CERTFICATE OF TEST AND THOUROGH EXAMINATION
CERTIFICATE OF TEST AND THOROUGH EXAMINATION
Prime Mover and Trailer Test Certification
Project Reference No.:IRMG/CS-0137/15-00709Certificate Reference No.:IRMG/8442/15-00709-01
Location of Testing:Fuji Mor Tando Adam, SindhInspection Date:May 27, 2015
Client Name:Crescent SyndicateLast Date and Reference:Nil
Inspection Code:OSHACertification Validation: May 26, 2016
Inspection Proposed By:Mr. Syed Azhar ZaidiSite Representative: Mr. Muhammad Yaseen
SPECIFICATIONENGINE SPECIFICATION
Make:
Type:
Model :
Manufacture:
Registration No.:
Year of Manufacturing:DaewooDouble Axle / Low bedV3T6FKoreaJU-39202008Engine No.:
Chassis No.:
Horse Power:
Axle Load:
Gross Load:
Trailer Dimension (L x W x H):D312T170553KK U3T6FDP00112320 HPNot AvailableNot Available(42x8.6x4.6) ft
Equipment Test ParametersInspection StatusResults Remarks
Visual Inspection
Functional
Performance (Holding/Brake)
Non Destructive Examination
Test DrivePerformed Performed Performed -Performed OKOKOK-
OKAcceptable
Acceptable
Acceptable
-Acceptable
Test Statement :
The Prime Mover / Trailer inspection has been carried out on the basis of visual, dimensional & performance parameters as mentioned above, along with test drive. The equipment acceptance sticker has been pasted in the driver cabin. Rectification work is required to be carried out as per remarks given on the last page of checklist.
Result: Acceptable
INSPECTION PERFORMED BY:
Muhammad HassnainInspection EngineerVALIDATED BY :
Muhammad AdilCountry Head of Inspection Division
Note: URS Pakistan, its parent company, its agents, employees & inspectors are not liable for any financial risks associated with this equipment and its operation.
CERTIFICATE OF TEST AND THOROUGH EXAMINATION
Prime Mover/ Trailer Test Certification
Project Reference No. : IRMG/CS-0137/15-00709Certificate No. : IRMG/8442/15-00709-01
Equipment Identification: JU-3920
S No.Item DescriptionStatusLevel of SeverityComments
AcceptableRejected*
I**
II
1.Steering (Check Free Play)
2.Clutch
3.Brake (Foot / Hand)
4.Air Brake (Leak-Bleed Down)
5.Gauges
6.Horn (Vehicle & Reverse)
7.Side Mirrors
8.Driver Cabin Condition
9.Seat & Seat Belts
10.Cooling System (Radiator, Hoses & Gauge)
11.Engine (Condition, Oil Level & Leakage)
12.Electrical System (Wiring, Starter& Generator etc)
13.Battery
14.Transmission
15.Drive Line U-Joint
16.Differential/Suspension
17.Gear Box (Condition & Drip)
18.Spring & Shocks/Suspension
19.Tie Rod
20.Parking / Brake Light
21.Reverse Warning Light & Alarm
22.Tires, Wheels & Bolts
23.Lights (Head Light Low Beam / High Beam)
24.Indicator Light (Right & Left)
25.Proper Lubrication
26.Protective Coating
27.Fifth Pin Only visual Inspection
28.Fifth Wheel Only visual Inspection
29.Interlocking System
30.Door Glasses / Locks
31.Window & Wind Shield Wiper
32.Bumper / Rear End Protection
33.Trailer Safety Lock Bolts (Container / Load)
34.Flame Arrestor- See Remarks
35.Fuel System
36.Exhaust System
37.Frame & Body (Overall Structure)
38.Welding (Overall)
39.Hydraulic System Included Hoses & Fittings
40.Safety Devices/PRVs of Prime Mover
41.Drive Right
42.Braking Mechanism
43.Hand Brake Mechanism
44.Operation of Hydraulic & Power Brake
45.Vehicle Front & Rear Protection
46.Driving License
47.Driver Training
48.Vehicle Log Book
49.Fire Extinguisher
50.First Aid Box
51.NDE Test -See Remarks
52.Accessories (Jack, Tool Box ,Wrench etc)
53.Maintenance
54.General Condition
CERTIFICATE OF TEST AND THOROUGH EXAMINATION
Prime Mover/ Trailer Test CertificationProject Reference No. : IRMG/CS-0137/15-00709Certificate No. : IRMG/8442/15-00709-01
Equipment Identification: JU-3920
Reference Remarks :Item No. 34: Flame arrestor was not available. It should be provided as per site requirement.Item No. 51: NDE Test was not recommended by client.General Information:
1. Equipment identification should be marked on suitable & visible location
2. Proper service & maintenance procedure should be adopted as per manufacturer instructions.
3. Schedule service & maintenance require on periodical & regular basis.
4. Visual inspection should also be carried out before each operation.
5. During the period equipment is to be operated by a competent & certified operator.
6. Proper greasing & lubrication of all rotating part will be required. All grease nipples should be checked for choking on Quarterly basis. Special Note :
LEGAL VERIFICATION DOES NOT COVER IN URSIS SCOPE OF SERVICE.
NOTE:
Inspection & certification becomes null & void should any modifications, structural damages, failure of maintenance, or circumstances occur that would in any way alter or change the safety feature of the above described equipment beyond the time & date mentioned above.
NOTE:(*Severity Level I = Minor rectification shall be done as soon as possible.)
(**Severity Level II = Rectification shall be done on Particular / Given Time Period i.e. 02-06 weeks)
INSPECTION PERFORMED BY:
Muhammad HassnainInspection EngineerVALIDATED BY :
Muhammad AdilCountry Head of Inspection Division