ISETT-ISSA Learnership Development Project. Presentation to the ISETT SETA Board 10th May 2002. Presented by Neville Nicholas ISETT SETA Project Manager. Agenda. Background on ISSA Project Objective Specific Outcomes Summary Project Overview Project Stakeholders & Role-players - PowerPoint PPT Presentation
Citation preview
ISETT-ISSA
Learnership Development Project
Presented byNeville Nicholas
ISETT SETA Project Manager
Presentation to the ISETT SETA Board
10th May 2002
Agenda
• Background on ISSA• Project Objective• Specific Outcomes• Summary Project Overview• Project Stakeholders & Role-players• Overview of the Project Plan
The Project In a Nutshell
• Three year duration
• Transforming 4 ISSA programmes to learnerships
• Managed by ISETT SETA - the Executing Agency
• Funded the the NSF
Background on ISSA• Institute for Satellite and Software Applications
• ISSA is situated in the space facilities built near Grabouw in the 1980s, at Houwteq in the Western Cape area
• The facility was built to house systems for the design, programme management, integration and testing of small satellites and launch vehicles
• ISSA started operating as a training institute from 1998, created and operated by (DoC)
Project Objective• To produce human resource capabilities for the SA
ICT Sector, through the transferable means of learnerships,
• Addressing the needs of PDIs.
• To be achieved through transforming existing programmes at ISSA into learnerships.
• Additional indirect contributions to the ICT Sector and the learnership development process, for example development of unit standards, some of which can be employed in other learnerships.
Specific Outcomes • The development of four learnerships
• To have all (530) graduates placed into SMME or Workplace Provider establishments over the three-year course of the project
• To achieve at least an 80% satisfaction rating from the establishments in which learners are placed
• To achieve at least a 50% learner sponsorship (while the learner is undergoing the Training Provider component) from the ICT Sector by the end of this project
Specific Outcomes (cont.)
• To gain the interest of at least two other universities in South Africa to adopt these learnerships
• To strive for 10% of graduates entering into the R&D/SMME environment
• To establish a graduate tracking process
Project Stakeholders & Role-playersDoL/NSFFunder
DoCInitiator
ISSATraining Provider/
Implementor
ISETT SETAExecuting Agency
Industry (IISA)Skills Demand SectorWorkplace Providers
Industry (SGBs)Skills/Learnership
Definition
R&D Support Providers
Bandwidth BarnInnovation Hub
Other GovtDACST, DTI
CHEFinal accrediting body
Project Consultative Committee
Reference Group
Overview of Project Plan
Stage 1Project Initiation &
Operation
Stage 2Generic
Learnership Processes &
Systems
Stage 3Learnership
Development & Implementation
Stage 4Project
Management
Develop Project Plan & ProposalProject Office Set-up & Operational
DesignDevelopment & Execution of
Communications PlanFormation of Project Consultative
Committee (PCC)
PlanningFinanceReportingQuality Management System
Overview of Project Plan
• Stage 2: Generic Learnership Processes & Systems
– General Administration– Develop Assessment Policies– Develop Agreements– Learnership Databases– Learnership Management & Reporting Processes– Learner Placement Processes & Systems– Learner Tracking Processes & Systems– Develop ISSA Practices, Policies, & Procedures (as a training
provider)
Overview of Project Plan• Stage 3: Learnership Development & Implementation
– Learnership Scoping Document
– Learnership Stakeholder Participation
– Learnership Definition
– Learnership Unit Standard Development
– Learnership Registration
– Assess Demand for the Learnership
– Set Up for & monitor Training Provider
– Set Up for & monitor SMMEs
– Set Up for & monitor Lecturers
– Set Up for & monitor Learners
– Set Up for & monitor Workplace Providers
Many thanks for your time and interest