8
IST 6th Call IST 6th Call KAIV Subsystems and KAIV Subsystems and Microsystems Microsystems European Commission DG INFSO E5 Brussels, January 16th, 2001 [email protected]

IST 6th Call KAIV Subsystems and Microsystems

Embed Size (px)

DESCRIPTION

IST 6th Call KAIV Subsystems and Microsystems. European Commission DG INFSO E5 Brussels, January 16th, 2001 [email protected]. Subsystems and Microsystems. - PowerPoint PPT Presentation

Citation preview

Page 1: IST 6th Call KAIV Subsystems and Microsystems

IST 6th CallIST 6th CallKAIV Subsystems and MicrosystemsKAIV Subsystems and Microsystems

European CommissionDG INFSO E5

Brussels, January 16th, 2001

[email protected]

Page 2: IST 6th Call KAIV Subsystems and Microsystems

Subsystems and MicrosystemsSubsystems and Microsystems

SubsystemSubsystem: : Multi-component assemblyMulti-component assembly with with well-defined functionality and interfaces. It well-defined functionality and interfaces. It includes the basic hardware and the includes the basic hardware and the associated software.associated software.

MicrosystemMicrosystem: : Intelligent miniaturised system Intelligent miniaturised system that combines that combines sensing and/or actuatingsensing and/or actuating with with processing functions.processing functions.

Page 3: IST 6th Call KAIV Subsystems and Microsystems

Types of ActionTypes of ActionRTD RTD Take-up measuresTake-up measures

– TrialsTrials– Best practiceBest practice– Assessments Assessments – Access ActionsAccess Actions

Accompanying measures and Thematic Accompanying measures and Thematic networksnetworks

Page 4: IST 6th Call KAIV Subsystems and Microsystems

IST 6th Call IST 6th Call KAIV Subsystems and MicrosystemsKAIV Subsystems and Microsystems

– IST 2001 - IV.7.2IST 2001 - IV.7.2 MicrosystemsMicrosystems

– IST 2001 - IV.7.3IST 2001 - IV.7.3 Subsystems and Microsystems - Subsystems and Microsystems - take-up measurestake-up measures

– IST 2001 - VIII.1.1 to VIII.1.9 Support activitiesIST 2001 - VIII.1.1 to VIII.1.9 Support activities

– CPAs (1 and 5)CPAs (1 and 5)

Page 5: IST 6th Call KAIV Subsystems and Microsystems

Take-up measuresTake-up measures Trials: Trials:

– adaptation and introduction of leading edge technologies in new adaptation and introduction of leading edge technologies in new products and processes and new design technologies or products and processes and new design technologies or methods in existing design flowsmethods in existing design flows

Best practice actions:Best practice actions:– take-up (first use) of mature and well established but insufficiently take-up (first use) of mature and well established but insufficiently

deployed methods & technologies to enhance existing products deployed methods & technologies to enhance existing products and systemsand systems

Assessments:Assessments:– evaluation of advanced material and prototype equipmentevaluation of advanced material and prototype equipment

Access:Access:– facilitate access to innovative industrially offered technologies facilitate access to innovative industrially offered technologies

and services, competence and applied researchand services, competence and applied research

Page 6: IST 6th Call KAIV Subsystems and Microsystems

Bringing R&D into UseBringing R&D into Use

R&D:Feasibility of technologyProof of concepts

R&D:Enhancement of capabilitiesIndustrialisation

Best Practice: First Use

Access Actions:Foundries & Design centresR&D multidisciplinary competence

Trials:

Optimisation and validation

Assessments: On-site analysis

Page 7: IST 6th Call KAIV Subsystems and Microsystems

Call 1-4 Results MST- and SubsystemsCall 1-4 Results MST- and Subsystems

RTDRTD Subsystems Subsystems 4646 1414 131.0131.0 30.50 30.50 Microsystems Microsystems 4646 1313 87.5 87.5 22.14 22.14

Access actionsAccess actions 4545 2020 48.2 48.2 12.20 12.20 Trials & first Trials & first

usersusers 2929 1313 13.99 13.99 4.03 4.03 EquipmentEquipment

assessmentassessment 7 7 5 5 6.15 4.16 6.15 4.16 AccompanyingAccompanying 5 5 3 3 3.35 3.35 1.29 1.29

measuresmeasures

TOTALTOTAL 178178 68 68 290.19290.19 74.32 74.32

(without CPAs, CRAFT, SME-EA)(without CPAs, CRAFT, SME-EA)

SubmittedSubmitted acceptedaccepted fundingfunding fundingfundingfor fundingfor funding request MEurorequest MEuro accept. MEuroaccept. MEuro

Page 8: IST 6th Call KAIV Subsystems and Microsystems

Europractice MST - structureEuropractice MST - structure

market, CAD

packaging,test

prototyping

additional processes

Network of subcontractors

and additional partners

Manufacturing cluster

• bulk• surface• thin film• SOI•optics + some other processes• magnetic

Competence Centres

• biomedical• micro-optics & MOEMS• microfluidics• physical measurement systems• microactuators• micro-chemical• medical instruments

Researchinfrastructure

network

• Contracted applied research• Concept, feasibility studies

Design

groups

Outside manufacturing

(IMPACT)