9
1 CITY OF WEST DES MOINES PLAN AND ZONING COMMISSION COMMUNICATION Meeting Date: June 8, 2020 Item: Linnwill Hy-Vee Fast & Fresh Preliminary Plat, 210, 220, & 300 Grand Avenue – Subdivide property into one lot for commercial development and one street lot – Hurd Indianola, LLC and Delavan,Inc.– PP-004662-2020 Requested Action: Recommend Approval of Preliminary Plat Case Advisor: Brian Portz, AICP Applicant’s Request: The applicant, Hy-Vee, Inc., in association with the property owners, Hurd Indianola, LLC and Delavan, Inc., is requesting approval of a preliminary plat to subdivide the property located at 210, 220, & 300 Grand Avenue into one lot for commercial development and one street lot to be dedicated to the city. The applicant is proposing to construct a Hy-Vee Fast & Fresh with coffee shop and an accessory car wash on the site. The applicant received plat of survey approval April 6, 2020 to parcel off a 16,844 square foot portion of the Delavan site to the south on which the Fast & Fresh building will be located. History: The subject property was platted as Linnwill Plat 2 in 1958. The existing building on the 210 Grand Avenue property was built in 1989. The properties at 220 and 300 Grand Avenue are vacant. The buildings on those properties were demolished in 2017. City Council Subcommittee: This item was presented to the Development & Planning City Council Subcommittee at their April 6, 2020 meeting as an informational item only. There was not discussion or disagreement with the proposed project. Staff Review and Comment: This request was distributed to other City departments and other agencies for their review and comment. There are no outstanding issues. Staff would note the following: Site Plan: A preliminary site plan is noted on the preliminary plat showing the proposed Fast & Fresh building, a gas pump canopy and a car wash. This site plan hasn’t yet been thoroughly reviewed by City Staff because the applicant intends to submit a separate site plan at a later date for formal site plan review and approval. Since the site plan noted on the preliminary plat is preliminary in nature, the approval of the preliminary plat does not actually approve the site plan shown. Staff recommends a condition of approval of the preliminary plat that allows the City to provide additional comments on the site plan that may require revisions to the site as a part of the final site plan approval Site Access: In 2021, the City is proposing to widen Grand Avenue to 5 lanes with a center median. This will provide this site with a full access on the west side and a shared right in/right out on the east side. With fewer accesses on Grand Avenue along with a raised median, internal connections to the west will be needed as the area develops so that drivers can reach the traffic signal at 4th Street & Grand Avenue to go west.  These connections are vital for providing access to all businesses, while still maintaining safe and efficient traffic flow on Grand Avenue.  This will give left-turning traffic options to use different routes during peak times, better distributing trips to the arterial streets and alleviating delays. An internal cross connection is proposed on the southwest corner of this site. This will provide a cross connection to the property to the west to be utilized when that property redevelops in the future. To facilitate access to the full access on the Hy-Vee property for the property to the west (i.e. Dairy Queen, Subway, etc.), Hy-Vee is proposing to construct a temporary driveway along its west property line that will allow vehicles from the west property to drive east to the full access on the Hy-Vee site.This temporary connection will be removed when the property to the west redevelops. Item 4c

Item 4c - Iowa

  • Upload
    others

  • View
    4

  • Download
    0

Embed Size (px)

Citation preview

1

CITY OF WEST DES MOINES PLAN AND ZONING COMMISSION COMMUNICATION

Meeting Date: June 8, 2020

Item: Linnwill Hy-Vee Fast & Fresh Preliminary Plat, 210, 220, & 300 Grand Avenue – Subdivide property into one lot for commercial development and one street lot – Hurd Indianola, LLC and Delavan,Inc.– PP-004662-2020

Requested Action: Recommend Approval of Preliminary Plat

Case Advisor: Brian Portz, AICP

Applicant’s Request: The applicant, Hy-Vee, Inc., in association with the property owners, Hurd Indianola, LLC and Delavan, Inc., is requesting approval of a preliminary plat to subdivide the property located at 210, 220, & 300 Grand Avenue into one lot for commercial development and one street lot to be dedicated to the city. The applicant is proposing to construct a Hy-Vee Fast & Fresh with coffee shop and an accessory car wash on the site. The applicant received plat of survey approval April 6, 2020 to parcel off a 16,844 square foot portion of the Delavan site to the south on which the Fast & Fresh building will be located.

History: The subject property was platted as Linnwill Plat 2 in 1958. The existing building on the 210 Grand Avenue property was built in 1989. The properties at 220 and 300 Grand Avenue are vacant. The buildings on those properties were demolished in 2017.

City Council Subcommittee: This item was presented to the Development & Planning City Council Subcommittee at their April 6, 2020 meeting as an informational item only. There was not discussion or disagreement with the proposed project.

Staff Review and Comment: This request was distributed to other City departments and other agencies for their review and comment. There are no outstanding issues. Staff would note the following:

• Site Plan: A preliminary site plan is noted on the preliminary plat showing the proposed Fast &Fresh building, a gas pump canopy and a car wash. This site plan hasn’t yet been thoroughlyreviewed by City Staff because the applicant intends to submit a separate site plan at a later datefor formal site plan review and approval. Since the site plan noted on the preliminary plat ispreliminary in nature, the approval of the preliminary plat does not actually approve the site planshown. Staff recommends a condition of approval of the preliminary plat that allows the City toprovide additional comments on the site plan that may require revisions to the site as a part of thefinal site plan approval

• Site Access: In 2021, the City is proposing to widen Grand Avenue to 5 lanes with a center median.This will provide this site with a full access on the west side and a shared right in/right out on theeast side. With fewer accesses on Grand Avenue along with a raised median, internal connectionsto the west will be needed as the area develops so that drivers can reach the traffic signal at 4thStreet & Grand Avenue to go west.  These connections are vital for providing access to allbusinesses, while still maintaining safe and efficient traffic flow on Grand Avenue.  This will giveleft-turning traffic options to use different routes during peak times, better distributing trips to thearterial streets and alleviating delays. An internal cross connection is proposed on thesouthwest corner of this site. This will provide a cross connection to the property to the west to beutilized when that property redevelops in the future. To facilitate access to the full access on theHy-Vee property for the property to the west (i.e. Dairy Queen, Subway, etc.), Hy-Vee is proposingto construct a temporary driveway along its west property line that will allow vehicles from the westproperty to drive east to the full access on the Hy-Vee site.This temporary connection will beremoved when the property to the west redevelops.

Item 4c

2

Comprehensive Plan Consistency: The project has been reviewed for consistency with the Comprehensive Plan. Based upon that review, a finding has been made that the proposed project is consistent with the Comprehensive Plan in that the project is consistent with all of the goals and policies of the Comprehensive Plan and the land use map of the Comprehensive Plan.

Findings: This proposed project was distributed to various city departments for review and comment. Based upon that review, the following findings have been made on the proposed project:

1. The proposed development and use is consistent with the West Des Moines Comprehensive Planin that the project has been reviewed for consistency with the Comprehensive Plan. Based uponthat review, a finding has been made that the proposed project is consistent with theComprehensive Plan in that the project is consistent with all of the goals and policies of theComprehensive Plan.

2. The proposed development and use does assure compatibility of property uses within the zone andgeneral area in that this project was reviewed by various City Departments for compliance with theZoning Ordinance.

3. All applicable standards and conditions have been imposed which protects the public health, safetyand welfare in that this project was reviewed by various City Departments and public agencies forcompliance with the various state and local regulations. Based upon that review a finding is madethat the project has been adequately conditioned to protect the health, welfare and safety of thecommunity.

4. There is adequate on-site and off-site public infrastructure to support the proposed development inthat this project was reviewed by various public agencies and City Departments and public utilitiesto ensure that either the petitioner will construct or the project has been conditioned to constructadequate public infrastructure to serve the development.

5. The proposed development and use has met the requirements contained in the City Code in thatthis project was reviewed by various City Departments and the project has complied with or hasbeen conditioned to comply with all City Code requirements.

6. The proposed development and use is in keeping with the scale and nature of the surroundingneighborhood in that the proposed project is consistent with the zoning designation andComprehensive Plan which designates this site as suitable for development such as that proposedby this project.

Staff Recommendation And Conditions Of Approval: Based upon the preceding review and a finding of consistency with the goals and policies of the Comprehensive Plan, staff recommends the Plan and Zoning Commission adopt a resolution recommending the City Council approve the Preliminary Plat to create 1 lot for commercial development and 1 lot for public street right of way, subject to the applicant meeting all City Code requirements and the following:

1. The City reserves the right to provide additional comments on the site plan that may requirerevisions to the site as a part of the final site plan approval.

3

Property Owners: Hurd Indianola, LLC 2000 Fuller Road West Des Moines, Iowa 50265 [email protected] Delavan, Inc. 811 4th Street West Des Moines, IA 60265 [email protected] Applicant: Hy-Vee, Inc. 5820 Westown Parkway West Des Moines, IA 50266 [email protected] Applicant's Representatives:

Kelsey Scallon Shive-Hattery, Inc. 4125 Westown Parkway, Suite 100 West Des Moines, Iowa 50266

[email protected]

Attachments:

Attachment A - Plan and Zoning Commission Resolution Exhibit A - Conditions of Approval

Attachment B - Location Map Attachment C - Preliminary Plat

C:\Users\Jcanaday\Desktop\PP-004662-2020_SR_Hy-Vee Fast & Fresh Preliminary Plat_06-08-2020_PZ.Docx

RESOLUTION NO. PZC-20-036

A RESOLUTION OF THE PLAN AND ZONING COMMISSION OF THE CITY OF WEST DES MOINES, RECOMMENDING TO THE CITY COUNCIL THAT IT APPROVE A PRELIMINARY PLAT TO SUBDIVIDE PROPERTY INTO 1 LOT FOR COMMERCIAL DEVELOPMENT AND 1 LOT FOR PUBLIC STREET RIGHT OF WAY

WHEREAS, pursuant to the provisions of Title 10, Chapter 1 et seq, of the West Des Moines Municipal Code, the applicant, Hy-Vee, Inc., in association with the property owners, Hurd Indianola, LLC and Delavan, Inc., has requested approval for a Preliminary Plat (PP-004662-2020) to create 1 commercial lot and 1 street lot, on that 1.8 acre site located at 210, 220 and 300 Grand Avenue; and

WHEREAS, studies and investigations were made, and staff reports and recommendations were submitted which is made a part of this record and herein incorporated by reference; and

WHEREAS, on June 8, 2020, this Commission held a duly-noticed public meeting to consider the application for a Preliminary Plat.

NOW, THEREFORE, THE PLAN AND ZONING COMMISSION OF THE CITY OF WEST DES MOINES DOES RESOLVE AS FOLLOWS:

SECTION 1. The findings, for approval, in the staff report or as amended orally at the Plan and Zoning Commission meeting are adopted.

SECTION 2. The Preliminary Plat (PP-004662-2020) to subdivide the property into 1 commercial lot and 1 street lot is recommended to the City Council for approval, subject to compliance with all the conditions in the staff report including conditions added at the meeting, and attached hereto as Exhibit “A.” Violation of any such conditions shall be grounds for revocation of the permit, as well as any other remedy which is available to the City.

PASSED AND ADOPTED on June 8, 2020.

Erica Andersen, Chairperson Plan and Zoning Commission

ATTEST:

Recording Secretary

I HEREBY CERTIFY that the foregoing resolution was duly adopted by the Plan and Zoning Commission of the City of West Des Moines, Iowa, at a regular meeting held on June 8, 2020, by the following vote:

AYES: NAYS: ABSTENTIONS: ABSENT:

ATTEST:

Recording Secretary

Attachment A

C:\Users\Jcanaday\Desktop\PP-004662-2020_SR_Hy-Vee Fast & Fresh Preliminary Plat_06-08-2020_PZ.Docx

Exhibit A CONDITIONS OF APPROVAL

1. The City reserves the right to provide additional comments on the site plan that may require revisionsto the site as a part of the final site plan approval.

Location Map

Disclaimer: The City of West Des Moines makes no warranties regarding theaccuracy or completeness of the data provided herein.

3,441

© City of West Des Moines, Iowa

573.5

THIS MAP IS NOT TO BE USED FOR NAVIGATION

1:

WGS_1984_Web_Mercator_Auxiliary_Sphere

Feet573.50

Legend

286.77

Addresses

Corporate Limits

Parcels

Attachment B

4

A B D E FC

3

2

1

A B D E FC

4

3

2

1

Iow

a | Illinois | Indiana

PR

ELIM

IN

AR

Y

- N

OT

F

OR

CO

NS

TR

UC

TIO

N

4125 W

estow

n P

kw

y, S

uite 100 | W

est D

es M

oines, Iow

a 50266

515.223.8104 | w

ww

.shive-hattery.com

DR

AW

N:

AP

PR

OV

ED

:

IS

SU

ED

F

OR

:

DA

TE

:

FIE

LD

B

OO

K:

PR

OJE

CT

N

O:

CLIE

NT

N

O:

Printed:

1 OF 3

CO

VE

R S

HE

ET

TL

S

KA

S

CIT

Y A

PP

RO

VA

L

20

20

-0

6-0

4

41

85

16

0

---

---

PR

ELIM

IN

AR

Y P

LA

T O

F

LIN

NW

ILL H

Y-V

EE

HY

VE

E, IN

C.

210 G

RA

ND

A

VE

NU

E | W

ES

T D

ES

M

OIN

ES

, IO

WA

50265

P:\P

ro

je

cts\D

M\4

18

51

60

\D

elive

ra

ble

s\D

ra

win

gs\1

_C

ivil\P

re

lim

in

ary P

la

t\C

ove

r S

he

et.d

wg

6/4

/2

02

0 1

:1

2:1

5 P

M

850

849

EXISTING PROPOSED

EASEMENT LINE

SANITARY MANHOLE

PROPERTY LINE

SANITARY SEWER

MAJOR CONTOUR

MINOR CONTOUR

DESCRIPTION

WATER MAIN

WATER VALVE

FIRE HYDRANT ASSEMBLY

OVERHEAD ELECTRIC

WATER SERVICE

850

849

STORM SEWER

STORM STRUCTURES

STORM SUBDRAIN

LIGHT POLE

ELECTRICAL BOX

R

1-800-292-8989

THE UTILITIES AS SHOWN ON THIS DRAWING WERE DEVELOPED FROM THE

INFORMATION AVAILABLE, THIS IS NOT IMPLIED NOR INTENDED TO BE THE

COMPLETE INVENTORY OF UTILITIES IN THIS AREA. IT IS THE

CLIENTS/CONTRACTORS RESPONSIBILITY TO VERIFY THE LOCATION OF ALL

UTILITIES (WHETHER SHOWN OR NOT) AND PROTECT SAID UTILITIES FROM ANY

DAMAGE.

APPLICANT

OWNER

HURD INDIANOLA, LLC

2000 FULLER ROAD

WEST DES MOINES, IA 50265

ATTN: RICHARD HURD

DELAVAN, INC

811 4TH STREET

DES MOINES, IOWA 50265

HY-VEE, INC.

5820 WESTOWN PARKWAY

WEST DES MOINES, IOWA 50266

ATTN: JOHN BREHM

FW

PUD

PUD

LI

R-1

R-1

R-1

R-1

PUD

CMC

CMC

GRAND AVENUE

63

RD

S

TR

EE

T

4T

H S

TR

EE

T

PRELIMINARY PLAT OF

LINNWILL HY-VEE

210 GRAND AVENUE | WEST DES MOINES, IOWA

PAGES, SHEETS OR DIVISIONS COVERED BY THIS SEAL:

My License Renewal Date is: DECEMBER 31,

Printed or typed name:

License Number:

Signature: Date

I HEREBY CERTIFY THAT THIS ENGINEERING DOCUMENT DESCRIBED

BELOW WAS PREPARED BY ME OR UNDER MY DIRECT PERSONAL

SUPERVISION AND THAT I AM A DULY LICENSED PROFESSIONAL ENGINEER

UNDER THE LAWS OF THE STATE OF IOWA.

KELSEY A SCALLON

2021

25081

CIVIL ENGINEER

PROJECT LOCATION

CMC

PROJECT LOCATION

VICINITY MAP: ZONING MAP:

FLOODPLAIN NOTE

CIVIL ENGINEER

SHIVE-HATTERY, INC.

4125 WESTOWN PARKWAY

SUITE #100

WEST DES MOINES, IOWA 50266

515-223-8104

LANDSCAPE ARCHITECT

SHIVE-HATTERY, INC.

4125 WESTOWN PARKWAY

SUITE #100

WEST DES MOINES, IOWA 50266

515-223-8104

SITE SURVEY

SHIVE-HATTERY, INC.

4125 WESTOWN PARKWAY

SUITE #100

WEST DES MOINES, IOWA 50266

515-223-8104

ZONING:

EXISTING: CMC (COMMUNITY COMMERCIAL)

PROPOSED: PUD (PLANNED UNIT DEVELOPMENT)

USE:

ZONING: LINNWILL HYVEE PUD - COMMUNITY

COMMERCIAL

COMPREHENSIVE LAND USE: PUD - COMMUNITY

COMMERCIAL

CONSTRUCTION NOT SPECIFICALLY DETAILED OR SPECIFIED WITHIN THE

PLANS OR PROJECT SPECIFICATIONS SHALL CONFORM TO THE DES MOINES

METROPOLITAN DESIGN STANDARDS WITH WEST DES MOINES ADDENDA.

ZONING & PUD BULK REGULATIONS

LEGEND

BENCHMARKS

WDM BENCHMARK #049 - INTERSECTION OF 4TH STREET AND VINE STREET,

NORTHEAST CORNER OF INTERSECTION, 50 FEET EAST OF THE CENTERLINE OF 4TH

STREET, 50 FEET NORTH OF THE CENTERLINE OF VINE STREET.

ELEVATION = 38.35 CITY DATUM (812.36 NAVD88)

WDM BENCHMARK #079 - INTERSECTION OF 8TH STREET AND ASHWORTH ROAD,

NORTHWEST CORNER OF INTERSECTION, 90.5 FEET WEST OF THE CENTERLINE OF 8TH

STREET, 32.3 FEET NORTH OF CENTERLINE OF ASHWORTH ROAD, BETWEEN SIDEWALK

AND BACK OF CURB, 2.7 FEET NORTH OF NORTH BACK OF CURB.

ELEVATION = 108.07 CITY DATUM (882.08 NAVD88)

SHEET LIST TABLE

SHEET NUMBER SHEET TITLE

1 COVER SHEET

2 SITE PLAN

3 GRADING & UTILITY PLAN

LEGAL DESCRIPTION

THAT PART OF LOTS TWO (2) AND THREE (3) IN LINNWILL PLAT 2, AN OFFICIAL PLAT, NOW INCLUDED IN AND

FORMING A PART OF THE CITY OF WEST DES MOINES, POLK COUNTY, IOWA, AS SHOWN IN PLAT OF SURVEY

#2018-18 RECORDED OCTOBER 15, 2019 IN BOOK 17544 AT PAGE 254.

AND

LOTS FOUR (4), FIVE (5), SIX (6), SEVEN (7), AND THE NORTH 79.3 FEET OF THE EAST 60 FEET OF LOT EIGHT (8)

IN LINNWILL PLAT 2, AN OFFICIAL PLAT, NOW INCLUDING IN AND FORMING A PART OF THE CITY OF WEST DES

MOINES, POLK COUNTY, IOWA.

AND

THAT PART OF LOTS TEN (10) AND ELEVEN (11) IN LINNWILL PLAT 2, AN OFFICIAL PLAT, NOW INCLUDED IN AND

FORMING A PART OF THE CITY OF WEST DES MOINES, POLK COUNTY, IOWA, AS SHOWN IN PLAT OF SURVEY

#2020-15 RECORDED APRIL 13, 2020 IN BOOK 17776 AT PAGE 917.

CONTAINING 77,982 SQ. FT. (1.790 ACRES) MORE OR LESS.

ACCORDING TO THE FLOOD INSURANCE RATE MAP - PANEL NUMBER 19153C0329F

PUBLISHED BY THE FEDERAL EMERGENCY MANAGEMENT AGENCY AND WITH AN

EFFECTIVE DATE OF FEBRUARY 1, 2019, THIS SITE APPEARS TO BE LOCATED IN ZONE "X"

(AREA WITH REDUCED FLOOD RISK DUE TO LEVEE), TO THE BEST OF MY KNOWLEDGE

AND BELIEF. THE SURVEYOR UTILIZED THE ABOVE REFERENCED FLOODPLAIN PANEL FOR

THIS DETERMINATION; FURTHERMORE, THE SURVEYOR DOES NOT CERTIFY THAT

REVISED FLOODPLAIN INFORMATION HAS NOT BEEN PUBLISHED BY THE FEDERAL

EMERGENCY MANAGEMENT AGENCY OR SOME OTHER SOURCE.

1. PRIOR TO CONSTRUCTION OF ANY PUBLIC IMPROVEMENTS ASSOCIATED WITH THIS

SUBDIVISION, CONSTRUCTION PLANS FOR SAID IMPROVEMENTS NEED TO BE

SUBMITTED TO AND APPROVED BY THE CITY ENGINEER.

GENERAL NOTE

ADJOINING LAND OWNERS

LOT 94 LINNWILL - REAL ESTATE HOLDINGS II, LLC

PT LOT 2 & 3 LINNWILL PLAT 2 - CITY OF WEST DES MOINES

LOT 10 LINNWILL PLAT 2 - DELAVAN, INC

AN NPDES GENERAL PERMIT NO. 2 AND ASSOCIATED STORMWATER POLLUTION

PREVENTION PLAN SHALL BE PROVIDED TO THE CITY OF WEST DES MOINES

PRIOR TO ANY CONSTRUCTION ACTIVITIES OR LAND DISTURBANCE ON THE SITE.

BUILDING SETBACK 15 FT

FUEL CANOPY SETBACK 35 FT FROM RIGHT-OF-WAY LINE AS MEASURED TO THE EXTREME EDGE OF

THE CANOPY

FUEL CANOPY HEIGHT MUST PROVIDE A MINIMUM CLEARANCE OF 14 FT. THERE SHALL BE NO

MAXIMUM FUEL CANOPY HEIGHT; HOWEVER, CANOPY HEIGHTS GREATER

THAN 20 FT SHALL ONLY BE ALLOWED IF THE CANOPY IS DEEMED TO CARY

AND REINFORCE THE DESIGN INTENT OF THE VAL-GATE DISTRICT.

LOT SIZE NO MINIMUM LOT SIZE REQUIRED

PARKING SUMMARY 1 SPACE PER 250 SQUARE FEET OF GROSS FLOOR AREA

PARKING SETBACK 10 FT FROM RIGHT-OF-WAY LINE

5 FT FROM ALL OTHER PROPERTY LINES

PARKING LOT SCREENING SUFFICIENT HEIGHT AND DENSITY

OPEN SPACE 15% MINIMUM

LANDSCAPING MINIMUM OF TWO (2) TREES AND THREE (3) SHRUBS PROVIDED FOR EVERY

3,000 SF OF REQUIRED OPEN SPACE. 50% OF THE TREES REQUIRED FOR

OPEN SPACE SHALL BE EVERGREEN IN NATURE.

Attachment C

AutoCAD SHX Text
S
AutoCAD SHX Text
IOWA ONE CALL
AutoCAD SHX Text
CALL 2 WORKING DAYS
AutoCAD SHX Text
BEFORE YOU DIG !
AutoCAD SHX Text
KELSEY A
AutoCAD SHX Text
SCALLON
AutoCAD SHX Text
25081
AutoCAD SHX Text
1" = 2000'
AutoCAD SHX Text
1" = 250'

CP-CX

CP-CX

BM1

CP-CX

CP-CX

CP-CX

CP-CX

36"

36"

FF = 43.04

FF = 42.97

FF = 43.46

FF = 43.50

STORM INTAKERIM=39.71

STORM MANHOLERIM=38.96IE(W)=35.81IE(SW)=35.76IE(E)=35.71

STORM MANHOLERIM=39.08IE(W)=35.41IE(E)=35.37

STORM INTAKET/C=38.99IE(S)=35.37

STORM INTAKERIM=40.81IE(S)=38.81

STORM MANHOLERIM=40.88IE(N)=38.36

CHAIN-LINKFENCE

CHAIN-LINKFENCE

SAN MANHOLERIM=39.53IE(W)=33.78IE(E)=33.70

GRAND AVENUE

EXISTINGBUILDING

CONCRETE

40

41

42

41

41

41

42

43

40

40

40

39

39

39

40

41

40

40

40

40

40

41

41

42

40

12

6

35

4

10 MPH

15"

10" 7"

ASPHALT

ASPHALTHYDRANT

8" WATERSERVICE LINE

6" SERVICE LINE (PERCITY MAPPING)

INGRESS-EGRESSEASEMENT (PRIVATE)BK:2945, PG:153

GAS PIPELINE EASEMENT(PRIVATE)BK:2960, PG:379

UNDERGROUND ELECTRICLINE EASEMENT (PRIVATE)BK:16573, PG:113

10.00

15.00

5.00

PERMANENT PUBLICUTILITY EASEMENTBK:16142, PG:215

STORM SEWER ANDUTILITY EASEMENT(PUBLIC)BK:17526, PG:301

15.00'

6" SANITARY SERVICE(PER PLANS)

91CLR 87CLR E85

87E10DIESEL

R

=

5

.

0

0

'

R

=

2

3

.

0

0

'

R

=

1

0

.0

0

'

R

=

2

1

.

0

0

'

R

=

8

.

0

0

'

R

=

3

3

.

0

0

'

R

=

2

0

.

0

0

'

R

=

4

.

0

0

'

R

=

1

0

.

0

0

'

R

=

1

0

.

0

0

'

9.50'9.00'9.00'

TYP

9.50'9.00'

TYP

9.50'

9.50'

19

.0

0'

9.00'

15.00'

13.00'

25

.0

0'

38

.0

0'

50

.0

0'

45.00'108.00'

43.00'

13

.0

0'

10' RIGHT-OF-WAY

10' STREETSCAPE AND PARKING S/B

35' CANOPY S/B

5.0

0'

25

.0

0'

19

.0

0'

6.0

0'

10

.0

0'

10

.0

0'

40

.5

'

50.00'

6.00'

11

.0

0'

340.87'

S 89°54'10" W

16

9.3

6'

S 0

0°0

1'1

3" W

59.95'

N 89°57'42" E

23.82'

N 89°52'39" E

1

0

1

.

0

0

'

S

3

5

°

0

4

'

3

5

"

E

174.69'

N 89°53'28" E

82.82'

N 00°23'20" W

25.26'

N 89°52'39" E

16

9.3

0'

N 00°05'41" W

10.00'

N 00°01'13" E

340.85'

N 89°54'10" E

10.00'

S 00°05'41" E

340.87'

S 89°54'10" W

65

.0

0'

B-B

O

W

N

E

R

:

D

E

L

A

V

A

N

,

I

N

C

O

W

N

E

R

:

R

E

A

L

E

S

T

A

T

E

H

O

L

D

I

N

G

S

I

I

,

L

L

C

O

W

N

E

R

:

H

U

R

D

I

N

D

I

A

N

O

L

A

,

L

L

C

O

W

N

E

R

:

H

U

R

D

I

N

D

I

A

N

O

L

A

,

L

L

C

O

W

N

E

R

:

H

U

R

D

I

N

D

I

A

N

O

L

A

,

L

L

C

O

W

N

E

R

:

H

U

R

D

I

N

D

I

A

N

O

L

A

,

L

L

C

OW

NE

R: H

UR

D

IN

DIA

NO

LA

, LLC

LOT 6 LINNWILL

PLAT 2

LOT 7 & PT LOT 8

LINNWILL PLAT 2

LOT 5 LINNWILL

PLAT 2

LO

T 4 LIN

NW

ILL

PLA

T 2

P

A

R

C

E

L

2

0

1

8

-

1

8

B

K

:

1

7

5

4

4

,

P

G

:

2

5

4

OW

NE

R: C

IT

Y O

F

WE

ST

D

ES

M

OIN

ES

O

W

N

E

R

:

C

I

T

Y

O

F

W

E

S

T

D

E

S

M

O

I

N

E

S

PT. LOT 2

LINNWILL PLAT 2

PT

. LO

T 3

LIN

NW

ILL P

LA

T 2

LOT 10 LINNWILL

PLAT 2

LOT 94 LINNWILL

37.00'

R

=

1

8

.

0

0

'

25

.0

0'

R

=

5

.

0

0

'

R

5

.

0

0

'

R

=

1

0

.

0

0

'

R

=

1

0

.

0

0

'

R

=

5

.

0

0

'

R

=

1

0

.

0

0

'

R

=

1

0

.

0

0

'

R

=

1

0

.

0

0

'

R

=

2

5

.

0

0

'

R

=

5

.

0

0

'

R

=

3

0

.

0

0

'

12.67'

R

=

2

.

0

0

'

R

=

2

0

.

0

0

'

R

=

1

0

.

0

0

'

R

=

2

0

.

0

0

'

6

.

0

0

'

25.00'

R

=

4

.

0

0

'

R

=

5

.

0

0

'

R

=

2

.

0

0

'

R

=

2

.

0

0

'

13.00'

R

=

1

0

.

0

0

'

R

=

1

0

.

0

0

'

15' BUILDING S/B

15

' B

UIL

DIN

G S

/B

4

A B D E FC

3

2

1

A B D E FC

4

3

2

1

Iow

a | Illinois | Indiana

PR

ELIM

IN

AR

Y

- N

OT

F

OR

CO

NS

TR

UC

TIO

N

4125 W

estow

n P

kw

y, S

uite 100 | W

est D

es M

oines, Iow

a 50266

515.223.8104 | w

ww

.shive-hattery.com

R

1-800-292-8989

THE UTILITIES AS SHOWN ON THIS DRAWING WERE DEVELOPED FROM

THE INFORMATION AVAILABLE, THIS IS NOT IMPLIED NOR INTENDED TO

BE THE COMPLETE INVENTORY OF UTILITIES IN THIS AREA. IT IS THE

CLIENTS/CONTRACTORS RESPONSIBILITY TO VERIFY THE LOCATION

OF ALL UTILITIES (WHETHER SHOWN OR NOT) AND PROTECT SAID

UTILITIES FROM ANY DAMAGE.

N O

R

T

H

0 20'

GRAPHIC SCALE

40' 60'

HYVEE CARWASH

HYVEE STORE

6,570 GROSS SF BUILDING

28 PARKING STALLS

HEAVY DUTY PCC PAVING

DR

AW

N:

AP

PR

OV

ED

:

IS

SU

ED

F

OR

:

DA

TE

:

FIE

LD

B

OO

K:

PR

OJE

CT

N

O:

CLIE

NT

N

O:

Printed:

2 OF 3

SIT

E P

LA

N

TL

S

KA

S

CIT

Y A

PP

RO

VA

L

20

20

-0

6-0

4

41

85

16

0

---

---

PR

ELIM

IN

AR

Y P

LA

T O

F

LIN

NW

ILL H

Y-V

EE

HY

VE

E, IN

C.

210 G

RA

ND

A

VE

NU

E | W

ES

T D

ES

M

OIN

ES

, IO

WA

50265

P:\P

ro

je

cts\D

M\4

18

51

60

\D

elive

ra

ble

s\D

ra

win

gs\1

_C

ivil\P

re

lim

in

ary P

la

t\0

2 S

ite

P

la

n.d

wg

6/4

/2

02

0 1

:2

4:3

5 P

M

GAS CANOPY

5' PARKING S/B (TYP.)

LIGHT DUTY

PCC PAVING (TYP)

5' PARKING S/B (TYP)

CURB RAMP (TYP.)

6" PCC CURB AND

GUTTER (TYP.)

PROPERTY LINE (TYP.)

LOT 1

LOT A

GRAND AVE (PUBLIC)

120' ROW

BIKE RACK

AN NPDES GENERAL PERMIT NO. 2 AND ASSOCIATED STORMWATER POLLUTION

PREVENTION PLAN SHALL BE PROVIDED TO THE CITY OF WEST DES MOINES

PRIOR TO ANY CONSTRUCTION ACTIVITIES OR LAND DISTURBANCE ON THE SITE.

15' BUILDING S/B (TYP)

5' PARKING S/B (TYP)

15' BUILDING S/B (TYP)

AutoCAD SHX Text
IOWA ONE CALL
AutoCAD SHX Text
CALL 2 WORKING DAYS
AutoCAD SHX Text
BEFORE YOU DIG !

91CLR 87CLR E85

87E10DIESEL

CP-CX

CP-CX

BM1

CP-CX

CP-CX

CP-CX

CP-CX

36"

36"

STORM INTAKERIM=39.71

STORM MANHOLERIM=38.96IE(W)=35.81IE(SW)=35.76IE(E)=35.71

STORM MANHOLERIM=39.08IE(W)=35.41IE(E)=35.37

STORM INTAKET/C=38.99IE(S)=35.37

STORM INTAKERIM=40.81IE(S)=38.81

STORM MANHOLERIM=40.88IE(N)=38.36

SAN MANHOLERIM=39.53IE(W)=33.78IE(E)=33.70

GRAND AVENUE

12

6

35

4

15"

10" 7"

O

W

N

E

R

:

D

E

L

A

V

A

N

,

I

N

C

O

W

N

E

R

:

R

E

A

L

E

S

T

A

T

E

H

O

L

D

I

N

G

S

I

I

,

L

L

C

O

W

N

E

R

:

H

U

R

D

I

N

D

I

A

N

O

L

A

,

L

L

C

O

W

N

E

R

:

H

U

R

D

I

N

D

I

A

N

O

L

A

,

L

L

C

O

W

N

E

R

:

H

U

R

D

I

N

D

I

A

N

O

L

A

,

L

L

C

O

W

N

E

R

:

H

U

R

D

I

N

D

I

A

N

O

L

A

,

L

L

C

OW

NE

R: H

UR

D

IN

DIA

NO

LA

, L

LC

O

W

N

E

R

:

C

I

T

Y

O

F

W

E

S

T

D

E

S

M

O

I

N

E

S

O

W

N

E

R

:

C

I

T

Y

O

F

W

E

S

T

D

E

S

M

O

I

N

E

S

O

W

N

E

R

:

F

I

R

S

T

S

T

R

E

E

T

L

P

O

W

N

E

R

:

D

E

L

A

V

A

N

I

N

C

.

O

W

N

E

R

:

R

A

S

M

U

S

S

E

N

&

S

O

N

S

B

I

C

Y

C

L

E

S

H

O

P

I

N

C

.

O

W

N

E

R

:

W

E

N

D

Y

'

S

W

E

S

T

M

A

P

L

E

L

L

C

O

W

N

E

R

:

P

A

J

I

S

I

A

-

D

E

L

L

C

O

W

N

E

R

:

W

I

L

L

I

A

M

C

K

N

A

P

P

V

I

L

L

A

G

E

G

R

E

E

N

I

I

L

C

INGRESS-EGRESSEASEMENT (PRIVATE)BK:2945, PG:153

GAS PIPELINE EASEMENT(PRIVATE)BK:2960, PG:379

UNDERGROUND ELECTRICLINE EASEMENT (PRIVATE)BK:16573, PG:113

10.00

15.00

5.00

PERMANENT PUBLICUTILITY EASEMENTBK:16142, PG:215

STORM SEWER ANDUTILITY EASEMENT(PUBLIC)BK:17526, PG:301

15.00'

ST INT 2.2 (SW-501)

RIM = 42.67'

IE = 36.91 ST 2.2

ST INT 1.7 (SW-501)

T/C = 42.30

IE = 36.50 ST 1.7

STMH 1.6 (48" - SW-401)

RIM = 42.30'

IE = 35.58 ST 1.7

IE = 35.62 ST 3.1

IE = 35.47 ST 1.6

ST INT 3.1 (48" - SW-502)

T/C = 40.75

IE = 36.25 ST 3.1

ST INT 1.3 (SW-506)

T/C = 40.62

IE = 33.84 ST 1.4

IE = 33.74 ST 1.3

ST INT 1.5 (SW-501)

T/C = 41.14

IE = 34.35 ST 1.6

IE = 34.50 ST 6.1

IE = 34.25 ST 1.5

ST INT 1.2 (SW-505)

T/C = 40.45

IE = 33.40 ST 1.3

IE = 33.30 ST 1.2

ST INT 1.1 (SW-503)

RIM = 40.69'

IE = 32.00 ST 1.2

IE = 34.87 ST 2.1

IE = 31.50 ST 1.1

ST INT 4.1 (SW-505)

RIM = 39.34'

IE = 34.00 ST 4.1

S

T

1

.

7

6

9

L

F

1

5

"

R

C

P

@

1

.

3

6

%

ST

1.6 113 LF

15" R

CP

@

1.00%

ST

1

.4

2

5 L

F

18

" R

CP

@

1

.0

0%

ST 1.3 34 LF

18" RCP @ 1.00%

ST 1.2 130 LF

24" RCP @ 1.01%

ST

2

.2

1

04

L

F

15

" R

CP

@

0

.8

8%

ST 3.1

64 L

F

15" RC

P @

1.0

0%

S

T

2

.

1

6

8

L

F

1

5

"

R

C

P

@

1

.

5

4

%

ST 1.1 49 LF

24" RCP @ 1.02%

ST 4.1 15 LF

15" RCP @ 6.97%

ST INT 2.1 (48" - SW-502)

RIM = 41.32'

IE = 36.00 ST 2.2

IE = 36.50 ST 6.1

IE = 35.90 ST 2.1

ST 6.1 138 LF 10" PVC

@ 1.00% MIN SLOPE

6" PVC STORM SEWER

@ 1.00% MIN SLOPE

10" CLEANOUT

RIM = 42.07

IE = 37.38

30 LF NEENAH R-3599

VANE DRAIN W/ 12" PVC

@ 1.35% SLOPE

219 LF 6" PVC SANITARY

SERVICE @ 1.00% SLOPE

CONNECT TO EXISTING SANITARY SEWER

IE = 33.75± (FIELD VERIFY)

4" GREASE WASTE

LINE CONNECTION

IE = 36.24

SEE PLUMBING PLAN

FOR CONTINUATION

4" SANITARY SEWER

CONNECTION

IE = 36.16

SEE PLUMBING PLAN

FOR CONTINUATION

4,000 GALLON GREASE INTERCEPTOR

RIM (N) = 42.44

RIM (S) = 42.61

IE = 36.11 (S)

IE = 35.94 (N)

SEE PLUMBING PLAN FOR DETAILS

13 LF 4" PVC

@ 1.00% SLOPE

45° BENDS

WYE

IE = 35.81

45° BEND

35 LF 4" PVC

@ 1.00% SLOPE

6" SANITARY SERVICE

IE = 36.00

SEE PLUMBING PLAN

FOR CONTINUATION

CONNECT TO EXISTING SANITARY SEWER

IE = 34.60± (FIELD VERIFY)

CONNECT TO STORM CULVERT

IE = 31.00 ST 1.1

75 LF 6" PVC SANITARY

SERVICE @ 1.65% SLOPE

HY-VEE STORE

6,150 GROSS SF BUILDING

FFE: 43.50

HY-VEE CARWASH

FFE: 42.00

4" 22.5° BEND

4" 45° BEND

2" 45° BEND (QTY 2)

CONNECT TO EXISTING WATER MAIN

WITH TAPPING SLEEVE AND VALVE

308 LF OF 4" DIP

WATER SERVICE

CONNECT TO STORM CULVERT

IE = 33.00 ST 4.1

4"X4"X4" TEE WITH

4"X2" REDUCER

4" FIRE SERVICE,

SEE PLUMBING PLANS

FOR CONTINUATION

2" DOMESTIC WATER SERVICE,

SEE PLUMBING PLANS

FOR CONTINUATION

STAGING AREA

(COORDINATE

WITH OWNER)

INLET PROTECTION (TYP.)

INLET PROTECTION (TYP.)

TEMPORARY CONSTRUCTION

ENTRANCE

SILT FENCE (TYP)

45

44

4

3

4

2

4

2

4

0

4

1

40

39

4

0

4

1

4

2

4

3

4

2

41

40

4

1

40

4

1

4

2

41

4

2

4

1

40

4

0

4

0

4

2

41

4

0

62 LF OF 4" DIP

WATER SERVICE

65.00'

B-B

ST 2.3 15 LF

15" RCP @ 6.88%

ST INT 5.1 (SW-501)

RIM = 41.14'

IE = 34.00 ST 2.3

ST INT 2.1 (48" - SW-502)

RIM = 41.32'

IE = 36.00 ST 2.2

IE = 35.90 ST 2.1

CONNECT TO STORM CULVERT

IE = 33.00 ST 4.1

COORDINATE RELOCATION OF

EXISTING SANITARY SERVICE AND

WATER SERVICE WITH ADJACENT

LANDOWNER AS REQUIRED FOR

CONSTRUCTION

ST INT 6.1 (SW-501)

T/C = 41.38

IE = 35.50 ST 6.1

ST 6.1 74 LF

12 '' RCP @ 1.35%

ST INT 1.4 (SW-503)

T/C = 41.41

IE = 34.18 ST 1.5

IE = 34.08 ST 1.4

4

1

4

1

4

2

4

2

4

1

4

2

4

1

4

2

4

2

4

3

41

42

43

4

1

4

2

3

9

4

0

4

1

4

1

42 41

4

0

4

A B D E FC

3

2

1

A B D E FC

4

3

2

1

Iow

a | Illinois | Indiana

PR

ELIM

IN

AR

Y

- N

OT

F

OR

CO

NS

TR

UC

TIO

N

4125 W

estow

n P

kw

y, S

uite 100 | W

est D

es M

oines, Iow

a 50266

515.223.8104 | w

ww

.shive-hattery.com

N O

R

T

H

R

1-800-292-8989

THE UTILITIES AS SHOWN ON THIS DRAWING WERE DEVELOPED FROM

THE INFORMATION AVAILABLE, THIS IS NOT IMPLIED NOR INTENDED TO

BE THE COMPLETE INVENTORY OF UTILITIES IN THIS AREA. IT IS THE

CLIENTS/CONTRACTORS RESPONSIBILITY TO VERIFY THE LOCATION

OF ALL UTILITIES (WHETHER SHOWN OR NOT) AND PROTECT SAID

UTILITIES FROM ANY DAMAGE.

0 20'

GRAPHIC SCALE

40' 60'

DR

AW

N:

AP

PR

OV

ED

:

IS

SU

ED

F

OR

:

DA

TE

:

FIE

LD

B

OO

K:

PR

OJE

CT

N

O:

CLIE

NT

N

O:

Printed:

3 OF 3

GR

AD

IN

G &

U

TILIT

Y

PLA

N

TL

S

KA

S

CIT

Y A

PP

RO

VA

L

20

20

-0

6-0

4

41

85

16

0

---

---

PR

ELIM

IN

AR

Y P

LA

T O

F

LIN

NW

ILL H

Y-V

EE

HY

VE

E, IN

C.

210 G

RA

ND

A

VE

NU

E | W

ES

T D

ES

M

OIN

ES

, IO

WA

50265

P:\P

ro

je

cts\D

M\4

18

51

60

\D

elive

ra

ble

s\D

ra

win

gs\1

_C

ivil\P

re

lim

in

ary P

la

t\0

3 U

tility &

G

ra

din

g P

la

n.d

wg

6/4

/2

02

0 1

:2

7:5

0 P

M

1. BEST MANAGEMENT PRACTICES (BMP'S) AND CONTROLS SHALL CONFORM TO FEDERAL,

STATE, OR LOCAL REQUIREMENTS OR MANUAL OF PRACTICE, AS APPLICABLE. CONTRACTOR

SHALL IMPLEMENT ADDITIONAL CONTROLS AS DIRECTED BY PERMITTING AGENCY OR

OWNER.

2. CONTRACTOR SHALL MINIMIZE CLEARING TO THE MAXIMUM EXTENT PRACTICAL.

3.ALL WASH WATER (CONCRETE TRUCKS, VEHICLE CLEANING, EQUIPMENT CLEANING, ETC.)

SHALL BE DETAINED AND PROPERLY TREATED OR DISPOSED.

4. SUFFICIENT OIL AND GREASE ABSORBING MATERIALS SHALL BE MAINTAINED ON SITE OR

READILY AVAILABLE TO CONTAIN AND CLEAN-UP FUEL OR CHEMICAL SPILLS AND LEAKS.

5. DUST ON THE SITE SHALL BE CONTROLLED. THE USE OF MOTOR OILS AND OTHER

PETROLEUM BASED OR TOXIC LIQUIDS FOR DUST SUPPRESSION OPERATIONS IS PROHIBITED.

6.RUBBISH, TRASH, GARBAGE, LITTER, OR OTHER SUCH MATERIALS SHALL BE DEPOSITED INTO

SEALED CONTAINERS. MATERIALS SHALL BE PREVENTED FROM LEAVING THE PREMISES

THROUGH THE ACTION OF WIND OR STORM WATER DISCHARGE INTO DRAINAGE DITCHES OR

WATERS OF THE STATE.

7. DISTURBED PORTIONS OF THE SITE WHERE CONSTRUCTION ACTIVITY HAS PERMANENTLY

STOPPED SHALL BE SEEDED. THESE AREAS SHALL BE SEEDED NO LATER THAN 14 DAYS

AFTER THE LAST CONSTRUCTION ACTIVITY OCCURRING IN THESE AREAS.

8. ALL MATERIALS SPILLED, DROPPED, WASHED, OR TRACKED FROM VEHICLES ONTO

ROADWAYS OR INTO STORM DRAINS MUST BE REMOVED IMMEDIATELY.

9. CONTRACTORS OR SUBCONTRACTORS WILL BE RESPONSIBLE FOR REMOVING SEDIMENT

THAT MAY HAVE COLLECTED IN THE STORM SEWER DRAINAGE SYSTEMS IN CONJUNCTION

WITH THE STABILIZATION OF THE SITE.

10. SLOPES SHALL BE LEFT IN A ROUGHENED CONDITION DURING THE GRADING PHASE TO

REDUCE RUNOFF VELOCITIES AND EROSION.

11. THE CONTRACTOR SHALL BE RESPONSIBLE FOR ADJUSTING THE EROSION CONTROL

MEASURES (SILT FENCES, WATTLES, INLET PROTECTION, ETC.) TO PREVENT EROSION.

12. ALL STORM SEWER INTAKES THAT RECEIVE STORMWATER RUNOFF FROM DISTURBED AREAS

SHALL BE PROVIDED WITH A FILTER SACK.

13. CONTRACTOR SHALL BE RESPONSIBLE FOR INSTALLATION, PERIODIC CHECKING AND

REINSTALLATION OF EROSION AND SEDIMENTATION CONTROL MEASURES.

GRADING AND EROSION CONTROL NOTES:

1. ALL WATER WORK, PUBLIC OR PRIVATE, SHALL BE DONE IN ACCORDANCE WITH WEST DES

MOINES WATER WORKS STANDARD SPECIFICATIONS.

2. CONTRACTOR SHALL NOTIFY WEST DES MOINES WATER WORKS AT LEAST ONE WEEK PRIOR

TO BUILDING CONSTRUCTION.

3. THE GENERAL CONTRACTOR SHALL BE RESPONSIBLE FOR THE COORDINATION OF WORK OF

ALL SUBCONTRACTOR(S) INVOLVED IN THE PROJECT.

4. CONTACT BUILDING INSPECTION (515-222-3630) A MINIMUM OF 24 HOURS IN ADVANCE FOR

PRIVATE UTILITY INSTALLATION INSPECTIONS.

5. THE GENERAL CONTRACTOR SHALL BE RESPONSIBLE FOR COMPLIANCE WITH THE WEST DES

MOINES WATER WORKS AND THE CITY'S CROSS CONNECTION CONTROL/CONTAINMENT

PROVISION.

6. THE GENERAL CONTRACTOR SHALL BE RESPONSIBLE FOR THE PROPER INSTALLATION OF AN

APPROVED BACKFLOW PREVENTION ASSEMBLY(IES) FOR CONTAINMENT IN ALL NEW

CONSTRUCTION. BACKFLOW PREVENTION TO BE INSTALLED PER CITY ORDINANCE 1297,

54-1998. CONTRACTOR SHALL NOTIFY WEST DES MOINES WATER WORKS, RALPH RENTERIA,

ENGINEERING TECHNICIAN (515-222-3465) A MINIMUM OF 24 HOURS AFTER INSTALLATION AND

TESTING OF ALL BACKFLOW DEVICES TO SCHEDULE FINAL INSPECTION.

7. ALL EXISTING WATER SERVICE STUBS THAT WILL NOT BE UTILIZED AFTER CONSTRUCTION

SHALL BE ABANDONED AT THE WATER MAIN. COORDINATE WITH WDMWW DISTRIBUTION

STAFF FOR ANY NECESSARY WATER SHUTDOWNS NEEDED TO COMPLETE THE WORK AT

515.222.3465.

8. ALL CROSSINGS WITH EXISTING UTILITIES SHALL BE POTHOLED AT THE CRITICAL CROSSING

LOCATION TO VERIFY MINIMUM CLEARANCE IS ACHIEVED.

GENERAL NOTES

LOT 1

LOT A

370 LF 4" DIP WATER SERVICE

16 LF 2" DIP WATER SERVICE

2 EA 4" TAPPING SLEEVE AND VALVE

1 EA 4"X4"X4" TEE

1 EA 4"X2" REDUCER

2 EA WATER SERVICE VALVES

2 EA 22.5° BEND

3 EA 45° BEND

WATER MAIN QUANTITIES (PRIVATE)

GRAND AVE (PUBLIC)

120' ROW

STAGING AREA, CONSTRUCTION ENTRANCE,

SILT FENCE & EXISTING INLET PROTECTION: PRIOR TO GRADING

INLET PROTECTION: AFTER UTILITY INSTALLATION

EROSION CONTROL INSTALLATION SCHEDULE

AN NPDES GENERAL PERMIT NO. 2 AND ASSOCIATED STORMWATER POLLUTION

PREVENTION PLAN SHALL BE PROVIDED TO THE CITY OF WEST DES MOINES

PRIOR TO ANY CONSTRUCTION ACTIVITIES OR LAND DISTURBANCE ON THE SITE.

AutoCAD SHX Text
IOWA ONE CALL
AutoCAD SHX Text
CALL 2 WORKING DAYS
AutoCAD SHX Text
BEFORE YOU DIG !