21
ITS upgrade Meeting Gruppi INFN V. Manzari – CERN, 6 Novembre 2012

ITS upgrade Meeting Gruppi INFN V. Manzari – CERN, 6 Novembre 2012

Embed Size (px)

Citation preview

Page 1: ITS upgrade Meeting Gruppi INFN V. Manzari – CERN, 6 Novembre 2012

ITS upgradeMeeting Gruppi INFN

V. Manzari – CERN, 6 Novembre 2012

Page 2: ITS upgrade Meeting Gruppi INFN V. Manzari – CERN, 6 Novembre 2012

Upgrades: status

On September 27 after the third round of discussions with ALICE, the LHCC has endorsed our Upgrade LoI and ITS CDR. Minutes are not out yet, but there is a statement which we can quote issued by the LHCC chair:“There is an interest amongst the collider experiments (ALICE, ATLAS and CMS) for a continued heavy ion programme that gives access to rare final states. This programme will extend well into the 20ies assuming the current HI running mode of one month per year.The physics programmes of the two general purpose detectors and ALICE are complementary: while the former may focus on selected hard probes ALICE will be optimized for particle identification at low transverse momenta. The experiments are hence sensitive to different ”messenger“ signals and phases of the evolution of the quark gluon plasma.This increase in sensitivity for ALICE entails an upgrade of the rate capability of the TPC, a high resolution ITS, and a major upgrade of the online system and the read-out electronics.The LHCC commends this joint approach to heavy ion physics and endorses the upgrade plans of the ALICE collaboration. The committee is looking forward to the seeing detailed technical solutions presented in the respective TDRs..”

Page 3: ITS upgrade Meeting Gruppi INFN V. Manzari – CERN, 6 Novembre 2012

RRB 29 Oct -1 Nov

oExtension of the construction MoUoGeneral Endorsement of the Upgrade

TDRs to be prepared in O(1 year)

oWill define the construction design oWill contain the specific commitments of the Institutions to the projectsoFollowed by MoU addendum (or addenda)

R&D

oWill have to continue vigorously throughout the process, with substantial funding, agreed within each project

Target date for ITS TDR August 2013 for submission to LHCC in September 2013

Upgrades: next steps

Page 4: ITS upgrade Meeting Gruppi INFN V. Manzari – CERN, 6 Novembre 2012

• Pb–Pb • int. luminosity per year 2.85 nb-1 (peak L = 7x1027 cm-2s-1)• needed int. luminosity 10 nb-1, statistics 8x1010 events• 3.5 month of running • +1 month of special run at low field for dileptons

• p–Pb• max event rate 200 kHz, flat (L = 1029 cm-2s-1)• needed int. luminosity 50 nb-1, statistics 1011 events• 0.5 month of dedicated p–Pb run

• pp• max event rate 200 kHz, flat (L = 3x1030 cm-2s-1)• needed int. luminosity 6 pb-1, statistics 4x1011 events• 2 month of dedicated pp run, assumed in 1 year

The list above fulfills the ALICE physics program as presented in the LoI. A run with lower mass nuclei (e.g. Ar) could be considered in addition, if a

physics case for it would emerge.

Running scenario after the upgrades

Page 5: ITS upgrade Meeting Gruppi INFN V. Manzari – CERN, 6 Novembre 2012

• ALICE plans to run 6 years with upgraded detector, i.e. until 2026 (assuming start in 2019 and 2 years break of LS3)

• Possible scenario:• 2019 – Pb–Pb 2.85 nb-1

• 2020 – Pb–Pb 2.85 nb-1 (low magnetic field)• 2021 – pp reference run

• 2022 – LS3• 2023 – LS3

• 2024 – Pb–Pb 2.85 nb-1

• 2025 – ½ Pb–Pb 1.42 nb-1 + ½ p–Pb 50 nb-1

• 2026 – Pb–Pb 2.85 nb-1

• This would not require pp running during high-luminosity runs, only a short time before a heavy-ion run for setting up and commissioning.

Upgrades: a possible running scheme

Page 6: ITS upgrade Meeting Gruppi INFN V. Manzari – CERN, 6 Novembre 2012

Organization, Timeline and Cost

Participating Institutes (subject to funding)• CERN• China (Wuhan, SINAP)• Czech Republic (Prague)• France IN2P3-CNRS (Strasbourg)• Italy INFN (Bari, Cagliari, Catania, Frascati, Legnaro, Padova, Roma, Torino, Trieste)• Korea (Yonsei University Seoul)• Pakistan (Islamabad COMSATS)• Russia (St. Petersburg)• Slovakia (Kosice IEP)• UK STFC (Univ. of Birmingham, Daresbury Lab, RAL)• Ukraine (Kharkov, Kiev)

Cost Estimate (Option A and B) (*)

R&D 4 MCHF

Option A (All pixels) 10 MCHF

Option B (pixels + strips) 16 MCHF

Already members of ITS project

New members of ITS project

(*) detailed cost breakdown in Table 6.2 of CDR

Upgrade Timeline 2012–2014 R&D 2012 evaluation of technologies & prototyp• 2013 selection of technologies, eng. Design,

TDR• 2014 final design and validation

• 2015-18 Construction and Installation• 2015-16 production, construction and test of

detector modules• 2017 assembly and pre-commissioning• 2018 installaiton in the cavern

Contribution of Institutes to be defined within

the next 8 months

Page 7: ITS upgrade Meeting Gruppi INFN V. Manzari – CERN, 6 Novembre 2012

7

ITS UpgradeBreakdown of the CORE Cost Estimate

V. Manzari - INFN Bari CSN III – 18 Settembre 2012

Option 1: 7 layers of monolithic pixel detectors, which would provide excellent standalone tracking efficiency and pt resolution, but limited PID capability.

Option 2:a combination of 3 innermost layers of hybrid pixel detectors and 4 outermost layers of strip detectors, which would provide better PID capability but worse standalone tracking efficiency and momentum resolution.

Page 8: ITS upgrade Meeting Gruppi INFN V. Manzari – CERN, 6 Novembre 2012

8

ITS UpgradeTimeline

V. Manzari - INFN Bari CSN III – 18 Settembre 2012

Page 9: ITS upgrade Meeting Gruppi INFN V. Manzari – CERN, 6 Novembre 2012

9

ALICE UpgradeCORE Cost Estimates

V. Manzari - INFN Bari CSN III – 18 Settembre 2012

Overall cost estimate for the major upgrade projects Detector components and production costs Upgrade items and Common Project

- ZDC included in “Trigger Detectors”, EMCal and HMPID require minor funds- The Offline cost is the investment needed for the offline central services at CERN

Page 10: ITS upgrade Meeting Gruppi INFN V. Manzari – CERN, 6 Novembre 2012

10

ALICE UpgradeSpending Profile

V. Manzari - INFN Bari CSN III – 18 Settembre 2012

Memorandum of Understanding An Addendum for each Project to the ALICE MoU Addendum for the Common Projects including M&O A

Page 11: ITS upgrade Meeting Gruppi INFN V. Manzari – CERN, 6 Novembre 2012

Cost Estimate

Detector Cost (KCHF)

ITS 6000

VHMPID 1000

TOF 600

Muon 600

ZDC 100

CommonFunds 1000

V. Manzari - INFN Bari CSN III – 20 Marzo 2012 11

ALICE UpgradeINFN Estimated Contributions

Overall cost estimate: ≈ 60 MCHF

Italian Contribution: ≈ 10 MCHF

Page 12: ITS upgrade Meeting Gruppi INFN V. Manzari – CERN, 6 Novembre 2012

Cost EstimateContributo INFN all’upgrade

Partecipazione INFN in ALICE: “Scientist” 107/574 (19%)

Costo Totale Upgrade ALICE: 36 - 42 MCHF 30 - 35 M€

Costo Totale Upgrade ITS: 10 - 16 MCHF (+ 4 MCHF per R&D)

Contributo INFN per upgrade ITS: 4.7 - 6.7 MCHF (33%) 3.9 - 5.6 M€

Common Projects: 0.9 M€

TOF: 0.6 M€

Muon: 1.8 M€ x 0.2 0.4 M€

Stima finanziamento globale INFN per upgrade ALICE:

5.8 M€ spalmato su 5-6 anni

Page 13: ITS upgrade Meeting Gruppi INFN V. Manzari – CERN, 6 Novembre 2012

Cost EstimateContributi gruppi INFN

Consultazione in corso con i vari gruppi che hanno espresso interesse a partecipare all’upgrade dell’ITS per definire contributi e responsabilità in base alle risorse disponibili (finanziarie, personale e infrastrutture)

Discussione all’IB meeting durante la mini-week in Dicembre

Come procediamo?

Individuare attività/sotto-progetti di interesse comune Salvaguardare contributi, specificità e visibilità dei vari gruppi Leadership in alcuni sotto-progetti Sviluppi tecnologici Utilizzo delle infrastrutture esistenti Negoziazione delle risorse locali con i rispettivi Direttori di Sez/Lab:

tecnici, tecnologi e servizi.

Page 14: ITS upgrade Meeting Gruppi INFN V. Manzari – CERN, 6 Novembre 2012

Activities People

Development, design and production of front-end electronics

Front-end wafer probing

Sensor development and production (in case of hybrid pixels and/or μstrips)

Wafer thinning &dicing

Detector interconnect technologies (bump-, tab-, wire-bonding, BGA, other)

Development and fabrication of test systems

Characterization and mass production tests of individual detector components

Power and Signal on-detector buses

On-detector readout and interface electronics

Radiation tests

Design and production of the Stave mechanical support

List of activities

Page 15: ITS upgrade Meeting Gruppi INFN V. Manzari – CERN, 6 Novembre 2012

Activities People

Design and production of the Integration and Installation mechanics

On-detector cooling

Cooling plant

Stave assembly

Barrel assembly and integration

Power Supply System

Detector Control and Interlock System

Construction Database

Off-detector readout electronics

Power and Signal Connections

Beam tests (hardware, software, analysis)

Online software (monitoring, DAQ, HLT)

Offline (MC, calibration and reconstruction)

Physics performance studies

Page 16: ITS upgrade Meeting Gruppi INFN V. Manzari – CERN, 6 Novembre 2012

CSN III – 20 Marzo 2012 16V. Manzari - INFN Bari

Backup

Page 17: ITS upgrade Meeting Gruppi INFN V. Manzari – CERN, 6 Novembre 2012

17

Riunione CSN3 28-29/03/2011• R&D activities for the ALICE inner tracker upgrade

http://agenda.infn.it/conferenceDisplay.py?confId=3202 Riunione CSN3 13-14/06/2011

• ALICE Inner Tracking System Upgrade

http://agenda.infn.it/conferenceDisplay.py?confId=3203 Riunione CSN3 19-20/03/2012

• ALICE Upgrade

http://agenda.infn.it/conferenceDisplay.py?confId=4296 Referee meeting 9/05/2012:

• Novità ITS e R&D status http://agenda.infn.it/conferenceDisplay.py?confId=5002

Referee meeting 20/07/2012:• ITS upgrade: consuntivo e richieste

http://agenda.infn.it/conferenceDisplay.py?confId=5291

Link a Presentazioni Precedenti

V. Manzari - INFN Bari CSN III – 18 Settembre 2012

Page 18: ITS upgrade Meeting Gruppi INFN V. Manzari – CERN, 6 Novembre 2012

18

Web pages:• Inner Tracking System

http://aliceinfo.cern.ch/ITS/• Inner Tracking System Upgrade

http://aliceinfo.cern.ch/ITSUpgrade/

Conceptual Design Report for the Upgrade of the ALICE ITS – Version: CDR-0, CERN-LHCC-2012-05 / LHCC-G-159; March 6, 2012 https://aliceinfo.cern.ch/ITSUpgrade/sites/aliceinfo.cern.ch.ITSUpgrade/files/

documents/AliceITSupgrade-CDR-0_1.pdf

Progress report on the Conceptual Design Report for the Upgrade of the ALICE ITS; June 18, 2012 https://aliceinfo.cern.ch/ITSUpgrade/sites/aliceinfo.cern.ch.ITSUpgrade/files/

documents/progress_report.pdf

Link a Documenti su Upgrade

V. Manzari - INFN Bari CSN III – 18 Settembre 2012

Page 19: ITS upgrade Meeting Gruppi INFN V. Manzari – CERN, 6 Novembre 2012

19

Upgrade of the ALICE Experiment – Letter of Intent; September 7, 2012 CERN-LHCC-2012-012 / LHCC-I-022 https://cdsweb.cer.ch/record/1475243/files/LHCC-I-022.pdf

Upgrade of the ALICE Inner Tracking System – Conceptual Design Report; CERN-LHCC-2012-013 / LHCC-P-005; September 11, 2012 http://cdsweb.cern.ch/record/1475244/files/LHCC-P-005.pdf

Link a Documenti su Upgrade

V. Manzari - INFN Bari CSN III – 18 Settembre 2012

Page 20: ITS upgrade Meeting Gruppi INFN V. Manzari – CERN, 6 Novembre 2012

20

Link alla Pagina Web ITS Upgrade

V. Manzari - INFN Bari CSN III – 18 Settembre 2012

Page 21: ITS upgrade Meeting Gruppi INFN V. Manzari – CERN, 6 Novembre 2012

1 Marzo 2012 21

P.T. 2013-2015 (draft di piano finanziario, CSN3 30/1/2012)Upgrades : nostre previsioni presentata da Nico in CSN3

Nel 2011-12 per R&D (ITS, VHMPID) : 131, 194.5 K€ (77.5 +117 s.j.) Previsioni costo upgrades (MB e CB meetings del 12/1/2012):ITS : 14 MCHF (CERN, INFN, IN2P3, UK, COMSATS, BMBF, Ukraina, Russia, China,

Slovakia, Czech Republic) 2012-2014 R&D e prototipi2014-2016 Costruzione2016-2017 Integrazione e commissioning in laboratorio2017-2018 Installazione e commissioning VHMPID : 3 (- 4) MCHF (USA, INFN, India, Mexico, Korea, Brazil, Hungary)2011-2012 R&D e prototipi2013-2016 Costruzione e commissioning in lab./testbeam2017-2018 Installazione e commissioning Contributo INFN old HMPID 57.4%Possibile contributo INFN (circa 16.7 %) : 500 KCHF tra 2013 e 2017 (100 KCHF nel 2013, 150 nel 2014, 150 nel 2015) Nuova strategia di upgrade del Central Barrel (MB e CB meetings del 12/1/2012):Stime approssimative dei costi per rivelatori con contributo INFN:TOF : 600 KCHF (100% INFN) → (72 schede DRM) 500 kEuroMuon Trigger : 604 KCHF (IN2P3, INFN) → 160 (rivel.) + 30 (sistema gas) = 190 kEuroMuon Tracking : 967 KCHF (IN2P3, INFN, India?, Russia?) → 200 – 250 kCHFZDC 70 kEuro (100% INFN) Contributo INFN old MUON 9.2% ……

Contributo INFN old ITS 49.1%