GOVERNMENT OF TELANGANA ABSTRACT

Irrigation and CAD Department - Medigadda Barrage - Construction of barrage across Godavari River near Medigadda (V), Mahadevpur (M), Karimnagar (Dist) with redial gates, hoisting arrangements including formation of guide bunds on either side of barrage etc., - Administrative approval - Accorded - Orders – Issued.

=================================================

IRRIGATION AND CAD (Projects-II) DEPARTMENT

G.O.RT.No. 231 Dated: 01/03/2016 Read:

From the Engineer-in-Chief (Irrigation), Hyderabad, Lr.No.ENC(I)/ DCE-IV/OT-4/AEE-12/Kaleshwaram Project/2016-1, Dt.18-02-2016.

&&&&

ORDER:-

In the reference read above, the Engineer-in-Chief (Irrigation), Hyderabad has stated that the Dr.BR Ambedkar Pranahitha Chevella Sujala Sravanthi Project was taken up across river Pranahitha near the confluence of river Pranahitha by constructing a Barrage at Tummidihatti(V), Koutala(M), Adilabad District. In order to minimise submergence in neighbouring Maharashtra State and as per the suggestions of the Directorate of Hydrology, Central Water Commission, New Delhi to re-look into the integrated storage planning aspects of the Project, Engineer-in-Chief(Irrigation) in the reference cited had suggested modifications in the storage capacities and has requested for Construction of barrages across Godavari River near Medigadda (V), Mahadevpur (M), Karimnagar (Dist) with redial gates, hoisting arrangements including formation of guide bunds on either side of barrage etc.

2. After careful examination of the proposal, Government hereby accord administrative approval for construction of a Barrage across Godavari river near Medigadda(V), Mahadevpur(M), Karimnagar District with radial Gates hoisting arrangement including formation of guide bunds on either side of the Barrage for an amount of Rs.2,591 crores (Rupees Two Thousand Five Hundred and Ninety One crores only) and make the necessary provision as per the work requirement with an overall plan allocation of the Department in BE 2016-17. This Barrage is an integral part of Kaleshwaram Project of the already sanctioned Dr.BRAPCSS Project.

3. The expenditure shall be debited to the following Head of Account:-

“4700-01- (To be allotted) – 11-26-530/531-530/532”.

3. This order issues with the concurrence of Finance (WP) Department vide their U.O.No.2745/53/WP/A1/2016, Dt.25-02-2016.

P.T.O.

// 2 //

4. The Engineer-in-Chief (Irrigation), Hyderabad shall take necessary action, accordingly.

(BY ORDER AND IN THE NAME OF THE GOVERNOR OF TELANGANA)

SHAILENDRA KUMAR JOSHI

PRINCIPAL SECRETARY TO GOVERNMENT

To The Engineer-in-Chief (Irrigation), Hyderabad The Accountant General, Hyderabad. The Pay & Account Officer, LMD Colony, Karimnagar. The Director of Works and Accounts, Hyderabad. Copy to: The Chief Engineer, Kaleshwaram, LMD Colony, Karimnagar. PS to Prl. Secretary, I&CAD Department. The Finance (WP) Department.

// FORWARDED : : BY ORDER //

SECTION OFFICER

GOVERNMENT OF TELANGANA ABSTRACT

Irrigation and CAD Department - Annaram Barrage - Construction of barrage with redial gates, hoisting arrangements including formation of guide bunds on either side of barrage etc., across Godavari River near Annaram (V), Mahadevpur (M), Karimnagar (Dist), – Administrative approval - Accorded - Orders – Issued.

=================================================

IRRIGATION AND CAD (Projects-II) DEPARTMENT

G.O.RT.No. 232 Dated: 01/03/2016 Read:

From the Engineer-in-Chief (Irrigation), Hyderabad, Lr.No.ENC(I)/ DCE-IV/OT-4/AEE-12/Kaleshwaram Project/2016-2, Dt.18-02-2016.

&&&&

ORDER:-

In the reference read above, the Engineer-in-Chief (Irrigation), Hyderabad has stated that the Dr.BR Ambedkar Pranahitha Chevella Sujala Sravanthi Project was taken up across river Pranahitha near the confluence of river Pranahitha by constructing a Barrage at Tummidihatti(V), Koutala(M), Adilabad District. In order to minimise submergence in neighbouring Maharashtra State and as per the suggestions of the Directorate of Hydrology, Central Water Commission, New Delhi to re-look into the integrated storage planning aspects of the Project, Engineer-in-Chief(Irrigation) in the reference cited had suggested modifications in the storage capacities and he has requested for Construction of barrages across Godavari River near Annaram (V), Mahadevpur (M), Karimnagar (Dist) with redial gates, hoisting arrangements including formation of guide bunds on either side of barrage etc.

2. After careful examination of the proposal, Government hereby accord administrative approval for construction of a Barrage across Godavari river near Annaram (V), Mahadevpur(M), Karimnagar District with radial Gates hoisting arrangement including formation of guide bunds on either side of the Barrage for an amount of Rs.1785.00 Crores (Rupees One Thousand Seven Hundred and Eight Five Crores only) and make the necessary provision as per the work requirement with an overall plan allocation of the Department in BE 2016-17. This Barrage is an integral part of Kaleshwaram Project of the already sanctioned Dr.BRAPCSS Project. 3. The expenditure shall be debited to the following Head of Account:-

“4700-01- (To be allotted) – 11-26-530/531-530/532”.

4. This order issues with the concurrence of Finance (WP) Department vide their U.O.No.2747/51/WP/A1/2016, Dt.25-02-2016.

P.T.O.

// 2 //

5. The Engineer-in-Chief (Irrigation), Hyderabad shall take necessary action, accordingly.

(BY ORDER AND IN THE NAME OF THE GOVERNOR OF TELANGANA)

SHAILENDRA KUMAR JOSHI PRINCIPAL SECRETARY TO GOVERNMENT

To The Engineer-in-Chief (Irrigation), Hyderabad The Accountant General, Hyderabad. The Pay & Account Officer, LMD Colony, Karimnagar. The Director of Works and Accounts, Hyderabad. Copy to: The Chief Engineer, Kaleshwaram, LMD Colony, Karimnagar. PS to Prl. Secretary, I&CAD Department. The Finance (WP) Department.

// FORWARDED : : BY ORDER //

SECTION OFFICER

GOVERNMENT OF TELANGANA ABSTRACT

Irrigation and CAD Department -– Construction of Sundilla Barrage with redial gates, hoisting arrangements including formation of guide bunds on either side of barrage etc., across Godavari River near Sundilla (V), Kamanpur (M), Karimnagar (Dist), – Administrative approval - Accorded - Orders – Issued.

=================================================

IRRIGATION AND CAD (Projects-II) DEPARTMENT

G.O.RT.No. 233 Dated: 01/03/2016 Read:

From the Engineer-in-Chief (Irrigation), Hyderabad, Lr.No.ENC(I)/ DCE-IV/OT-4/AEE-12/Kaleshwaram Project/2016-3, Dt.18-02-2016.

&&&&

ORDER:-

In the reference read above, the Engineer-in-Chief (Irrigation), Hyderabad has stated that the Dr.BR Ambedkar Pranahitha Chevella Sujala Sravanthi Project was taken up across river Pranahitha near the confluence of river Pranahitha by constructing a Barrage at Tummidihatti(V), Koutala(M), Adilabad District. In order to minimise submergence in neighbouring Maharashtra State and as per the suggestions of the Directorate of Hydrology, Central Water Commission, New Delhi to re-look into the integrated storage planning aspects of the Project Engineer-in-Chief(Irrigation) in the reference cited had suggested modifications in the storage capacities and he has requested for Construction of barrages across Godavari River near Sundilla (V), Kamanpur (M), Karimnagar (Dist) with redial gates, hoisting arrangements including formation of guide bunds on either side of barrage etc.

2. After careful examination of the proposal, Government hereby accord administrative approval for construction of a Barrage across Godavari river near Sundilla (V), Kamanpur (M), Karimnagar District with radial Gates hoisting arrangement including formation of guide bunds on either side of the Barrage for an amount of Rs.1437.00 Crores (Rupees One Thousand Four Hundred and Thirty Seven Crores only) and make the necessary provision as per the work requirement with an overall plan allocation of the Department in BE 2016-17. This Barrage is an integral part of Kaleshwaram Project of the already sanctioned Dr.BRAPCSS Project.

3. The expenditure shall be debited to the following Head of Account:-

“4700-01- (To be allotted) – 11-26-530/531-530/532”.

4. This order issues with the concurrence of Finance (WP) Department vide their U.O.No.2746/52/WP/A1/2016, Dt.25-02-2016.

P.T.O.

// 2 //

5. The Engineer-in-Chief (Irrigation), Hyderabad shall take necessary action, accordingly.

(BY ORDER AND IN THE NAME OF THE GOVERNOR OF TELANGANA)

SHAILENDRA KUMAR JOSHI

PRINCIPAL SECRETARY TO GOVERNMENT

To The Engineer-in-Chief (Irrigation), Hyderabad The Accountant General, Hyderabad. The Pay & Account Officer, LMD Colony, Karimnagar. The Director of Works and Accounts, Hyderabad. Copy to: The Chief Engineer, Kaleshwaram, LMD Colony, Karimnagar. PS to Prl. Secretary, I&CAD Department. The Finance (WP) Department.

// FORWARDED : : BY ORDER //

SECTION OFFICER

GOVERNMENT OF TELANGANA ABSTRACT

Irrigation and CAD Department – Construction of Lift System with pump house with Metallic Volute pumps including Supply, erection, testing and commissioning of Electro – Mechanical & Hydro – Mechanical works with allied works, pressure main, delivery cistern, approach channel, gravity canal including construction of CM & CD works and Head Regulator from Annaram Barrage to Sundilla Barrage to lift 160 TMC of water from Godavari River to Sripada Yellampally Project – Administrative Approval – Accorded- Orders issued. =====================================================

IRRIGATION AND CAD (Projects-II) DEPARTMENT

G.O.Rt.No.450 Dated:29-04-2016 Read the following

1. G.O.Rt.No.231, I&CAD (Projects-II) Dept., Dt.01-03-2016. 2. G.O.Rt.No.232, I&CAD (Projects-II) Dept., Dt.01-03-2016. 3. G.O.Rt.No.233, I&CAD (Projects-II) Dept., Dt.01-03-2016.

4. From the Engineer-in-Chief (Irrigation), Hyderabad, Lr.No.ENC(I)/ DCE-IV/OT-4/AEE-12/Kaleshwaram Project/2016/2,Dt.24-04-2016.

&&&&

ORDER:

In the reference 1st to 3rd read above, administrative approval was accorded for construction of three Barrages across Godavari river 1) near Medigadda (V), Mahadevpur(M), Karimnagar District, 2) near Annaram (V), Mahadevpur(M), Karimnagar District, 3) near Sundilla (V), Kamanpur (M), Karimnagar District with radial Gates hoisting arrangement including formation of guide bunds on either side of the Barrage. These Barrages are an integral part of Kaleshwaram Project of the already sanctioned Dr.BRAPCSS Project.

In the reference 4th read above, the Engineer-in-Chief (Irrigation), Hyderabad has requested the Government accord Administrative approval for Construction of Lift System with pump house with Metallic Volute pumps including Supply, erection, testing and commissioning of Electro – Mechanical & Hydro – Mechanical works with allied works, pressure main, delivery cistern, approach channel, gravity canal including construction of CM & CD works and Head Regulator from Annaram Barrage to Sundilla Barrage to lift 160 TMC of water from Godavari River to Sripada Yellampally Project for an amount of Rs.2141Crore. 2. After careful examination of the proposal submitted by the Engineer-in-Chief (Irrigation), Hyderabad Government hereby accord Administrative approval for Construction of Lift System with pump house with Metallic Volute pumps including Supply, erection, testing and commissioning of Electro – Mechanical & Hydro – Mechanical works with allied works, pressure main, delivery cistern, approach channel, gravity canal including construction of CM & CD works and Head Regulator from Annaram Barrage to Sundilla Barrage to lift 160 TMC of water from Godavari River to Sripada Yellampally Project for an amount of Rs.2140 Crores. 3. The expenditure shall be debited to the following Head of Account: “4700-01-232-11-26 -530/531” 4. This orders issues with the concurrence of Finance (WP) Dept., vide their U.O.No.5704/83/A1/WP/2016, Dt.29-04-2016.

P.T.O.

// 2 //

5. The Engineer-in-Chief (Irrigation), Hyderabad is requested to take necessary action, accordingly.

(BY ORDER AND IN THE NAME OF THE GOVERNOR OF TELANGANA)

SHAILENDRA KUMAR JOSHI PRINCIPAL SECRETARY TO GOVERNMENT

To The Engineer-in-Chief (Irrigation), Hyderabad The Accountant General, Hyderabad. The Assistant Pay & Account Officer, Karimnagar. The Director of Accounts, Hyderabad. Copy to: The Chief Engineer, Kaleshwaram, LMD Colony, Karimnagar PS to Prl. Secretary, I&CAD Department. The Finance (WP) Dept.

// FORWARDED : : BY ORDER //

SECTION OFFICER

GOVERNMENT OF TELANGANA ABSTRACT

Irrigation and CAD Department – Construction of Lift System with pump house with Metallic Volute pumps including Supply, erection, testing and commissioning of Electro – Mechanical & Hydro – Mechanical works with allied works, pressure main, delivery cistern, approach channel, gravity canal including construction of CM & CD works and Head Regulator from Sundilla Barrage to Sripada Yellampally Project to lift 160 TMC of water from Godavari River– Administrative Approval – Accorded – Orders issued. ================================================

IRRIGATION AND CAD (Projects-II) DEPARTMENT

G.O.Rt.No.451 Dated:29-04-2016 Read the following:

1. G.O.Rt.No.231, I&CAD (Projects-II) Dept., Dt.01-03-2016. 2. G.O.Rt.No.232, I&CAD (Projects-II) Dept., Dt.01-03-2016. 3. G.O.Rt.No.233, I&CAD (Projects-II) Dept., Dt.01-03-2016. 4. From the Engineer-in-Chief (Irrigation), Hyderabad, Lr.No.ENC(I)/

DCE-IV/OT-4/AEE-12/Kaleshwaram Project/2016, Dt:24-04-2016.

&&&& ORDER:

In the reference 1st to 3rd read above, administrative approval was accorded for construction of three Barrages across Godavari river 1) near Medigadda (V), Mahadevpur(M), Karimnagar District, 2) near Annaram (V), Mahadevpur(M), Karimnagar District, 3) near Sundilla (V), Kamanpur (M), Karimnagar District with radial Gates hoisting arrangement including formation of guide bunds on either side of the Barrage. These Barrages are an integral part of Kaleshwaram Project of the already sanctioned Dr.BRAPCSS Project.

2. In the reference 4th read above, the Engineer-in-Chief (Irrigation), Hyderabad has requested the Government to accord Administrative Construction of Lift System with pump house with Metallic Volute pumps including Supply, erection, testing and commissioning of Electro – Mechanical & Hydro – Mechanical works with allied works, pressure main, delivery cistern, approach channel, gravity canal including construction of CM & CD works and Head Regulator from Sundilla Barrage to Sripada Yellampally Project to lift 160 TMC of water from Godavari Riveror an amount of Rs.2335 Crores.

3. After careful examination of the proposal submitted by the Engineer-in-Chief (Irrigation), Hyderabad Government hereby accord Administrative approval for Construction of Lift System with pump house with Metallic Volute pumps including Supply, erection, testing and commissioning of Electro – Mechanical & Hydro – Mechanical works with allied works, pressure main, delivery cistern, approach channel, gravity canal including construction of CM & CD works and Head Regulator from Sundilla Barrage to Sripada Yellampally Project to lift 160 TMC of water from Godavari Riveror an amount of Rs.2334 crores.

4. The expenditure shall be debited to the following Head of Account: “4700-01-232-11-26 -530/531”.

5. This orders issues with the concurrence of Finance (WP) Dept., vide their U.O.No.5705/84/A1/WP/2016, Dt.29-04-2016.

P.T.O.

// 2 //

5. The Engineer-in-Chief (Irrigation), Hyderabad is requested to take necessary action, accordingly.

(BY ORDER AND IN THE NAME OF THE GOVERNOR OF TELANGANA)

SHAILENDRA KUMAR JOSHI PRINCIPAL SECRETARY TO GOVERNMENT

To The Engineer-in-Chief (Irrigation), Hyderabad The Accountant General, Hyderabad. The Assistant Pay & Account Officer, Karimnagar. The Director of Accounts, Hyderabad. Copy to: The Chief Engineer, Kaleshwaram, LMD Colony, Karimnagar. PS to Prl. Secretary, I&CAD Department. The Finance (WP) Dept.

// FORWARDED : : BY ORDER //

SECTION OFFICER

GOVERNMENT OF TELANGANA ABSTRACT

Irrigation and CAD Department – Construction of Lift System with pump house with Metallic Volute pumps including Supply, erection, testing and commissioning of Electro – Mechanical & Hydro – Mechanical works with allied works, pressure main, delivery cistern, approach channel, gravity canal including construction of CM & CD works and Head Regulator from Medigadda Barrage to Annaram Barrage to lift 160 TMC of water from Godavari River to Sripada Yellampally Project – Administrative Approval – Accorded – Orders issued. =====================================================

IRRIGATION AND CAD (Projects-II) DEPARTMENT

G.O.RT.No. 452 Dated: 29/04/2016 Read the following:

1. G.O.Rt.No.231, I&CAD (Projects-II) Dept., Dt.01-03-2016. 2. G.O.Rt.No.232, I&CAD (Projects-II) Dept., Dt.01-03-2016. 3. G.O.Rt.No.233, I&CAD (Projects-II) Dept., Dt.01-03-2016.

4. From the Engineer-in-Chief (Irrigation), Hyderabad, Lr.No.ENC(I)/ DCE-IV/OT-4/AEE-12/ Kaleshwaram Project/2016, Dt:24 -04-2016.

.&&&&

ORDER:

In the reference 1st to 3rd read above, administrative approval was accorded for construction of three Barrages across Godavari river 1) near Medigadda (V), Mahadevpur(M), Karimnagar District, 2) near Annaram (V), Mahadevpur(M), Karimnagar District, 3) near Sundilla (V), Kamanpur (M), Karimnagar District with radial Gates hoisting arrangement including formation of guide bunds on either side of the Barrage. These Barrages are an integral part of Kaleshwaram Project of the already sanctioned Dr.BRAPCSS Project.

2. In the reference read 4th above, the Engineer-in-Chief (Irrigation), Hyderabad has requested the Government to accord Administrative approval for Construction of Lift System with pump house with Metallic Volute pumps including Supply, erection, testing and commissioning of Electro – Mechanical & Hydro – Mechanical works with allied works, pressure main, delivery cistern, approach channel, gravity canal including construction of CM & CD works and Head Regulator from Medigadda Barrage to Annaram Barrage to lift 160 TMC of water from Godavari River to Sripada Yellampally Project for an amount of Rs.3524 Crore.

3. After careful examination of the proposal submitted by the Engineer-in-Chief (Irrigation), Hyderabad Government hereby accord Administrative approval for Construction of Lift System with pump house with Metallic Volute pumps including Supply, erection, testing and commissioning of Electro – Mechanical & Hydro – Mechanical works with allied works, pressure main, delivery cistern, approach channel, gravity canal including construction of CM & CD works and Head Regulator from Medigadda Barrage to Annaram Barrage to lift 160 TMC of water from Godavari River to Sripada Yellampally Project for an amount of Rs.3524 Crore. 4. The expenditure shall be debited to the following Head of Account:

4700-01-232-11-26 -530/531.

5. This order issues with the concurrence of Finance (WP) Department vide their U.O.No.5706/85/A1/WP/2016, Dt.29-04-2016.

P.T.O.

6. The Engineer-in-Chief (Irrigation), Hyderabad is requested to take necessary accordingly.

(BY ORDER AND IN THE NAME OF THE GOVERNOR OF TELANGANA)

SHAILENDRA KUMAR JOSHI PRINCIPAL SECRETARY TO GOVERNMENT

To The Engineer-in-Chief (Irrigation), Hyderabad The Accountant General, Hyderabad. The Assistant Pay & Account Officer, Karimnagar. The Director of Accounts, Hyderabad. Copy to: PS to Prl. Secretary to Government , I&CAD Department. The Finance (WP) Dept.

// FORWARDED : : BY ORDER //

SECTION OFFICER