Itmccs-2224 Final Ok

Embed Size (px)

Citation preview

  • 7/31/2019 Itmccs-2224 Final Ok

    1/59

    ITMCCS-2224Metro Services @ a Click

    Manolis KaliotisSenior Network Engineer Professional ServicesServices BUIntracom Telecom [email protected]

    Orestis KaradimitriouSenior Manager

    Access & TransportNetwork Engineering & Opshellas online [email protected]

    Themis KordogiannisSenior IP Engineer

    Access & Transport IPNetwork Engineering & Opshellas online [email protected]

  • 7/31/2019 Itmccs-2224 Final Ok

    2/59

    2012 Cisco and/or its affiliates. All rights reserved. Cisco PublicPresentation_ID 2

    Housekeeping

    We value your feedback- don't forget to complete your online sessionevaluations after each session & the Overall Conference Evaluationwhich will be available online from Thursday

    Visit the World of Solutions and Meet the Engineer

    Visit the Cisco Store to purchase your recommended readings

    Please switch off your mobile phones

    After the event dont forget to visit Cisco Live Virtual:www.ciscolivevirtual.com

    http://www.ciscolivevirtual.com/http://www.ciscolivevirtual.com/http://www.ciscolivevirtual.com/
  • 7/31/2019 Itmccs-2224 Final Ok

    3/59

    2012 Cisco and/or its affiliates. All rights reserved. Cisco PublicPresentation_ID 3

    Session Scope

    This Session IS About:- Carrier Ethernet Project Implementation

    - How Cisco ISC was used to facilitate deployment

    This Session Is NOT About:- Complete ISC Scenarios

    - Detailed analysis of problems

  • 7/31/2019 Itmccs-2224 Final Ok

    4/59

    2012 Cisco and/or its affiliates. All rights reserved. Cisco PublicPresentation_ID 4

    Agenda

    Part 1- Who we are @ a Glance- The Business Need : Bandwidth and sophistication @ competitive prices- The Technical Requirements : How to implement business needs- The Solution : Topology and components- Cisco ME and Cisco ISC : How it all came together

    Part 2- Cisco ISC : Step by step provisioning Metro Ethernet services- Roadmap and milestones @ hol- Its all about numbers- Whats next- We want MORE- Its a successful story

  • 7/31/2019 Itmccs-2224 Final Ok

    5/59

    2012 Cisco and/or its affiliates. All rights reserved. Cisco PublicPresentation_ID 5

    @ a Glance

    Versatile Telecom Operator - First operator to provide retail Internet Access in Greece back in 1994

    - Member of Intracom Group, Major shareholder Vodafone

    - Operate in Greek market, one of the few in Europe with substantial broadbandgrowth the last years. hol managed to attract ~ 450K Broadband subscribers

    - Full 3-Play and Fixed VNO Services An asset based Operator

    - Largest alternative fiber network in Greece currently covering more than 4,150 KMwith a c.72% addressable market coverage with 315 Collocations in LECs

    - Investments of 360 M since 2006

    Appealing competitive positioning across all customer segments- Compelling retail product portfolio complemented by strategic partnership with

    Vodafone

    - The extensive network footprint uniquely positions the company to serve more than2K corporate customers in metro areas

    Profile

  • 7/31/2019 Itmccs-2224 Final Ok

    6/59

    2012 Cisco and/or its affiliates. All rights reserved. Cisco PublicPresentation_ID 6

    Intracom Telecom @ a Glance

    A Recognized InternationalTelecommunicationSystems Vendor operating inEEMEA, CIS and APAC

    Over 30 years experience inthe telecom market

    Revenue 2010 (Group): 256million

    Over 2,000 employees inGreece and abroad

    Part of SITRONICS TelecomSolutions

    Core Business Offerings :- Wireless Network Systems

    - Telco Software

    - Services

    Profile

    SITRONICSSubsidiaries/Office

    Intracom TelecomSubsidiaries/Branches

  • 7/31/2019 Itmccs-2224 Final Ok

    7/59

    hellas online Cisco ME

    The Business Need

  • 7/31/2019 Itmccs-2224 Final Ok

    8/59 2012 Cisco and/or its affiliates. All rights reserved. Cisco PublicPresentation_ID 8

    The Business Need

    The demand for bandwidth is increasing- The drive for bandwidth intensive multimedia applications

    - The need to centralize storage and servers and implement remote businessstrategies (Cloud)

    - The need for flexible upgrade capabilities

    - Wholesale /open networks to other providers

    The demand for sophisticated services is increasing. Carriers need to staycompetitive, as customers looking for solutions that:

    - Provide Collaboration & service consolidation - run Data, Voice & Video onone network with QoS

    - Ensure the best performance (SLAs) for the always on connected world

    - Ensure Privacy & Security, as the level of concern imposed by new servicesincreases

    All of the above fast and efficiently @ a click

    Bandwidth and Sophistication @ competitive prices

  • 7/31/2019 Itmccs-2224 Final Ok

    9/59 2012 Cisco and/or its affiliates. All rights reserved. Cisco PublicPresentation_ID 9

    hellas online Cisco ME

    hellas online operates a 2500Km Metro Area fiber network for corporatecustomers with Nortel equipment. For this, the company was awardedthe MEF "Outstanding Innovation" award in 2005

    In 2009 we decided to renew the equipment

    The challenge was quite high as the service already provided was moreadvanced in features from the competition

    The Case

  • 7/31/2019 Itmccs-2224 Final Ok

    10/59 2012 Cisco and/or its affiliates. All rights reserved. Cisco PublicPresentation_ID 10

    Translating Business Need into ME requirementsHow to implement Business Needs

    End2End capabilityE-Line & E-LAN Services

    StandardizationIEEE 802.1ad (Q-in-Q)

    IEEE 802.1ah (PBB)

    Always OnLess than 10ms latency

    N+1 Equipment resiliency50 ms protection

    Low TCO15 switch Ethernet RingsReuse of existing Fiber Integrate with DWDM

    Interoperabilityinteroperate with existing

    IP/MPLS network

    ScalabilityMultiple 10GE Ports

    Capability for QoSMultiservice QoS

  • 7/31/2019 Itmccs-2224 Final Ok

    11/59

    hellas online Cisco ME The Project and Solution

  • 7/31/2019 Itmccs-2224 Final Ok

    12/59 2012 Cisco and/or its affiliates. All rights reserved. Cisco PublicPresentation_ID 12

    hellas online Cisco METhe Project

    Scope: 5 core nodes, >1000 CPEs, >4000 CircuitsTimeline: Over 1 year project preparation and testing

    Selection Process- Discussions with most of the major vendors

    - Down to two possible vendors- Over 5 months in house lab testing (POC)

    Primary goal: A network architecture that supports all features required

    Secondary goal: Support provisioning @ a click- Existing Operations teams not Cisco friendly

    - Launch immediately, no time for extensive Cisco IOS training

    - Northbound Interface to CRM and Business Assurance tools

  • 7/31/2019 Itmccs-2224 Final Ok

    13/59 2012 Cisco and/or its affiliates. All rights reserved. Cisco PublicPresentation_ID 13

    hellas online Cisco METhe Solution

    Cisco Metro Ethernet based on Cisco ISC (now Cisco PRIME Fulfillment ) for Provisioning C7600 Series for NPE ME3400E Series for UPE REP for Resiliency Dual NPE Attached Rings Cisco ONS 15454

    Key drivers for the selection Provisioning application Ring Topology Solution with 10GE support Multiple Options for Access Switch (ME3400E/C4900) Seamless integration with existing network C7600/ME3400 Proven platforms OAM Support

  • 7/31/2019 Itmccs-2224 Final Ok

    14/59 2012 Cisco and/or its affiliates. All rights reserved. Cisco PublicPresentation_ID 14

    hellas online Cisco METhe Solution: Cisco ME Rings

  • 7/31/2019 Itmccs-2224 Final Ok

    15/59 2012 Cisco and/or its affiliates. All rights reserved. Cisco PublicPresentation_ID 15

    hellas online Cisco ME

    Cisco ONS 15454 for Access Distribution

    - GE-XPE (20GE XPE Cards)

    Cisco 7600 for CORE (NPE)

    - ES+ (Ethernet Services Plus Cards)

    ME3400E/4900 for Access Switch (UPE)

    Cisco ISC for Provisioning of ME

    Cisco CTM for DWDM Provisioning

    The Solution: Building ME Rings directly on the DWDM Core

  • 7/31/2019 Itmccs-2224 Final Ok

    16/59 2012 Cisco and/or its affiliates. All rights reserved. Cisco PublicPresentation_ID 16

    hellas online Cisco METhe Solution: ME Rings Scenario 1

    Logical Path

  • 7/31/2019 Itmccs-2224 Final Ok

    17/59 2012 Cisco and/or its affiliates. All rights reserved. Cisco PublicPresentation_ID 17

    hellas online Cisco METhe Solution: ME Rings Scenario 2

    Logical PathVPLS LDP(Full Mesh)

    AKR

    KRS

    PER

    ADR

    ES+40G

    C7600

    ES+40G

    C7600

    MED

    ME3400segment

  • 7/31/2019 Itmccs-2224 Final Ok

    18/59 2012 Cisco and/or its affiliates. All rights reserved. Cisco PublicPresentation_ID 18

    hellas online Cisco METhe Solution: The Hard Part #1 E2E Resilience w/ C7600 & ME3400

    ME3400E segments connected toC7609 ES+ ports in EVC mode

    Local significant S-VLAN per ME3400E segment

    REP (Resilient Ethernet Protocol)used to detect/respond to linkfailures

    REP is a segment protocol thatguarantees there is noconnectivity between two edgeports on a segment

    MAJOR CHANGE in ASR9K REP Access Gateway

    STP between UPE and NPE

    VPLS LDP

    (Full Mesh)

    C7609 ADR

    C7609MED

    EE EE

    REP edge portEVC/port mode

    REP edge portEVC/port mode

    REP Open Segment

    Blockedby REP

  • 7/31/2019 Itmccs-2224 Final Ok

    19/59 2012 Cisco and/or its affiliates. All rights reserved. Cisco PublicPresentation_ID 19

    hellas online Cisco METhe Solution: The Hard Part #2 E2E Resilience w/ ONS XP/XPE Cards

    VPLS LDP(Full Mesh)

    Blockedby GR 3

    UNI port intransparent mode& BPDU tunnel

    S-VLANA

    S-VLANB

    GE-XPE ADR

    GE_XPEMED

    ONSGE_XPE

    ONSGE_XPE

    ME3400

    ME3400

    ME3400

    C7600MED

    C7600 ADR

    UNI port intransparent mode& BPDU tunnel

    UNI port intransparent mode& BPDU tunnel

    DWDM

    RING

    Layer 2 mode

    Two protected S-VLAN's per MESwitches segment

    XPE GR3 protection (G.709 RapidRing Restoration) for trafficaround the DWDM ringNO MAC learning on XPE Cards

    XPE S-VLAN's not carried toC7600's & ME Switches

    Link Integrity feature (r9.0)Propagating local link failure toremote port

  • 7/31/2019 Itmccs-2224 Final Ok

    20/59

    Cisco IP Solution Centre (ISC)

  • 7/31/2019 Itmccs-2224 Final Ok

    21/59 2012 Cisco and/or its affiliates. All rights reserved. Cisco PublicPresentation_ID 21

    ISC Provisioning Facts

    Definition : Cisco IP Solution Centre is a family of intelligent networkmanagement applications for planning, provisioning, and automateddiagnostics of MPLS and Carrier Ethernet networks

    Key Idea : The operator will select the end-points of a service and ISC willdeploy this service configuring every device in the path with theappropriate commands

    NOTE : ISC is not an NMS, just a provisioning tool

    The Challenges

  • 7/31/2019 Itmccs-2224 Final Ok

    22/59

    2012 Cisco and/or its affiliates. All rights reserved. Cisco PublicPresentation_ID 22

    ISC Provisioning Facts

    Existing Metro Network infrastructure Nortel devices CLI vs.GUI- Operators accustomed to GUI provisioning

    - No CLI or Cisco IOS experience

    - Smooth Transition KISS principle

    Mapping of marketing/sales Metro Services Offerings to ISC Policies- 3 Starter Services ISC Policies

    - Basic Premium Gold

    - Differentiation in CoS marking, MAC numbers, L2 tunneling

    The Challenges Business

  • 7/31/2019 Itmccs-2224 Final Ok

    23/59

    2012 Cisco and/or its affiliates. All rights reserved. Cisco PublicPresentation_ID 23

    ISC Provisioning Facts

    FlexUNI/EVC Policies for provisioning E-Line and E-LAN Ethernetservices over a VPLS core

    - Not out of the box solution

    - Integration / Customization phase

    - Configuration Templates chosen by Operators or attached to Policies

    Dual attached rings not supported in 5.2 (later in 6.0)- Workaround provided by second ES+ LC (pseudo links)

    All configurations must be done by ISC and not by CLI- Device configs must be in sync with ISC for smooth operation

    - CLI is more error prone

    - CLI is not a scalable solution

    The Challenges Technical

  • 7/31/2019 Itmccs-2224 Final Ok

    24/59

    2012 Cisco and/or its affiliates. All rights reserved. Cisco PublicPresentation_ID 24

    ISC Provisioning Facts

    Reduction in provisioning errors- Service Design through planning

    - Automatic deployment of commands to all relevant devices

    Speed Time to Market

    - Quick deployment of services on the network

    Device Awareness- Automation of which commands to what devices

    Services Assurance

    - Easy to identify the services deployed for customers

    Benefits

  • 7/31/2019 Itmccs-2224 Final Ok

    25/59

    Provisioning with Cisco IP Solution Centre (ISC)

  • 7/31/2019 Itmccs-2224 Final Ok

    26/59

    2012 Cisco and/or its affiliates. All rights reserved. Cisco PublicPresentation_ID 26

    ISC Provisioning

    Building the Topology- Entering the Devices

    - Collecting Device Configurations

    - Assigning Roles to Devices

    - Defining NPCs and NPC RingsISC makes decisions during provisioning time

    - Which devices (topology)

    - What commands (device type)

    Preparation for Provisioning Topology Design

  • 7/31/2019 Itmccs-2224 Final Ok

    27/59

    2012 Cisco and/or its affiliates. All rights reserved. Cisco PublicPresentation_ID 27

    ISC ProvisioningEntering the Devices

    Create a Cisco Device

  • 7/31/2019 Itmccs-2224 Final Ok

    28/59

    2012 Cisco and/or its affiliates. All rights reserved. Cisco PublicPresentation_ID 28

    ISC ProvisioningEntering the Devices

    Device Hostname (DNS)

    Management IP address

    Access method and credentials

    SNMP version and communities All switches must operate in VTPtransparent mode

  • 7/31/2019 Itmccs-2224 Final Ok

    29/59

    2012 Cisco and/or its affiliates. All rights reserved. Cisco PublicPresentation_ID 29

    ISC ProvisioningCollecting Device Configuration

    Create a Collect Config Task

  • 7/31/2019 Itmccs-2224 Final Ok

    30/59

    2012 Cisco and/or its affiliates. All rights reserved. Cisco PublicPresentation_ID 30

    ISC ProvisioningCollecting Device Configuration

    Select Devices

    Retrieve additional info

    Schedule for later?

  • 7/31/2019 Itmccs-2224 Final Ok

    31/59

    2012 Cisco and/or its affiliates. All rights reserved. Cisco PublicPresentation_ID 31

    ISC ProvisioningCollecting Device Configuration

  • 7/31/2019 Itmccs-2224 Final Ok

    32/59

    2012 Cisco and/or its affiliates. All rights reserved. Cisco PublicPresentation_ID 32

    ISC Provisioning Assigning Device Roles

    Select Device

    Select Role (NPE/UPE)

  • 7/31/2019 Itmccs-2224 Final Ok

    33/59

    2012 Cisco and/or its affiliates. All rights reserved. Cisco PublicPresentation_ID 33

    ISC Provisioning Assigning Device Roles

    Interfaces are listedbased on config collect

    Loopback must beselected for NPE devices

  • 7/31/2019 Itmccs-2224 Final Ok

    34/59

    2012 Cisco and/or its affiliates. All rights reserved. Cisco PublicPresentation_ID 34

    ISC ProvisioningCreating NPC Rings

    Dual NPE Attachment

  • 7/31/2019 Itmccs-2224 Final Ok

    35/59

    2012 Cisco and/or its affiliates. All rights reserved. Cisco PublicPresentation_ID 35

    ISC ProvisioningCreating NPCs

    C7600

    3400-12CS

    3400E-12CS

    NPCs are automatically createdfor all devices in a ring

    Each device in a ring has 2NPCs

  • 7/31/2019 Itmccs-2224 Final Ok

    36/59

    2012 Cisco and/or its affiliates. All rights reserved. Cisco PublicPresentation_ID 36

    ISC ProvisioningCreating NPCs

  • 7/31/2019 Itmccs-2224 Final Ok

    37/59

    2012 Cisco and/or its affiliates. All rights reserved. Cisco PublicPresentation_ID 37

    ISC ProvisioningCreating NPCs

    Select a device in the ring

    Select the NPE of the ring

  • 7/31/2019 Itmccs-2224 Final Ok

    38/59

    2012 Cisco and/or its affiliates. All rights reserved. Cisco PublicPresentation_ID 38

    ISC Provisioning

    E-Line Service- UNIs on SW2 and SW6

    - Commands for SW1-SW2-R1-R2-R3-R4-SW5-SW6

    Internet Feed Service- UNI on SW7

    - Direct Connect Link on R5

    - Commands for R5-R3-R4-SW7-SW8

    Step by step

  • 7/31/2019 Itmccs-2224 Final Ok

    39/59

    2012 Cisco and/or its affiliates. All rights reserved. Cisco PublicPresentation_ID 39

    ISC Provisioning

    1. Select a Policy- Set of predefined commands and values configured

    based on design (Gold service, OAM, number of MAC addresses allowed)

    2. Select End-points- Which devices participate in the service

    3. Select Interfaces- Specify the UNI interfaces

    4. Fill in the service attributes- Service Instance, Bridge Domain, S-Vlan, VLAN

    manipulation, UNI type

    5. Select additional templates- Extra commands to complete the service (QoS)

    Step by stepService Request

    Service Policy

    End-points

    Attachment Circuits(N-PE/U-PE)

    Editable Variables

    Template Datafileselection or creation

    Service Deployment

  • 7/31/2019 Itmccs-2224 Final Ok

    40/59

    2012 Cisco and/or its affiliates. All rights reserved. Cisco PublicPresentation_ID 40

    ISC ProvisioningStep by step

    Select FlexUNI(EVC) SR

  • 7/31/2019 Itmccs-2224 Final Ok

    41/59

    2012 Cisco and/or its affiliates. All rights reserved. Cisco PublicPresentation_ID 41

    ISC ProvisioningStep by step - ONE

    Select a Policy

  • 7/31/2019 Itmccs-2224 Final Ok

    42/59

    2012 Cisco and/or its affiliates. All rights reserved. Cisco PublicPresentation_ID 42

    ISC ProvisioningStep by step - TWO

    Add VPN end-

    points (UPEs)

    Add NPE directconnect links (NPE)

  • 7/31/2019 Itmccs-2224 Final Ok

    43/59

  • 7/31/2019 Itmccs-2224 Final Ok

    44/59

    2012 Cisco and/or its affiliates. All rights reserved. Cisco PublicPresentation_ID 44

    ISC ProvisioningStep by step - FOUR

  • 7/31/2019 Itmccs-2224 Final Ok

    45/59

    2012 Cisco and/or its affiliates. All rights reserved. Cisco PublicPresentation_ID 45

    ISC ProvisioningStep by step - FOUR

    Choose UNI InterfaceEncapsulation

  • 7/31/2019 Itmccs-2224 Final Ok

    46/59

    2012 Cisco and/or its affiliates. All rights reserved. Cisco PublicPresentation_ID 46

    ISC ProvisioningStep by step - FIVE

    Choose Device

    Click Template

  • 7/31/2019 Itmccs-2224 Final Ok

    47/59

    2012 Cisco and/or its affiliates. All rights reserved. Cisco PublicPresentation_ID 47

    ISC ProvisioningStep by step - FIVE

    Choose Devicein Ring

    Add Datafile

  • 7/31/2019 Itmccs-2224 Final Ok

    48/59

    2012 Cisco and/or its affiliates. All rights reserved. Cisco PublicPresentation_ID 48

    ISC ProvisioningStep by step

    Save the SR

  • 7/31/2019 Itmccs-2224 Final Ok

    49/59

    2012 Cisco and/or its affiliates. All rights reserved. Cisco PublicPresentation_ID 49

    ISC ProvisioningStep by step

    Deploy SR

  • 7/31/2019 Itmccs-2224 Final Ok

    50/59

    2012 Cisco and/or its affiliates. All rights reserved. Cisco PublicPresentation_ID 50

    ISC ProvisioningDeployment Action

    ISC will check the LOGIC for inconsistencies- Mismatched attributes, UNI encapsulation

    ISC will collect all parameters of the SR and combine them with the attachedtemplates to produce configlets per device

    ISC will try to download the configlets to all appropriate devices in the network

    Once finished it will gather the latest configuration from devices

    It will perform a configuration audit for the commands provisioned bycomparing configurations files

  • 7/31/2019 Itmccs-2224 Final Ok

    51/59

    2012 Cisco and/or its affiliates. All rights reserved. Cisco PublicPresentation_ID 51

    ISC ProvisioningConfiglets

    Ring Attached NPE (C7600)!l2 vfi TLAS-101-10000 manualvpn id 10000neighbor 62.38.0.5 encapsulation mpls!vlan 2300

    name TLAS-101-10000!ethernet evc hol_196!interface GigabitEthernet3/0/15!service instance 1200 ethernet hol_196encapsulation dot1q 1200rewrite ingress tag pop 1 symmetric

    bridge-domain 2300 split-horizon!interface Vlan2300no ip addressdescription hol 0101-R1-R3mtu 9216xconnect vfi TLAS-101-10000no shutdown

  • 7/31/2019 Itmccs-2224 Final Ok

    52/59

    2012 Cisco and/or its affiliates. All rights reserved. Cisco PublicPresentation_ID 52

    ISC ProvisioningConfiglets

    UPE with UNI(ME3400)!vlan 1200

    name TLAS-101-10000!interface GigabitEthernet0/1

    switchport trunk allowed vlan add 1200!interface GigabitEthernet0/2

    switchport trunk allowed vlan add 1200!policy-map hol_196-inclass class-default

    police cir 512000conform-action set-cos-transmit 1conform-action set-qos-transmit 1

    exceed-action drop!

    UPE with UNI(ME3400)!interface FastEthernet0/1speed 100duplex fullswitchportswitchport access vlan 1200switchport mode dot1q-tunnelswitchport port-security aging type inactivityswitchport port-security maximum 30switchport port-security aging time 120switchport port-security violation restrictswitchport port-securitylstorm-control broadcast level 5.0keepalivemac access-group deny-mcast indescription TLAS-0101-Site-1load-interval 30storm-control action trap

    ip access-group deny-mcast-ip inservice-policy input hol_196!mac-address-table learning vlan 1200!

  • 7/31/2019 Itmccs-2224 Final Ok

    53/59

    2012 Cisco and/or its affiliates. All rights reserved. Cisco PublicPresentation_ID 53

    ISC ProvisioningConfiglets

    Transit UPE (ME3400)!vlan 1200

    name TLAS-101-10000!interface GigabitEthernet0/1

    switchport trunk allowed vlan add 1200!interface GigabitEthernet0/2

    switchport trunk allowed vlan add 1200!no mac-address-table learning vlan 1200!

  • 7/31/2019 Itmccs-2224 Final Ok

    54/59

    2012 Cisco and/or its affiliates. All rights reserved. Cisco PublicPresentation_ID 54

    ISC @ HOL RoadmapMilestones

    ISC 5.2 Launch in April 2010

    15 Cisco TAC SRs Opened

    13 Bug IDs (New/Existing)

    ISC 6.0 Launch in April 2011

    9 Cisco TAC SRs Opened

    3 Bug IDs (New/Existing)

    The Future Cisco Prime Fulfillment

    POC in March 2012

  • 7/31/2019 Itmccs-2224 Final Ok

    55/59

    2012 Cisco and/or its affiliates. All rights reserved. Cisco PublicPresentation_ID 55

    ISC @ HOL in numbers

    3 NPE ring pairs: 2 C7600 1 ASR9k

    16 Total NPEs: 14 C7600 2 ASR9k

    300 UPEs: ME3400E, C4948, 4900M

    50 Rings: 40 on C7600 10 on ASR9k

    600 SRs

    More than a 100 unique Customers already- More than 1000 Customers / 3000 Circuits to gradually migrate from

    Nortel network

    Results

  • 7/31/2019 Itmccs-2224 Final Ok

    56/59

    2012 Cisco and/or its affiliates. All rights reserved. Cisco PublicPresentation_ID 56

    ISC @ HOL Next Steps

    Migration of existing C7600 ring SRs to ASR9k

    ME3600 & ME3800

    Cisco PRIME Fulfillment (old ISC) & Cisco PRIME Optical (old CTM)

    Cisco PRIME Service Provider Suite

    Future

  • 7/31/2019 Itmccs-2224 Final Ok

    57/59

    2012 Cisco and/or its affiliates. All rights reserved. Cisco PublicPresentation_ID 57

    ISC @ HOL Wish List

    More Automation and Native Support- Insert new UPE in Ring, Automatic Ring Discovery

    - UNI VLAN translation, Selective QinQ

    - QoS on UPE

    - Shared UNI services

    New Features- 802.1ah support (PBB)

    - FlexUNI/EVC services reporting

    - Common E2E provisioning (From CTM to ISC)

    - Support for Ethernet OAM provisioning- Ethernet Diagnostic Expert (equivalent of MDE)

    - Full support for REP on ASR9K (RAG is a temporary solution)

    Features

  • 7/31/2019 Itmccs-2224 Final Ok

    58/59

    2012 Cisco and/or its affiliates. All rights reserved. Cisco PublicPresentation_ID 58

    A successful story

    Rapid product introduction

    Fast & error free service provisioning (~15min)

    Instant response to revenue assurance

    Scalability device awareness

    Reliability resiliency (~200ms) and latency (~ 3ms)

  • 7/31/2019 Itmccs-2224 Final Ok

    59/59

    Thank you.