18
PERU – COLOMBIA INTEGRAL SOLUTIONS IN EXCAVATION FOR MINING OPEN PIT MINING YEARS

INTEGRAL SOLUTIONS IN EXCAVATION FOR MINING

  • Upload
    others

  • View
    1

  • Download
    0

Embed Size (px)

Citation preview

Page 1: INTEGRAL SOLUTIONS IN EXCAVATION FOR MINING

PERU – COLOMBIA

INTEGRALSOLUTIONS INEXCAVATION FOR MININGOPEN PIT MINING

YEARS

Page 2: INTEGRAL SOLUTIONS IN EXCAVATION FOR MINING

2017 20202011 2013 2018 2019

We included Anglo American, “Quellaveco” Project, in our

client portfolio.

We developed the specialized Cable Bolting Service.

Barrick, Freeport-MacMoRan, Grupo Mexico and Chinalco became part of our client portfolio as an effort to

diversify our customers and activities.

We ventured into Raise Boring. We were awarded with our first contract in

Colombia by Newmont/Continental Gold

in the Buriticá project.

We constructed a 4.10m diameter by 310m deep

ventilation shaft. The first of its type in Colombia

and one of a very few in Latin America.

We won our second contract in Colombia; FURA in their Coscuez project for

underground mine development services of

their emerald mine.

2005 19972010

We implemented good corporate governance

practices: External CEO and Independent Board of

Directors.

1995

We successfully implemented our first

engineering project abroad.

We ventured into the infrastructure market: sanitation

and roads.

We focused our efforts only on mining. The service

portfolio was complemented with the Trackless mining work.

1993

INCIMMET was founded in response to the demand for

specialized services in the mining and metallurgy sector. We successfully implemented

the Hydraulic Fill system in Buenaventura.

OUR HISTORY

Page 3: INTEGRAL SOLUTIONS IN EXCAVATION FOR MINING

Integral solutions.

Passionate about rocks and minerals.

MISSION

VALUES

Safety Honesty Responsibility Passion to improve Teamwork

Be recognized as top specialists in excavation.

Presence in our client’s flagship projects.

Doubled our revenue compared to 2017 without

neglecting safety and margins.

VISION

OUR MISSION, VISION & VALUES

Page 4: INTEGRAL SOLUTIONS IN EXCAVATION FOR MINING

OUR INTERNATIONAL STANDARDS

ISO45001

ISO9001

ISO14001

Page 5: INTEGRAL SOLUTIONS IN EXCAVATION FOR MINING

UNDERGROUND MINING

Under the concept of providing integral excavation solutions, our objective is to have underground mining operations with the adequate portfolio of services to offer our clients the lowest production cost. We seek to be autonomous in the work area assigned by the client, to increase productivity and to improve safety standards. With this business model, we seek to provide the possibility to reduce the interferences and inefficiencies that are generated by having several contractors.

FOR MINING

OUR SERVICES

Vertical excavation Cable Bolting

Shotcrete for vertical excavation Shotcrete for mine development

Mine development Ancillary services

Ore exploitation

Mine backfill (hydraulic / paste /cemented / cemented rock fill)

Underground and surface civil works

Hauling and transport

Page 6: INTEGRAL SOLUTIONS IN EXCAVATION FOR MINING

SURFACE MINING

Our company has the experience and relevant certifications to offer efficient construction processes, competitive prices with high safety and environmental

standards.

Drilling and BlastingTechnical assistance, planning and management of drilling and blasting. We use the most modern techniques in accordance to the requirements of our clients.

EarthworksRemoval, loading, hauling and disposition of topsoil. In site excavation, loading, hauling of ore, quarry and disposal of waste material. Construction of dumps and remediation of quarries, clearing and shaping of slopes.

Roads and accessesDesign, construction and maintenance of roads and accesses for ore exploitation.

Quarry operationsOperation and exploitation of quarries; drilling and blasting to produce limestone and construction aggregates of different diameters, according to the client's technical specifications.

Slope SupportInstallation of bolts and cables for slope stabilization as well as support meshes, supply and placement of shotcrete.

Civil worksEarth movements and concrete works for the construction of canals, barriers, slabs, HDPE pipe installation, and “Work for Taxes”.

Mine water managementConceptual, basic and detailed engineering for the implementation and operation of dewatering systems, tailings facilities, drains and canals, among others.

TunnelsDesign, construction and maintenance of tunnels for conveyor belts for ore and waste, tailings and water, among others.

OUR SERVICES

FOR MINING

Page 7: INTEGRAL SOLUTIONS IN EXCAVATION FOR MINING

MINERA CHINALCO (NYSE: ACH)

TOROMOCHO MINE – 235k TN/Day (January – March 2018)Construction of drains and canals. Pipes placement.

Supply and placement of 18" 400M HDPE pipes.

Canal 01 and 02 construction – 320M.

Canal 11 and 08 construction – 850M.

Magazine canal construction – 300M.

Canal construction and geotextile placement – 510M.

PRINCIPLE PROJECTS ALREADY COMPLETED

SOCIEDAD MINERA CERRO VERDE (Freeport MacMoRan, NYSE: FCX)

CERRO VERDE MINE – 120k TN/Day (April 2019 – December 2019)Civil works for Linga and Enlozada drains.

Unclassified Material Excavation .............................. 2,050 M3

Surface Preparation .......................................................... 8,700 M2

Place and Compact ............................................................ 24,200 M3

Placement of Geotextile ................................................. 12,450 M2

OPEN PIT MINING

Page 8: INTEGRAL SOLUTIONS IN EXCAVATION FOR MINING

SOCIEDAD MINERA CERRO VERDE (Freeport MacMoRan, NYSE: FCX)

CERRO VERDE MINE – 120k TN/Day (December 2017 – March 2018)Civil works for the AR-115 highway project.

Dump construction ..................................................... 33,000 M3

Opening and closure of quarries ..................... 11,000 M2

Kerb construction ........................................................ 11,000M.

Ditch construction ....................................................... 4,500M.

Stone walls outlets ..................................................... 3,900 M2

Placement of road signs ........................................ 1.0 glb.

Page 9: INTEGRAL SOLUTIONS IN EXCAVATION FOR MINING

SOUTHERN PERU COPPER CORPORATION (GRUPO MEXICO)

TOQUEPALA MINE – 60k TN/Day – Peru (July 2018 – September 2018)1810-02 project: PHASE 1 — EPC - Detailed engineering.

Rehabilitation of the sewer at 176 KM of the railway. Simarrona - Toquepala.

Page 10: INTEGRAL SOLUTIONS IN EXCAVATION FOR MINING

SOUTHERN PERU COPPER CORPORATION (GRUPO MEXICO)

TOQUEPALA MINE – 60K TN/Day (September 2018 – October 2018)1810-02 project: PHASE II — Construction stage for the rehabilitation of the of railway line km 176 in Simarrona-Toquepala.

Earthworks ....................................................................................... 11,200 M3

Hauling and stacking of material for fillings ............ 5,600 M3

Supply and placement of concrete ............................. 700 M3

Ø = 2.0 m sewer placement ............................................... 75M

Page 11: INTEGRAL SOLUTIONS IN EXCAVATION FOR MINING

SOUTHERN PERU COPPER CORPORATION (GRUPO MEXICO)

TOQUEPALA MINE (November 2017 – January 2018)Rehabilitation of a sewer at 186 KM of the railway line.

Earthworks - 1,300 M3

Supply and placement of 151 meters of TMC pipes with Ø 32”

Concrete works – 78 units.

BARRICK GOLD CORPORATION

PIERINA MINE (April 2017 - August 2017)Supervision on the mine closure.

Civil works supervision for mine closure.

Page 12: INTEGRAL SOLUTIONS IN EXCAVATION FOR MINING

ANGLO AMERICAN QUELLAVECO

QUELLAVECO PROJECT (September 2011 - December 2013)Civil works and earth movements.

Construction of accesses for the operation stage. Earthworks for the constructions of mine facilities in a consortium with the local company WCARO.

Page 13: INTEGRAL SOLUTIONS IN EXCAVATION FOR MINING

INCIMMET is alsoUnderground Mining

We actively participate in commercial activities across the region.

Thus, we know the challenges that our region has in mining.

ARGENTINA

NICARAGUA

COLOMBIA

Arequipa

Lima

Medellín

OUR EXPERIENCE IN THE REGION

Page 14: INTEGRAL SOLUTIONS IN EXCAVATION FOR MINING

HOURS WORKED WITHOUT DISABLING ACCIDENTS

CORPORATE ACCIDENTABILITY INDEX

INCIMMETLABOR FORCE

1, 000,000.00

1, 500,000.00

2, 000,000.00

2, 500,000.00

500,000.00

02016 2017 2018 2019 2020

283,854.00

536,084

2,134,743

139,816 159,8180.02

0.28

2016 2017 2018 2019 2020

0.55

4.41

0.000.00

1.00

2.00

3.00

4.00

5.00

0

200

400

600

800

1,000

1,200

600

2016

600

2017

970

2018

1,100

2019

761

2020

OUR CORPORATE SAFETY METRICS

INCIMMET’S RELATIVE CULTURAL STRENGTH IN SAFETY

Natural Instincts

Supervision

INJ

UR

Y R

AT

ES Year 2018

2,20 Year 2019 2,70 Year 2020

3,40 Year 20244,05Self

Teams

ExcellenceFundamental Conscience Ability

Reactive• Safety by Natural Instinct.• Compliance is the Goal.• Delegated to Safety Manager.• Lack of Management Involment.

Dependant• Management Commitment.• Training.• Rules Procedures.• Supervisor control, emphasis and goals.• Condition of Employment.• Fear / Discipline.• Expectations.

Independent• Personal Knowledge, Commitment & Standards.• Internalization. • Personal Value.• Careo of Self.• Practice, Habits.• Individual Recognition.

World Class

Interdependent• Help Others Conform.• Others Keeper.• Networking Contributor.• Care for Others.• Organizational Pride.

0 1 2 3 4 5

*Data up to 2020

Page 15: INTEGRAL SOLUTIONS IN EXCAVATION FOR MINING

We care about the physical and mental health of our employees. We recognize the human value of each

member of the company.

We encourage the professional and

personal growth of our employees

by providing them a career path

with the company.

Health care /“We care about your health”

Recreation /“We get together”

Training /“Growing together”

“Strengtheningour social skills”

OUR SOCIAL RESPONSIBILITY PROGRAMS

"WE CARE ABOUT YOU AND WE GROW WITH YOU"

Page 16: INTEGRAL SOLUTIONS IN EXCAVATION FOR MINING

Recognition /“We recognize your effort”

Recognition for the children with high grades at school”: It enables parents to be

sensitized and made aware of the importance of their participation in the

academic training of their minor children.

Environmental Care /"Recycling at Home“

It allows families to be sensitized on the importance of recycling in homes;

thus, contributing to the non-contamination of the environment.

"WORKING FOR THE INCIMMET´ FAMILY"

OUR SOCIAL RESPONSIBILITY PROGRAMS

Page 17: INTEGRAL SOLUTIONS IN EXCAVATION FOR MINING

Because we are one family /“Welcome baby INCIMMET”

It allows our employees to feel that the company shares the joy of the birth of

a new member of their family.

We get together /“Our family trips”

Promotes the company's involvement with our employees’ family,

sharing a day of family gathering.

"WORKING FOR THE INCIMMET´ FAMILY"

OUR SOCIAL RESPONSIBILITY PROGRAMS

Page 18: INTEGRAL SOLUTIONS IN EXCAVATION FOR MINING

CONTACT US

INCIMMET PERU Headquarters

MORE INFORMATION www.incimmet.com

Social media.

INCIMMET COLOMBIA Circular 3 N° 66 B 155 Int 301,

Medellín, Antioquía.

Av. Manuel Olguín 211 Office 1401-1404,

Santiago de Surco - Lima 15023

Telephone Number: +511 714 7300

[email protected]

Arequipa office413 Street Ferrocarril,

Tingo - Cercado de Arequipa