It’s Time to Set Higher Standards for Your Overhead Crane System. Keeping Your Productivity at its Highest and Operating Costs at Their Lowest is Our Business.

It’s Time to Set Higher Standards for Your Overhead Crane ... · Power System Preventive Maintenance • Comprehensive evaluation of your company’s complete power system including

  • Upload
    haliem

  • View
    214

  • Download
    1

Embed Size (px)

Citation preview

Page 1: It’s Time to Set Higher Standards for Your Overhead Crane ... · Power System Preventive Maintenance • Comprehensive evaluation of your company’s complete power system including

It’s Time to Set Higher Standards for Your Overhead Crane System.

Keeping Your Productivity at its Highest and Operating Costs at Their Lowest is Our Business.

Page 2: It’s Time to Set Higher Standards for Your Overhead Crane ... · Power System Preventive Maintenance • Comprehensive evaluation of your company’s complete power system including

Authorized Sales & Service Provider for:

Magnetech Preventive Maintenance Service Optimizes Overhead Crane Operation While Reducing Breakdown and Repair

Are you seeing any of these crane system failure warning signs?• Increasing noise & vibration levels. • Jerky movement.• Pitted or burned electrical contacts. • Deterioration of controls.• Hook or hook block is contacting the trolley. • Improper oil levels or oil leaks.• Visible wear or corrosion on rope, chain, or hook. • Infrequent use or excessive idle time. Now is the Time to ActTo prevent these symptoms from turning into a catastrophic failure that results in expensive downtime and repair costs, ask us for a complete crane system evaluation. Our factory-trained service technicians offer decades of overhead crane service and troubleshooting experience to pinpoint problems and recommend common-sense solutions.

Magnetech Overhead Crane System Maintenance Program - Setting Standards Far Above The RestMagnetech overhead crane technicians are professionally trained, certifi ed, and available to develop a customized preventive maintenance program for your system to:

• Eliminate system failures • Perform OSHA inspections• Extend equipment service life • Improve system performance• Reduce downtime & repair costs with regular inspections & service • Modernize & upgrade• Inspect hoist, rope & hook with magnetic particle testing • Inspect controls & structure • Perform runway evaluations & accident investigatons/evaluations

Each program is developed based on your facility’s exact requirements and features:

• Regularly scheduled visits by a Magnetech technician to examine, test & perform routine maintenance on your cranes to meet or exceed the original manufacturer’s specifi cations.• Provide a written report after each inspection that details equipment condition & includes any recommended action.• Priority response to system & equipment malfunctions.

Don’t Wait for an Expensive Failure Contact us today to see how a Magnetech Overhead Crane Preventive Maintenance program can improve your facility’s productivity and reduce costs.

Magnetech Preventive Maintenance Programs - We Keep Your Productivity Healthy.

Overhead Crane System Preventive Maintenance Checklist

Check all functional operating mechanisms for excessive wear and maladjustment Check lines, valves, air or hydraulic systems for deterioration or leakage

Check hook for deformation or cracks with magnetic particle inspection Check wire rope, chains, and end connections for wear, twists, broken wires and kinks

Ensure bridge stops, sweeps and bumpers extend below runway rail Check electrical apparatus for signs of pitting or deterioration of contacts

Check pins, bearings, shaft, gears, rollers, locking and clamping devices for wear, cracks, distortion, or improper alignment

Ensure resistors have covers to prevent contact when entering cab and check overall condition of resistors Check clearance between crane and obstructions Ensure limit switches are operable with a safe stopping distance

Check gearcases for leakage Check brake system parts

Check rope and reeving for non-compliance with manufacturer’s recommendation

Check trolley rails for misalignment, worn rail, or loose clips Check strain relief for cord

Check sheaves, drums, and upper and lower blocks

Page 3: It’s Time to Set Higher Standards for Your Overhead Crane ... · Power System Preventive Maintenance • Comprehensive evaluation of your company’s complete power system including

Power System Preventive Maintenance• Comprehensive evaluation of your company’s complete power system including substations, circuit breakers, switchgear, transformers, cable and wiring

• Regularly scheduled inspections to ensure your power system remains in prime operating condition.

Air CompressorPreventive Maintenance• Regularly scheduled visits by a Magnetech technician to examine, test and perform routine maintenance on your system to meet or exceed the original manufacturer’s specifications.• A written report will be provided after each inspection that details equipment condition and includes any recommendations.• Priority response to system and equipment malfunctions.

Adding a New Dimension to Industrial Service and Repair

www.magnetech.com • 24/7 Emergency Service

More Cost-Saving Support Available from Magnetech

Form 140C

7 LOCATIONS NATIONWIDE!

ISO 9001:2008 Certified