47
Island Economic Development Island Economic Development Implementation through form-based Implementation through form-based codes codes Town of South Padre Island Town of South Padre Island Scott Polikov September 1, 2009

Island Economic Development Implementation through form-based codes

  • Upload
    landen

  • View
    20

  • Download
    0

Embed Size (px)

DESCRIPTION

Island Economic Development Implementation through form-based codes. Town of South Padre Island Scott Polikov September 1, 2009. Form-based coding is not new. Great walkable places were once developed under private form codes. - PowerPoint PPT Presentation

Citation preview

Page 1: Island Economic Development  Implementation through form-based codes

Island Economic Development Island Economic Development Implementation through form-based Implementation through form-based

codescodes

Town of South Padre IslandTown of South Padre IslandScott Polikov

September 1, 2009

Page 2: Island Economic Development  Implementation through form-based codes

Form-based coding is not new. Great walkable places were once developed under private form codes.

Page 3: Island Economic Development  Implementation through form-based codes

Today, public form-based codes can create a de facto master developer context across multiple ownership.

Leander, TexasLeander, Texas

Page 4: Island Economic Development  Implementation through form-based codes
Page 5: Island Economic Development  Implementation through form-based codes

Placemaking and economic development

are becoming inextricably interdependent

Page 6: Island Economic Development  Implementation through form-based codes

Durability of value- lifecycle analysis

Durability of Value

Page 7: Island Economic Development  Implementation through form-based codes

The Opportunities

• Implement the vision for a walkable Padre Boulevard and Entertainment District

• Attract more high quality, pedestrian-oriented, mixed use development

• Predictability of development outcomes

• Protect public investments in infrastructure (existing and future)

• Attract and sustain private investment

Page 8: Island Economic Development  Implementation through form-based codes

Form-Based Codes

A method of regulating development to achieve a specific urban form. Form-based codes create a predictable public realm primarily by controlling physical form, with a lesser focus on land use, through city or county regulations.

Page 9: Island Economic Development  Implementation through form-based codes

Form-Based Codes

Page 10: Island Economic Development  Implementation through form-based codes
Page 11: Island Economic Development  Implementation through form-based codes

Assessed the built environmentThe Corridor was initially analyzed for redevelopment opportunity.

Page 12: Island Economic Development  Implementation through form-based codes

A Building-Scale Master Plan was developed.

Page 13: Island Economic Development  Implementation through form-based codes

Main Street TodayMain Street Before

Page 14: Island Economic Development  Implementation through form-based codes

Main Street After

Page 15: Island Economic Development  Implementation through form-based codes

The Master Plan then informed a new Main

Street design

Page 16: Island Economic Development  Implementation through form-based codes

A Regulating Plan was then prepared delineating character zones.

Page 17: Island Economic Development  Implementation through form-based codes

The new development standards are organized by character zone

Page 18: Island Economic Development  Implementation through form-based codes

DowntownDuncanville District

Core MainStreet FrontageStandards Core Main Street

Development Standards

Page 19: Island Economic Development  Implementation through form-based codes

Regulating Plan based on City’s GIS data

Street Redesign based on survey

The Regulating Plan sets out the schematic design for the final redesign and reconstruction of Main Street

Page 20: Island Economic Development  Implementation through form-based codes

Fiscal Analysis to Support Financing of Main Street Reconstruction

5-Year PhasingPhase 1 Phase 2 Phase 3 Phase 4

New retail in mixed use (sqf)

36,000 51,250 230,250 46,500

New retail in live/work (sqf) 23,400 14,400 0 0

Town homes (units) 109 0 0 0

Live/work (units) 39 20 0 0

Office (sqf) 28,625 25,625 111,875 15,125

New lofts (units) 115 96 132 65

Page 21: Island Economic Development  Implementation through form-based codes

Fiscal Impact

Existing Value:

$48,206,147

Property

Value

Property Tax

Revenue

Retail

Sales

Sales Tax

Revenue

Total Tax

Revenue

Existing + Phase 1 $101,484,897 $370,820 $11,880,000 $237,600 $608,420

Existing + Phase 1-2 $132,156,147 $584,292 $25,010,000 $500,200 $1,084,492

Existing + Phase 1-3 $200,634,897 $1,060,904 $71,060,000 $1,421,200 $2,482,104

Existing + Phase 1-4 $218,328,647 $1,184,053 $80,360,000 $1,607,200 $2,791,253

The initiative offers the potential of four times current tax base, with total

additional revenue impact approaching $3 million per year at buildout

Page 22: Island Economic Development  Implementation through form-based codes

New town homes are under construction bringing urban living back to Main Street

Page 23: Island Economic Development  Implementation through form-based codes

The same approach can now be taken on State HighwaysThe same approach can now be taken on State Highways(Padre Boulevard – Park Road 100)(Padre Boulevard – Park Road 100)

Page 24: Island Economic Development  Implementation through form-based codes

Downtown Seoul before CSS

Page 25: Island Economic Development  Implementation through form-based codes

Same corridor after CSS

Page 26: Island Economic Development  Implementation through form-based codes

Same corridor after CSS

Page 27: Island Economic Development  Implementation through form-based codes

A happy Mayor, who became President

Page 28: Island Economic Development  Implementation through form-based codes

TxDOT

Polikov appointed by TxDOT to co-chair the Committee along with Mark Marek,

TxDOT’s Design Division Dir. and former co-author of the AASHTO “Green” Book.

The Committee concludes that urbanism is the key.

Page 29: Island Economic Development  Implementation through form-based codes

What is urbanism?

“…places that encourage unplanned contact with other people.”

-Milosav Cekic Gateway Planning Group

Page 30: Island Economic Development  Implementation through form-based codes
Page 31: Island Economic Development  Implementation through form-based codes

The Current Process

1. What is future mobility need for a particular roadway corridor?

2. What functional classification (how many more lanes) accommodates this need?

3. Is there money to pay for the project?

4. Hold public meetings per NEPA (“design – defend”)

5. Final design, letting and construction

Page 32: Island Economic Development  Implementation through form-based codes

The New Process

Revised TxDOT Project Development Process Manual[revisions in italics]

Subsection 1000

“For urban projects, particularly capacity improvements, the need for a project may be determined from traffic modeling of future travel demands as well as from the need for a sustainable street and transit network associated with the potential project in the context of desired land uses and urban design established in regional plans …neighborhood plans, other local plans …public-private partnerships or economic development plans.”

Subsection 1330

The Institute of Transportation Engineers (ITE) and the Congress for the New Urbanism (CNU) have developed … context sensitive design [processes and criteria] for streets, intersections, and networks…. Those resources … shall provide guidance for the CSS process.

Page 33: Island Economic Development  Implementation through form-based codes

A partnership of the ITE and the Congress for the New Urbanism

Page 34: Island Economic Development  Implementation through form-based codes

Slides courtesy of Jim Daisa of Kimley Horn

Page 35: Island Economic Development  Implementation through form-based codes

Downtown Owensboro InitiativeDowntown Owensboro Initiative(Building on a history of tourism)

Page 36: Island Economic Development  Implementation through form-based codes

The starting point- the cultural arts, festivals, a great history of tourism

Page 37: Island Economic Development  Implementation through form-based codes

17 Acre “Executive Inn” site—an opportunity

Page 38: Island Economic Development  Implementation through form-based codes

West Downtown Development Options

“Executive Inn” Site Development Options

Page 39: Island Economic Development  Implementation through form-based codes

A

B

D

E

F

GC

Catalytic Public Investments

Page 40: Island Economic Development  Implementation through form-based codes

Package of Catalyst ProjectsProject Cost ($2008)

“Finish-Out” of Smothers Park $15.0 million

Market Square Public Plaza $4.8 million

Street Improvements $12.9 million

Convention Center (@ $350 per SF Gross) $21.0 million

Parking Garage ($15K per space) $7.5 million

Arts Academy $5.0 million

Sub-Total $66.2 million

20% Contingency $13.2 million

TOTAL $79.4 million

A C

B

D

F

F

G

H

Catalytic Public Investment

Page 41: Island Economic Development  Implementation through form-based codes

Current Conditions

Page 42: Island Economic Development  Implementation through form-based codes

Implemented Plan

Page 43: Island Economic Development  Implementation through form-based codes

Existing Zoning

Page 44: Island Economic Development  Implementation through form-based codes

FBC Character Zones

Historic Core

Downtown Core

Riverfront Core

Riverfront Edge

Downtown Transition

Frederica Blvd. Corridor

Downtown Campus

Neighborhood

Page 45: Island Economic Development  Implementation through form-based codes

Form & Development Standards by Character Zone

Page 46: Island Economic Development  Implementation through form-based codes

Overall Design Standards

Page 47: Island Economic Development  Implementation through form-based codes

www.gatewayplanning.com

An opportunity to create SPI’s Bold Move