The Bio-Pure Pumped Installation 1 INSTALLATION Bio-Pure Twin

INSTALLATION Bio-Pure Twin - We Build It · 4 The Bio-Pure Twin Installation Installation of Air Blower It is recommended that the air blower pump be installed in the pump housing,

  • Upload
    ledat

  • View
    215

  • Download
    1

Embed Size (px)

Citation preview

The Bio-Pure Pumped Installation 1

INSTALLATIONBio-Pure Twin

2 The Bio-Pure Twin Installation

Installation of a Twin Unit (S tandard Installation e x cluding high wate r table areas )

It is s imp le r a nd che a p e r to tr e a t the ins ta lla t io n o f a twin unit a s two s e p a r a te ins ta lls . T he units a r e ins ta lle d in s e r ie s with the p r ima r y ta nk a lway s be ing the la r ge s t o f the ta nk s ma r k e d ‘A ’ . Ins ta ll ta nk A a s be low a nd the n le av e a 2 m wall ga p be fo r e ins ta ll ing the s e co nd ta nk ( ta nk ‘ B ’ ) a ls o a s be low. N O T E tha t the o u tle t o f ta nk A wil l fa l l 10 0 mm a nd the o u tle t o f ta nk B wil l fa l l a fu r the r 10 0 mm .

1) B io -Pure 1 & 2 Excavateahole2.1mroundx2.25mdeeptaperingthelast1.2m,ensuringthesoilatthebaseoftheholeisfirmandundisturbed.Ifnotpossible,compactsandorpeagravelintobaseuntildesiredlevelisobtained.B io -Pure 3 Excavateahole2.4mroundx2.3mdeeptaperingthelast1.5m.B io -Pure 4 & 5 Excavateahole2.4mroundx2.7mdeeptaperingthelast1.5m.B io -Pure 6 Excavateahole2.8mx2.95m,taperingthe

last1.5m. ( N B . Tr y to fo l low s ha p e o f unit a s much a s p o s s ib le )

2 ) Removetheservicehatchfromthecompressorboxhousingsectionoftheunitbymeansofcuttingthecableties(note-careshouldbetakennottodamagethis)andretaininsafeplace.

3 ) Lifttheunitbymeansofstrappingthroughtheeyebolts,ensurethatunitisemptyofwaterbeforefitting.

4 ) Lowertheunitintotheholecheckingthattheinletandoutletconnectionsontheunitwillalignwiththecorrespondingconnections.

5 ) Ifyouareusingananchoringkit,removeunitandinstallnow.

6 ) Leveltheunitintheholeusingthepumpboxhousingtolevelfrom.Beginbackfillaroundthebaseoftheunittoadepthofapproximately700mm(youhavetheoptionatthisstageofcirculatingthewedgeswithaconcreteringtoensurenoliftingifthegroundissubjecttomoderatewaterlog).Filltheunitwithacorrespondingamountofwatertohelpstabilisetheunit.

N o te – back fi ll ma te r ia l mu s t be 2 0 mm to d u s t s calp ing s to e ns u r e no d a mage is cau s e d to unit .

7) Continuebackfillaroundtheunitwhilstsimultaneouslyfillingtheunitwithwateruntiltheunitisfull.

8 ) Connectinletandoutletconnectionstosewerpipes.

9 ) Removethepumpboxhousingandattachtheblowerpipetotheblowertubebymeansofthejubileeclipsuppliedandpasstheotherendintothepumpboxhousing.

10 ) Continuebackfilluptogroundlevel.

11) Lay2.5mmarmouredcablefromproposedelectricalconnectiontotheunitpassingitintotheunitviatheelectricalglandalreadyinplace.Leavea½mloopinsidethebodyofthetreatmentplantandpassthecablethroughthe2ndelectricalglandintheairpumpbox.SecurelyfixadoubleIPratedsocket(youmayneedtwooftheseforapumpedunit).I f y o u d o no t fi x y o u r e le ctr ica l co nne ctio n s e cu r e ly to the box , it wil l r a tt le a nd ma k e a no is e a s the p u mp s co ns ta ntly v ib r a te .

12 ) SecurelyfixoneendoftheblueTsectiontotheblowerpipeandthensecuretheotherendtothecompressor.

13 ) Fixblowerboxbackintoplace.

14 ) Installthealarm–thesmallclearhoseattachestotheblueT-Section.

IF IN D O U B T, P L E A S E A S K .

The Bio-Pure Twin Installation 3

High Water Table SupplementIf the B io -P ure is installe d in w E T g r O U N D , the top and bottom par ts of the unit s hould be se ale d by me ans of a wate r tight mastic se alant and the unit s hould be anchore d by me ans of concre te or anchorage pins .

It is e s se ntial that the B io -P ure Twins are anchore d by me ans of one of the fo llowing me thods : -

A nchorage by Concre teTheBio-Purehas4anti-floatationwedgespositionedonthesides.Formoderatelywetgroundthesecanbecoveredinaleanmixofconcretetoactasananti-floatationring.

IN S E V E r E w E T g r O U N D T H E E N T Ir E U N IT S H O U L D B E B U r IE D IN C O N C r E T E U P T O T H E IN L E T A N D O U T L E T S O r T H E A N C H O r A g E P IN M E T H O D S H O U L D B E U S E D .

N B . w he n u s ing co ncr e te the unit s ho uld be fi l le d with wa te r a t the s a me r a te a s co ncr e te is p o u r e d .

D r y P in M e thod1) Insertthesteelanchoragepinsbyhammeringthemhorizontally(90degrees)tothewallsoftheexcavationinto

theundisturbedgroundatadepthof1200mm(fromthetop).Thepinsneedtobeinsertedleaving300mmprotrudingintotheexcavatedarea.

2 ) Connectalengthofgalvanisedchainintotheholeintheendofeachpinusingashackle.Takethelooseendtothetopoftheexcavationandsecuretemporarily.

3 ) Continuetoinstalltankasperfittinginstructions.

4 ) WhenBio-pureisfullyinstalledinserteyeboltsintothedownpositionie.Eyeboltatthebottom,nutatthetop.Attachthelooseendofthechainintotheeyeboltsbymeansofshackle,adjustandtighteneacheyebolttotakeupanyslackinchain–donotleaveanyslackinchainsastankmaymove.

5 ) Continuetobackfilltodesiredlevel.

D r y Pin A nchoring K it4x1200mmgalvanisedsteelangleirons(50mmx50mmx6mm)eachwithapointatoneendanda13mmholeattheother.8xgalvanisedsteel‘D’shackles.4x1200mmlong,6mmdiameterweldedlinkgalvanisedsteelchain.

Electrical InstallationItisnotfeasibletostateaspecificinstallationmethodduetothevarianceofsites.Itisimportantthereforethatanelectricalinstallationbeperformedinaccordancewiththe17thorlatereditionoftheInstituteofElectricalEngineersRegulationswithappropriatecurrentprotectiondevicesforsiteconfiguration.Thesupplytotheairpumphousingshouldhaveadedicatedcircuitincorporatingisolationandprotectiondevices.Anearthleakagecircuitbreakerisrecommended.Adevicewitha30mAmaximumtripcurrentisrecommended.

A ty pical e x ample of the e lectrical installation is the following : -1) Afusespurisinstalledatasuitableaccessibleposition

2 ) A2.5mmarmouredcableislaidfromthefusespurtotheBio-Pure,itisthenpassedthroughthefirstelectricalglandinstalledintheshellofthetreatmentplantand½mloopisthenleftinthebody.Itisthenpassedthroughthe2ndelectricalgland

3 ) AdoubleIPratedsocketissecurelyfixedtothewalloftheAirBoxandthe2.5mmarmouredcableisconnected.

4 The Bio-Pure Twin Installation

Installation of Air B lowerItisrecommendedthattheairblowerpumpbeinstalledinthepumphousing,withanappropriatesinglephase13ampsupply.Caremustbetakentoensuretheunitisnotsubjecttowateringressage,freefromdustanddirtthatcouldclogtheairfilters.Accesstotheairblowerunitwillberequiredformaintenance.Ensureunitiswellventilated.

N o te – T he a ir b lowe r unit ca n be fi tte d in a o u tbuild ing within 10 m o f the unit . E ns u r e unit is we ll v e nti la te d a nd no t s ubj e ct to a ir te mp e r a tu r e s e x ce e d ing 37 d e g r e e s ce ntig r ad e .

Werecommendthatonlyaqualifiedelectricianisemployedtoundertaketheelectricalinstallationoftheairblowerpump.Theairblowerpipeissecuredtothepumpandtheblowertubebymeansofthejubileeclipssupplied.

I t is v e r y imp o r ta nt tha t the e le ctr ica l co nne ctio n is s e cu r e ly fi x e d to the box . T his wil l av o id it v ib r a ting a nd ma k ing e x ce s s iv e no is e .

Commissioning Check list prior to switching on power supply

Priortouseofunitandbeforeanysewageenterspleasecheckthefollowing:-

■ Ensureairdiffuserissecureontheendoftheblowertubeandblowertubeissecuretoitsmounting

■ Ensuretheblowerpipeisnotkinkedordamagedinanyway(makesureithasbeencuttothecorrectsize)

■ Removeanyconstructiondebrisfromareassurroundingunit

Commissioning Check list after turning on power supply■ Ensuretheairblowerisworking(itshouldhumandvibrateslightly)

■ Listenforanyairleaks(tightenjointsifrequired)

■ Standingabovetheunitwiththeservicehatchremoved,checkforwaterturbulence(thewatershould bubblevigorously)

■ Runsometapsinthehouseandobservetheflowintotheunit(anyconstructiondebrisbroughtinbythe flowshouldberemoved)

■ Allowwatertoentertheunituntilfull,observingthedisplacementaroundtheoutletweir

■ Securelyreplacepumphousingandservicehatch,securewithcabletiessupplied