FORM NO : KJM/IP/CONST/002 Rev00
INSPECTION CHECKLIST FOR REINFORCED CEMENT CONCRETE WORKS
Building / Area :
Location :( For Location / Grid please refer Location plan attached herewith)
Structure Member/ ID / No. :
Reference Latest revision of GFC Drawing :
Sr.
No.
Inspection Items Date & Time of
Checking
1.0 CONCRETE PRE POUR CHECK
Check for Base (PCC) and Survey
1.1 Check for Cleaning of PCC Base
1.2 Check for Centerline marking
1.3 Check for PCC Top Level
CHECK FOR SHUTTERING WORKS
1.4 Check for Shuttering material Suitability
1.5 Check for Shuttering Size as per ref. drawing
1.6 Check for Shuttering Line, Level & Plumb
1.7 Check for Shuttering Supports system
1.8 Check for Provision of Pockets and its sizes
1.9 Check for Formwork Tightness
1.10 Check for Concrete Top Level
1.11 Check for Shuttering Release oil Application
1.12 Check for Concrete Cover as specified in the ref. drawing
1.13 Check for marking of Concrete Top Level
CHECK FOR REINFORCEMENT WORKS
1.14 Check for Cleanliness of Rebar (Free from Rust, Oil,
Grease, Oil & Dirt)
1.15 Check for Bar Dia, Spacing & , Bar Shape & Spacing
1.16 Check for Provision of Chairs / Supports
CHECK FOR INSERTS IF ANY
1.17 Check for Size, Spacing of Inserts / Structural Steel
CHECK FOR RESOURCES (MATERIAL, PLANT & MACHINERY)
1.18 Check for Concrete Qty. availability from RMC
Check for availability of Concrete Pumps, Chutes, Vibrators
CHECK FOR SAFETY
1.19 Check for Working Area / Area Lighting / Platform
availability
Date :
Checking Status Remarks
.T.O. For During Concrete Pour Check & Rectification Compliance Statu
Ok Rectification
Required
Ok
Rectification
Required
Ok Rectification
Required
OkRectification
Required
Ok Rectification
Required
Ok Rectification
Required
OkRectification
Required
OkRectification
Required
Ok RectificationRequired
OkRectification
Required
OkRectification
Required
OkRectification
Required
Ok Rectification
Required
OkRectification
Required
OkRectificationRequired
Ok Rectification
Required
Ok Rectification
Required
OkRectification
Required
OkRectification
Required
Footing / Raft - Pedestal - Plinth Beam / -
RCC Wall Lift- Other
B0__- - - - -
2014- -
, , ,
8/9/2019 Inspection Checklist Format
2/2
FORM NO : KJM/IP/CONST/002 Rev00
Sr.
No.
Inspection Items Date & Time of
Checking
Checking Status Remarks
2.0 DURING CONCRETE POUR CHECK
2.1 Check for Concrete Grade (M30)
2.2 Check for Concrete Slump @ Site
2.3 Check for Concrete Sampling (Concrete Cube Casting)
Legend :
CECL : Coromandel Engineering Construction Limited
VRC : VR Earthmovers & Constructions (Pvt. Ltd.)
Sr.
No.
Inspection Items Checking Record
Concrete Quantity_____________Cum
RECTIFICATION COMPLIANCE STATUS
Checking Status Signature
Ok Rectification
Required
OkRectification
Required
OkRectification
Required