1 INSTALLATION AND MAINTENANCE MANUAL SI 150 / 2

INSTALLATION AND MANTLING MANUAL SI 150 2...9 3 .SI 150 / 2 MOUNTING KIT MANTLING STEPS Mantle the two supporting blades ( 3.1 , 3.2 & 3.3 ) using the screws and screw nuts . Slightly

  • Upload
    others

  • View
    0

  • Download
    0

Embed Size (px)

Citation preview

Page 1: INSTALLATION AND MANTLING MANUAL SI 150 2...9 3 .SI 150 / 2 MOUNTING KIT MANTLING STEPS Mantle the two supporting blades ( 3.1 , 3.2 & 3.3 ) using the screws and screw nuts . Slightly

1  

  

    

INSTALLATION AND MAINTENANCE MANUAL SI 150 / 2 

    

         

 

Page 2: INSTALLATION AND MANTLING MANUAL SI 150 2...9 3 .SI 150 / 2 MOUNTING KIT MANTLING STEPS Mantle the two supporting blades ( 3.1 , 3.2 & 3.3 ) using the screws and screw nuts . Slightly

2  

C  O N T E N T S 

Introduction                                                                                         3 Warrantee                                                                                                            4 Declaration of conformity                                                                                 5 1 .GENERAL REQUIREMENTS                                                                            6 1.1 Standards 1.2 Collector labeling  

2 .INSTALLATION INSTRUCTIONS SI 150/2                                                     7       Technical characteristics         Dimensions and weights  3 .SI 150 / 2 MOUNTING KIT MANTLING STEPS                                             9  4. SI 150 /2 COLLECTOR AND STORAGE TANK INSTALLATION ON                                      MOUNTING KIT                                                                           10  5 . SI 150/2   ACCESSORIES                                                                               11  6 . COLLECTOR COUPLING                                                                                12  7 . FILLING THE COLLECTOR                                                                             13  8.VENTILATION                                                                                                   14  9 . STORAGE TANK ELECTRICAL CONNECTION                                             14  10. LIGHTNING PROTECTION                                                                           15  11. ANTIFREEZE PROTECTION                                                                 15 – 16   12. MAINTENANCE REQUIREMENTS                                                              17         12.1 General          12.2 Regular maintenance by the user          12.3 Maintenance by service crew every three years  

13 .TROUBLESHOOTING – PROBABLE CAUSE – SOLUTIONS                      18  14 . ANNEX          Inspection and maintenance recording papers                                                        19  

Page 3: INSTALLATION AND MANTLING MANUAL SI 150 2...9 3 .SI 150 / 2 MOUNTING KIT MANTLING STEPS Mantle the two supporting blades ( 3.1 , 3.2 & 3.3 ) using the screws and screw nuts . Slightly

3  

Introduction  We would like to thank you for choosing a Sigma solar water heater.  We would like to assure you that each Sigma product is confronted with the general requirements imposed by the European Norms, related to solar systems qualifications.  In this pamphlet, you will find any details necessary for your solar water heater mantling, installation and an excellent state of working conditions. We would like to point you out the excellent quality of our materials, tested, certified and harmonized with all European standards. In any case, please don’t hesitate to reach us for further details.    

              

Page 4: INSTALLATION AND MANTLING MANUAL SI 150 2...9 3 .SI 150 / 2 MOUNTING KIT MANTLING STEPS Mantle the two supporting blades ( 3.1 , 3.2 & 3.3 ) using the screws and screw nuts . Slightly

4  

Warrantee  

 

   

 

Page 5: INSTALLATION AND MANTLING MANUAL SI 150 2...9 3 .SI 150 / 2 MOUNTING KIT MANTLING STEPS Mantle the two supporting blades ( 3.1 , 3.2 & 3.3 ) using the screws and screw nuts . Slightly

5  

Declaration of conformity      

 The undersigned A. and G. Samouil , Sigma co. declare under our sole responsibility that our product SI 150/2 is in  conformity with the EC Directives :73/23/EEC : low voltage directive , harmonized with the ELOT standards : EN 60335, EN 60335‐2‐21 and DIN 4573 .  Technical documentation required by the conformity procedure is kept at company headquarters.  COMPANY                            A. et G. Samouil  , Sigma co. ADDRESS                            112 Athinon avenue , 38334 , Volos COUNTRY                            Greece TEL .                                     00302421066551 FAX                                       00302421060091 EMAIL                                   [email protected]  , sigma@sigma‐sa.com  INTERNET                            www.sigma‐sa.com  

Page 6: INSTALLATION AND MANTLING MANUAL SI 150 2...9 3 .SI 150 / 2 MOUNTING KIT MANTLING STEPS Mantle the two supporting blades ( 3.1 , 3.2 & 3.3 ) using the screws and screw nuts . Slightly

6  

1. GENERAL REQUIREMENTS   

1.1      Each solar water heater has to be confronted with the general requirements  imposed by European standards related to flat solar thermal water heaters quality and performance evaluation.    Standards are : I )  ΕΝ 12975 – 1 ( solar collector general requirements )  II ) ΕΝ 12975 – 2 ( qualification tests of glazed liquid solar collectors ). III) ΕΝ 12976 – 1 (solar water heating system general requirements) IV) ΕΝ 12976 – 2 ( thermal performance of solar domestic water heating                                           systems) .  1.2     Solar water heater labeling           On each solar collector an ineffaceable distinctive label is been stuck ( upwards and on the left side ) , containing the following data : 

Manufacturer name  

Solar water heater type  

Serial number  

Production year Ολική επιφάνεια του συλλέκτη / των συλλεκτών του συστήματος 

Collector gross area  

Collector aperture area  

Storage tank nominal capacity  

Maximum working pressure  

Working pressure  

Protection against overheating  

All electric parts voltage  

Liquid  

 

Page 7: INSTALLATION AND MANTLING MANUAL SI 150 2...9 3 .SI 150 / 2 MOUNTING KIT MANTLING STEPS Mantle the two supporting blades ( 3.1 , 3.2 & 3.3 ) using the screws and screw nuts . Slightly

7  

2 .INSTALLATION INSTRUCTIONS SI 150/2  

      

Page 8: INSTALLATION AND MANTLING MANUAL SI 150 2...9 3 .SI 150 / 2 MOUNTING KIT MANTLING STEPS Mantle the two supporting blades ( 3.1 , 3.2 & 3.3 ) using the screws and screw nuts . Slightly

8  

SI 150 / 2 Dimensions and weight  1. Mounting kit dimensions : 

  2.  Weights :  Mounting kit : 16 kg  Collector ( empty ) : 40 kg  Storage tank ( empty ): 60 kg  

                       

Page 9: INSTALLATION AND MANTLING MANUAL SI 150 2...9 3 .SI 150 / 2 MOUNTING KIT MANTLING STEPS Mantle the two supporting blades ( 3.1 , 3.2 & 3.3 ) using the screws and screw nuts . Slightly

9  

3 .SI 150 / 2 MOUNTING KIT MANTLING STEPS  

 

 

     Mantle the two supporting blades ( 3.1 , 3.2 & 3.3 ) using the screws and screw nuts . Slightly loose screw.        Put in opposite directions the two supporting blades ( that you have already mantle ) and attach them with the diagonal stabilization blades ( 3.4 )using screws and screw nuts .Slightly loose screw.      Choose the place at your roof , where you will install the solar water heater , taking care that it faces :SOUTH .  Stabilize the mounting kit on the roof cement using relief plugs. 

 

  

Page 10: INSTALLATION AND MANTLING MANUAL SI 150 2...9 3 .SI 150 / 2 MOUNTING KIT MANTLING STEPS Mantle the two supporting blades ( 3.1 , 3.2 & 3.3 ) using the screws and screw nuts . Slightly

10  

 

4 .SI 150 /2 COLLECTOR AND STORAGE TANK INSTALLATION ON                         MOUNTING KIT  Having finished mounting kit mantling , stabilize the mounting kit on the roof , mantling its parts rather loose .  INSTALLATION STEPS  

  

Page 11: INSTALLATION AND MANTLING MANUAL SI 150 2...9 3 .SI 150 / 2 MOUNTING KIT MANTLING STEPS Mantle the two supporting blades ( 3.1 , 3.2 & 3.3 ) using the screws and screw nuts . Slightly

11  

5 . SI 150/2   ACCESSORIES   

4.1  Galvanized female elbow  ½ for the storage tank  1 piece 

4.2  Brass PEX elbow φ22 x ¾ male  1 piece 

4.3  Brass male elbow  ½ x ¾  1 piece 

4.4  Plastic PEX pipe φ22 x 3 length  2.50m  1 piece 

4.5  Flexible pipe φ ¾ length 0.75m  1 piece 

4.6  Female cap ½  1 piece 

4.7  Closed circuit pressure relief safety valve   1 piece 

4.8  Check safety valve . Safe function pressure 6 bar  1 piece 

4.9  Clamps for flexible pipe φ ¾  2 pieces 

 

                    

Page 12: INSTALLATION AND MANTLING MANUAL SI 150 2...9 3 .SI 150 / 2 MOUNTING KIT MANTLING STEPS Mantle the two supporting blades ( 3.1 , 3.2 & 3.3 ) using the screws and screw nuts . Slightly

12  

6 . COLLECTOR COUPLING  

  

      

Page 13: INSTALLATION AND MANTLING MANUAL SI 150 2...9 3 .SI 150 / 2 MOUNTING KIT MANTLING STEPS Mantle the two supporting blades ( 3.1 , 3.2 & 3.3 ) using the screws and screw nuts . Slightly

13  

7 . FILLING THE COLLECTOR  

1 . Fill in collector with water from the long plastic pipe 4.4 until a small quantity of water overflows from the short flexible pipe 4.5 , sign that collector is full and ventilated . 2 . Then you connect :  

      Filling is done using water and antifreeze. The recommended antifreeze is propylene glycol that is non‐toxic. Quantity of propylene glycol shall depend upon frost conditions. 

Page 14: INSTALLATION AND MANTLING MANUAL SI 150 2...9 3 .SI 150 / 2 MOUNTING KIT MANTLING STEPS Mantle the two supporting blades ( 3.1 , 3.2 & 3.3 ) using the screws and screw nuts . Slightly

14  

Filling of the collector(s) with water and antifreeze shall be done in the morning or in the afternoon during summer months, in order to avoid forming of air bubbles due to overheating, thus causing air trapping, because then the system would not be properly ventilated and it is possible to retain which would reduce performance.  Filling up of the collector(s) is to be done with low flow, to let liquid to come out from the opposite copper pipe for better ventilation.  The filling with antifreeze is to be done according to the instructions of the antifreeze (see table) i.e. according to the exterior temperature ▫C under which the system is functioning.  

8.VENTILATION  

 Special attention is needed to provide adequate ventilation for the collector(s) so the system runs without problems. Let the hot water ‐ liquid to flow from the opposite site of the filling. Do not fill the system when the collector has been exposed to sun for more than 15 min in summer months and more than 30 min in other cases, because overheating would cause the formation of bubbles in the collector’s loop resulting in malfunctioning.   

9 . STORAGE TANK ELECTRICAL CONNECTION  For hot water during cloudy days , there is the storage tank electric resistance as a backup .  

 

1 ) Storage tank has to be already full of water .                          2 ) Adjust the security thermostat to 50 – 60 ° C. 

                  

 

Page 15: INSTALLATION AND MANTLING MANUAL SI 150 2...9 3 .SI 150 / 2 MOUNTING KIT MANTLING STEPS Mantle the two supporting blades ( 3.1 , 3.2 & 3.3 ) using the screws and screw nuts . Slightly

15  

10. LIGHTNING PROTECTION  In case the collector, is placed on the highest part of the building as usual, special measures for lightning protection shall be taken according to the pertinent regulations. One lighting rod should be considered to install .If there is ready – made lightning  protection device, please connect it with collector .  

 

11. ANTIFREEZE PROTECTION 

 Depending on the place of the collector(s) installation there are potential freezing conditions that can cause damage to the collector and the piping.  Thus the use of propylene glycol as antifreeze for the protection of the collector(s) and piping is obligatory . The following table gives the necessary volume ratio of antifreeze (water‐antifreeze mixture) for protection against low ambient temperatures, while table no 2 gives the capacity of collector S 2.0 in water.   

Page 16: INSTALLATION AND MANTLING MANUAL SI 150 2...9 3 .SI 150 / 2 MOUNTING KIT MANTLING STEPS Mantle the two supporting blades ( 3.1 , 3.2 & 3.3 ) using the screws and screw nuts . Slightly

16  

ATTENTION: for the right ratio, you have to increase the ratio of the capacity of the collector S2.0, in antifreeze, with the additional quantity 

A) of the piping form the collector to the boiler B) with the capacity of the closed system of the storage tank . 

 Tables N° 1 – N° 2 

 TABLE N° 1 

Propylene glycol solution   

Temperature  Propylene Glycol  Water 

5  15%  85% 

‐15  30%  70% 

‐25  40%  60% 

  TABLE N 2°    Collector S 2.0 capacity  

    

Collector S 2.0  Piping Capacity  Storage tank capacity  

capacity 2.00 lt  according to distance and cross section size 

see manufacturer’s data 

                      

Page 17: INSTALLATION AND MANTLING MANUAL SI 150 2...9 3 .SI 150 / 2 MOUNTING KIT MANTLING STEPS Mantle the two supporting blades ( 3.1 , 3.2 & 3.3 ) using the screws and screw nuts . Slightly

17  

12. MAINTENANCE REQUIREMENTS  12.1 General The collector(s), as all other devices, needs basic maintenance to ensure constant and high performance at all times. There are various actions that can be done by the user; other actions must be carried out by the manufacturer’s licensed service crew. For high performance and long service life of the entire water heating ‐ distribution installation , maintenance is required and for the rest of installation (boiler, piping, control systems).  12.2 Regular maintenance by the user It is preferred that the user checks twice per year the place where the collector(s) is placed and visually controls the collector and the rest of the components. More specifically: ‐check   the leaks in collector’s piping and the leaks in components ‐check for any condensation of the collector ‐check the installation of the collector on the mounting kit and the screws on the mounting kit in order to find any loose screws because of the wind etc. ‐if for any reason there is a need to fill the closed system of the collector with water, you should also add antifreeze to retain the ratio according to table No. 1 ‐Observe any probable cracking of the collector’s glass ‐ Observe the clarity of the glass ‐Observe the condition of the piping insulation conveying water from the collector to the boiler  Cleaning of the collector’s glass, when required, is best done without too much sun.  It is recommended that a skilled authorized technician visits the installation in all other cases. In case of glass cracking, the glass should be replaced immediately because there is risk of collector corrosion.  12.3 Maintenance by service crew every three years It is recommended that the following controls shall take place periodically every three years by a licensed team: ‐check glass (cleaning, cracking, shading of collector) ‐check collector’s support on the mounting kit ‐check water‐tightness of collectors ‐check insulation of collector It is recommended that the licensed team fill in a printed form quoting the following: ‐works done ‐spare parts ‐possible damages These data appear in the relative maintenance‐inspection data sheet in page 18. 

Page 18: INSTALLATION AND MANTLING MANUAL SI 150 2...9 3 .SI 150 / 2 MOUNTING KIT MANTLING STEPS Mantle the two supporting blades ( 3.1 , 3.2 & 3.3 ) using the screws and screw nuts . Slightly

18  

 

13 .TROUBLESHOOTING – PROBABLE CAUSE – SOLUTIONS  

     Troubleshooting      Probable cause              Solutions  

When installed there is no hot water . 

The solar water heater reaches the optimum performance two days after the installation. During these two days, it is recommended to avoid hot water consumption, even if there is sunshine.  

Please wait until next days noon(sunshine obligatory ) 

Even though , a whole day has passed , no sufficient hot water . 

1 )There is air trapped in the collector closed circuit  2 ) There is a leakage in the closed circuit . 

1 )Ventilation needed.   2 ) Check the leakage and fill closed circuit with water 

Though before there was hot water, now there is not. 

1 )Water mixture between storage tank and solar water heater .  2 ) Valves problem   3 )The consumption of hot water is bigger than the appliance's capacity.  Huge hot water consumption during the night. 

1 ) Check the valves and set off the solar water heater valves.  2 ) Call installators to check if the valves are damaged . 

Cold water tabs give hot water. 

Valves or hydraulic problem. 

Check the hydraulic installation. Ensure that the supply of hot water is not connected to a supply of cold water. 

Hot water exists , but there is a small leakage on the roof .  

Probably there is a connection leakage between collector and pipes ,  

Tight or change the screws 

Water adding in closed circuit , in order to get a good function . 

Closed circuit leakage  ( either collector or pipes). 

Locate the leakage. 

Hot water exists ,but you can see moisture or greenery on collector down part  

Reasonable deliquescence caused by temperature difference .  

Expected phenomenon ,not decreasing solar collector lifetime . 

Page 19: INSTALLATION AND MANTLING MANUAL SI 150 2...9 3 .SI 150 / 2 MOUNTING KIT MANTLING STEPS Mantle the two supporting blades ( 3.1 , 3.2 & 3.3 ) using the screws and screw nuts . Slightly

19  

14 . ANNEX Inspection and maintenance recording papers  

1  Date  

Works Description    

    Accessories    

    Remarks    

    Inspector’s name and signature   

2  Date  

Works Description    

    Accessories    

    Remarks    

    Inspector’s name and signature   

3  Date  

Works Description    

    Accessories   

    Remarks    

    Inspector’s name and signature