ISE4 Integrated Demo First Draft April 7, 2005

ISE4 Integrated Demo

Embed Size (px)

DESCRIPTION

ISE4 Integrated Demo. First Draft April 7, 2005. ISE4 Integrated Demo. Arrangement Requirements (LEAPs). Ship check Project?. Initial Arrangement (Tribon). Updated Initial Arrangement (Sener). Detailed Structural Design (Intergraph). Initial Electrical System Design (KSSI). - PowerPoint PPT Presentation

Citation preview

Page 1: ISE4 Integrated Demo

ISE4 Integrated Demo

First Draft

April 7, 2005

Page 2: ISE4 Integrated Demo

April 7, 2005

ISE4 Integrated Demo 2

ISE4 Integrated Demo

ArrangementRequirements

(LEAPs)Initial

Arrangement(Tribon) Updated Initial

Arrangement(Sener) Initial Electrical

System Design(KSSI)

Ship checkProject?

Detailed StructuralDesign

(Intergraph) FEM Analysis(EB)

Structural DesignFeedback

(Intergraph) NeutralManufacturing

(ISPE) Yard SpecificManufacturing

(EB & Intergraph )

Page 3: ISE4 Integrated Demo

April 7, 2005

ISE4 Integrated Demo 3

ISE4 Demo Scenario• ASSET mission and compartment requirements generated in LEAPS (P21)

• Create initial compartment and equipment arrangement (Tribon XML)– Include importing vendor data for main engine - CPC + AP 203– Incorporate Atlantec SBIR demonstration to import equipment?

• Update arrangement (Sener – P21)– Structural update required which impacts tank size (mission requirement)– Or incorporate Ship Check results to drive structural change

• Demonstrate Initial Electrical System design (KSSI)– Electronic system in Pilot House

• Transfer arrangements to detailed design (Intergraph)

• Extract structure for analysis (Intergraph)

• FEM analysis of Engine Room (EB)

• Feedback from Analysis (Ingr)

• Extract Structure for Manufacturing (Ingr)

• Develop neutral structural manufacturing model (ISPE)

• Generate yard-specific manufacturing data (EB, Ingr)– Compare EB and Avondale manufacturing outputs

Page 4: ISE4 Integrated Demo

April 7, 2005

ISE4 Integrated Demo 4

Demo Scenario Issues

• Better way to integrate Electrical into demo?

• Reason that arrangements are updated – Ship Check doesn’t fit with Initial Arrangement scenario

• If LEAPS does not provide initial ASSET data– Could provide reason arrangements are updated – Claim Navy Analysis programs determined xxx

Page 5: ISE4 Integrated Demo

April 7, 2005

ISE4 Integrated Demo 5

Eng Analysis Demo Scenario

AP 203P21

Shipyard(Add to CPC, CAD)

Vendor

Equip arrangement

Ship ProductModel(ISDP)

AP 227P28

Equip arrangement

AP 215P28

Compartmentation

AP 216P21

AP 218P28

AP 209P28

CPCCAD Parts

Analysis

(COG, weight,location)

AP 209 /218P28 GUID, doc URL

Feedback

Page 6: ISE4 Integrated Demo

April 7, 2005

ISE4 Integrated Demo 6

Notional Mediators RequiredAP ARM -> AIM AIM-ARM ARM-> 209 AIM

P21

216 Eng Analysis Eng Analysis

215 Arrangements Arrangements

218 Eng Analysis

227 Eng Analysis

209 Eng Analysis ??

Page 7: ISE4 Integrated Demo

April 7, 2005

ISE4 Integrated Demo 7

Mediators Required

209 218 216 215227 203/PLM

ARM

AIM

P28 P28

P28

P28 P28 P28

P21 P21 P21

P28

P21

P28