53
Irvine Ranch Water District Michelson Water Recycling Plant Phase 2 Expansion SCAP Water Quality Committee Meeting Randy Lee, P.E. , Assistant Director of Recycling Operations September 23, 2014

Irvine Ranch Water District Michelson Water Recycling Plant Phase 2 Expansion

Embed Size (px)

DESCRIPTION

Irvine Ranch Water District Michelson Water Recycling Plant Phase 2 Expansion. SCAP Water Quality Committee Meeting. Randy Lee, P.E. , Assistant Director of Recycling Operations September 23, 2014. Presentation Overview. IRWD Background MWRP Existing Processes Overview - PowerPoint PPT Presentation

Citation preview

Page 1: Irvine Ranch Water District Michelson Water Recycling Plant Phase 2 Expansion

Irvine Ranch Water DistrictMichelson Water Recycling PlantPhase 2 Expansion

SCAP Water Quality Committee Meeting

Randy Lee, P.E. , Assistant Director of Recycling Operations

September 23, 2014

Page 2: Irvine Ranch Water District Michelson Water Recycling Plant Phase 2 Expansion

2

1. IRWD Background

2. MWRP Existing Processes Overview

3. MWRP Phase II Expansion

4. Biosolids Project Status Update

Presentation Overview

Page 3: Irvine Ranch Water District Michelson Water Recycling Plant Phase 2 Expansion

3

IRWD Serves 20% of Orange County

Page 4: Irvine Ranch Water District Michelson Water Recycling Plant Phase 2 Expansion

4

Water, Wastewater, Water Recycling, and Urban Runoff

California Special District governed by a publicly-elected Board

IRWD customer base:• Residential population: 330,000• Daytime population: >500,000• Service connections: 102,380

IRWD service area:• 181 square miles (20% of Orange County)• All or part of six cities and unincorporated county:

About the Irvine Ranch Water District

IrvineTustin

Orange

Lake ForestNewport Beach

Costa Mesa

Page 5: Irvine Ranch Water District Michelson Water Recycling Plant Phase 2 Expansion

5

IRWD Services Drinking Water

Sewage Collection

Recycled Water

Urban Runoff Treatment

Page 6: Irvine Ranch Water District Michelson Water Recycling Plant Phase 2 Expansion

Phase 2 Expansion Project

6

ASCE OC

Water Treatment Project

of the Year - 2013

Page 7: Irvine Ranch Water District Michelson Water Recycling Plant Phase 2 Expansion

7

• Produces 18 MGD of Title 22 recycled water.

• Phase 2 Expansionincreases capacity to 28 MGD.

• Scheduled completion June 2014.

Michelson Water Recycling Plant

Page 8: Irvine Ranch Water District Michelson Water Recycling Plant Phase 2 Expansion

MWRP Aerial View

Page 9: Irvine Ranch Water District Michelson Water Recycling Plant Phase 2 Expansion

9

Michelson Water Recycling Plant

NORTH IRVINE INTERCEPTOR

SOUTH IRVINE INTERCEPTOR

INFLUENT GRINDERS

PRIMARY SEDIMENTATION

TANKS

FLOW EQUALIZATION

BASINS

ACTIVATED SLUDGE BASINS

SECONDARY SEDIMENTATION

TANKS

DUAL MEDIA

FILTERSCHLORINE

CONTACT TANKS

RECYCLED WATER CUSTOMERS

OCSD

Treatment Process Prior to Expansion

Page 10: Irvine Ranch Water District Michelson Water Recycling Plant Phase 2 Expansion

10OCSD

NORTH IRVINE INTERCEPTOR

SOUTH IRVINE INTERCEPTOR

HEADWORKS

PRIMARY SEDIMENTATION

TANKS

FLOW EQUALIZATION

BASINS

ACTIVATED SLUDGE BASINS

SECONDARY SEDIMENTATION

TANKS

DUAL MEDIA

FILTERS

CHLORINE CONTACT TANKS RW

CUST.

HIGH RATE CLARIFIER

UV DISINFECTIONMEMBRANE BIOREACTOR

PRIMARY EFFLUENT

PUMP STATION

Phase 2 Overall Process Train

Page 11: Irvine Ranch Water District Michelson Water Recycling Plant Phase 2 Expansion

11

Phase 2 Expansion Overview

`

HEADWORKSNEWPSTs

EXISTINGPSTs

PEPS

MEMBRANE BIOREACTOR

FLOWEQUALIZATION

BASINS

EXISTINGBLOWER

ROOM

HIGH RATE

CLARIFIER

UV DISINFECTION

SPENT BACKWASH TANK

CHLORINE CONTACT TANK

EFFLUENT PUMPS

NEW TREATMENT FACILITIES

MODIFIED EXISTING TREATMENT FACILITIES

NEW CHEMICAL FACILITIES

NEW ELECTRICAL FACILITIES

SPENT BACKWASH TANK

Page 12: Irvine Ranch Water District Michelson Water Recycling Plant Phase 2 Expansion

12

New Headworks

Page 13: Irvine Ranch Water District Michelson Water Recycling Plant Phase 2 Expansion

13

New Primary Sedimentation Tanks

Page 14: Irvine Ranch Water District Michelson Water Recycling Plant Phase 2 Expansion

14

New Primary Effluent Pump Station

Page 15: Irvine Ranch Water District Michelson Water Recycling Plant Phase 2 Expansion

15

Membrane Bioreactor

FINESCREENS

DE-OX ZONE

DE-OX ZONE

ANOXIC ZONE

ANOXIC ZONE

AERATION BASIN

AERATION BASIN

MLP.S.

RASBOX

RA

S C

HA

NN

EL

MEMBRANETANKS

DIPTANK

B.P.TANK

PE

RM

EA

TE

PU

MP

RO

OM

BL

OW

ER

RO

OM

Page 16: Irvine Ranch Water District Michelson Water Recycling Plant Phase 2 Expansion

16

MBR Process Flow

10 MGD

5 MGD

5 MGD

30 MGD

30 MGD

10 MGD

Page 17: Irvine Ranch Water District Michelson Water Recycling Plant Phase 2 Expansion

17

MBR Fine Screens & Aeration Basins

Page 18: Irvine Ranch Water District Michelson Water Recycling Plant Phase 2 Expansion

18

MBR Mixed Liquor Pump Station

Page 19: Irvine Ranch Water District Michelson Water Recycling Plant Phase 2 Expansion

19

Loading MBR Membrane Cassettes

Page 20: Irvine Ranch Water District Michelson Water Recycling Plant Phase 2 Expansion

20

MBR Air & Permeate Piping

Page 21: Irvine Ranch Water District Michelson Water Recycling Plant Phase 2 Expansion

21

Permeate Pump & Blower Rooms

Page 22: Irvine Ranch Water District Michelson Water Recycling Plant Phase 2 Expansion

22

MBR Photos

Page 23: Irvine Ranch Water District Michelson Water Recycling Plant Phase 2 Expansion

23

Ultraviolet Disinfection Facility

Page 24: Irvine Ranch Water District Michelson Water Recycling Plant Phase 2 Expansion

24

New Phase 2 Buildings

High Rate Clarifier Electrical Bldg.

Headworks Membrane Bioreactor

Page 25: Irvine Ranch Water District Michelson Water Recycling Plant Phase 2 Expansion

25

MWRP Phase 2 Overview

Page 26: Irvine Ranch Water District Michelson Water Recycling Plant Phase 2 Expansion

26

Floodwall – 200 Yr Flood Protection

Page 27: Irvine Ranch Water District Michelson Water Recycling Plant Phase 2 Expansion

27

Treatment Process $83

Million

Floodwall

$ 5 Million

Overall Construction Cost: $88 Million

Change Orders:

$ 4 Million 4.5%

Total

$92 Million

Construction Management $14 Million

15%

Phase 2 Construction Cost

Page 28: Irvine Ranch Water District Michelson Water Recycling Plant Phase 2 Expansion

Biosolids & Energy Recovery Facilities Project

28

Page 29: Irvine Ranch Water District Michelson Water Recycling Plant Phase 2 Expansion

29

Project Objectives

• Beneficially reuse Biosolids and Biogas produced during the treatment process.

• Manage residuals (Biosolids) at reduced costs to IRWD’s customers.

• Construct project to meet IRWD’s future Biosolids handling needs.

• Minimize environmental impacts:Drying and pelletizing reduces export truck loads by factor of four.

• Reduces greenhouse gas effects by beneficially using pellets locally as a fertilizer or e-fuel.

Biosolids & Energy Recovery Project

Page 30: Irvine Ranch Water District Michelson Water Recycling Plant Phase 2 Expansion

30

Project Description

• IRWD to construct facilities at MWRP for:

• Biosolids digestion, dewatering and drying

• Biogas management and energy recovery

• Odor control systems

• IRWD would no longer export solids to Orange County Sanitation District (OCSD).

• Project would also accept Biosolids trucked in from IRWD’s Los Alisos Water Recycling Plant (LAWRP).

Biosolids & Energy Recovery Project

Page 31: Irvine Ranch Water District Michelson Water Recycling Plant Phase 2 Expansion

31

Biosolids Facilities Site Location

MWRP

Biosolids and Energy

Recovery Facilities

Page 32: Irvine Ranch Water District Michelson Water Recycling Plant Phase 2 Expansion

32

EXISTING PRIMARY CLARIFIER

EXISTING SECONDARY CLARIFIER

ACID-METHANE PHASE ANAEROBICDIGESTION

DEWATERINGCENTRIFUGE

DIGESTED SLUDGE STORAGE

MICROTURBINES

BIOGAS ELECTRICITY

CAKESTORAGE & LOADOUT

CLASS BCAKE HAUL(BACKUP)

ROTARYDRUMDRYER

PELLET STORAGE & LOADOUT

CLASS A PELLET HAUL

FATS, OILS & GREASE

CENTRATETREATMENT

TO LIQUID TREATMENT

RECYCLED WATER

PS

WAS

THICKENINGCENTRIFUGE

THICKENINGCENTRIFUGE

DIGESTER GAS CLEANING

Simplified Process Schematic

Page 33: Irvine Ranch Water District Michelson Water Recycling Plant Phase 2 Expansion

33

Air Permit Process Diagram

33

Page 34: Irvine Ranch Water District Michelson Water Recycling Plant Phase 2 Expansion

34

Heat Drying System

Furnace

Mixer

ID Fan

Pellet Cooler

To Storage Silos

Cake from dewatering

Cake BinRecycle Bin

RTO

Venturi Scrubber

Condenser

Furnace

Triple Pass Drying Drum

Gas Recirculation

Pneumatic Transporter

Atmosphere

Preseparator Baghouse

Page 35: Irvine Ranch Water District Michelson Water Recycling Plant Phase 2 Expansion

35

• Produces a pellet suitable for local beneficial reuse

• Nitrogen for fertilizer

• Btu content for e-fuel

• Dryers in CA:

• Encina (Carlsbad)

• Sacramento

• Corona

Heat Drying System

Page 36: Irvine Ranch Water District Michelson Water Recycling Plant Phase 2 Expansion

3-D Model Renderings

36

Page 37: Irvine Ranch Water District Michelson Water Recycling Plant Phase 2 Expansion

37

Digestion Facilities

37

Egg-Shaped DigestersSludge Holding Tanks

Acid Phase Digesters

Digester Control Bldg.

FOG Foodwaste Receiving.

Page 38: Irvine Ranch Water District Michelson Water Recycling Plant Phase 2 Expansion

38

Biosolids Handling BuildingDryer and Odor Control

Discharge Stacks

Polymer Storage

Solids Receiving Pellet Loadout

Page 39: Irvine Ranch Water District Michelson Water Recycling Plant Phase 2 Expansion

3939

Biosolids Handling Building

Centrate Treatment

Polymer Storage

Centrifuge Area

Dryer Area

Page 40: Irvine Ranch Water District Michelson Water Recycling Plant Phase 2 Expansion

40

Biogas Treatment & Microturbines

Biogas Storage

Biogas Conditioning Microturbines

Page 41: Irvine Ranch Water District Michelson Water Recycling Plant Phase 2 Expansion

4141

Centrifuge Room

Thickening Centrifuges

Dewatering Centrifuges

Page 42: Irvine Ranch Water District Michelson Water Recycling Plant Phase 2 Expansion

4242

Dryer System – Lower Level

Dryer Drum

Pellet Screen

Page 43: Irvine Ranch Water District Michelson Water Recycling Plant Phase 2 Expansion

4343

Dryer System – Upper Level

Dryer Drum

Solids/Off Gas Separation

Pellet Mixer

Recycle Bin

Page 44: Irvine Ranch Water District Michelson Water Recycling Plant Phase 2 Expansion

44

Sub-Surface View of 3,028 Piles

Page 45: Irvine Ranch Water District Michelson Water Recycling Plant Phase 2 Expansion

Construction Photos

45

Page 46: Irvine Ranch Water District Michelson Water Recycling Plant Phase 2 Expansion

46

Construction Photos

Pile Installation – Digester Area

Completed:• Construction of

structure and

Page 47: Irvine Ranch Water District Michelson Water Recycling Plant Phase 2 Expansion

47

Construction Photos

Pile Installation – Basement of Solids Handling Building

Page 48: Irvine Ranch Water District Michelson Water Recycling Plant Phase 2 Expansion

48

Installation of Piles in Methane Digester Area

May 2014 Quarterly Report

Page 49: Irvine Ranch Water District Michelson Water Recycling Plant Phase 2 Expansion

49

Installation of Piles in Solids Handling Facility

May 2014 Quarterly Report

Page 50: Irvine Ranch Water District Michelson Water Recycling Plant Phase 2 Expansion

Project Schedule

50

Page 51: Irvine Ranch Water District Michelson Water Recycling Plant Phase 2 Expansion

51

Project Schedule

DATE ACTIVITY

April 29, 2013 Notice of Award

June 3, 2013 Notice to Proceed

Sept. 2013 – March 2014 Pile Driving

January 17, 2016 Anaerobic Digestion Facilities Online

March 2, 2016 Produce Class B Biosolids (Cake)

June 30, 2016 Microturbine Power Generation Online

August 29, 2016 Produce Class A Biosolids (Pellets)

October 28, 2016 Project Completion

Page 52: Irvine Ranch Water District Michelson Water Recycling Plant Phase 2 Expansion

52

Pile Driving $

10 Million 6%

Digesters $

45 28%

Dryer

$ 13 8%

Biogas & Microturbines $ 8

5%

Sitework $

14 9%

Other

$ 73 45%

Total Bid Amount $ 163

Million

Biosolids Construction Cost

Page 53: Irvine Ranch Water District Michelson Water Recycling Plant Phase 2 Expansion

Contact Information:

Randy Lee, P.E.Irvine Ranch Water [email protected]