CERTIFICATE OF TEST AND THOROUGH EXAMINATION Prime Mover and Trailer Test Certification Project Reference No.: IRMG/CS-0137/15- 00709 Certificate Reference No.: IRMG/8442/15-00709- 01 Location of Testing: Fuji Mor Tando Adam, Sindh Inspection Date: May 27, 2015 Client Name: Crescent Syndicate Last Date and Reference: Nil Inspection Code: OSHA Certification Validation: May 26, 2016 Inspection Proposed By: Mr. Syed Azhar Zaidi Site Representative: Mr. Muhammad Yaseen SPECIFICATION ENGINE SPECIFICATION Make: Type: Model : Manufacture: Registration No.: Year of Manufacturing: Daewoo Double Axle / Low bed V3T6F Korea JU-3920 2008 Engine No.: Chassis No.: Horse Power: Axle Load: Gross Load: Trailer Dimension (L x W x H): D312T170553KK U3T6FDP00112 320 HP Not Available Not Available (42x8.6x4.6) ft Equipment Test Parameters Inspection Status Results Remarks Visual Inspection Functional Performance (Holding/Brake) Non Destructive Examination Test Drive Performed Performed Performed - Performed OK OK OK - OK Acceptable Acceptable Acceptable - Acceptable Test Statement : The Prime Mover / Trailer inspection has been carried out on the basis of visual, dimensional & performance parameters as mentioned above , along with test drive. The equipment acceptance sticker has been pasted in the driver cabin. Rectification work is required to be carried out as per remarks given on the last page of checklist. Result: Acceptable

IRMG-15-CS-JU-3920-8442-01.doc

Embed Size (px)

Citation preview

CERTFICATE OF TEST AND THOUROGH EXAMINATION

CERTIFICATE OF TEST AND THOROUGH EXAMINATION

Prime Mover and Trailer Test Certification

Project Reference No.:IRMG/CS-0137/15-00709Certificate Reference No.:IRMG/8442/15-00709-01

Location of Testing:Fuji Mor Tando Adam, SindhInspection Date:May 27, 2015

Client Name:Crescent SyndicateLast Date and Reference:Nil

Inspection Code:OSHACertification Validation: May 26, 2016

Inspection Proposed By:Mr. Syed Azhar ZaidiSite Representative: Mr. Muhammad Yaseen

SPECIFICATIONENGINE SPECIFICATION

Make:

Type:

Model :

Manufacture:

Registration No.:

Year of Manufacturing:DaewooDouble Axle / Low bedV3T6FKoreaJU-39202008Engine No.:

Chassis No.:

Horse Power:

Axle Load:

Gross Load:

Trailer Dimension (L x W x H):D312T170553KK U3T6FDP00112320 HPNot AvailableNot Available(42x8.6x4.6) ft

Equipment Test ParametersInspection StatusResults Remarks

Visual Inspection

Functional

Performance (Holding/Brake)

Non Destructive Examination

Test DrivePerformed Performed Performed -Performed OKOKOK-

OKAcceptable

Acceptable

Acceptable

-Acceptable

Test Statement :

The Prime Mover / Trailer inspection has been carried out on the basis of visual, dimensional & performance parameters as mentioned above, along with test drive. The equipment acceptance sticker has been pasted in the driver cabin. Rectification work is required to be carried out as per remarks given on the last page of checklist.

Result: Acceptable

INSPECTION PERFORMED BY:

Muhammad HassnainInspection EngineerVALIDATED BY :

Muhammad AdilCountry Head of Inspection Division

Note: URS Pakistan, its parent company, its agents, employees & inspectors are not liable for any financial risks associated with this equipment and its operation.

CERTIFICATE OF TEST AND THOROUGH EXAMINATION

Prime Mover/ Trailer Test Certification

Project Reference No. : IRMG/CS-0137/15-00709Certificate No. : IRMG/8442/15-00709-01

Equipment Identification: JU-3920

S No.Item DescriptionStatusLevel of SeverityComments

AcceptableRejected*

I**

II

1.Steering (Check Free Play)

2.Clutch

3.Brake (Foot / Hand)

4.Air Brake (Leak-Bleed Down)

5.Gauges

6.Horn (Vehicle & Reverse)

7.Side Mirrors

8.Driver Cabin Condition

9.Seat & Seat Belts

10.Cooling System (Radiator, Hoses & Gauge)

11.Engine (Condition, Oil Level & Leakage)

12.Electrical System (Wiring, Starter& Generator etc)

13.Battery

14.Transmission

15.Drive Line U-Joint

16.Differential/Suspension

17.Gear Box (Condition & Drip)

18.Spring & Shocks/Suspension

19.Tie Rod

20.Parking / Brake Light

21.Reverse Warning Light & Alarm

22.Tires, Wheels & Bolts

23.Lights (Head Light Low Beam / High Beam)

24.Indicator Light (Right & Left)

25.Proper Lubrication

26.Protective Coating

27.Fifth Pin Only visual Inspection

28.Fifth Wheel Only visual Inspection

29.Interlocking System

30.Door Glasses / Locks

31.Window & Wind Shield Wiper

32.Bumper / Rear End Protection

33.Trailer Safety Lock Bolts (Container / Load)

34.Flame Arrestor- See Remarks

35.Fuel System

36.Exhaust System

37.Frame & Body (Overall Structure)

38.Welding (Overall)

39.Hydraulic System Included Hoses & Fittings

40.Safety Devices/PRVs of Prime Mover

41.Drive Right

42.Braking Mechanism

43.Hand Brake Mechanism

44.Operation of Hydraulic & Power Brake

45.Vehicle Front & Rear Protection

46.Driving License

47.Driver Training

48.Vehicle Log Book

49.Fire Extinguisher

50.First Aid Box

51.NDE Test -See Remarks

52.Accessories (Jack, Tool Box ,Wrench etc)

53.Maintenance

54.General Condition

CERTIFICATE OF TEST AND THOROUGH EXAMINATION

Prime Mover/ Trailer Test CertificationProject Reference No. : IRMG/CS-0137/15-00709Certificate No. : IRMG/8442/15-00709-01

Equipment Identification: JU-3920

Reference Remarks :Item No. 34: Flame arrestor was not available. It should be provided as per site requirement.Item No. 51: NDE Test was not recommended by client.General Information:

1. Equipment identification should be marked on suitable & visible location

2. Proper service & maintenance procedure should be adopted as per manufacturer instructions.

3. Schedule service & maintenance require on periodical & regular basis.

4. Visual inspection should also be carried out before each operation.

5. During the period equipment is to be operated by a competent & certified operator.

6. Proper greasing & lubrication of all rotating part will be required. All grease nipples should be checked for choking on Quarterly basis. Special Note :

LEGAL VERIFICATION DOES NOT COVER IN URSIS SCOPE OF SERVICE.

NOTE:

Inspection & certification becomes null & void should any modifications, structural damages, failure of maintenance, or circumstances occur that would in any way alter or change the safety feature of the above described equipment beyond the time & date mentioned above.

NOTE:(*Severity Level I = Minor rectification shall be done as soon as possible.)

(**Severity Level II = Rectification shall be done on Particular / Given Time Period i.e. 02-06 weeks)

INSPECTION PERFORMED BY:

Muhammad HassnainInspection EngineerVALIDATED BY :

Muhammad AdilCountry Head of Inspection Division