INVESTMENT PROJECTS IN THE AGRO-INDUSTRIAL COMPLEX OF THE EAST KAZAKHSTAN REGION

INVESTMENT PROJECTS IN THE AGRO-INDUSTRIAL COMPLEX …€¦ · dairy and meat industry, sheep, horse, pigs, reindeer antlers breeding, poultry, ... Construction of meat production

  • Upload
    others

  • View
    6

  • Download
    0

Embed Size (px)

Citation preview

Page 1: INVESTMENT PROJECTS IN THE AGRO-INDUSTRIAL COMPLEX …€¦ · dairy and meat industry, sheep, horse, pigs, reindeer antlers breeding, poultry, ... Construction of meat production

INVESTMENT PROJECTS IN THE

AGRO-INDUSTRIAL COMPLEX OF

THE EAST KAZAKHSTAN REGION

Page 2: INVESTMENT PROJECTS IN THE AGRO-INDUSTRIAL COMPLEX …€¦ · dairy and meat industry, sheep, horse, pigs, reindeer antlers breeding, poultry, ... Construction of meat production

CONTENT

Brief description

Meat production and packing factory

The feeding areas construction

Growing and processing of the crop production

The livestock’s wool and pelt processing

Dairy Farms Construction

Milk processing

Poultry Factory Construction

Reconstruction of irrigated areas

Greenhouses

Maral breeding and beekeeping

Fish farming

Timber processing

The country tourism and improvement of the persons health

Transport and logistic centre

Bridge construction

Page 3: INVESTMENT PROJECTS IN THE AGRO-INDUSTRIAL COMPLEX …€¦ · dairy and meat industry, sheep, horse, pigs, reindeer antlers breeding, poultry, ... Construction of meat production

Dear participants of the Business Forum!

I invite you to take part in the investing activity of

agricultural complex of East Kazakhstan region which is

highly potential and full of big opportunities.

Today, our region is one of the unique areas of the

Republic of Kazakhstan. It is the place where agriculture

and heavy industry are cooperating perfectly. Both

agricultural and heavy industry greatly impact on supplying

of provisions and economy not only in this region, but in the

whole country.

The main part of the agrarian sector of our region is

an agricultural industry which is wide-spread into six soil-climatic zones of seven

available.

The total area of the region is 28,3 mln. ha, where 22,7 mln. ha for farm

landing and 10.4 mln. ha for agricultural purposes land and 1,4 mln. ha from total

area for plowing.

The soil cover is represented by all types of black earth, chestnut and gray

soils. The average grade of estimated productivity is ploughed fields-39, hayfields-

40 and pastures-21. In the northern parts of the region the average grade of

estimated productivity is about 70.

The variety of soil-climatic zones, large areas of farmland and market

requirement to agriculture products predetermined the diversification of

agriculture in the region.

Today, we may admit that nearly all agricultural fields are developed here:

dairy and meat industry, sheep, horse, pigs, reindeer antlers breeding, poultry,

beekeeping and fish farming.

Crop production is represented by corn, sunflower seeds, potatoes,

vegetables, melons and fodder crops.

I am confident that this business forum will be the launching for the

exchange of important business information and will contribute to investing into

the further development of economy of the agrarian sector in this region.

We are waiting for You and Your partners in the Eastern Kazakhstan!

Akim of the East Kazakhstan region

D. Akhmetov

Page 4: INVESTMENT PROJECTS IN THE AGRO-INDUSTRIAL COMPLEX …€¦ · dairy and meat industry, sheep, horse, pigs, reindeer antlers breeding, poultry, ... Construction of meat production

Meat production and

packing factory

Page 5: INVESTMENT PROJECTS IN THE AGRO-INDUSTRIAL COMPLEX …€¦ · dairy and meat industry, sheep, horse, pigs, reindeer antlers breeding, poultry, ... Construction of meat production

Construction of meat production complex, with the of sheep development

Applicant: LLC "Eurasia Agro Holding"

The purpose and concept of the project are: Production

and sales of meat products in the region and outside.

Period of realization: 2016-2018 years

Place of realization: EKR, Ayagoz rayon, Mamyrsu village

Current state: There are a business plan, project documentation and

feasibility study of the project. By resolution of akimat there

allocated 52 hectares of land for the construction of meat

production complex and feedlots.

Total cost of project: 7 100 million tenge

Government support: 1. Summarizing deficient infrastructure on the program

"Business Road Map-2020";

2. To subsidize the interest rates on loans, and leasing of

technological equipment and agricultural machinery;

3. To subsidize for the construction to meat production

complex;

4. To subsidize for feed production (seeds, fuels and

lubricants, herbicides, fertilizers);

5. To subsidize for meat production.

Expected Result: Breeding every year about 50 thousand heads of small cattle

on an area of 600 thousand hectares of pasture, production

and exports per year in other regions of Kazakhstan and

abroad such as China, Russia, the United Arab Emirates about

10 thousand tons of mutton, 12 thousand tons of beef.

Workplaces: Considering the growth number of livestock up to 500

persons

Page 6: INVESTMENT PROJECTS IN THE AGRO-INDUSTRIAL COMPLEX …€¦ · dairy and meat industry, sheep, horse, pigs, reindeer antlers breeding, poultry, ... Construction of meat production

Construction of meat production complex and organization of feedlot for

3,000 head of cattle

Applicant: LLC«Yelim-ai Kokpekty rayon»

The purpose and concept of the project are: Production

and sales of meat products in the region and outside.

Period of realization: 2015-2016 years

Place of realization:

EKR, Kokpekty rayon , Kokzhaiyk

Current state: Here realized 1 and 2 stages of the project (breeding

reproducer for 2000 heads and food supply). There are a

project documentation and business plan.

Total cost of project: 810 million tenge

Required investments:

700 million tenge

Government support: 1. Investment subsidies for the construction meat

production complex and feedlots, as well as the introduction

of irrigation systems;

2.Subsidies for meat production;

3. Subsidies for feed production (fuel and lubricants, seeds,

herbicides, fertilizers);

4. Subsidies for irrigation water delivery.

Expected Result: 4 million tons of beef production every year.

Workplaces 45 persons

Page 7: INVESTMENT PROJECTS IN THE AGRO-INDUSTRIAL COMPLEX …€¦ · dairy and meat industry, sheep, horse, pigs, reindeer antlers breeding, poultry, ... Construction of meat production

Construction of plant for deep processing of meat and the creation of an

irrigation system in the area of 700 hectares

Applicant: LLC «Shalabai»

The purpose and concept of the project are: Expansion of

production modernization, creation of a stable food supply

for the cattle breeding and production of competitive meat

products.

Period of realization: 2016-2020 years

Place of realization:

EKR, Zharma rayon, Shalabai village.

Current state: For irrigating 700 hectares of arable land on the river Kyzyl-

Su is built reservoir capacity of 650-700tys.m3. project

documentation for the construction of plant for meat

processing is developed.

Total cost of project: 5 500 million tenge

Required investments: 5 500 million tenge

Government support: 1. Subsidies of interest rates on loans, and leasing of

technological equipment and agricultural machinery;

2. Subsidies to implement irrigation system;

3. Subsidies for feed production (seeds, fuels and lubricants,

herbicides, fertilizers), and the delivery of water;

4. Subsidies for meat production.

Expected Result: Production of 200 tons per year of premium beef and canned

meat products

Workplaces 30 persons

Page 8: INVESTMENT PROJECTS IN THE AGRO-INDUSTRIAL COMPLEX …€¦ · dairy and meat industry, sheep, horse, pigs, reindeer antlers breeding, poultry, ... Construction of meat production

Construction of a meat processing plant, followed by a deep processing

(processing of meat of cattle and small cattle, production of canned meat and

sausages on the standard "Halal")

Applicant: LLC «Agro-Portal»

The purpose and concept of the project are: deep

processing of meat of cattle and small cattle, production of

canned meat and sausages on the standard "Halal". Exports

of meat to Iran, UAE, Europe.

Period of realization: 2016-2017 years

Place of realization:

EKR, Semey city

Current state: Decorated 48.0 hectares of land for the construction of the

meat industry. Project documentation is developed

Total cost of project: 4 550 million tenge

Required investments: 4 550 million tenge

Government support: 1. Subsidies of interest rates on loans, and leasing of

technological equipment and agricultural machinery;

2. Subsidies for the construction of meat production complex;

3. Subsidies for feed production (seeds, fuels and lubricants,

herbicides, fertilizers), and the delivery of water;

4. Subsidies for meat production.

2.

Expected Result: Production of 30 thousand tones of beef and 40 thousand

tones of lamb and 7 tones of canned meat and sausages per

year.

Workplaces 250 persons

Page 9: INVESTMENT PROJECTS IN THE AGRO-INDUSTRIAL COMPLEX …€¦ · dairy and meat industry, sheep, horse, pigs, reindeer antlers breeding, poultry, ... Construction of meat production

Construction of a mini factory for slaughtering cattle and meat production

Applicant: LLC «Plemfactory Kalbatau»

The purpose and concept of the project are: ensuring food

security in the region with meat products

Period of realization: 2016-2018 years

Place of realization: EKR, Ayagoz city

Current state: By akimat was allocated 1.44 hectares of land. There

construction of the factory is going.

Total cost of project: 140 million tenge

Required investments: 140 million tenge

Government support: 1. Summarizing deficient infrastructure on the program

"Business Road Map-2020";

2. Subsidize of interest rates on loans, and leasing of

technological equipment and agricultural machinery;

3. Investment subsidies for the construction of a meat

processing company;

Expected Result: Bringing production up to 1000 tons of sausages a year.

Workplaces 30 persons

Page 10: INVESTMENT PROJECTS IN THE AGRO-INDUSTRIAL COMPLEX …€¦ · dairy and meat industry, sheep, horse, pigs, reindeer antlers breeding, poultry, ... Construction of meat production

Building of factory for processing of meat products

Applicant: LLC «Sakhnovskoye»

The purpose and concept of the project are: Production

and sales of meat products in the region and outside.

Period of realization: 2016-2018 years

Place of realization: EKR, Borodulikha rayon, Sakhnovka village.

Current state 10 hectares of land for the construction of factory and feedlot

for 2,500 head of cattle and 5 hectares for construction of

pedigree reproducer.

Total cost of project: 1 000 million tenge

Required investments: 880 million tenge

Government support: 1. Investment subsidies for the construction of breeding

reproducer;

2. Subsidies for feed production (fuel and lubricants, seeds,

herbicides, fertilizers);

3. Subsidies for meat production.

Expected result: Production of 5000 tonnes of beef per year.

Workplaces 40 persons

Page 11: INVESTMENT PROJECTS IN THE AGRO-INDUSTRIAL COMPLEX …€¦ · dairy and meat industry, sheep, horse, pigs, reindeer antlers breeding, poultry, ... Construction of meat production

Reconstruction and modernization of existing pig farm

Applicant: LLC «Malorosinka»

The purpose and concept of the project are: Increased

production of pork to implement it in the district and region

Period of realization: 2016 2017 years

Place of realization: EKR, Zyryanovsk rayon, Parygino village

Current state There is a base of pig 24 700 sq.m, a granary of 8000 cubic

meters, as well as the entire infrastructure. Business plan,

project documentation are available. Compiled intention

agreement with the French company I-Tek for the supply of

equipment.

Total cost of project: 500 million tenge

Required investments: 500 million tenge

Government support: Subsidies for the production of pork.

Expected Result: Annual production of up to 360 tons of pork.

Workplaces 150 persons

Page 12: INVESTMENT PROJECTS IN THE AGRO-INDUSTRIAL COMPLEX …€¦ · dairy and meat industry, sheep, horse, pigs, reindeer antlers breeding, poultry, ... Construction of meat production

Construction of feeding

areas

Page 13: INVESTMENT PROJECTS IN THE AGRO-INDUSTRIAL COMPLEX …€¦ · dairy and meat industry, sheep, horse, pigs, reindeer antlers breeding, poultry, ... Construction of meat production

Creation of breeding reproducer and feedlots, the development of fodder

production

Applicant: «Algabas» farm

The purpose and concept of the project are: growing and

selling of breeding cattle

Period of realization: 2016 2018 years

Place of realization: EKR, Urdzhar

Current state Effective feedlot for 1,500 head of cattle, also built and

prepared documents for the introduction of the feedlot for

1500 animals. Land is available.

Total cost of project: 870 million tenge

Required investments: 520 million tenge

Government support: 1. Summarizing deficient infrastructure on the program

"Business Road Map-2020";

2.Subsidies for feed production;

3. Subsidies for breeding work.

Expected Result:

Реализация ежегодно до 375 тонн мяса говядины.

Workplaces 75 persons

Page 14: INVESTMENT PROJECTS IN THE AGRO-INDUSTRIAL COMPLEX …€¦ · dairy and meat industry, sheep, horse, pigs, reindeer antlers breeding, poultry, ... Construction of meat production

Extension of milk and meat production with subsequent downstream

processing

Applicant: LLC «Semey city-Agroinvest»

The purpose and concept of the project are: expansion of

milk-meat products production, and its subsequent

downstream processing for implementation in the region.

Period of realization: 2016 2020 years

Place of realization: EKR, Borodulikha rayon

Current state Business plan are ready

Total cost of project: 7 650 million tenge

Required investments: 3 825 million tenge

Government support: 1. Subsidizing of fee rates on loans and leasing of

technological equipment and agricultural machinery;

2. Investment subsidies for construction of feedlots, milk

processing companies, milk farms, milk collection centers;

3. Subsidies for feed production (seeds, fuels and lubricants,

herbicides, fertilizers);

4. Subsidies for production of meat and milk.

Expected Result: production of 500 tons milk production, 1000 tones of meat

products per year.

Workplaces 30 persons

Page 15: INVESTMENT PROJECTS IN THE AGRO-INDUSTRIAL COMPLEX …€¦ · dairy and meat industry, sheep, horse, pigs, reindeer antlers breeding, poultry, ... Construction of meat production

Growing and processing of

the crop production

Page 16: INVESTMENT PROJECTS IN THE AGRO-INDUSTRIAL COMPLEX …€¦ · dairy and meat industry, sheep, horse, pigs, reindeer antlers breeding, poultry, ... Construction of meat production

Construction of oil processing of oilseeds crops

Applicant: LLC «EastAroKholding»

The purpose and concept of the project are: production

and sale of its oil in the region

Period of realization: 2016 2020 years

Place of realization: EKR, Ust-Kamenogorsk city

Current state There is an engineering infrastructure, where develop design

documentation.

Total cost of project: 900 million tenge

Required investments: 600 million tenge

Government support Subsidized of interest rates on loans, and leasing of

technological equipment and agricultural machinery;

Expected Result: Production annual 16,900 tons of butter, 15 600 tonnes of

meal, 12,800 tons of meal.

Workplaces 47 persons

Page 17: INVESTMENT PROJECTS IN THE AGRO-INDUSTRIAL COMPLEX …€¦ · dairy and meat industry, sheep, horse, pigs, reindeer antlers breeding, poultry, ... Construction of meat production

Growing and processing of artichoke to produce granular concentrated feed,

bioethanol and monosugars

Applicant: LCC «Zelenstroi KZ»

The purpose and concept of the project are: creation of a

modern agricultural holding for breeding and deep

processing of complex technical and forage crops

Period of realization: 2016 2018 years

Place of realization: EKR, Ust-Kamenogorsk

Current state There are 1600 hectares of land. Also all the necessary

engineering and transport communications are available.

Business plan.

Total cost of project: 400 million tenge

Required investments: 320 million tenge

Government support subsidies for feed production (seeds, fuels and lubricants,

herbicides, fertilizers).

Expected Result: The annual production of up to 37,000 granulated

concentrated feed, bioethanol and monosugars.

Workplaces: 220 persons

Page 18: INVESTMENT PROJECTS IN THE AGRO-INDUSTRIAL COMPLEX …€¦ · dairy and meat industry, sheep, horse, pigs, reindeer antlers breeding, poultry, ... Construction of meat production

Building of factory for processing of agricultural crops

Applicant: LCC «LongXin»

The purpose and concept of the project are: Getting high-

quality, export-oriented and competitive agricultural products

for the domestic and foreign market

Period of realization: 2016 2020 years

Place of realization: EKR, Beskaragai rayon, Malaya Vladimirovka village

Current state: The issue of allocation of 14,700 hectares of land is

considering.. Business plan are ready. The infrastructure is

absent.

Total cost of project: 5 400 million tenge

Required investments: 5 400 million tenge

Government support 1. Summarizing of the missing infrastructure on the

program "Business Road Map-2020";

2. Subsidizing of fee rates on loans and leasing of

technological equipment and agricultural machinery;

3. Subsidies for crop production (seeds, fuels and lubricants,

herbicides, fertilizers).

Expected Result:

Production and processing annual 2 000 tonnes of agricultural

products.

Workplaces: 150 persons

Page 19: INVESTMENT PROJECTS IN THE AGRO-INDUSTRIAL COMPLEX …€¦ · dairy and meat industry, sheep, horse, pigs, reindeer antlers breeding, poultry, ... Construction of meat production

Construction corn-treacle factory

Applicant: «Bota» farm

The purpose and concept of the project are: processing of

corn starch release and other products for sale on the territory

of the region and outside.

Period of realization: 2016 2018 years

Place of realization EKR, Zaisan

Current state:

There are 1500 hectares of land. Develop a business plan,

feasibility study for the project.

Total cost of project: 2 500 million tenge

Required investments: 1 800 million tenge

Government support 1. Subsidized of interest rates on loans, and leasing of

technological equipment and agricultural machinery;

2. Subsidies for crop production (seeds, fuels and lubricants,

herbicides, fertilizers).

Expected Result:

Production per day 70 tons of starch.

Workplaces: 60 persons

Page 20: INVESTMENT PROJECTS IN THE AGRO-INDUSTRIAL COMPLEX …€¦ · dairy and meat industry, sheep, horse, pigs, reindeer antlers breeding, poultry, ... Construction of meat production

Potato farming development

Applicant: «Kulyndy» farm

The purpose and concept of the project are: the

cultivation, storage and sale of potatoes in the region.

Period of realization: 2016 2018 years

Place of realization:

EKR, Ulan, Novo-Azovoe

Current state: There is a land area of 180 hectares. Develop a business plan,

feasibility study for the project. Required laying of the

pipeline length of 2.5 km, reconstruction of two silos at the

vegetable store total capacity of 7000 tons.

Total cost of project: 262 million tenge

Required investments: 250 million tenge

Government support Subsidies to support crop production (fuel and lubricants,

seeds, herbicides, fertilizers).

Expected Result: The cultivation and sale of annual up to 4200 tonnes.

Workplaces: 25 persons

Page 21: INVESTMENT PROJECTS IN THE AGRO-INDUSTRIAL COMPLEX …€¦ · dairy and meat industry, sheep, horse, pigs, reindeer antlers breeding, poultry, ... Construction of meat production

Processing of wool and

pelt

Page 22: INVESTMENT PROJECTS IN THE AGRO-INDUSTRIAL COMPLEX …€¦ · dairy and meat industry, sheep, horse, pigs, reindeer antlers breeding, poultry, ... Construction of meat production

Manufacture of felt products

Applicant: LLP "Rose felting Plant"

The purpose and concept of the Project: the expansion and

modernization of production

Implementation period: 2016

Place of realization: EKR, Semey city

Current state LLP "Rose felting Works" carries on business since 1991.

Produces boots (women, men, children, rubber), felts

(technical, aviation, for yurta, heating, boots made of felt, in

the range).

Total cost of project: 24 million tenge

Required investments: 24 million tenge

Government support: Subsidizing of fee rates on loans and leasing of technological

equipment and agricultural machinery

Expected result: Expanding the range of shoes made of felt.

Page 23: INVESTMENT PROJECTS IN THE AGRO-INDUSTRIAL COMPLEX …€¦ · dairy and meat industry, sheep, horse, pigs, reindeer antlers breeding, poultry, ... Construction of meat production

Construction of dairy

farms

Page 24: INVESTMENT PROJECTS IN THE AGRO-INDUSTRIAL COMPLEX …€¦ · dairy and meat industry, sheep, horse, pigs, reindeer antlers breeding, poultry, ... Construction of meat production

Construction of the milk farm for 600 heads

Applicant: LCC «Experimental farm of oilseeds»

The purpose and concept of the project are: increase

production of its own milk

Period of realization: 2015- 2017 years

Place of realization: EKR, Glubokoe, Solnechnoe

Current state: The construction of the milking of unit, maintained interior

finishing work. Before the year is over installation of

equipment.

Total cost of project: 2 312,8 million tenge

Required investments::

:

500,9 million tenge

Government support 1. Summary of the missing infrastructure on the program

"Business Road Map-2020";

2. Subsidized interest rates on loans, and leasing of

technological equipment and agricultural machinery;

3. Investsubsidies for the construction of the milk farm;

4. Grants for fodder production (seeds, fuels and lubricants,

herbicides, fertilizers).

Expected Result:

increase in milk production at 4320 tonnes per year

Workplaces: 20 persons

Page 25: INVESTMENT PROJECTS IN THE AGRO-INDUSTRIAL COMPLEX …€¦ · dairy and meat industry, sheep, horse, pigs, reindeer antlers breeding, poultry, ... Construction of meat production

Construction of the dairy farm for 600 heads

Applicant: CH "Bagration2"

The purpose and concept of the project: increase

production of its own milk for further processing

Period of realization:: 2013-2015

Place of realization East Kazakhstan region, Ulan

district, Bagrationovsk rural district, Privolnoe

village

Current status:

Construction completed on 80%, are finishing work.

Total project cost:

497.0 million tenge

Required investments:

65.5 mln

State support:

1. Wrap the missing infrastructure on the program

"Business Road Map-2020";

2. Subsidized interest rates on loans, and leasing of

technological equipment and agricultural

machinery;

3. Investment subsidies the construction of the

dairy farm;

4. Grants for fodder production (seeds, fuels and

lubricants, herbicides, fertilizers).

Expected results Increase in the annual volume of milk production to

5 million tons

Creating jobs

20 persons

Page 26: INVESTMENT PROJECTS IN THE AGRO-INDUSTRIAL COMPLEX …€¦ · dairy and meat industry, sheep, horse, pigs, reindeer antlers breeding, poultry, ... Construction of meat production

Milk processing

Page 27: INVESTMENT PROJECTS IN THE AGRO-INDUSTRIAL COMPLEX …€¦ · dairy and meat industry, sheep, horse, pigs, reindeer antlers breeding, poultry, ... Construction of meat production

Opening milk processing plant

Applicant: SP "Ak Kainar"

The purpose and concept of the project: the

production and sale of milk and dairy products in

the area.

Period of realization: 2016

Project location: East Kazakhstan region, Kurchum

district, Kurchum village

Current status: There is a land plot of 1, 2 hectares. Repair of the

building of shop comes to the end. Replacement of

the sewerage is made. The project documentation is

developed.

Total project cost: 110 million tenge.

Required investments: 70 million tenge for the purchase of equipment.

Government support: Subsidies for the purchase of milk for the production

of its advanced processing

Expected Result: Processing of up to 5 000 ton of milk.

Job Creation: 10 persons

Page 28: INVESTMENT PROJECTS IN THE AGRO-INDUSTRIAL COMPLEX …€¦ · dairy and meat industry, sheep, horse, pigs, reindeer antlers breeding, poultry, ... Construction of meat production

Expansion of the range of manufacture of dairy products, the installation of a

biogas plant

Applicant: a / v "E.Zaytenov"

The purpose and concept of the project: the

expansion of the range and volume of production

and sales of dairy products to the population field

Period of realization:: 2016-2018 years

Location of the project

East Kazakhstan region ,Borodulikha district,

Ivanovka village

Current status:

There are 14,982 hectares of farmland. All the

necessary material and technical base and

infrastructure are available. Project documentation

for the project is missing.

Total project cost:

130 million tenge

Required investments:

130 million tenge in the expansion and

modernization of plants for the production of cheese.

Government support:

1. Subsidizing of fee rates on loans and leasing of

technological equipment and agricultural machinery;

2. Subsidies for feed production

3. Subsidies for milk production

Expected Result:

Reaching of 60 tons of cheese production per year.

Work places:

10 persons

Page 29: INVESTMENT PROJECTS IN THE AGRO-INDUSTRIAL COMPLEX …€¦ · dairy and meat industry, sheep, horse, pigs, reindeer antlers breeding, poultry, ... Construction of meat production

Reconstruction and modernization of the existing dairy

Applicant: TOO "Sunrise Milk"

The purpose and concept of the project: the

expansion of the range and volume of production

and sales of dairy products to the population field

Period of realization: 2016-2017 years

Location of the project

East Kazakhstan region , Glubokoe district,

Uvarovo village

Current status: There is a valid minishop capacity of 15 tons per

shift. Project documentation for the project is

missing.

Total project cost

150 million tenge

Required investments:

100 million tenge for the reconstruction of the

existing dairy, installation and commissioning of

equipment for packaging dairy products, the

acquisition of a special transport arrangement outlets

in regional and district centers.

Government support:

1. Subsidized interest rates on loans, and leasing of

technological equipment and agricultural machinery;

2. Subsidies for fodder production;

3. Subsidies for milk production.

Expected Result

Increase the output of dairy products up to 20 tons

per shift.

Creating jobs

4 persons

Page 30: INVESTMENT PROJECTS IN THE AGRO-INDUSTRIAL COMPLEX …€¦ · dairy and meat industry, sheep, horse, pigs, reindeer antlers breeding, poultry, ... Construction of meat production

Construction of poultry

factory

Page 31: INVESTMENT PROJECTS IN THE AGRO-INDUSTRIAL COMPLEX …€¦ · dairy and meat industry, sheep, horse, pigs, reindeer antlers breeding, poultry, ... Construction of meat production

Construction of poultry farm productivity

30 thousand tons of poultry meat a year

Applicant: Akimat of Urdzharsky district

The purpose and concept of the project: production

and exports out of the region and the countries of chilled

and frozen broiler meat

Period of realization: 2016-2018 years

Project location: East Kazakhstan region, Urjar district;

Current status: Akimat of the Urdzhar district for the construction of

the poultry farm will be granted 225 hectares of land

for the development of their own forage production

transferred to the long-term lease 40,808 hectares of

land, of which 4653 hectares of irrigated land.

Developed a business plan, feasibility study for the

project.

Total project cost:

23 500 mln. tenge

Required investments

23 500 mln. tenge

Government support:

1. Summary of the missing infrastructure on the program

"Business Road Map-2020";

2. Subsidize interest rates on loans, and leasing of

technological equipment and agricultural machinery;

3. Investment subsidies to build poultry complex, the

introduction of irrigation systems;

4. Subsidies for fodder production (seeds, fuels and

lubricants, herbicides, fertilizers) and the delivery of

irrigation water;

5. The subsidies for the production of poultry meat, as

well as to carry out breeding.

Expected Result: Annual production of 30 thousand tons of chilled and

frozen broiler meat.

Job Creation: 879 persons

Page 32: INVESTMENT PROJECTS IN THE AGRO-INDUSTRIAL COMPLEX …€¦ · dairy and meat industry, sheep, horse, pigs, reindeer antlers breeding, poultry, ... Construction of meat production

Construction of poultry farm capacity of 100 million.

Eggs per year

Applicant: Xinjiang Commerce and Industry

Corporation "San Bao"

The purpose and concept of the project: the

production and export of eggs in the Xinjiang Uygur

Autonomous Region of China

Period of realization:: 2016-2018 years

Location of the project East Kazakhstan region,

Ulan district, Bozanbay village

Current status: Signed an agreement on attraction of foreign

investments for the construction of poultry farms in

the East Kazakhstan region, dated 30 October 2015

with the Xinjiang Commerce and Industry

Corporation "San Bao" on mutual cooperation

The total cost of the project:

6,750 million. tenge

Required investments:

6 750 million. tenge

Government support:

1. Summary of the missing infrastructure on the

program "Business Road Map-2020";

2. Subsidize interest rates on loans, and leasing of

technological equipment and agricultural machinery;

3. Subsidies for fodder production (seeds, fuels and

lubricants, herbicides, fertilizers);

4. Subsidies for the production of edible eggs.

Expected Result annual production of up to 100 million of eggs

Creating jobs: 160 persons

Page 33: INVESTMENT PROJECTS IN THE AGRO-INDUSTRIAL COMPLEX …€¦ · dairy and meat industry, sheep, horse, pigs, reindeer antlers breeding, poultry, ... Construction of meat production

Reconstruction of the poultry farms of egg direction

Applicant: LLP "Poultry Farm Families"

The purpose and concept of the project:

Production and sale of commercial eggs in Semey

city

Period of realization: 2016

Project location: East Kazakhstan region, Semey

city city, Small Aktyuba village

Current status: Industrial buildings, as well as all the shop poultry

farms, feed mills sealed, sealed and ready to run at

any time. Production has been suspended due to the

lack of working capital.

Total project cost:

502 million. tenge

Required investments:

150 million for working capital

Government support:

1. Subsidies for acquisition of daily young growth,

acquisition of breeding incubatory eggs, and also

reduction in cost of cost of production of food egg.

Expected Result:

Production in the year to 24.6 million. Eggs (stage 1),

which will satisfy the needs of families in the city

60%. Subsequently, it is planned to increase egg

production to 100 million pieces.

Job Creation:

48 persons

Page 34: INVESTMENT PROJECTS IN THE AGRO-INDUSTRIAL COMPLEX …€¦ · dairy and meat industry, sheep, horse, pigs, reindeer antlers breeding, poultry, ... Construction of meat production

Reconstruction of

irrigated areas

Page 35: INVESTMENT PROJECTS IN THE AGRO-INDUSTRIAL COMPLEX …€¦ · dairy and meat industry, sheep, horse, pigs, reindeer antlers breeding, poultry, ... Construction of meat production

Developing of 1300 hectares of irrigated land

in Zaisan district

Applicant : Akimat of Zaisan district

The purpose and concept of the project: Developing of 1300 hectares of unused land

irrigated for cultivation and sale of agricultural

products.

Period of realization: 2016

Project location: East Kazakhstan region, Zaisan district, territory and

Karabulak Aynabulakskiy rural districts.

Current status: 1000 hectares in the Karabulak rural district: the

section is in 10 km from the village of Karabulak.

Point site class of the earth 32 points. A watering

source Uydeninskiy irrigating system, the trunk

LMH2-32 channel requiring repair of intercompany

channels.

300 hectares in the Aynabulak rural district: the

section is in 3, 5 km from the village of Aynabulak.

Point site class of the earth 32 points. Watering

source Zhemeneyskiy irrigating system of the

Zhemeney river.

Total project cost: 618.5 million. tenge (approximately)

Required investments: 618.5 million. tenge (approximately)

Government support:

1. Summary of the missing infrastructure on the

program "Business Road Map-2020";

2. Subsidize interest rates on loans, and leasing of

technological equipment and agricultural machinery;

3. Investment subsidies for implementation of

irrigation systems;

4. Subsidies for crop production (seeds, fuels and

lubricants, herbicides, fertilizers), as well as the

delivery of irrigation water.

Expected Result:

Manufacture and sale of crop production, including

forage production management

Page 36: INVESTMENT PROJECTS IN THE AGRO-INDUSTRIAL COMPLEX …€¦ · dairy and meat industry, sheep, horse, pigs, reindeer antlers breeding, poultry, ... Construction of meat production

Organization of 4157 square hectare agro- platform

"Zhanbyr"

Applicant: Akimat of the Beskaragay rayon.

The purpose and concept of the project: Developing of 4157 hectares of irrigated unused land

for cultivation and realization of agricultural products.

Period of realization: 2016-2017 years

Project location: East Kazakhstan region,

Beskaragay district, former state territory

"Krivinsky" and "Semiyarsky."

Current status: The feasibility study of the project verifying by

government.

Total project cost:

3 653.8 million. tenge (approximately)

Required investments:

3 653.8 million. tenge (approximately)

Government support:

1. Summarizing of the missing infrastructure on the

program "Business Road Map-2020";

2. Subsidizing of fee rates on loans and leasing of

technological equipment and agricultural machinery;

3. Investment subsidies for implementation of

irrigation systems;

4. Subsidies for crop production (seeds, fuels and

lubricants, herbicides, fertilizers), as well as the

delivery of irrigation water.

Expected Result:

Producing and selling of crop production, including

forage production.

Work places:

17 persons

Page 37: INVESTMENT PROJECTS IN THE AGRO-INDUSTRIAL COMPLEX …€¦ · dairy and meat industry, sheep, horse, pigs, reindeer antlers breeding, poultry, ... Construction of meat production

Developing of 3197 hectares of irrigated landin Tarbagatai area

Applicant: Akimat of the Tarbagatay district

The purpose and concept of the project: Developing of 3197

hectares of unused land irrigated for cultivation and sale of

agricultural products.

Implementation period: 2016-2017 years

Project location: East Kazakhstan region, Tarbagatay district,

territory and Kokzhyrinsky Zhetyaralsky rural district.

Current status: 1500 hectare Zhetyaralsky rural district. The plot is at the end of

irrigation reservoir Kandysu. Irrigated through the main

channels Begetay, Kazakbay, Karash, Bolat (length about 17-25

km). Average land bonitet 20-26 points. The composition of the

soil medium loamy;

1697 hectare Kokzhyrinsky rural district. The plot is at the

end of irrigation main canal Karymsakov Bazar area. Irrigated

through internal channels Karymsakov, koybgar, Satpayev

(length 22 km). Average land bonitet 18-20 points. The

composition of the soil medium loamy;

Total project cost:

1 506.7 million. tenge (approximately)

Required investments:

1 506 7 million. tenge (approximately)

Government support:

1. Summary of the missing infrastructure on the program

"Business Road Map-2020";

2. Subsidize interest rates on loans, and leasing of

technological equipment and agricultural machinery;

3. Investment subsidies for implementation of irrigation

systems;

4. Subsidies for crop production (seeds, fuels and lubricants,

herbicides, fertilizers), as well as the delivery of irrigation

water.

Expected Result:

Manufacture and sale of crop production, including forage

production management.

Page 38: INVESTMENT PROJECTS IN THE AGRO-INDUSTRIAL COMPLEX …€¦ · dairy and meat industry, sheep, horse, pigs, reindeer antlers breeding, poultry, ... Construction of meat production

Developing of 4653 hectares of irrigated land

Urjar in the area to create a food base for the production of poultry farms each year

to 30 thousand tons of poultry meat

Applicant: Akimat of the Urdzhar district

The purpose and concept of the project: the

creation of fodder Urdzhar poultry farms to produce

annually up to 30 thousand tons of poultry meat.

Period of realization:: 2016-2018 years

Project location: East Kazakhstan region, Urjar area

Current status: Akimat of the Urdzhar area prepared for transfer to

long-term lease of land in 4653 hectares of unused

irrigated lands

Total project cost:

2 640.0 million. tenge

Required investments:

2 640.0 million. tenge

Government support:

1. Summary of the missing infrastructure on the

program "Business Road Map-2020";

2. Subsidize interest rates on loans, and leasing of

technological equipment and agricultural machinery;

3. Investment subsidies for implementation of

irrigation systems;

4. Subsidies for crop production (seeds, fuels and

lubricants, herbicides, fertilizers), as well as the

delivery of irrigation water.

Expected Result:

Provide your own food supply poultry farms

Page 39: INVESTMENT PROJECTS IN THE AGRO-INDUSTRIAL COMPLEX …€¦ · dairy and meat industry, sheep, horse, pigs, reindeer antlers breeding, poultry, ... Construction of meat production

Construction of the dairy farm on 400 goals

Applicant: LLP "Batwa"

The purpose and concept of the project: organization of production of milk and dairy

products for the subsequent implementation of it in

the region and beyond

Period of realization:: 2016-2018 years

Project location: East Kazakhstan region, Urjar area

of land Sarterek

Current status On the territory of the district akimat Sarterek area

granted 200 hectares of land for the construction of

dairy farms

Total project cost:

340 mln

Required investments 340 mln, of which 270 million tenge for the

construction of the dairy farm

Government support:

1. Summary of the missing infrastructure on the

program "Business Road Map-2020";

2. Investment subsidies for implementation of

irrigation systems, the construction of the dairy farm;

3. Subsidies for feed production (fuel and lubricants

work, seeds, fertilizers, herbicides);

4. Subsidies for water delivery.

Expected Result: Organization of the dairy farm on 400 goals.

Job Creation: 50 persons

Page 40: INVESTMENT PROJECTS IN THE AGRO-INDUSTRIAL COMPLEX …€¦ · dairy and meat industry, sheep, horse, pigs, reindeer antlers breeding, poultry, ... Construction of meat production

Construction of irrigation networks on irrigated land to 6000 hectares

Applicant: LLP "Batwa"

The purpose and Concept of the Project:

Expansion of irrigated land due to development of

rainfed lands fallow, introduction of new advanced

water saving technology for crops growing

Period of realization:: 2016-2018 years

Project location: East Kazakhstan region, Urjar area

of land Sarterek

Current status 6,000 hectares of irrigation networks to carry out.

Total project cost:

3000 mln

Required investments 3000 mln, 5000 million tenge to conduct irrigation

networks.

Government support:

1 Subsidies for water delivery.

Expected Result: Entering into circulation 6000 hectares of new

irrigated land..

Job Creation: 180 persons

Page 41: INVESTMENT PROJECTS IN THE AGRO-INDUSTRIAL COMPLEX …€¦ · dairy and meat industry, sheep, horse, pigs, reindeer antlers breeding, poultry, ... Construction of meat production

Greenhouses

Page 42: INVESTMENT PROJECTS IN THE AGRO-INDUSTRIAL COMPLEX …€¦ · dairy and meat industry, sheep, horse, pigs, reindeer antlers breeding, poultry, ... Construction of meat production

Construction of a hothouse complex

Applicant: LLP "Alzhan AGROTRADE"

The purpose and concept of the project: Growing

vegetable crops using advanced technologies.

Period of realization: 2016-2017 years

Project location: East Kazakhstan region,

Ust-Kamenogorsk city

Current status: There is a 2.2 hectare plot of land in the area of New

Sogra. The necessary infrastructure is lacking. PSD

does not. There is a business plan.

The total cost of the project: 1 350 mln. tenge

Required investments: 1 350 mln. tenge

State support:

1. Wrap the missing infrastructure on the program

"Business Road Map-2020";

2. Subsidize interest rates on loans, and leasing of

technological equipment and agricultural machinery;

3. Investment subsidies for the construction and

expansion of the greenhouse complex.

Output expected: Annual production of vegetables

and 550 tons of cucumbers and 450 tons of tomatoes.

Job Creation:

40 persons

Page 43: INVESTMENT PROJECTS IN THE AGRO-INDUSTRIAL COMPLEX …€¦ · dairy and meat industry, sheep, horse, pigs, reindeer antlers breeding, poultry, ... Construction of meat production

Building a greenhouse with a mini processing plant litter and manure

Applicant: "Ust-Kamenogrosky innovative

technology"

The purpose and concept of the project:

Cultivation of agricultural products using advanced

technology.

Period of realization: 2016-2017 years

Project location: East Kazakhstan region, Ulan

district, Kasim Kaysenova village

Current status: The issue of land allocation is decided. In a selected

area has all the necessary infrastructure. Project

documentation for the project is missing.

The total cost of the project:

1 400 mln. Tenge

Required investments:

1 400 million. Tenge

State support:

1. Subsidizing interest rates on loans, and leasing of

technological equipment and agricultural machinery;

2. Investment subsidies for the construction and

expansion of the greenhouse complex

Output expected:

Annual production and sales of the region up to 1000

tons.

Job Creation:

100 persons

Page 44: INVESTMENT PROJECTS IN THE AGRO-INDUSTRIAL COMPLEX …€¦ · dairy and meat industry, sheep, horse, pigs, reindeer antlers breeding, poultry, ... Construction of meat production

Maral breeding and

beekeeping

Page 45: INVESTMENT PROJECTS IN THE AGRO-INDUSTRIAL COMPLEX …€¦ · dairy and meat industry, sheep, horse, pigs, reindeer antlers breeding, poultry, ... Construction of meat production

Construction of plant for packing the honey

Applicant: CH "Apiary"

The purpose and concept of the project: Increasing production and sales volumes in the

region and the Republic of honey products.

Period of realization: 2016

Project location: East Kazakhstan region, Ust-

Kamenogorsk city, Menovnoe village

Current Status: The construction of the plant and are maintained

interior finishing work. It is considering the issue of

the supply of equipment to suppliers.

Total project cost:

360 million tenge

Required investments:

140 million tenge for the purchase of equipment.

Government support:

Subsidizing interest rates on loans, and leasing of

technological equipment and agricultural machinery.

Expected Result:

The annual production of up to 1,000 ton of honey

products.

Job Creation:

15 persons

Page 46: INVESTMENT PROJECTS IN THE AGRO-INDUSTRIAL COMPLEX …€¦ · dairy and meat industry, sheep, horse, pigs, reindeer antlers breeding, poultry, ... Construction of meat production

Building of innovative complex with deer corral,

antlers processing shop and wellness center

Applicant: CH "Caton-Karagayskiy deer park"

The purpose and concept of the project: Creating

a wellness center for 100 persons and deer complex

200 persons.

Period of realization: 2016-2018

Project location: East Kazakhstan region

Katonkaragay rayon, Katon-Karagay village

Current status: There is a 33 hectare plot of land. The infrastructure

is absent.

A business plan and feasibility study for the project

are ready. There is an agreement with suppliers for

the supplying of necessary materials.

The total cost of the project:

580 million tenge

Required investments: 450 mln for the construction and purchasing of

equipment for deer complex.

Government support:

1. Summarizing of the missing infrastructure on the

program "Business Road Map-2020";

2. Subsidizing of fee rates on loans and leasing of

technological equipment and agricultural machinery.

Expected result:

Processing of 200 tons antlers per year.

Work places:

12 persons

Page 47: INVESTMENT PROJECTS IN THE AGRO-INDUSTRIAL COMPLEX …€¦ · dairy and meat industry, sheep, horse, pigs, reindeer antlers breeding, poultry, ... Construction of meat production

Fish farming

Page 48: INVESTMENT PROJECTS IN THE AGRO-INDUSTRIAL COMPLEX …€¦ · dairy and meat industry, sheep, horse, pigs, reindeer antlers breeding, poultry, ... Construction of meat production

Complex for industrial fish farming

Applicant: LLP «Ostfish»

The purpose and concept of the project: Creation

of a significant production of fish products and

giving it to the market of Kazakhstan and beyond

Period of realization: 2015-2021 years

Project location: East Kazakhstan region, Ulan

district, Saratovka village

Current status: Allocate land of 5.6 hectares. Fully completed

construction of the complex. Completed interior

finishing work. Communication is available.

The total cost of the project:

1 881.6 million tenge

Required investments:

132 mln settlement on the road.

State support:

1. preference in accordance with the Law "On

investments";

2. Subsidizing the cost of maintaining broodstock of

valuable fish species;

The expected result in the production of 45 tons of

meat a year sturgeon, 4 tons of caviar.

Creating jobs

25 persons

Page 49: INVESTMENT PROJECTS IN THE AGRO-INDUSTRIAL COMPLEX …€¦ · dairy and meat industry, sheep, horse, pigs, reindeer antlers breeding, poultry, ... Construction of meat production

Creating an integrated management of intensive cultivation of valuable species

(sturgeon, salmon, whitefish), walleye, cancer, animal feed and the production of

vermicompost in the integrated system and the development of tourism (sports and

recreational fishing)

Applicant: LLP "Kuzmich"

The purpose and concept of the project: Creation of

full-fishery commodity production and the development

of sports and recreational fishing

Period of realization: 2014-2018 years

Project location: East Kazakhstan region, Kokpekty rayon district,

Kulynzhon village

Current status: The project is ready for implementation. Investigations.

Business plan. Constructed and put into operation, the

incubation and fish processing plant, built winter

greenhouses, summed utilities including water treatment

RAS is connected to the 10kW solar power, secured land

at Bukhtarma reservoir for the development of fisheries

and tourism.

Total project cost:

170 million tenge

Required investments:

120 million tenge for working capital and construction of

tourist facilities

Government support:

1. Summary of the missing infrastructure on the program

"Business Road Map-2020";

2. The preferences in accordance with the Law "On

investments";

3. Subsidizing the cost of maintaining broodstock of

valuable fish species

Expected Result:

Growing in the year 20 tons of commercial fish

production of 100 million hatchling year.

Job creation:

33 persons

Page 50: INVESTMENT PROJECTS IN THE AGRO-INDUSTRIAL COMPLEX …€¦ · dairy and meat industry, sheep, horse, pigs, reindeer antlers breeding, poultry, ... Construction of meat production

Improvement of spawning and nursery farm

Applicant: LLP "Bukhtarma spawning and nursery

farm"

The purpose and concept of the project: Updating

of fish stocks in the waters of the region and the

Republic.

Period of realization:: 2016-2018 years

Project location: East Kazakhstan region, Kurchum

district, Kurchum village

Current status: The business plan is available. The current

production base there. Infrastructure available.

Total project cost:

150 mln. Tenge

Required investments:

150 mln for the purchase of machinery and

equipment.

Government support:

Subsidizing the cost of maintaining broodstock of

valuable fish species.

Expected Result: 32.4 million. Pieces of fish fry.

Job Creation: 50 persons

Page 51: INVESTMENT PROJECTS IN THE AGRO-INDUSTRIAL COMPLEX …€¦ · dairy and meat industry, sheep, horse, pigs, reindeer antlers breeding, poultry, ... Construction of meat production

Timber processing

Page 52: INVESTMENT PROJECTS IN THE AGRO-INDUSTRIAL COMPLEX …€¦ · dairy and meat industry, sheep, horse, pigs, reindeer antlers breeding, poultry, ... Construction of meat production

Plant for the production of fuel pellets waste timber capacity of 20 000 tons in year

Applicant: LLP "Nurbilding"

The purpose and concept of the project: Construction of a

plant production of fuel briquettes from waste wood

processing capacity of 20 000 tons in year.

Implementation period: 2016-2017 years

Project location: Place of Ust-Kamenogorsk

Current status: The business plan, feasibility study. There is a plot pl.5,5

hectares of land in the "Zone of business development on

the Mashinostroiteley street Ust-Kamenogorsk

city. "All necessary engineering and transport

communications are available.

Total cost project:

270 million. тenge.

Required investments:

270 million. тenge.

The State Support:

1.Summarizing missinginfrastructure

the program "Business Road Map-2020";

2.Preferences in accordance with the Law "On

Investments ";

3.Different measures of financial and nonfinancial

state support and business development services

business support for the "Road Map of Business-2020 ";

Job Creation 47 persons

Page 53: INVESTMENT PROJECTS IN THE AGRO-INDUSTRIAL COMPLEX …€¦ · dairy and meat industry, sheep, horse, pigs, reindeer antlers breeding, poultry, ... Construction of meat production

Construction of plant for production of wood MDF thickness of 2.3 to 13 mm

further downstream processing

Applicant: LLP "FAVORITE"

The purpose and concept of the project: Production of

MDF 50 thousand m3.

There are all the necessary technical conditions

construction.

Estimated profit - up to 40 million. Dollars. Per annum

Implementation period: 2016-2017 years

Location of the project Ziryanovsk

Current Status There are all the necessary technical conditions

construction.

Total project cost: 9 450,0 mln. Tenge.

Required investments: 9 450.0 mln. Tenge.

The State Support:

1.Summarizing missing infrastructure

the program "Business Road Map-2020";

2.Preferences in accordance with the Law "On

Investments ";

3.Different measures of financial and nonfinancial

state support and business development

business support services for program "Business Road

Map-2020";

Expected Result: Production of wood pellets capacity of 70 thousand tons

per year.

Estimated profit - from 40 euros tons of pellets and

briquettes

Creating jobs: 250 persons

Page 54: INVESTMENT PROJECTS IN THE AGRO-INDUSTRIAL COMPLEX …€¦ · dairy and meat industry, sheep, horse, pigs, reindeer antlers breeding, poultry, ... Construction of meat production

Building of department

for the production of wood pellets (pellets) and wood briquettes.

Alternative sources of heat to replace coal and oil

Applicant: PC "KAZAKHSTAN"

The purpose and concept of the project: Production of

wood pellets capacity of 70 thousand tons per year.

Implementation period: 2016-2017 years

Project location: Zyryanovsk rayon city

Current status: We have all the necessary technical conditions

construction.

Total cost project 3 780.0 mln. Тenge

Required investments 3 780.0 mln. Тenge

The State Support:

1.Summarizing missing infrastructure

the program "Business Road Map-2020";

2.Preferences in accordance with the Law "On

Investments ";

3.Different measures of financial and nonfinancial

state support and business development services business

support for the "Road Map of Business-2020 ";

Expected result: Estimated profit - from 40 euros per ton of pellets and

briquettes

Job creation 255 persons

Page 55: INVESTMENT PROJECTS IN THE AGRO-INDUSTRIAL COMPLEX …€¦ · dairy and meat industry, sheep, horse, pigs, reindeer antlers breeding, poultry, ... Construction of meat production

Construction of the plant for the production of chip-cement slabs, Production

of wooden building constructions for housing

Applicant: LLP "Altai RIV"

The purpose and concept of the project: Production of

particle-cement boards board (permanent formwork for

social housing and industrial facilities), production of

wooden building designs for house building "House of

the package."

Implementation period: 2016-2017 years

Place of Ust-Kamenogorsk

Current status We have all the necessary technical conditions

construction. 1 MW Electricity, water 20 thousand cu. /

year.

Network and communications are to connect to the

within 50 meters of land area portion.

The total cost of the project 2 250.0 million. Tenge

Required investments 2 250.0 million. Tenge

The State Support 1. Summarizing missing infrastructure the program

"Business Road Map-2020";

2. Preferences in accordance with the Law "On

Investments ";

3. Different measures of financial and nonfinancial state

support and business development business support

services for program "Business Road Map-2020";

Creating jobs 355 persons

: -

:

Page 56: INVESTMENT PROJECTS IN THE AGRO-INDUSTRIAL COMPLEX …€¦ · dairy and meat industry, sheep, horse, pigs, reindeer antlers breeding, poultry, ... Construction of meat production

Organization of the production of wood products

Applicant: SP "Tsykunov AA"

The purpose and concept of the project: Procurement of

raw materials for the wood production and the further

processing.

Implementation period: 2016-2017 years

Project location: Ridder city

Current status: - At the design stage

Total project cost: 750.0 million. Tenge

Required investments: 720.0 million. Tenge

The State Support 1. Summing missing infrastructure the program "Business

Road Map-2020";

2. Preferences in accordance with the Law "On Investments

";

3. Different measures of financial and nonfinancial state

support and business development services business

support for the "Road Map of Business-2020 "; Expected

result: The final product (the number of ton per year):

- Cutting board - 10,000 m3; - Dry timber - 1350 m3; -

Laminated veneer lumber for housing - 1200m3; - glulam

for manufacturing euro windows - 1200m3; - Round logs

for log cabins - 10000m3; - wooden doors

Creating jobs 60 persons

: -

Page 57: INVESTMENT PROJECTS IN THE AGRO-INDUSTRIAL COMPLEX …€¦ · dairy and meat industry, sheep, horse, pigs, reindeer antlers breeding, poultry, ... Construction of meat production

Reconstruction of the sawmill for placement of OSB production line

Applicant: LLP "Ridder MLC"

The purpose and concept of the project: Reconstruction of a

sawmill line placement production boards OSB.

The source of the raw material is wood, including semi-

subsistence, softwood and hardwood timber. Crushing

machine and press - China.

Implementation period: 2016-2017 years

Place of Ridder city

Current status At the design stage.

total cost project: 300.0 million. Tenge

Required investments 300.0 million. Tenge

The State Support 1. Summarizing missing infrastructure program "Business

Road Map-2020";

2. Preferences in accordance with the Law "On Investments ";

3. Different measures of financial and nonfinancial state

support and business development services business support

for the "Road Map Business-2020 ";

Expected result The company is planning for the project to achieve the

volume of production and sales of 36-40 m3 in year.

Creating jobs 60 persons

: -

:

Page 58: INVESTMENT PROJECTS IN THE AGRO-INDUSTRIAL COMPLEX …€¦ · dairy and meat industry, sheep, horse, pigs, reindeer antlers breeding, poultry, ... Construction of meat production

The project of deep processing of waste deciduous and coniferous forests second,

third grade, sawdust and straw

Applicant: SP "Grigoryev N."

The purpose and concept of the project: Starting line

(capacity 1000 kg / h) for Production of biofuel briquettes

high quality charcoal class A, including the preparation of

raw materials to the processing and Organization and

storage of primary end product.

Implementation period: 2016-2017 years

Project location: Ridder city

Current status: At the design stage.

The total cost of the project: 60.0 mln. Tenge

Required investments: 60.0 mln. Tenge

The State Support:

1. Summarizing missing infrastructure the program

"Business Road Map-2020";

2. Preferences in accordance with the Law "On Investments

";

3. Different measures of financial and nonfinancial state

support and business development services business

support for the "Road Map of Business-2020 ";

Expected result: The final product (the number of ton per year): -

Biofuel briquettes - 3,000 tons; - charcoal

Class A - 1 000 ton

Creating jobs 100 persons

: -

Page 59: INVESTMENT PROJECTS IN THE AGRO-INDUSTRIAL COMPLEX …€¦ · dairy and meat industry, sheep, horse, pigs, reindeer antlers breeding, poultry, ... Construction of meat production

Organization of mini-factory for the production of plywood (veneer)

Applicant: Andrievsky, AL

The purpose and concept of the project: Production of 10

sqm veneer month.

Implementation period: 2016-2017 years

Project location: the Shemonaikha city

Current status: - Prepared Spaces the plant, prepared a

business plan is being work on the collection of documents,

preparing collateral mass.

Total cost project: 25.0 mln. Tenge

Required investments: 20.0 mln. Tenge

The State Support:

1. Summarizing missing infrastructure the program

"Business Road Map-2020";

2. Preferences in accordance with the Law "On Investments

";

3. Different measures of financial and nonfinancial state

support and business development services business

support for the "Road Map of Business-2020 ";

Expected Result:

Production of 10 thousand of veneer per month.

Creating jobs 25 persons

Page 60: INVESTMENT PROJECTS IN THE AGRO-INDUSTRIAL COMPLEX …€¦ · dairy and meat industry, sheep, horse, pigs, reindeer antlers breeding, poultry, ... Construction of meat production

The country tourism

and improvement of the

persons health

Page 61: INVESTMENT PROJECTS IN THE AGRO-INDUSTRIAL COMPLEX …€¦ · dairy and meat industry, sheep, horse, pigs, reindeer antlers breeding, poultry, ... Construction of meat production

Creating a tourist base for 125 places

Applicant: LLP "Topkayyn"

The purpose and concept of the project: the

development of agricultural tourism

Period of realization: 2016-2019 years

Project location: Katon district, Topkayyn village

Current status: There are 10 hectares of land bought out. There is a

business plan, feasibility study, project

documentation project. The construction of 7 guest

houses.

Total project cost:

810 million tenge

Required investments:.

750 million tenge for the purchase of fixed and

current assets

Expected Result:

adoption annually until 1500 campers

Job Creation:

30 persons

Page 62: INVESTMENT PROJECTS IN THE AGRO-INDUSTRIAL COMPLEX …€¦ · dairy and meat industry, sheep, horse, pigs, reindeer antlers breeding, poultry, ... Construction of meat production

Construction of ethno-ecological agricultural tourism and recreation сentre

Applicant: SP "Kanapyanov"

The purpose and concept of the project: the

development of agricultural tourism

Period of realization: 2016-2017 years

Project location: East Kazakhstan region, Ulan

district, Kobayashi Utepov village

Current status: Available land of 580 hectares. The project is under

development

Total project cost: 370 million tenge

Required investments: 300 million tenge for the construction of the base, a

cafe, stables

Expected Result: restoration of the destroyed ethno-village of Kush-

Birlik with a single capacity of 60 persons

Job Creation: 11 persons

Page 63: INVESTMENT PROJECTS IN THE AGRO-INDUSTRIAL COMPLEX …€¦ · dairy and meat industry, sheep, horse, pigs, reindeer antlers breeding, poultry, ... Construction of meat production

Production of cleaned water

Applicant: LLP "Shygys Su Bio»

The purpose and concept of the project meet the

needs of the population with quality drinking water

Period of realization: 2016-2017 years

Project location : East Kazakhstan region, Ust-Kamenogorsk city

Current status: The issue of allocation of land under development.

There is a business plan

Total project cost: 100 million tenge

Required investments: 100 million tenge for the purchase of technological

equipment.

Expected Result: Cleansing the year 2400 tons of tap water.

Job Creation: 12 persons

Page 64: INVESTMENT PROJECTS IN THE AGRO-INDUSTRIAL COMPLEX …€¦ · dairy and meat industry, sheep, horse, pigs, reindeer antlers breeding, poultry, ... Construction of meat production

Transport and logistic

centres

Page 65: INVESTMENT PROJECTS IN THE AGRO-INDUSTRIAL COMPLEX …€¦ · dairy and meat industry, sheep, horse, pigs, reindeer antlers breeding, poultry, ... Construction of meat production

The opening of the service center for the sale of tractors and agricultural equipment

Applicant: LLP "Irtysh TK"

The purpose and concept of the project: the

opening of a service center for the sale of tractors and

agricultural equipment.

Period of realization: 2016-2018 years.

Location of the project: East Kazakhstan region,

Zaisan district, Zaisan city

Current state: The issue of allocation of land under development. It

developed a business plan and feasibility study for

the project.

Total project cost: 80 million tenge.

Required investments: 80 million tenge for the construction of the service

center, and working capital

Expected Result: Sales and service of each year until 3000 tractors.

Job creation: 25 persons

Page 66: INVESTMENT PROJECTS IN THE AGRO-INDUSTRIAL COMPLEX …€¦ · dairy and meat industry, sheep, horse, pigs, reindeer antlers breeding, poultry, ... Construction of meat production

The organization of agriculture transport and logistics center "Northern"

Applicant: SP "Aubakirov NT"

The purpose and concept of the project: Organization of transport and logistics center of

transit and trade.

Period of realization:: 2015-2017 years

Project location: East Kazakhstan region, Semey

city city

Total project cost: 750 million tenge

Required investments: 350 million tenge for the construction of warehouses

and storage facilities.

Expected Result: The increase in supply turnover

Job creation: 30 persons

Page 67: INVESTMENT PROJECTS IN THE AGRO-INDUSTRIAL COMPLEX …€¦ · dairy and meat industry, sheep, horse, pigs, reindeer antlers breeding, poultry, ... Construction of meat production

The organization of agriculture transport and logistics center

Applicant: SP "Khamitov AA"

The purpose and concept of the project:

Organization of transport and logistics center of

transit and trade.

Period of realization: 2015-2016 years

Location of the project East Kazakhstan region,

Shemonaikha city

Current status: Under construction Growers. Built checkpoint,

carried out all the finishing work.

Total project cost: 1160 mln

Required investments: 750 million tenge

Expected Result The increase in turnover.

Creating jobs 30 persons

-

Page 68: INVESTMENT PROJECTS IN THE AGRO-INDUSTRIAL COMPLEX …€¦ · dairy and meat industry, sheep, horse, pigs, reindeer antlers breeding, poultry, ... Construction of meat production

Construction of bridges

Page 69: INVESTMENT PROJECTS IN THE AGRO-INDUSTRIAL COMPLEX …€¦ · dairy and meat industry, sheep, horse, pigs, reindeer antlers breeding, poultry, ... Construction of meat production

Construction and operation of a bridge across the reservoir Bukhtarma

Applicant: Akimat of East Kazakhstan region, in the

face of "Department of passenger transport and

highways East Kazakhstan region"

Period of realization: 2017-2019 years

Project location: East Kazakhstan region, Kurchum

district

The purpose and concept of

the project:

to promote industrial and innovative development of

East Kazakhstan region of the Republic of

Kazakhstan by improving the transport infrastructure

in the region

• provide residents and businesses of the East

Kazakhstan region year-round opportunity to cross

to the opposite shore of the reservoir Bukhtarma

without threat to life and health

• give impetus to economic development of the

surrounding areas Bukhtarma lake: Zharma,

Kokpekty rayon, Kurchum and Katon-Karagay

• increases the investment appeal of industrial and

agricultural enterprises in the region through the

development of transport infrastructure

It creates a favorable environment for the

development of transport and logistics industry,

international transit traffic, the growth of domestic

and foreign trade

Current state:

Feasibility study of the project is developed, there is

a conclusion of the state, environmental, industry

expertise, is currently in the Ministry of National

Economy of Kazakhstan for the passage of economic

expertise.

Total project cost 23,578 million tenge

Required investments 23,578 million tenge

Expected Result:

The provision of safe crossings, reducing deaths,

improving the organization of traffic at any time of

Page 70: INVESTMENT PROJECTS IN THE AGRO-INDUSTRIAL COMPLEX …€¦ · dairy and meat industry, sheep, horse, pigs, reindeer antlers breeding, poultry, ... Construction of meat production

the year and the increase in traffic. Total cargo ferry

Kyzyl Tu in 2014 for the navigation period totaled

45,465 units; according to the forecasts for the first

year of operation of freight traffic was 372 thousand.

Units per year;

• will be given a boost to the economy surrounding

Bukhtarma reservoir area: Zaisan, Kokpekty rayon,

Kurchum and Katon-Karagai;

• increase the investment attractiveness of industrial

and agricultural enterprises in the region through the

development of transport infrastructure;

• increase the competitiveness of domestic

manufacturing enterprises by reducing transportation

costs, a significant share in the cost structure;

• The project will boost the performance of domestic

and international tourism by increasing access of

tourists to the recreational areas adjacent to

Bukhtarma reservoir.

Job creation: 47 persons