Upload
others
View
4
Download
0
Embed Size (px)
Citation preview
www.en.klaro.eu
Intelligent wastewater solutions
1
www.en.klaro.eu
About us
• Medium-sized company in Bayreuth
• Innovative and flexible solutions, createdfor the requirements of our customers
• Ca. 32 employees
• Production in Bayreuth
• Globally active
• Experience since 2001
• Part of since January 2014
KLARO in Bayreuth
2
www.en.klaro.eu
About us
KLARO world wide
70.000 plantsin over 70 countries
for more than 600.000 users
3
www.en.klaro.eu
Intelligent wastewater solutions
Small wastewater treatment plantsup to 50 PE / 7,5 m³/day
Container treatment plantsthe mobile solution
Wastewater treatment plantsup to 5.000 PE / 750 m³/day
SeparatorsLight fluid and grease separators
4
www.en.klaro.eu
Intelligent wastewater solutions
5
Fields of application
SchoolsHotels
Appartement blocksResidential houses
Office Buildings
Developement / Community
projects
www.en.klaro.eu
Zambia in need of intelligent wastewater solutions
• Water shortages – especially in dry periods
• Not all areas are connected to a public sewer network
• Protection of the water resources
Necessity of individual and reliable solutions for sewage treatment which ensures reusable water
www.en.klaro.eu
Products – Wastewater treatment plants
KLARO
Program
KLARO MAX
1.500 – 5.000 PEup to 750 m³/day
KLARO One
4 – 500 PEup to 75 m³/day
4 – 1.500 PEup to 225 m³/day
7
www.en.klaro.eu
Products – Wastewater treatment plants
Components
8
www.en.klaro.eu
• Installation in new or existing tanks
• Various materials (concrete, plastic, GRP…)
• For every tank geometry (round, rectangular …)
• Retrofitting for 1-, 2-, 3- or 4-chamber pits
9
GRP tanksPlastic tanks
Concrete tanks
Tanks
Products – Wastewater treatment plants
www.en.klaro.eu
Products – Wastewater treatment plants
SBR process – System KLARO
10
2. Aeration phase
3. Rest phase
4. Clearwater extraction
and sludge return
1. Charging phase
• Wastewater flows into the
1. chamber
• In portions into SBR tank
(2. chamber)
• Activation of the micro-
organisms
• Settlement of the sludge
at the bottom
• Outflow of the cleaned water
• Returning of the sludge into
the 1. chamber
1
2
3
4
www.en.klaro.eu
Products – Wastewater treatment plants
SBR process – System KLARO One
11
2. Settle phase
3. Discharge phase
1. Aeration phase
• Raw sewage enters pre
treatment phase
• Directly undergoes aerobic
purification
• Activated sludge settles to
the bottom
• Clear water zone forms in
the upper part
• Incoming raw sewege is
retained by the dividing wall
• Purified water is removed
by means of a
compressed air lift
1
23
www.en.klaro.eu
Effluent values
Parameter % mg / l
COD 94,7 36
BOD5 98,1 6
NH4-N 88,7 4,6
Ntot 84,7 11
Ptot 95,1 0,4
SS 95,7 14
Parameter % mg / l
COD 95,0 39
BOD5 97,0 9
NH4-N 95,0 6,1
Ntot 67,0 18,7
Ptot. 95,0 0,4
SS 96,0 15
Results KLARO Results KLARO One
Plants tested at PIA Aachen under
fixed inflow conditions
12
Parameter mg / l
COD 90
BOD5 50
SS 100
NH4-N 10
Ptot 1
Requirements Zambia
Products – Wastewater treatment plants
www.en.klaro.eu
Products – Wastewater treatment plants
Switch cabinets
Indoor cabinet
13
Metal outdoor cabinet
EPP cabinet Outdoor cabinet
Metal outdoor cabinet
www.en.klaro.eu
Products – Wastewater treatment plants
Machine technology
14
www.en.klaro.eu
Retrofit kits 4 to 1.500 PE
15
• All transfer processes carried out
using compressed air
• No wear, no blockages
• All components are made from
wastewater-resistant plastic or
stainless steel
• High quality membrane
diffusors for a fine bubble
aeration (EPDM membrane)
Products – Wastewater treatment plants
www.en.klaro.eu 16
• Only simple and robust components
• Airlifts instead of pumps
• No mechanical elements inside the tank
• No electrical elements inside the tank
No pumps, mechanical or electrical components inside the wastewater treatment plant
Products – Wastewater treatment plants
Components
www.en.klaro.eu 17
Products – System KLARO
Sampling point
Aeration unit
Clearwater lifter
Charging lifter
Excess sludge lifter
Installed parts in the tank
Submersible foil
www.en.klaro.eu
Products – Additional modules
P-Elimination
Grease separator
Peak load absorption
WebMonitor
UV Disinfection
Chlorine disinfection
Sludge dewatering module
18
www.en.klaro.eu
Products – Wastewater treatment technology
References in Africa
Project data
• Location
Kiambu, Kenya
• Size
200 PE / 30 m³/day
• Commissioning
2017
• Tank
Onsite concrete
• Extras
Cleaned wastewater is
passed to a small stream
19
inlet outlet
www.en.klaro.eu
Products – Wastewater treatment technology
References in Africa
Project data
• Location
Ngoma & Nyagatare, Rwanda
• Size
200 PE
2,25 m³/day during mid-week
60 m³/day during weekend
• Commissioning
2019
• Tank
Onsite concrete
• Extras
Additional buffer tank
Chlorine disinfection
20
www.en.klaro.eu
Products – Wastewater treatment technology
References in Africa
Project data
• Location
Lagos, Nigeria
• Size
204 PE / 30,6 m³ per day
• Commissioning
2017
• Tank
Onsite concrete
• Extras
UV disinfection
21
www.en.klaro.eu
Products – Wastewater treatment technology
Project data
• Location
Sathya Sai School Kisaju,
Kenya
• Size
420 PE / 63 m² per day
• Commissioning
2018
• Particularities
Retrofitting and extension of
an old septic tank
• Extras
Additional buffer
Reusing water for gardening
References in Africa
22
www.en.klaro.eu 23
Contact
KLARO GmbH
Spitzwegstraße 63
DE-95447 Bayreuth
Tel.: +49 (0) 921/16279-0
Mail: [email protected]
www.en.klaro.eu