Integración de puestos de trabajo con HR - SAP
Citation preview
Getting Started Newsletters Store
Products Services & Support About SCN Downloads
Industries Training & Education Partnership Developer Center
Lines of Business University Alliances Events & Webinars Innovation
Log On Join UsHi, Guest Search the Community
Activity Communications Actions
Browse
Enterprise Asset Management (SAP EAM)
0 Tweet
We can integrate PM Work Center with HR Work Center in transaction IR02.
PM Work Center Master as below:
PM WC linked to HR WC, as below:
Per the logic, the Cost center in PM WC and CC in PERNR should be same:
Integration of PM Work Center with HR Work CenterPosted by Piyush Gupta in Enterprise Asset Management (SAP EAM) on Aug 11, 2015 12:28:12 PM
Share 1 4Like
The cost center in PERNRs has to be same as Cost center in WC master:
Used WC 1000 in equipment EQUI1000 below:
Created WO: WO1000, using equipment EQUI1000, as below:
We can assign the personnel number at operation level.
Time Confirmation, below. We can again select the PERNR from among the PERNRs already assigned to HR WC forthe PM WC. The selected PERNR refers to the person who has performed the actual work. It may be different from theone assigned at operation level.
Cost posted, as below:
Cost posting against the cost center, as below:
Hope it is useful. Any other inputs are welcome.
689 Views
Follow SCNSite Index Contact Us SAP Help PortalPrivacy Terms of Use Legal Disclosure Copyright
Average User Rating
(3 ratings)
0 TweetShare 1 4Like
4 Comments
Like (0)
Paul White Aug 11, 2015 2:46 PM
Good job, thanks for sharing!
Like (0)
Piyush Gupta Aug 11, 2015 4:48 PM (in response to Paul White)
Thanks Paul.
Like (0)
Jogeswara Rao Kavala Aug 13, 2015 3:02 PM
Good knowledge sharing Piyush.
Like (0)
Piyush Gupta Aug 13, 2015 7:56 PM (in response to Jogeswara Rao Kavala)
Thanks Rao Sir.