8/13/2019 Introduction to Defect Prevention
1/32
Internal 2010 Infosys Technologies Limited, India
Infosys
Introduction to Defect PreventionSeptember, 2011
INFOSYS TECHNOLOGIES LIMITED
Mexico
8/13/2019 Introduction to Defect Prevention
2/32
Internal 2
COPYRIGHT NOTICE
2010 Infosys Technologies Limited, Bangalore, India. All rights reserved. Infosys believes theinformation in this document is accurate as of its publication date; such information is subject to changewithout notice. Infosys acknowledges the proprietary rights of other companies to the trademarks,product names and such other intellectual property rights mentioned in this document. Except asexpressly permitted, neither this document nor any part of it may be reproduced, stored in a retrievalsystem, or transmitted in any form or by any means, electronic, mechanical, printing, photocopying,recording or otherwise, without the prior permission of Infosys Technologies Limited and/or any namedintellectual property rights holders under this document.
Infosys Technologies LimitedHosur RoadElectronic City, 3rd CrossBangalore 560 100India.Telephone: (91) (80)28520 261-270Fax: (91) (80) 8520 362
Website: http://www.infosys.com
2010 Infosys Technologies Limited, India
http://www.infosys.com/http://www.infosys.com/8/13/2019 Introduction to Defect Prevention
3/32
Internal 3
Date written (Sep/29/2011):
2010 Infosys Technologies Limited, India
Tania FloresDeyanira AraujoErnesto CantuIsaias Varela
Authors
8/13/2019 Introduction to Defect Prevention
4/32
Internal 4 2010 Infosys Technologies Limited, India
Target Readers
Defect Prevention Anchors and Backups, Project Managers and DP team.
Keywords
Defect Prevention, Types of Defects, DP Plan, Peer Reviews, Verification and Validation, DP
Anchor and Team responsibilities.
Purpose of the Document
This document provides an Introduction about DP definitions, advantages, DP process, DP
Cycle and responsibilities for each role and involves related topics as V&V, Peer-Reviews
and the usage of IPM+ for defect tracking.
Target Readers, Keywords and Purpose
8/13/2019 Introduction to Defect Prevention
5/32
Internal 5 2010 Infosys Technologies Limited, India
Defect Prevention
Defect-free software
does not exist.- Wietse Venema
8/13/2019 Introduction to Defect Prevention
6/32
Internal 6 2010 Infosys Technologies Limited, India
Agenda
Defect Definition Types of Defects Common Fallacies in all Projects Cost of not identifying Defects DP Definition and Advantages Defect Prevention Purpose Validation and Verification
Verification Examples Validation Examples Defect Prevention Process
Defect Prevention Cycle Defect Prevention Plan Data needed for DP Defect tracking at IPM+ How to diagnose the process and reduce defects Most Common Problems Faced by DP Team DP Project Anchor Responsibilities DP Team Responsibilities References
8/13/2019 Introduction to Defect Prevention
7/32Internal 7 2010 Infosys Technologies Limited, India
Defect Definition
A defect can be termed as a flaw or discrepancy in anydeliverable which includes planning documents,estimations, requirement analysis, design documents,lines of code or test cases.
What is a Defect?
8/13/2019 Introduction to Defect Prevention
8/32Internal 8 2010 Infosys Technologies Limited, India
Types of Defects
The following are just some of the most common types of defects:Coding standards, modularity, hard coding, indentation, alignment, layout, comments, misspelling coding
Field length, quality of images, typos, security, mismatch of interfaces, user-friendly.
Functionality missed, test case missed, wrong test case, redundant/repeated test case, improperalgorithm.
Wrong interpretation of specs/requirements
Server response time, render response time, performance specifications requirements,
concurrency/throughput, timing.
Matching applications to environments, program libraries, minimum memory capacity; multitasking for
background calculations; interactive mode; a guaranteed floating point accuracy; etc
Application frameworks, component-bases development, program libraries.
Defects in product documentation requirements of corresponding design of artifacts, code, and test cases
and in traceability matrix
Defects in project plan document, lack of understanding of project management tools, wrongassumptions, errors in definition of cost, time, and high level resources (people, hardware and
software)
Physical organization, logical organization, protection, relocation, sharing, virtual memory, dynamicmemory allocation, garbage collector and paging.
When the requirement itself is ambiguous
When test cases in the test plan are not sufficient to test the code/modification.
Standards:
User Interface:
Design:
Logic:
Performance:
Portability:
Reusability:
Traceability:
Planning:
Memory Management:
Unclear Requirements:
Incomplete Test Case:
8/13/2019 Introduction to Defect Prevention
9/32
Internal 9 2010 Infosys Technologies Limited, India
Common Fallacies in all Projects
All the defects that we get are cosmetic ones.
In our Project we don't have any defects.
In our process there are so many causes of defectsthat it is practically impossible to track them.
8/13/2019 Introduction to Defect Prevention
10/32
Internal 10 2010 Infosys Technologies Limited, India
Cost of not identifying defects
Requirements Design Code Unit Test QA Test Release
1X10-20 X
80-100 X
Cost
World class benchmark: Defect removal
efficiency of 70-90% before QA Test
Early detection of defects reduces cost of fixing a defect
8/13/2019 Introduction to Defect Prevention
11/32
Internal 11 2010 Infosys Technologies Limited, India
DP Definition and Advantages
1. Better Quality ofdeliverables andprogrammer productivity.
2. Reduce review and reworkeffort.
3. Better understanding ofissues by team members.
Can be defined as the systematic way of analyzing defects to determine theroot cause and taking required action to prevent it from occurring in thefuture.
DP Advantages
Defect Prevention
1. Reduce costs since defectscaught in early stages arecheaper to fix
2. Reduce schedule sincerework will be less.
Defect Detection (earlystage)
8/13/2019 Introduction to Defect Prevention
12/32
Internal 12 2010 Infosys Technologies Limited, India
Defect Prevention Purpose
Reduce
Defects
Reduce
Rework
Less
EffortSpent
HighQuality
andProductivity
8/13/2019 Introduction to Defect Prevention
13/32
Internal 13 2010 Infosys Technologies Limited, India
Verification and Validation
Ensures that the system complies with an organization standards andprocess. Did we build the right system?Verification
Physically ensures that the system operates according to plan byexecuting the system function through a series of test that can beobserved and evaluated.Didwe build the system right?
Validation
*Note: The verification and validation techniques can be applied to every element of the system.
Verification
Validation
Standards andprocess of design,
requirements,code, test etc.
To execute a reallife function
Find defectsbefore building
the system
DefectPreventio
n Process
8/13/2019 Introduction to Defect Prevention
14/32
Internal 14 2010 Infosys Technologies Limited, India
Verification Examples
Verification Examples Explanation
Requirements
Reviews
The study of discussion of the system requirements to ensure
they meet stated user needs and are feasible.
Design ReviewsThe study of discussion of the system design to ensure it will
support the system requirements.
Code WalkthroughsAn informal analysis of the program source code to find
defects and verify coding techniques
Code InspectionsA formal analysis of the program source code to find defects as
defined by meeting system specifications.
8/13/2019 Introduction to Defect Prevention
15/32
Internal 15 2010 Infosys Technologies Limited, India
Validation Examples
Validation Examples Explanation
Unit Testing The testing of a single program, module of unit of code.
Integrated Testing
The testing of related programs, modules of units of code.
Validates the multiple parts of the system interact according tothe system design.
System TestingThe testing of an entire system. It can include functional and
structural testing (White Box Testing ).
User Acceptance
Testing
It is a process to obtain confirmation that a system meets
mutually agreed-upon requirements. A Subject Matter Expert
(SME), preferably the owner or client of the object under test,
provides such confirmation after trial or review. In software
development, UAT is one of the final stages of a project and
often occurs before a client or customer accepts the new
system.
8/13/2019 Introduction to Defect Prevention
16/32
Internal 16 2010 Infosys Technologies Limited, India
Defect Prevention Process
Identify
&
execute
checklist
Track
&
analyse
defects
Identify
solution
Execute
action
items
Validate
action
items
Identify
work
product
8/13/2019 Introduction to Defect Prevention
17/32
Internal 17 2010 Infosys Technologies Limited, India
Defect Prevention Process
Identify
&
execute
checklist
Track
&
analyse
defects
Identify
solution
Execute
action
items
Validate
action
items
1. Identify Work Product
The DP anchor will identify theitems that will be reviewed for the
project. Reviews can either bePeer-Review or Self-Review. Anyclients deliverable should bereviewed.
Identify
work
product
8/13/2019 Introduction to Defect Prevention
18/32
Internal 18 2010 Infosys Technologies Limited, India
Defect Prevention Process
Identify
&
execute
checklist
Track
&
analyse
defects
Identify
solution
Execute
action
items
Validate
action
items
Identify
work
product
2. Identify & execute checklist
A checklist should be identified andexecuted over every work product.The checklist will contain specificreview points that will help you toidentify defects in the deliverable.
8/13/2019 Introduction to Defect Prevention
19/32
Internal 19 2010 Infosys Technologies Limited, India
Defect Prevention Process
Identify
&
execute
checklist
Track
&
analyse
defects
Identify
solution
Execute
action
items
Validate
action
items
Identify
work
product
3. Track & analyse defects
Any defect identified during thereview should be tracked.
8/13/2019 Introduction to Defect Prevention
20/32
Internal 20 2010 Infosys Technologies Limited, India
Defect Prevention Process
Identify
&
execute
checklist
Track
&
analyse
defects
Identify
solution
Execute
action
items
Validate
action
items
Identify
work
product
4. Identify solution
The DP team will analyse thetracked defects during a Defect
Prevention Sessionor CARs.The output of this meeting is a
proposed solution with clear actionitems and deadlines for
completion.
8/13/2019 Introduction to Defect Prevention
21/32
Internal 21 2010 Infosys Technologies Limited, India
Defect Prevention Process
Identify
&
execute
checklist
Track
&
analyse
defects
Identify
solution
Execute
action
items
Validate
action
items
Identify
work
product
5. Execute action items
The DP team makes sure the
identified action items areexecuted. Following up meetings
could be required for this.
8/13/2019 Introduction to Defect Prevention
22/32
Internal 22 2010 Infosys Technologies Limited, India
Defect Prevention Process
Identify
&
execute
checklist
Track
&
analyse
defects
Identify
solution
Execute
action
items
Validate
action
items
Identify
work
product
6. Validate action items
The DP team validates theefficiency of the executed action
items by analyzing a portion ofnew defects and comparing thedefect injection rate betweenprevious and actual.
8/13/2019 Introduction to Defect Prevention
23/32
Internal 23 2010 Infosys Technologies Limited, India
Defect Prevention Cycle
The Defect Prevention is a continuous process. Its a cycle that should be
performed during all the SDLC, since the project begins until it ends.
1.- Identify work product
2. Execute
checklist
3.- Track &analyse defects
4.- Identify solution
5.- Executeaction items
6.- Validate
action items
ContinuousDefect Prevention
8/13/2019 Introduction to Defect Prevention
24/32
Internal 24 2010 Infosys Technologies Limited, India
Defect Prevention Plan
The Defect Prevention Plan is a long-term plan for defect
prevention activities within the project. It containsinformation like:
Objective & Scope
Strategy
DP Team
DP Tools
Checklist
Planned Schedule
Planned Effort
8/13/2019 Introduction to Defect Prevention
25/32
Internal 25 2010 Infosys Technologies Limited, India
Data needed for DP
Criticality of Defect (Severity, Priority)
Defect Detected stage
Cause
Type
Defect Injected Stage
Configuration, Consistency,Design issues, Documentation,,
Incorrect Solution, Logic,Portability, Redundancy, etc.
Severity: Critical, Major, Minor,Cosmetic
Priority: High, Medium, Low
Requirement Analysis, HLD,Detailed Design, Build, Project
Initiation
Ambiguous Specification,Carelessness, Error in ExistingProgram, Impact Not Analyzed,
Improper Setup, InsufficientTime, Lack of Coordination, Lack
of Training, etc
8/13/2019 Introduction to Defect Prevention
26/32
Internal 26 2010 Infosys Technologies Limited, India
Defect Tracking at IPM+
IPM+ allows projects to add reviews to a product, or set of work products, andit is presented to project members or other stakeholders for comment or
approval.You can add a review under Tracking > Reviews section.
8/13/2019 Introduction to Defect Prevention
27/32
Internal 27 2010 Infosys Technologies Limited, India
How to diagnose the process and reduce defects
Normally we follow our intuition andprevious experience to assess the situationbut in the first place what we should use is aStructured way of finding defects and its
root cause by analyzing the data we haveand then we can go with our previousexperience to add value to the analysis.
8/13/2019 Introduction to Defect Prevention
28/32
Internal 28 2010 Infosys Technologies Limited, India
Most Common Problems Faced by DP Team
1. Not logged on time
2. Logged with improper causes
3. Usually caught with cause as "Over Sight" or"Carelessness". This needs to be avoided if possible.
4. Not closed in IPM+ on time (same goes for Reviews).
Defects are:
8/13/2019 Introduction to Defect Prevention
29/32
Internal 29 2010 Infosys Technologies Limited, India
DP Project Anchor Responsibilities
Generate a DP Plan for the project.
Identify the work products (deliverables) that will be reviewed as part of V&V process.
Identify validation checklists for every deliverable and tailor it if needed.
Verify that Peer or Self Reviews are being executed.
Verify the checklist identified are executed and is updated if required.
Make sure that defects are being tracked at IPM+
Execute Defect Prevention Meetings (CAR sessions) as per defined in the DP Plan.
Identify solutions and create/monitor action plan until closure.
Provide any DP information at Infosys DP SharePoint sites.
Bring awareness of Defect Prevention to the rest of their team.
Investigate on DP tools to be implemented in the project.
Collect and distribute Lessons Learned and Best Practices for DP across the team .
8/13/2019 Introduction to Defect Prevention
30/32
Internal 30 2010 Infosys Technologies Limited, India
DP Team Responsibilities
Execute peer-reviews and record defects.
Utilize effectively the checklists.
Make sure data tracked from reviews is accurate.
Verify the defects are being tracked in IPM+.
Participate actively in the CAR sessions.
Suggest actions in the DP session to prevent the occurrence ofdefects.
Execute the action items assigned until closure.
Attend any DP meeting/training required.
Suggest lessons learned and best practices.
DP team should be well organized and there should be properassignment ofresponsibilities to the DP team.
8/13/2019 Introduction to Defect Prevention
31/32
Internal 31
1.Infosys PRIDE2.Infosys KSHOP3.Defect and Problem Prevention Guidelines.doc at PRIDE4.Defect Prevention Plan template at PRIDE5.CSQA CBOK 20066.chrk09.blogspot.com
7.http://www.famousquotes.com/category/defect /8.http://en.wikipedia.org/wiki/Wietse_Venema9.http://www.defectmanagement.com/defectmanagement/dprevention.htm10.http://www.icspi.com/tutorials-h2007.htm
2010 Infosys Technologies Limited, India
References