ISETT-ISSA
Learnership Development Project
Presented byNeville Nicholas
ISETT SETA Project Manager
Presentation to the ISETT SETA Board
10th May 2002
Agenda
• Background on ISSA• Project Objective• Specific Outcomes• Summary Project Overview• Project Stakeholders & Role-players• Overview of the Project Plan
The Project In a Nutshell
• Three year duration
• Transforming 4 ISSA programmes to learnerships
• Managed by ISETT SETA - the Executing Agency
• Funded the the NSF
Background on ISSA• Institute for Satellite and Software Applications
• ISSA is situated in the space facilities built near Grabouw in the 1980s, at Houwteq in the Western Cape area
• The facility was built to house systems for the design, programme management, integration and testing of small satellites and launch vehicles
• ISSA started operating as a training institute from 1998, created and operated by (DoC)
Project Objective• To produce human resource capabilities for the SA
ICT Sector, through the transferable means of learnerships,
• Addressing the needs of PDIs.
• To be achieved through transforming existing programmes at ISSA into learnerships.
• Additional indirect contributions to the ICT Sector and the learnership development process, for example development of unit standards, some of which can be employed in other learnerships.
Specific Outcomes • The development of four learnerships
• To have all (530) graduates placed into SMME or Workplace Provider establishments over the three-year course of the project
• To achieve at least an 80% satisfaction rating from the establishments in which learners are placed
• To achieve at least a 50% learner sponsorship (while the learner is undergoing the Training Provider component) from the ICT Sector by the end of this project
Specific Outcomes (cont.)
• To gain the interest of at least two other universities in South Africa to adopt these learnerships
• To strive for 10% of graduates entering into the R&D/SMME environment
• To establish a graduate tracking process
Project Stakeholders & Role-playersDoL/NSFFunder
DoCInitiator
ISSATraining Provider/
Implementor
ISETT SETAExecuting Agency
Industry (IISA)Skills Demand SectorWorkplace Providers
Industry (SGBs)Skills/Learnership
Definition
R&D Support Providers
Bandwidth BarnInnovation Hub
Other GovtDACST, DTI
CHEFinal accrediting body
Project Consultative Committee
Reference Group
Overview of Project Plan
Stage 1Project Initiation &
Operation
Stage 2Generic
Learnership Processes &
Systems
Stage 3Learnership
Development & Implementation
Stage 4Project
Management
Develop Project Plan & ProposalProject Office Set-up & Operational
DesignDevelopment & Execution of
Communications PlanFormation of Project Consultative
Committee (PCC)
PlanningFinanceReportingQuality Management System
Overview of Project Plan
• Stage 2: Generic Learnership Processes & Systems
– General Administration– Develop Assessment Policies– Develop Agreements– Learnership Databases– Learnership Management & Reporting Processes– Learner Placement Processes & Systems– Learner Tracking Processes & Systems– Develop ISSA Practices, Policies, & Procedures (as a training
provider)
Overview of Project Plan• Stage 3: Learnership Development & Implementation
– Learnership Scoping Document
– Learnership Stakeholder Participation
– Learnership Definition
– Learnership Unit Standard Development
– Learnership Registration
– Assess Demand for the Learnership
– Set Up for & monitor Training Provider
– Set Up for & monitor SMMEs
– Set Up for & monitor Lecturers
– Set Up for & monitor Learners
– Set Up for & monitor Workplace Providers
Many thanks for your time and interest