DURAWEAVE TM Cover SUPERCEDES – Q725.8.7 ITEM 810516 10/05 Copyright 2005. All Rights Reserved. FRAMEWORK COVER END PANELS DT2R DOOR OPTION ROLL-UP DOOR OPTION WinchLoc TM Fastening System THE DT2R DOOR INSTALLATION MANUAL IS SUPPLIED SEPARATELY INSTALLATION MANUAL Utility Series

INSTALLATION MANUAL - Gempler's · IMPORTANT – READ MANUAL FIRST ... 7. The purlins overlap where they are bolted at the arches. 8. REMEMBER - Install 3 of 1 1/4” Tek screws

Embed Size (px)

Citation preview

Page 1: INSTALLATION MANUAL - Gempler's · IMPORTANT – READ MANUAL FIRST ... 7. The purlins overlap where they are bolted at the arches. 8. REMEMBER - Install 3 of 1 1/4” Tek screws

DURAWEAVETM Cover

SUPERCEDES – Q725.8.7

Manual

# Q725.8.8

ITEM 810516 10/05 Copyright 2005. All Rights Reserved.

INCLUDES

FRAMEWORK COVER END PANELS DT2R DOOR OPTION ROLL-UP DOOR OPTION

WinchLocTM Fastening System

QSUS 26 UB

THE DT2R DOOR INSTALLATION MANUAL IS SUPPLIED SEPARATELY

UTILITY - Ground Mount

INSTALLATION MANUAL

U t i l i t y S e r i e s

Page 2: INSTALLATION MANUAL - Gempler's · IMPORTANT – READ MANUAL FIRST ... 7. The purlins overlap where they are bolted at the arches. 8. REMEMBER - Install 3 of 1 1/4” Tek screws

Q725.8.8

1 Copyright © 2005. All rights reserved. No part of the contents of this manual may be reproduced or transmitted in any form or by any means without the written permission.

Page 3: INSTALLATION MANUAL - Gempler's · IMPORTANT – READ MANUAL FIRST ... 7. The purlins overlap where they are bolted at the arches. 8. REMEMBER - Install 3 of 1 1/4” Tek screws

Q725.8.8

Improper Site Preparation, Assembly and Maintenance may invalidate warranty and cause unnecessary and costly mistakes. If you have any questions contact your local authorized dealer.

IMPORTANT – READ MANUAL FIRST

MAINTENANCE SCHEDULE

Failure to comply with this maintenance schedule will invalidate the warranty. A. INSTALLATION ADJUSTMENT

1. The cover of your QuickStructureTM building may relax after installation. It is important to keep the cover tight to prevent wear and ensure a long life. Adjust the cover and curtain lashing winches to achieve a wrinkle free, drum tight appearance over the entire building. For most buildings 35 - 45 ft. lbs of torque provides adequate cover tension. Adjust the end winches until the fastening pipe is level. Retighten end flaps.

NOTE: Building covers installed during cooler weather tend to relax more than covers installed during warmer weather. If your cover was installed in cooler weather recheck its tightness on the first available warm sunny day.

B. INSTALLATION INSPECTION - 1 WEEK

1. Cover - ensure the cover and curtain lashing straps are secure and the cover has a wrinkle free, drum tight appearance. For most buildings 35 - 45 ft. lbs of torque provides adequate cover tension. Adjust cover and curtain tension as required.

2. Belting - check for premature belting wear and ensure tightness.

3. End Flaps - ensure the flaps remain tight and securely fastened. Tighten the ratchets until they refuse to ratchet.

4. Cables - ensure the cables have the correct tension. Adjust the cables as required.

5. Steel - Seal all surface penetration marks with a sealant or high zinc content paint.

C. QUARTERLY MAINTENANCE

1. Repeat above “INSTALLATION INSPECTION - 1 WEEK” a minimum of 4 times per year.

D. GENERAL

1. Cover - Clean with water and non-abrasive soap. Do not use solvents or chemicals.

2. Snowfall - Snow accumulating on the cover could indicate that the cover needs re-tensioning. Remove snow and check tension.

3. Use caution when using heavy equipment to clear away avalanched snow.

E. ACCIDENTAL DAMAGE

Fabric: Sharp objects can puncture and damage the DURAWEAVE® fabric. Do not attempt to seal or repair with conventional materials. Call your local authorized representative. They can assess the damage and facilitate replacement or provide a heat-weld service if the fabric is repairable.

Structure: Report and document any damage to the steel structure, components immediately. Have your local authorized representative inspect the damage and provide a comprehensive evaluation. Perform any temporary or emergency repairs as determined. Replace or repair damaged components as determined.

2

Page 4: INSTALLATION MANUAL - Gempler's · IMPORTANT – READ MANUAL FIRST ... 7. The purlins overlap where they are bolted at the arches. 8. REMEMBER - Install 3 of 1 1/4” Tek screws

Q725.8.8

Page TABLE OF CONTENTS STEP 1 - REQUIRED EQUIPMENT.................................................................. 4 STEP 2 - SITE PREPARATION ....................................................................... 4 STEP 3 - BUILDING LAYOUT ....................................................................... 5-6 STEP 4 - DETERMINE MOUNTING OPTION................................................... 7 STEP 5 - INSTALL THE BASE PLATES........................................................... 8 STEP 6 - ASSEMBLE THE ARCHES................................................................ 9 STEP 7 - INSTALL THE COVER LASHING WINCHES .................................... 9 STEP 8 - ERECT THE ARCHES..................................................................... 10 STEP 9 - ASSEMBLE THE END WALL HEADER........................................... 11 STEP 10 - INSTALL THE STANDARD 8’ HEADER ....................................... 12 STEP 11 - INSTALL THE OPTIONAL 10’ HEADER........................................ 12 STEP 12 - INSTALL THE STANDARD 8’ VERTICALS ................................... 13 STEP 13 - INSTALL THE OPTIONAL 10’ VERTICALS................................... 13 STEP 14 - INSTALL THE OPTIONAL 10’ PERSONNEL DOOR HEADER...... 14 STEP 15 - INSTALL THE END BRACE PURLINS .......................................... 14 STEP 16 - INSTALL THE CROSS CABLES ................................................... 15 STEP 17 - TENSION THE CROSS CABLES ................................................ 15 STEP 18 - ASSEMBLE THE COVER PVC PIPE ............................................ 16 STEP 19 - LASHING STRAP NOTCH-OUTS ................................................. 16 STEP 20 - ASSEMBLE THE COVER FASTENING PIPES ............................ 16 STEP 21 - INSTALL THE COVER FASTENING PIPES ................................. 17 STEP 22 - INSTALL THE COVER PVC PIPE AND COVER .......................... 17 STEP 23 - LACE THE COVER PVC .............................................................. 18 STEP 24 - TIGHTEN THE LASHING WINCHES ............................................ 18 STEP 25 - INSTALL THE END PANELS......................................................... 19 STEP 26 - INSTALL THE END PANEL FASTENING PIPE ............................ 19 STEP 27 - TIGHTEN THE END FLAPS ......................................................... 20 STEP 28 - CUT OUT DOOR OPENINGS ....................................................... 20 STEP 29 - SECURE THE APRONS ............................................................... 21 STEP 30 - OPTIONAL - DT DOOR INSTALLATION ....................................... 21 STEP 31 - OPTIONAL- ROLL-UP DOOR INSTALLATION ........................ 22-23 STEP 32 - READ BUILDING MAINTENANCE SCHEDULE PAGE 2 .............. 23 STEP 33 - COMPLETE WARRANTY REGISTRATION .................................. 23 BASE PLATE TEMPLATES......................................................................8 & 23 CONVERSIONS AND TORQUE VALUES ...................................................... 24 ANCHOR REFERENCE............................................................................. 25-26 MAINTENANCE RECOMMENDATIONS - Corrosive Environments ................... 27 SQUARING A BUILDING LAYOUT................................................................. 28 WARRANTY INFORMATION.......................................................................... 29

3

Improper Site preparation and Layout can cause unnecessary and costly mistakes. Contact a local contractor or your QuickStructuresTM authorized dealer for assistance.

QUICKSTRUCTURESTM IS NOT RESPONSIBLE FOR ANY DAMAGES WHICH MAY OCCUR DURING INSTALLATION.

IMPORTANT

Page 5: INSTALLATION MANUAL - Gempler's · IMPORTANT – READ MANUAL FIRST ... 7. The purlins overlap where they are bolted at the arches. 8. REMEMBER - Install 3 of 1 1/4” Tek screws

Q725.8.8

4

1. Start with a level site.

2. Stake out the location of the corner posts A, B, C and D. Use an accepted method to make the building layout straight and square.

See Squaring A Building Layout (Page 20) for assistance.

3. String a line from A to B and from C to D.

4. With a measuring tape attached to stake A & C, measure and stake the post intervals along the length of the building using a running measurement.

Eg. 10' centers - 10', 20', 30' etc.

5. Check linear measurements by measuring the distance between each stake. Distance should be equal. Check the square of the building layout by measuring diagonally. Diagonal measurements should be equal. Continue to check the width and diagonal measurements the entire length of the building.

IMPORTANT NOTE ON CONCRETE PADS:

Concrete pads must be one foot (12") longer and one foot (12") wider than the building’s dimensions to ensure proper anchor support.

EG: (W) 26' 0" x (L) 30' 0" requires a 27' 0" x 31' 0" outside dimension pad.

Consult a contractor for concrete pad specifications

REQUIRED EQUIPMENT Step 1

SITE PREPARATION Step 2

1. Measuring tape.

2. String and string level for alignment.

3. Stakes.

4. 2 of 50’ lengths of rope to pull cover.

5. 2 step ladders or lift to reach 15 feet.

6. Drill and 1/2” Drill Bit.

8. 2 of #10 x 3/4” round headed Phillips screw and bit.

9. Wrenches - 9/16", 3/4”; 15/16"; 1 1/8”.

10. Hacksaw.

11. Temporary bracing - dimensional lumber or rope.

12. Square level.

Page 6: INSTALLATION MANUAL - Gempler's · IMPORTANT – READ MANUAL FIRST ... 7. The purlins overlap where they are bolted at the arches. 8. REMEMBER - Install 3 of 1 1/4” Tek screws

Q725.8.8

BUILDING LAYOUT Step 3

UB

26 X 30 UB 10’ BAYS

5

Page 7: INSTALLATION MANUAL - Gempler's · IMPORTANT – READ MANUAL FIRST ... 7. The purlins overlap where they are bolted at the arches. 8. REMEMBER - Install 3 of 1 1/4” Tek screws

Q725.8.8

(W) WIDTH = 26' 0 9/16" (BP) WIDTH = 26' 3 1/2"

(S) PLATE CENTERS =

5', 6', 8' or 10'

SERIES 26 UB

RUNNING MEASUREMENTS

Example (S) PLATE CENTERS = 10'

10', 20', 30' 40’.

LENGTH, WIDTH AND ARCH SPACING MEASUREMENTS ARE CENTER-OF-TRUSS-TUBE TO CENTER-OF-TRUSS-TUBE.

6

ALL OFFSETS AND DOOR JAMB

PLACEMENTS APPLY

Center-of-Truss Tube to Center-of-Truss Tube

Building Length (L)

Building Width (W)

Plate Distance (S)

Outside-of-base plate to Outside-of-base plate

Building Width (BP)

(BP)

BUILDING LAYOUT Step 3

CONTINUED

REMINDER

Concrete pads must be one foot (12") longer and one foot (12") wider

than the building’s dimensions to ensure proper anchor support.

See previous page.

Page 8: INSTALLATION MANUAL - Gempler's · IMPORTANT – READ MANUAL FIRST ... 7. The purlins overlap where they are bolted at the arches. 8. REMEMBER - Install 3 of 1 1/4” Tek screws

Q725.8.8

IT IS THE RESPONSIBILITY OF THE OWNER to ensure that the anchoring systems are adequate for the building. Contact

your QuickStructuresTM authorized representative for more information. Complete Section A on Page 4 before proceeding. See Page 5 for end plate offset. Mounting on a Soil Base - including asphalt surfaced soil 1. All anchor holes

should be used when securing the plates on a soil base including asphalt surfaced soil unless otherwise determined by a contractor or qualified engineer.

2. If pin type ground anchors are used install pins diagonally. 3. If earth anchors are used U-bolt

mounting adaptors may be required. 4. Install U-bolt mounting adaptors

to the truss tube.

Install a Tek screw below the U-bolt as a stop. 7

DETERMINE MOUNTING OPTION Step 4

U-bolt Adaptors must be ordered separately

Page 9: INSTALLATION MANUAL - Gempler's · IMPORTANT – READ MANUAL FIRST ... 7. The purlins overlap where they are bolted at the arches. 8. REMEMBER - Install 3 of 1 1/4” Tek screws

Q725.8.8

Mounting on a Constructed Base

1. All anchor holes should be used when securing the plates on a constructed base unless otherwise determined by a qualified engineer.

1. Install all base plates and check all installation dimensions before proceeding.

8

BUILDING BASE PLATE TEMPLATES

INSTALL THE BASE PLATES Step 5

Page 10: INSTALLATION MANUAL - Gempler's · IMPORTANT – READ MANUAL FIRST ... 7. The purlins overlap where they are bolted at the arches. 8. REMEMBER - Install 3 of 1 1/4” Tek screws

Q725.8.8

NOTE: Be sure to inspect all arch pieces for burrs or rough edges which may have

developed during handling or assembly and file them smooth. 1. Ensure that the building layout is

square and all base plates are secured.

2. Lay the truss sections flat on

level ground. Insert the swaged end of the cornerstones (A) sections into the keystone (B) and install the legs (C) into the cornerstones.

3. IMPORTANT: install with holes parallel to ground.

4. Fasten using 1 1/4” Tek screws - 3 per joint.

Do not install the screws on the outside of the truss where the fabric will rest.

5. Wrap each joint with duct tape to protect the fabric from any sharp edges.

9

ASSEMBLE THE ARCHES Step 6

INSTALL THE LASHING WINCHES Step 7

1. Install cover lashing winches on the corner base plates in the upper hole of the winch bracket using a 5/8 x 1 1/4" bolts/nuts.

2. IF YOUR BUILDING HAS BEEN SUPPLIED WITH FABRIC ENDS install a second cover lashing winches on the corner base plates in the upper hole of the winch bracket using a 5/8 x 1 1/4" bolts/nuts.

3. Install 1 lashing winch on the building side base plates.

5' on-center buildings have cover winches on all corners and every other base plate. In some cases buildings will require winches adjacent to the corner base plates on one end of the building.

Page 11: INSTALLATION MANUAL - Gempler's · IMPORTANT – READ MANUAL FIRST ... 7. The purlins overlap where they are bolted at the arches. 8. REMEMBER - Install 3 of 1 1/4” Tek screws

Q725.8.8

1. Use a safe method to lift and brace the arch in a plumb position.

Brace the arch on the inside to avoid interference when installing the cover.

Remove the bracing after the cover is installed. 2. Install 3 of 1 1/4” Tek screws from the side at each arch base.

3. Install purlins at the pre-drilled holes in the sides and at the top center of the arches using 1/2 x 4” carriage bolts/washers/nuts installed from the outside.

4. INPORTANT: Install header angle brackets - on

the outside arches only - using the single hole as illustrated - when installing the purlins.

10

ERECT THE ARCHES Step 8

Page 12: INSTALLATION MANUAL - Gempler's · IMPORTANT – READ MANUAL FIRST ... 7. The purlins overlap where they are bolted at the arches. 8. REMEMBER - Install 3 of 1 1/4” Tek screws

Q725.8.8

5. Continue installing arches and purlins until the building is

complete. 6. Remember to install the header angle brackets at both ends of

the building. 7. The purlins overlap where they are bolted at the arches. 8. REMEMBER - Install 3 of 1 1/4” Tek screws - from the side - at

each arch base.

STANDARD 8' HIGH HEADER 1. Assemble the standard header by inserting

the 2 1/2" pipe sleeve equally into the 2 7/8" header sections and securing all with 6 of 1 1/4" Tek screws. Ensure that the flattened ends are parallel and that the header sections are touching before securing with Tek screws.

OPTIONAL 10' HIGH HEADER

1. Measure and cut 4" off the 74 3/4" STD ESS HORIZONTAL

2. Locate the 119 1/8" header section and assemble a 190" header using a 2 1/2" sleeve section and 6 of 1 1/4" Tek screws. Ensure that the flattened ends are parallel and that the header sections are touching before securing with Tek screws.

11

ASSEMBLE THE END WALL HEADER Step 9

Page 13: INSTALLATION MANUAL - Gempler's · IMPORTANT – READ MANUAL FIRST ... 7. The purlins overlap where they are bolted at the arches. 8. REMEMBER - Install 3 of 1 1/4” Tek screws

Q725.8.8

1. Attach the header to the angle brackets - in the lower hole - using 5/8" x 2" bolts/nuts.

1. Measure and mark 41 5/16" from the keystone joint.

2. Drill a 1/2" hole and attach the header angles using 1/2" x 4" carriage bolts/nuts.

3. Attach the header to the brackets - in the lower hole - using 5/8” x 2” bolts/nuts.

4. Position the ESS vertical tubes on the end wall base plates. Ensure they are plumb.

INSTALL THE STANDARD 8' HEADER Step 10

INSTALL THE 0PTIONAL 10' HEADER Step 11

12

Page 14: INSTALLATION MANUAL - Gempler's · IMPORTANT – READ MANUAL FIRST ... 7. The purlins overlap where they are bolted at the arches. 8. REMEMBER - Install 3 of 1 1/4” Tek screws

Q725.8.8

ENSURE THE BUILDING IS PLUMB BEFORE INSTALLING VERTICALS

1. VERTICALS WITH WELDED PLATES -THE PLATES FACE THE OUTSIDE.

Use these verticals as door posts for RU and DT doors. Position the ESS vertical tubes on the end wall base plates and attach to the header using saddle bracket w/tab a 5/8” x 1 1/2” bolt/nut and a 7/16” x 4 1/2” carriage bolt/washer/nut.

2. Verticals without welded plates are used for personnel doors and on ends without openings. Position the ESS vertical tubes on the end wall base plates and attach to the header using saddle bracket w/tab a 5/8” x 1 1/2” bolt/nut and with a

7/16” x 4 1/2” carriage bolt/washer/nut.

3. The verticals install BEHIND the brackets.

1. Plumb and attach the verticals to the header using saddle bracket w/tab a 5/8” x 1 1/2” bolt/nut and a 7/16” x 4 1/2” carriage bolt/washer/nut.

2. The verticals install BEHIND

the brackets.

INSTALL THE STANDARD 8' VERTICALS Step 12

INSTALL THE OPTIONAL 10' VERTICALS Step 13

13

Page 15: INSTALLATION MANUAL - Gempler's · IMPORTANT – READ MANUAL FIRST ... 7. The purlins overlap where they are bolted at the arches. 8. REMEMBER - Install 3 of 1 1/4” Tek screws

Q725.8.8

PURLIN - UB - 2 3/8" Ø 14GA Length Depends On Bay Spacing

1. Drill a 1/2" hole and attach a header angle at the

determined height using 1/2" x 4" carriage bolt/nut.

2. Attach the ESS saddle w/tab to the door vertical at the determined height using a 7/16" x 3 1/2" carriage bolt/nut.

3. Sleeve together the 2 1/2” x 34”and 2 7/8” x 54 3/4” pipes and install the assembled header in the building frame. DO NOT FASTEN THE SLEEVE UNTIL STEP 5.

4. Install the header and attach it to the saddle bracket and header angle using 5/8" x 2" bolts/nuts.

5. Install 3 of 1 1/2" Tek screws in the sleeved header in a manner that they will not interfere with the fabric when it is installed.

The End Brace Purlins are identified as in the diagram on the next page.

All 26 UB buildings are supplied with end brace purlins.

The end brace purlins attach at the pre-drilled holes in the END BAYS only using 1/2” x 4” bolts/nuts.

SEE INSTALLATION DIAGRAM STEP 16 ON NEXT PAGE

OPTIONAL 10’ - PERSONNEL DOOR HEADER Step 14

HEADER SECTIONS 2 1/2” x 34” 2 7/8” x 54 3/4”

INSTALL END BRACE PURLINS Step 15

14

Page 16: INSTALLATION MANUAL - Gempler's · IMPORTANT – READ MANUAL FIRST ... 7. The purlins overlap where they are bolted at the arches. 8. REMEMBER - Install 3 of 1 1/4” Tek screws

Q725.8.8

Cross Cables

All 26 UB buildings are supplied with 8 cross cables. The cross cables attach at the bases and at purlin mounting bolts and extend for the length of the building, or the first 50' of the building, on both sides.

1. Attach cables by drilling 1/2" holes at the end arch base and in the main purlins next to

the end arch and installing 1/2" x 4" bolts/washers/nuts. 2. Cable A, B. 3. Cable B, C ALWAYS INSTALL CABLE THIMBLES 4. Cable D, E 5. Cable E, F. Install identical cables on the opposite side of the building.

1. Tighten the cable turnbuckles until appropriate cable tension is achieved.

DO NOT OVERTIGHTEN.

2. Tighten the turnbuckle lock nuts.

INSTALL CROSS CABLES Step 16

ONLY IF BUILDING IS LONGER THAN 50’

TENSION THE CROSS CABLES Step 17

15

END BRACE SP PURLINS INSTALL IN BOTH END BAYS

ONLY IF BUILDING IS 50’ OR LESS

Page 17: INSTALLATION MANUAL - Gempler's · IMPORTANT – READ MANUAL FIRST ... 7. The purlins overlap where they are bolted at the arches. 8. REMEMBER - Install 3 of 1 1/4” Tek screws

Q725.8.8

1. Glue PVC tubes together in pairs to make four 20' lengths.

2. Cut all at 12' 8".

The short PVC sections (7’ 4”) install in the lower wall and the long PVC assemblies

(12’ 8”) install in the roof.

3. Install #10 X 3/4” round head Phillips screws at each connection - not supplied.

IMPORTANT: ALWAYS install screws at every connection. PVC glue looses adhesive qualities when applied in cold weather and in damp and humid conditions.

1. If necessary, widen lashing winch strap notch-outs in the cover fastening pipe pockets so the lashing strap pulls straight down

5' on-center buildings - have lashing winches every other arch. Notch out pockets at winch locations as required.

1. Assemble both fastening pipes before installing the cover. The pipes terminate inside the

end arches.

2. Measure and cut pipes to fit.

3. Fasten together with one (1) 1 1/4” Tek screw.

4. Install the end caps.

LASHING STRAP NOTCH-OUTS Step 19

ASSEMBLE THE COVER PVC PIPE Step 18

ASSEMBLE THE COVER FASTENING PIPES Step 20

16

Page 18: INSTALLATION MANUAL - Gempler's · IMPORTANT – READ MANUAL FIRST ... 7. The purlins overlap where they are bolted at the arches. 8. REMEMBER - Install 3 of 1 1/4” Tek screws

Q725.8.8

1. Roll out the DURAWEAVETM cover on a ground sheet. Align the cover evenly to each end of the frame. The notches in the cover line up with the winches on the base plates.

2. Insert both fastening pipes into the cover pipe pockets.

3. Loosely secure the lashing straps in the lashing winches on one side.

DO NOT TIGHTEN.

NOTE: DO NOT install the DURAWEAVETM cover onto the frame of your QuickStructuresTM

building in high wind conditions. A slight breeze is the most advantageous for cover installation. To take advantage of the breeze, pull the cover up over the arches with the breeze blowing into the cover . . . like a sail filled with air.

1. Install the short PVC sections (7’ 4”) in

the lower wall and the long PVC assemblies (12’ 8”) in the roof.

2. Tie rope to the leading fastening pipe and pull the cover over the frame.

3. Loosely secure the lashing straps in the lashing winches on the other side.

DO NOT TIGHTEN.

4. Adjust the cover so that it is square and evenly centered on the frame. The end flaps overhang evenly at both ends.

INSTALLING THE COVER FASTENING PIPES Step 21

INSTALL THE PVC PIPE AND THE COVER Step 22

17

CROSS CABLES ARE NOT SHOWN IN THE FOLLOWING COVER

ILLUSTRATIONS BUT MUST BE INSTALLED BEFORE PROCEEDING.

Page 19: INSTALLATION MANUAL - Gempler's · IMPORTANT – READ MANUAL FIRST ... 7. The purlins overlap where they are bolted at the arches. 8. REMEMBER - Install 3 of 1 1/4” Tek screws

Q725.8.8

1. With the end flaps flipped back and out of the way, use the supplied belting to lace the cover PVC to the end arches.

The recommended procedure is to use separate pieces of belting and start by first lacing the cover from the bottom edges up to the top center.

Secure the belting at the top center and THEN apply tension as you lace down both sides. Fasten the belting at the bottom edge.

NOTE: DO NOT LEAVE THE COVER UNATTENDED UNDER ANY CIRCUMSTANCES

until final assembly and tightening has been completed. Remove the bracing after final tightening has been completed.

1. Add tension to

the lashing winches evenly until a drum tight appearance is achieved.

2. Install a 3/4" Tek screw and pipe clip in through the end lashing strap into the fastening tube.

3. Install a cotter pin in the lashing winches pilot hole to lock the release lever.

5. Center the cover on the building. If the cover has alignment marks on the inside of the

cover, align the marks with the center row purlins.

The end flaps must overhang evenly at both ends. .

LACE THE COVER PVC PIPE Step 23

TIGHTEN THE LASHING WINCHES Step 24

18

Page 20: INSTALLATION MANUAL - Gempler's · IMPORTANT – READ MANUAL FIRST ... 7. The purlins overlap where they are bolted at the arches. 8. REMEMBER - Install 3 of 1 1/4” Tek screws

Q725.8.8

1. Lace a short piece of belting through the top center D-ring and temporarily suspend the end panel from the arch tube.

2. The recommended procedure is to use separate pieces of belting and start by first lacing from one base all the way to the top center and tie off . Lace the belting loosely through the D-rings.

Repeat this lace-up procedure for the other side. Remove the belting suspending the panel and secure both belting ends.

3. THEN working from the top down, adjust the panel lacing so that the end panel is flat and the D-rings touch the bottom of the arch tube.

Hint: Some tightening adjustments may be necessary to produce a flat, tensioned end panel.

1. Cut the pipe pockets at the lashing winches and door openings to allow for the lashing straps.

2. The end panel fastening pipes fit inside the

verticals. Cut the fastening pipes to fit inside the end verticals and install in the pipe pockets.

3. Add tension to the end panel by tightening the lashing

winches until a drum tight appearance is achieved.

INSTALL THE END PANELS Step 25

IMPORTANT End panels and covers should have a drum tight appearance after final tensioning. Loose or sagging fabric is subject to movement in windy conditions and will reduce the life expectancy of the fabric.

INSTALL THE END PANEL FASTENING PIPES Step 26

19

Page 21: INSTALLATION MANUAL - Gempler's · IMPORTANT – READ MANUAL FIRST ... 7. The purlins overlap where they are bolted at the arches. 8. REMEMBER - Install 3 of 1 1/4” Tek screws

Q725.8.8

20

CUT OUT THE DOOR OPENINGS Step 28

1. Attach a 1" ratchet with J-hook to the lashing winch release bar on the corner base plate. Cut a slit in the end panel 1" above the folded ratchet.

2. Thread the end flap belting through the slit and tighten the end flap. You will need to ratchet, release and re-ratchet a number of times until the belt tension does not allow further ratcheting.

TIGHTEN THE END FLAPS Step 27

1. Cut out the fabric at the

doors. Cut so that you have excess fabric that you can grip and wrap around the frame.

2. Apply tension to the fabric when wrapping the fabric around the frame and use screws and flat washers or cleating material (both not supplied) to secure fabric to the horizontal and verticals.

HINT Adding

dimensional lumber (not

supplied) to the inside of the

steel frame will make finishing

the fabric easier.

Page 22: INSTALLATION MANUAL - Gempler's · IMPORTANT – READ MANUAL FIRST ... 7. The purlins overlap where they are bolted at the arches. 8. REMEMBER - Install 3 of 1 1/4” Tek screws

Q725.8.8

THE DURATRAC 16' X 8' DT 2R DOOR IS DESIGNED TO BE INSTALLED WITHOUT DIMENSIONAL LUMBER FRAMING. THE DT 2R OWNER’S MANUAL # 216

IS REQUIRED TO INSTALL THE DOOR COMPONENTS.

If you have received the door header, mounting plates, brackets and hardware listed under DT 2R Door components inside the back cover of this manual follow these instructions first

and then refer to the instructions in the DT 2R DOOR manual #216 . See STEP 3 on Page 6 in this manual for door jamb installation restrictions.

1. No wood framing is required. Attach the lower bracket and track directly to the steel verticals using 1 1/4" Tek screws. Mount the tracks flush to inside of verticals. The tracks extend above the header.

2. Install the mounting plates to the header - even with the top of the track - by first drilling 2 of 7/16" holes through the header and using 7/16" x 3 1/2" carriage bolts/nuts. Drill a 3/8" hole in the track and install the angle brackets using 5/16" x 1" carriage bolts/nuts.

IMPORTANT: the hoist must mount on the larger #1 mounting plate. Install the #1 mounting plate on the left or right side as required.

3. Install the Ø 1.9” x 195" door header at the top of the tracks using 1 1/4" Tek screws.

4. The transfer shaft and hoist hardware attach to the mounting plates. The steady brackets supplied with the door are not required.

5 The top edge of the door fabric attaches to the door header.

NOTE: The door fabric drapes into the door opening. Clearance is less than 8 feet.

ALWAYS SECURE THE COVER AND END PANEL APRON The fabric is designed to be under tension at all times.

GROUND Use dimensional lumber to attach the apron to the frame or foundation. Or back fill the apron at the foundation. CONCRETE

Never install fabric over concrete edges. Always install a dimensional lumber buffer or equivalent.

SECURE THE APRONS Step 29

DT 2R - 16' X 8' DOOR OPTION Step 30

21 X

Page 23: INSTALLATION MANUAL - Gempler's · IMPORTANT – READ MANUAL FIRST ... 7. The purlins overlap where they are bolted at the arches. 8. REMEMBER - Install 3 of 1 1/4” Tek screws

Q725.8.8

22

1. Attach the door panel to the header using 1 1/4” Tek screws and washers every 12".

2. Install the Ø 2 3/8” tensioning tube in the bottom of the door and fasten the door fabric to the tube using 4 of 1 1/4” Tek screws and pipe clips.

3. Attach the tension bracket, on the outside of the fabric, to the slotted plate on the end wall door vertical using 5/16" x 1 1/4" carriage bolts/nuts.

4. Adjust the bracket to allow 1/8" clearance for the door tube to fit under the bracket.

5. Attach a RU mount bracket inside the fabric at a reachable height using a 1/2" x 4" carriage bolt/nut. Attach the handle bracket on the outside of the fabric using 5/16" x 1 1/4" carriage bolt/nut.

6. Attach the handle to the u-joint using 3/8" x 2" bolt/nut. If the u-joint is not welded in the door tube, install the u-joint in the door tube using the 3/8" spring clip.

7. With the door tube in the tension brackets apply tension to the door panel with the handle. Lift the handle flat against the fabric and secure in the handle bracket with the 5/16” spring clip.

OPTION - ROLL-UP DOOR INSTALLATION Step 31

IMPORTANT Cut the door tubes to fit if not supplied to required length.

See components inside back cover.

Continued Next Page

Page 24: INSTALLATION MANUAL - Gempler's · IMPORTANT – READ MANUAL FIRST ... 7. The purlins overlap where they are bolted at the arches. 8. REMEMBER - Install 3 of 1 1/4” Tek screws

Q725.8.8

END WALL BASE PLATE TEMPLATES

23

READ BUILDING MAINTENANCE SCHEDULE - PAGE 2 Step 32

COMPLETE WARRANTY REGISTRATION Step 33

NOTE: IF THE HANDLE DOES NOT LAY FLAT TO THE FABRIC hold the door tube in place (pipe wrench) remove the spring clip holding the u-joint and rotate the u-joint. Re-install the spring clip. Repeat until handle is tensioned and held flat.

DOORS WITH WELDED ON U-JOINTS You may need to remove the screws/pipe clips to release the door fabric from the door tube, rotate the door tube, and re-attach the door fabric with the screws/pipe clips. Repeat as necessary. 10' HIGH DOORS ONLY

8. Install the Ø 1” mid-support tube in the door panel and secure the tube in the panel using 2 of 3/4” Tek screws and pipe clips.

9. Install RU mount brackets on the inside of the fabric using 1/2” x 4” carriage bolts/nuts.

Add the mid-support brackets on the outside using 5/16" x 1 1/4" carriage bolts/nuts. Adjust so the tube rests in the bracket under tension.

See Illustration Previous Page

Page 25: INSTALLATION MANUAL - Gempler's · IMPORTANT – READ MANUAL FIRST ... 7. The purlins overlap where they are bolted at the arches. 8. REMEMBER - Install 3 of 1 1/4” Tek screws

Q725.8.8

BOLT TORQUE INCHES MILLIMETERS 1/32" 2/32 1/16" ...................................................... 1.6 3/32 4/32 2/16 1/8" .............................................. 3.2 5/32 6/32 3/16" ......................................................….. 4.8 7/32 8/32 4/16 2/8 1/4" .............................… 6.4 5/16 6/16 3/8" .............................................. 9.5 7/16 8/16 4/8 2/4 1/2" ............… 12.7 9/16 10/16 5/8" ............................................. 15.9 11/16 12/16 6/8 3/4" ...........................… 19.0 13/16 14/16 7/8" ............................................. 22.2 15/16 16/16 8/8 4/4 2/2 1” 25.4

FEET METERS

1' .305 2 .610 3 .914 4 1.219 5 1.524 6 1.829 7 2.134 8 2.438 9 2.743

10 3.048 25 7.620 30 9.144 35 10.668 40 12.192 45 13.716 50 15.240 60 18.288 70 21.336 80 24.384 90 27.432

100' 30.480

1 ft.lb. = 1.356 N.m

VOLUME 1 CUBIC YARD = .77 M3 1 CUBIC FOOT = .03 M3

CONVERSIONS

SUGGESTED ASSEMBLY TORQUE VALUES FOR STRUCTURAL BOLTS

SIZE THREADS GRADE 5 DIA (INCH) PER INCH ft – lbs DRY WET* 3/8 16 30 23 7/16 14 50 35 1/2 13 75 55 5/8 11 150 110 3/4 10 260 200 1 1/4 7 1120 840

* Lubricant

ASSEMBLY TORQUE VALUES

24

Page 26: INSTALLATION MANUAL - Gempler's · IMPORTANT – READ MANUAL FIRST ... 7. The purlins overlap where they are bolted at the arches. 8. REMEMBER - Install 3 of 1 1/4” Tek screws

Q725.8.8

ANCHOR REFERENCE

All anchor information is based on normal soils. See CFR - 9.

25

Page 27: INSTALLATION MANUAL - Gempler's · IMPORTANT – READ MANUAL FIRST ... 7. The purlins overlap where they are bolted at the arches. 8. REMEMBER - Install 3 of 1 1/4” Tek screws

Q725.8.8

CFR - 9 COMMON SOIL-TYPE DESCRIPTION GEOLOGICAL SOIL CLASSIFICATION TYPICAL BLOW COUNT

"N" PER ASTM-D1856 SOUND HARD ROCK, UNWEATHERED GRANITE, BASALT, MASSIVE LIMESTONE N.A. ROD-50 1/2 VERY DENSE AND/OR CEMENTED SANDS CAUCHE, (NITRATE BEARING GRAVEL / ROCK) 60 - 100+ COARSE GRAVEL AND COBBLES DENSE FINE SAND;: VERY HARD SILTS BASAL TILL; BOULDER CLAY; CAUCHE, 45 - 60 AND CLAYS (MAY BE PRELOADED) WEATHERED LAMINATED ROCK DENSE CLAYS, SANDS AND GRAVELS; GLACIAL TILL; WEATHERED SHALES, SCHIST 35 - 50 HARD SILTS AND CLAYS GNEISS AND SILTSTONE MEDIUM DENSE SANDY GRAVEL; VERY GLACIAL TILL, HARDPAN; MARLS 24 - 40 STIFF TO HARD SILTS AND CLAY MEDIUM DENSE COARSE SAND AND SANDY SAPROLITES, RESIDUAL SOILS 14 - 25 GEAVEL; VERY STIFF SILTS AND CLAY LOOSE TO MEDIUM DENSE FINE TO COARSE DENSE HYDRAULIC FILL; COMPACTED FIL, 7 - 14 SAND, FIRM TO STIFF CLAYS AND SILTS RESIDUAL SOILS LOOSE FINE SAND, ALLUVIUM LOESS; FLOOD PLAIN SOILS, LAKE CLAYS; ADOBE; 4 - 8 SOFT-FRIM CLAYS; VARIED CLAYS; FILL GUMBO, FILL PEAT, ORGANIC SILTS, INUNDATED SILTS, MISCELLANEOUS FILL, SWAMP MARSH 0 - 5 FLY ASH

SOIL TYPES LABORATORY TEST METHOD

NO

RM

AL

ANCHOR REFERENCE - cont.

All anchor information is based on normal soils. See CFR - 9.

26

Page 28: INSTALLATION MANUAL - Gempler's · IMPORTANT – READ MANUAL FIRST ... 7. The purlins overlap where they are bolted at the arches. 8. REMEMBER - Install 3 of 1 1/4” Tek screws

Q725.8.8

Maintenance Recommendations For Buildings in Corrosive Environments

BUILDING STEEL Manufactured steel components are hot dipped galvanized, hot zinc plated or coated with a high quality sealant. It is recommended that the building owner/operator: - Prevent corrosive material or product from resting against or covering the building steel. - Remove any environmental residue that accumulates on the building steel.

- Seal all surface penetration marks with a high quality sealant or a high zinc content paint. BUILDING HARDWARE Hardware components are made of galvanized steel or aluminum alloy; are zinc plated with an added leachant-sealant; or are zinc or cadmium plated. It is recommended that the building owner/operator: - Prevent corrosive material or product from coming in direct contact with the building

hardware. - Remove any environmental residue that accumulates on the building hardware. - Seal or protect from corrosion any non-building components that are connected to, or that

come in contact with, the building hardware. ANCHOR BOLTS It is recommended that the building owner/operator: - Seal the exposed anchor bolt threads with a high quality sealant or a high zinc content paint. FABRIC LASHING WINCHES It is recommended that the building owner/operator: - Spray the lashing winches with a moisture displacing filming lubricant. (WD40 or equivalent) DURAWEAVE® FABRIC It is recommended that the building owner/operator: - Prevent corrosive material or product from resting against or covering the building fabric. - Remove any environmental residue that accumulates on the building fabric. Where moisture

will not contribute to corrosion – wash with water and non-abrasive soap.

27

Page 29: INSTALLATION MANUAL - Gempler's · IMPORTANT – READ MANUAL FIRST ... 7. The purlins overlap where they are bolted at the arches. 8. REMEMBER - Install 3 of 1 1/4” Tek screws

Q725.8.8

SQUARING A BUILDING LAYOUT

1. Measure and string a straight line the exact length of the building (D1-D2). 2. Attach a measuring tape to stake D2 and measure the exact width of the building

perpendicular to line D1-D2. Make an arc in the dirt at that exact measurement. Repeat this procedure at stake D1 and make a second arc.

3. String an extended line (D3-D4) at the crowns of these two arcs. Recheck width

measurements. USING THE 3-4-5 METHOD TO SQUARE THE BUILDING LAYOUT 4. With the measuring tape still attached to stake D1, measure the distance (4 x Y) from

stake D1 towards stake D2 and place a stake (M1). See chart this page for a suggested value for Y for your building.

5. With the measuring tape still attached to stake D1, measure the distance (3 x Y) through

the crown of the arc and past line D3-D4 to M2. 6. With a second tape attached to stake M1, measure the distance (5 x Y) to M2. 7. Keeping the tapes tight, cross the two tapes

at exactly the (3 x Y) measurement and the (5 x Y) measurement and hold in position. Place a stake (D6) exactly where line D1-M2 crosses line D3-D4. Remove stake M2.

8. Follow the linear and diagonal measurement

checks on Page 4 of this manual.

IMPORTANT Depending on the size of your building, you may need a qualified contractor or engineer

to lay out the building plan to ensure that it is straight and square. The following is a suggested method only.

BLD SUGGESTED WIDTH Y VALUE 26 9’

28

Page 30: INSTALLATION MANUAL - Gempler's · IMPORTANT – READ MANUAL FIRST ... 7. The purlins overlap where they are bolted at the arches. 8. REMEMBER - Install 3 of 1 1/4” Tek screws

Q725.8.8

LIMITED WARRANTY QUICKSTRUCTURES™ QSAS and QSUS Lines

1. Scope of Limited Warranty: Only the QuickStructures™ Arch Series (QSAS) and QuickStructures™ Utility Series (QSUS) building components described in this agreement are warranted to the original Building Owner to be free of defects in materials and workmanship under normal use and proper maintenance. Building membranes are also warranted against damage caused by hail and deterioration caused by ultraviolet rays, when such damage or deterioration results in the loss of effectiveness of the membrane as a weather barrier. This warranty shall be effective only if and when the warranty is properly registered as per instructions in Section 2, below; and Quick Structures receives notice of such defect during the period of the warranty. Remedy of the defect(s) may be through the supply of new, used, or rebuilt parts, or on-site repair, at the option of Quick Structures. If Quick Structures elects to repair or replace the defective product or component, Quick Structures shall have a reasonable time to do so.

This warranty contains the sole expressed warranty of Quick Structures and is applicable to the QSAS and QSUS building lines only. There are no other warranties expressed or implied. This warranty is made in lieu of any implied warranties of merchantability or fitness for a particular purpose. Specifications and warranties are applicable to units sold and erected in Canada, the United States and its territories and possessions, and may vary outside these areas.

2. Warranty Registration: Buildings are shipped with a warranty registration package. Follow all instructions and return the completed warranty registration card within 60 days of the instal-lation of the building in order to register your warranty.

3. Standard Terms of Limited Warranty Coverage: Should any components be found to have manufacturer’s defects under normal use and proper maintenance, the defect(s) will be repaired or the components re-placed, at the option of Quick Structures. The Building Owner shall be responsible for the cost of the repair or replacement parts pro-rated per year following the original purchase date, plus the cost of delivery and installation of replacement parts, if required. All replacement parts are F.O.B. Saskatoon, Saskatchewan, Can-ada. Any parts repaired or replaced under this warranty are subsequently warranted only for the remaining unexpired portion of the warranty period applicable to the original product. Quick Structures reserves the right to substitute replacement parts that are comparable in function and quality to the original, and shall not be liable if the replacement component varies in appearance from the original.

4. Standard Limited Warranty Coverage Periods: 1

THIS WARRANTY STATEMENT ONLY APPLIES TO THE BUILDING MODELS LISTED ABOVE

Notes on Limited Warranty Coverage Periods: 1. All repair or replacement costs are pro-rated per year as per this table. 2. Consists of cover panels for main building only. Does not include any cover fastening system components. 3. Consists of main building trusses, purlins, and manufactured brackets. 4. Consists of end panel fabric. Does not include fastening system components. End panel must be properly supported by QuickStructures™ End Support

System or rigid frame designed to match end panel fastening system. 5. Consists of manufactured steel vertical columns, horizontal members, and brackets. Does not include cables or fasteners. 6. Consists of door membrane (Standard DuraWeave®, FR DuraWeave®, or PVC) and all steel door parts. 7. Consists of cables, winches, ratchets, fasteners, belting, fastening straps, PVC pipe, and other parts not listed above.

5. Limits and Release of Liability: Quick Structures makes no claims or representations regarding the structural capacity of QSAS and QSUS buildings. This warranty does not apply to defects or damage resulting from a) installation that is improper and/or not in accordance with the QuickStructures™ installation instructions; b) improper or inadequate maintenance; c) modification or alteration of the product; d) neglect, misuse or abuse of product; e) accident; f) unauthorized repair or alteration; g) integration with other products or accessories not manufactured specifically for use with the QuickStructuresTM building; h) exposure to corrosive elements; i) corrosion resulting from building application, environment, and/or insufficient maintenance or any cause other than a defect in an item’s described corrosion protection; j) use of abrasive cleaning methods, chemicals or solvents; k) natural hazards, including environmental loads such as wind, snow, ice, and water / rain; l) foundation design and/or installation and/or deficiency in the foundation; m) product upgrades; n) product recall; o) normal wear and tear; p) wear caused by multiple installations; q) storage and/or handling of the building components; or r) an act of God. This warranty does not apply to cosmetic defects or deterioration, including fading or discoloration. This warranty does not apply to any products not manufactured as part of the QSAS and QSUS lines. No one is authorized to change or add to this warranty. Quick Structures and its manufacturers shall not be liable for any damages incurred during or as a result of installation of Quick Structures product, whether or not in accordance with the installation instructions. This warranty gives you specific legal rights. You may also have other rights which vary from jurisdiction to jurisdiction. In no event shall Quick Structures, its manufacturers, any distributor, or the selling dealer be liable for any direct, indirect, special, incidental or consequential damages (including loss of profits, loss of time, inconvenience, or the use or inability to use this product for any purpose whatsoever), whether based on contract, tort, strict liability or any other legal basis; even if Quick Structures, its manufacturers, its distributor, or its authorized dealer was ad-vised of the possibility of the occurrence of such damages. By registering for and taking the benefit of this warranty, the Building Owner expressly releases and discharges Quick Structures, its manufacturers, all distributors, and all authorized dealers from all claims, causes of action, demands, actions, suits, judgments and executions for any actual, incidental or consequential damages, bodily or otherwise, that the Building Owner ever had, now has, or may have by reason of the as-sembly, erection, use and/or operation of any QuickStructuresTM building. All references to Building Owners, Quick Structures, its manufacturers, all distributors and all authorized dealers, include such parties’ spouse, heirs, successors, legal representatives and assigns. Quick Structures and its authorized dealers are independent businesses; authorized dealers are not agents or legal representatives of Quick Structures. Authorized dealers have no right or authority to assume or create any legal obligation or responsibility, express or implied, on behalf of Quick Structures, or to bind Quick Structures in any manner whatsoever. Quick Structures shall have no liability for any acts, errors, omissions, workmanship, supplies, advice, representations, or misrepresentations of any authorized dealer. 7/05

Component Type QSAS 20, 22, 26,30

QSUS 26 UB

QSUS 26 HC

QSUS 26x30

UB Pkg Main Building Cover 2 3 3 3 1 Main Steel Framework 3 3 3 3 1 End Fabric 4 3 3 3 1 End Steel 5 3 3 3 1 Door Fabric / Steel 6 1 1 1 1 Small Components 7 1 1 1 1

Page 31: INSTALLATION MANUAL - Gempler's · IMPORTANT – READ MANUAL FIRST ... 7. The purlins overlap where they are bolted at the arches. 8. REMEMBER - Install 3 of 1 1/4” Tek screws

Q725.8.8

30

Page 32: INSTALLATION MANUAL - Gempler's · IMPORTANT – READ MANUAL FIRST ... 7. The purlins overlap where they are bolted at the arches. 8. REMEMBER - Install 3 of 1 1/4” Tek screws