \\BBLibrary\Documentation.

Product Cost Planning calculates costs for materials without reference to a special production situation. The result of the calculation is the standard cost estimate. It is updated in the material master as the standard price. The standard price is used to valuate goods movements within the company.

2 Preparation

2.1 PrerequisitesIf you want to use this building block, you must first install the following building blocks:

Building Block # Description

B32 Settings for Best Practices Installation

J02 Organizational Structure

J03 External Accounting - Central FI

J08 Basic Cost Accounting

N74 Cost of Sales Accounting

J05 Materials Management

J04 Sales and Distribution

J30 Master Data

3 Configuration

3.1 Basic Settings for Material CostingIn this section, the basic settings needed for material costing are configured, such as the Costing Sheet and the Cost Component Structure.

3.1.1 Overhead SurchargeOverhead surcharge is done to take into account costs that cannot directly be assigned to materials or orders, such as warehouse or procurement costs.

© SAP AG Page 5 of 15

Page 6: J18_BB_ConfigGuide_EN_US

SAP Best Practices Product Cost Planning (J18): Configuration Guide

3.1.1.1 Defining Calculation Bases

UseCalculation Bases are used in the Costing Sheet. They define which cost elements a percentage rate refers to.

Procedure1. Access the activity using one of the following navigation options:

Transaction Code SM34 with Customizing Object CO_CALC1

IMG Menu Controlling Product Cost Controlling Product Cost Planning Basic Settings for Material Costing Overhead Costing Sheet: Components Define Calculation Bases

2. On the Change View “Calculation base”: Overview screen, choose New Entries.

3. On the New Entries: Overview of Added Entries screen, make the following entries:

Base Name

Y100 Raw Materials

Y200 Packing Materials

Y300 Other costs

4. Choose Save, and go back.

5. Select the line with the Y100 Base you just entered, and double-click the Details folder in the left panel.

6. Enter BP01 the Set Controlling Area dialog box, and choose Continue.

7. On the Change View “Details”: Overview screen, enter the following:

From CElem To CstElem Cost Elem Group

510000 510000

8. Choose Save and go back.

9. Repeat steps 5. through 8., replacing the Base and other values with the ones in the following table:

Base From CElem To CstElem Cost Elem Group

Y100 510000 510000

Y200 510005 510005

Y300 OH_group

10. Choose Save.

ResultYou have defined Calculation Bases to be used in the Costing Sheet.

© SAP AG Page 6 of 15

Page 7: J18_BB_ConfigGuide_EN_US

SAP Best Practices Product Cost Planning (J18): Configuration Guide

3.1.1.2 Defining Percentage Overhead

UsePercentage Overheads are used in the Costing Sheet. The percentage value specifies the amount of overhead costs that is added to the costs covered by the respective calculation base.

Procedure1. Access the activity using one of the following navigation options:

Transaction Code KZZ2

IMG Menu Controlling Product Cost Controlling Product Cost Planning Basic Settings for Material Costing Overhead Costing Sheet: Components Define Percentage Overhead

2. On the Change View “Percentage overhead”: Overview screen, choose New Entries.

3. On the New Entries: Overview of Added Entries screen, enter the following:

OH rate Name Dependency Description

Y011 Pur. raw material D020 Overhead Type/Plant

Y012 Pur. packing mat. D020 Overhead Type/Plant

Y013 Raw Material WH D020 Overhead Type/Plant

Y014 Finished Goods WH D020 Overhead Type/Plant

4. Choose Save, and go back.

5. Select the row with OH rate Y011.

6. Double-click the Details folder in the left panel.

7. Enter the following values for OH rate Y011:

Valid from to COarea Ohtype Plant Percent.

01/01/2000 12/31/9999 BP01 1 BP01 5.000

01/01/2000 12/31/9999 BP01 2 BP01 5.000

8. Choose Save and go back.

9. Select the row with OH rate Y012.

10. Double-click the Details folder in the left panel.

11. Enter the following values for OH rate Y012:

Valid from to COarea Ohtype Plant Percent.

01/01/2000 12/31/9999 BP01 1 BP01 10.000

01/01/2000 12/31/9999 BP01 2 BP01 10.000

12. Choose Save and go back.

13. Select the row with OH rate Y013

14. Double-click the Details folder in the left panel.

© SAP AG Page 7 of 15

Page 8: J18_BB_ConfigGuide_EN_US

SAP Best Practices Product Cost Planning (J18): Configuration Guide

15. Enter the following values for OH rate Y013:

Valid from to COarea Ohtype Plant Percent.

01/01/2000 12/31/9999 BP01 1 BP01 5.000

01/01/2000 12/31/9999 BP01 2 BP01 5.000

16. Choose Save and go back.

17. Select the row with OH rate Y014

18. Double-click the Details folder in the left panel.

19. Enter the following values for OH rate Y014:

Valid from to COarea Ohtype Plant Percent.

01/01/2000 12/31/9999 BP01 1 BP01 6.500

01/01/2000 12/31/9999 BP01 2 BP01 6.500

20. Choose Save.

ResultYou have defined Percentage Overheads to be used in the Costing Sheet.

3.1.1.3 Defining Credits

UseCredits are used in the Costing Sheet and contain information about the credited sender and the cost element for the overhead posting.

Procedure1. Access the activity using one of the following navigation options:

Transaction Code KZE2

IMG Menu Controlling Product Cost Controlling Cost Object Controlling Product Cost by Order Basic Settings for Product Cost by Order Overhead Costing Sheet: Components Define Credits

2. On the Change View “Credit”: Overview screen, choose New entries to create new credit items.

3. On the New Entries: Overview of Added Entries screen, enter the Credit keys and a names as shown below:

Credit Name

Y01 Cred Raw Mat Purch

Y02 Cred Pack Mat Purch

Y03 Credit Raw Mat WH

Y04 Credit Fin.Goods WH

4. Choose Save and go back

5. Select the row with Y01 and choose the Details folder in the left panel.

© SAP AG Page 8 of 15

Page 9: J18_BB_ConfigGuide_EN_US

SAP Best Practices Product Cost Planning (J18): Configuration Guide

6. On the Set Controlling Area dialog box, enter Controlling Area BP01, and choose Continue.

7. On the Change View “Details”: Overview screen, make the following entries:

Credit Valid to Cost Element Fxd % Cost Center

Y01 12/31/9999 941010 * 1201

8. Choose Save.

9. Repeat steps 5 through 8, for the following credit keys:

Credit Valid to Cost Element Fxd % Cost Center

Y02 12/31/9999 941020 * 1201

Y03 12/31/9999 941030 * 1202

Y04 12/31/9999 941040 * 1203

ResultYou have new Credit items.

3.1.1.4 Defining Costing Sheet

UseThe Costing Sheet calculates Overhead surcharges to standard cost estimates and production orders.

Procedure1. Access the activity using one of the following navigation options:

Transaction Code KZS2

IMG Menu Controlling Product Cost Controlling Cost Object Controlling Product Cost by Order Basic Settings for Product Cost by Order Overhead Define Costing Sheets

2. On the Change View “Costing sheets”: Overview screen, choose New Entries, and create the following Costing Sheet.

Costing Sheet Description

YPP-PC SMB PC Costing Sheet CO-PC

3. Choose Save.

4. Mark the new line and double-click the folder Costing sheet rows.

5. On the Change View “Costing sheet rows”: Overview screen, enter your costing sheet as shown in the table:

Row Base Overhead rate

From Row To Row Credit

10 Y100

© SAP AG Page 9 of 15

Page 10: J18_BB_ConfigGuide_EN_US

SAP Best Practices Product Cost Planning (J18): Configuration Guide

20 Y200

30 Y011 10 10 Y01

40 Y012 20 20 Y02

50 Y013 10 10 Y03

60 Y300

70 Y014 10 60 Y04

6. Save your entries.

ResultYou have created a new Costing Sheet.

3.1.2 Creating Cost Component Structure

UseThe Cost Component Structure structures the costs of cost objects by grouping Cost Elements to so called cost components such as Material Costs, Packaging, Internal Activity and so on.

Procedure1. Access the activity using one of the following navigation options:

Transaction Code OKTZ

IMG Menu Controlling Product Cost Controlling Product Cost Planning Basic Settings for Material Costing Define Cost Component Structure

2. On the Change View “Cost Component Structure”: Overview screen, choose New entries and enter:

Cost Comp. Str. Active Name

Y1 BP Cost Component Layout

3. Choose Save.

4. Mark the created line and double-click the folder Cost Components with Attributes.

5. On the Change View “Cost Components with Attributes”: Overview screen, enter the following values:

Cost Component StructureCost ComponentName

Y1 10 Direct Materials

Y1 30 Prod. Setup OH

Y1 40 Prod. Labor OH

Y1 50 Prod. Machine OH

Y1 60 Material OH

© SAP AG Page 10 of 15

Page 11: J18_BB_ConfigGuide_EN_US

SAP Best Practices Product Cost Planning (J18): Configuration Guide

Y1 70 Direct Purchases

Y1 100 Miscellaneous

6. Save your entries and go back to first level.

7. On the Change View “Cost Components with Attributes”: Overview screen, mark the line with Cost Comp. Str Y1 and double-click the folder Assignment: Cost Component - Cost Element Interval.

8. Enter the following assignments of Cost Elements to Cost Components.

CCo Str. Ch of Acct From Cost elem. OrGp To cost elem. CostComponent

Y1 0010 510010 510085 10

Y1 0010 943030 943030 30

Y1 0010 943110 943110 40

Y1 0010 943120 943120 40

Y1 0010 943010 943010 50

Y1 0010 941010 941040 60

Y1 0010 610010 610085 70

Y1 0010 943040 943060 100

9. Save your entries and go back to the first level.

10. Double click Assignment: Organiz. Units - Cost Component Struct and make the following entry:

Company Code Plant Costing Variant Valid from Cost Component Structure

BP01 ++++ ++++ 01/01/2002 Y1

9. Save your entries and go back to the first level.

10. Activate your Cost Component Structure by clicking the Active Checkbox. Always repeat this step when additional work on the Cost Component Structure is necessary.

11. Save your entries.

ResultYou have created a Cost Component Structure and activated it.

3.2 Settings Cost Estimate with Qty StructureIn this section, settings are configured that enable the user to perform costing of materials.

© SAP AG Page 11 of 15

Page 12: J18_BB_ConfigGuide_EN_US

SAP Best Practices Product Cost Planning (J18): Configuration Guide

3.2.1 Definition of Valuation Variant

UseThe Valuation Variant controls various parameters regarding the valuation of input items for the object for which costs are being determined.

Procedure1. Access the activity using one of the following navigation options:

Transaction Code OKK4

IMG Menu Controlling Product Cost Controlling Product Cost Planning Material Cost Estimate with Quantity Structure Costing Variant: Components Define Valuation Variants

2. On the Change View “Valuation Variants”: Overview screen, choose the valuation variant 001Planned valuation - mat. by marking the respective line.

3. Copy the entry by clicking the (Copy As) button.

4. On the Change View “Valuation Variants”: Details of Selected Set screen, enter the new name and description of your valuation variant: 001, Planned Valuation: Mat..

5. Choose the Overhead tab and change the entry for the Costing Sheet for Overhead on Finished and Semi finished Materials to PP-PC Standard.

6. Save your entries.

ResultYou have defined a valuation variant.

3.2.2 Defining Costing Variant

UseThe Costing Variant controls various parameters when costs for a cost object or a material are being determined, such as the costing type or the valuation variant used.

Procedure1. Access the activity using one of the following navigation options:

Transaction Code OKKN

IMG Menu Controlling Product Cost Controlling Product Cost Planning Material Cost Estimate with Quantity Structure Define Costing Variant

2. On the change View “Costing Variants”: Overview screen, choose New Entries.

3. On the New Entries: Details of Added Entries screen, make the following entries:

Costing Variant Name

YPC1 SMB Standard cost est.

Control tab

© SAP AG Page 12 of 15

Page 13: J18_BB_ConfigGuide_EN_US

SAP Best Practices Product Cost Planning (J18): Configuration Guide

Costing Type Val. Variant Date Control Qty. Str. Ctrl Transf. Ctrl

YPC1 01 Y01 PC01 PC01 PC01

Quantity Structure tab

Pass on Lotsize Ignore PCE TrCtrl can be chd Transf. act. SCE

YPC1 NO Not set Not set Not set

Additive Costs tab

YPC1 Ignore; include AC with Stock Transfers: not set

Update tab

Saving allowed Save Itemization Save Error Log Defaults changes

YPC1 set Set set Not set

Miscellaneous tab

YPC1 Log and Save Messages, mail inactive

ResultYou have defined a costing variant.

3.2.3 Activating Cross-Company Costing

Use

Activating cross-company costing allows the system advanced operations during costing, such as accessing information in more than one company code, taking into account additive costs (for example, transportation charges for planned stock transfers) or releasing costing results for all company codes in the controlling area.

Procedure1. Access the activity using one of the following navigation options:

Transaction Code OKYV

IMG Menu Controlling Product Cost Controlling Cost Object Controlling Product Cost by Sales Order Preliminary Costing and Order BOM Costing Product costing for Sales Order Items/Order BOMs Costing Variants for Product Costing Activate Cross-company Costing

2. On the Change View “Cross Company Costing”: Overview screen, make the following entries:

Controlling Area Costing Type Valuation Variant Cost Across Company Codes

BP01 01 Y01 X

ResultYou have activated cross-company costing.

© SAP AG Page 13 of 15

Page 14: J18_BB_ConfigGuide_EN_US

SAP Best Practices Product Cost Planning (J18): Configuration Guide

3.3 Maintain Overhead Percentages

UseThis section contains all the information needed to maintain the percentage values for the overhead rates.

Procedure1. Access the transaction using:

IMG Menu Controlling Product Cost Controlling Product Cost Planning Basic Settings for Material Costing Overhead Costing Sheet: Components Define Percentage Overhead Rates

SAP R/3 Role Menu

J18 - Product Cost Planning Installation Role Installation Maintain OH Percentages

Transaction Code

SPRO

2. On the Change View “Percentage Overhead”: Overview screen, select the overhead rate for which you want to maintain percentage values. The Overhead Rates to be changed are located in the OH rate column of the table below.

3. In the dialog substructure on the right part of screen, choose Details. Confirm the Display IMG dialog box.

4. On the Change View “Details”: Overview screen, choose New Entries and enter data. Save your entries.

Overview of data records:

OH rate

Valid from to CO area

OH type

Plant Percent. Dependency

Y011 01/01/2000 12/31/9999 BP01 1 BP01 5 D020

Y011 01/01/2000 12/31/9999 BP01 2 BP01 5 D020

Y012 01/01/2000 12/31/9999 BP01 1 BP01 10 D020

Y012 01/01/2000 12/31/9999 BP01 2 BP01 10 D020

Y013 01/01/2000 12/31/9999 BP01 1 BP01 5 D020

Y013 01/01/2000 12/31/9999 BP01 2 BP01 5 D020

Y014 01/01/2000 12/31/9999 BP01 1 BP01 6.5 D020

Y014 01/01/2000 12/31/9999 BP01 2 BP01 6.5 D020

ResultPercentage values have been assigned to the overhead rates. The system now can determine overhead costs in Material Costing and Cost Object Controlling.

3.4 Check Cost Component Structure Active Status

UseCheck the cost component structure status for active.

© SAP AG Page 14 of 15

Page 15: J18_BB_ConfigGuide_EN_US

SAP Best Practices Product Cost Planning (J18): Configuration Guide

Procedure1. Access the transaction using:

IMG Menu Controlling Product Cost Controlling Product Cost Planning Basic Settings for Material Costing Define Cost Component Structure

Transaction Code

OKTZ

2. On the Change View “Cost Component Structure”: Overview screen, verify active status:

Cost Comp. Str. Active Name

Y1 x BP Cost Component Layout

3. Choose Save.

ResultThe system now can determine overhead costs in Material Costing and Cost Object Controlling.

© SAP AG Page 15 of 15