    FORM NO : KJM/IP/CONST/002 Rev00

    INSPECTION CHECKLIST FOR REINFORCED CEMENT CONCRETE WORKS

    Building / Area :

    Location :( For Location / Grid please refer Location plan attached herewith)

    Structure Member/ ID / No. :

    Reference Latest revision of GFC Drawing :

    Sr.

    No.

    Inspection Items Date & Time of

    Checking

    1.0 CONCRETE PRE POUR CHECK

    Check for Base (PCC) and Survey

    1.1 Check for Cleaning of PCC Base

    1.2 Check for Centerline marking

    1.3 Check for PCC Top Level

    CHECK FOR SHUTTERING WORKS

    1.4 Check for Shuttering material Suitability

    1.5 Check for Shuttering Size as per ref. drawing

    1.6 Check for Shuttering Line, Level & Plumb

    1.7 Check for Shuttering Supports system

    1.8 Check for Provision of Pockets and its sizes

    1.9 Check for Formwork Tightness

    1.10 Check for Concrete Top Level

    1.11 Check for Shuttering Release oil Application

    1.12 Check for Concrete Cover as specified in the ref. drawing

    1.13 Check for marking of Concrete Top Level

    CHECK FOR REINFORCEMENT WORKS

    1.14 Check for Cleanliness of Rebar (Free from Rust, Oil,

    Grease, Oil & Dirt)

    1.15 Check for Bar Dia, Spacing & , Bar Shape & Spacing

    1.16 Check for Provision of Chairs / Supports

    CHECK FOR INSERTS IF ANY

    1.17 Check for Size, Spacing of Inserts / Structural Steel

    CHECK FOR RESOURCES (MATERIAL, PLANT & MACHINERY)

    1.18 Check for Concrete Qty. availability from RMC

    Check for availability of Concrete Pumps, Chutes, Vibrators

    CHECK FOR SAFETY

    1.19 Check for Working Area / Area Lighting / Platform

    availability

    Date :

    Checking Status Remarks

    .T.O. For During Concrete Pour Check & Rectification Compliance Statu

    Ok Rectification

    Required

    Ok

    Rectification

    Required

    Ok Rectification

    Required

    OkRectification

    Required

    Ok Rectification

    Required

    Ok Rectification

    Required

    OkRectification

    Required

    OkRectification

    Required

    Ok RectificationRequired

    OkRectification

    Required

    OkRectification

    Required

    OkRectification

    Required

    Ok Rectification

    Required

    OkRectification

    Required

    OkRectificationRequired

    Ok Rectification

    Required

    Ok Rectification

    Required

    OkRectification

    Required

    OkRectification

    Required

    Footing / Raft - Pedestal - Plinth Beam / -

    RCC Wall Lift- Other

    B0__- - - - -

    2014- -

    , , ,

  • 8/9/2019 Inspection Checklist Format

    2/2

    FORM NO : KJM/IP/CONST/002 Rev00

    Sr.

    No.

    Inspection Items Date & Time of

    Checking

    Checking Status Remarks

    2.0 DURING CONCRETE POUR CHECK

    2.1 Check for Concrete Grade (M30)

    2.2 Check for Concrete Slump @ Site

    2.3 Check for Concrete Sampling (Concrete Cube Casting)

    Legend :

    CECL : Coromandel Engineering Construction Limited

    VRC : VR Earthmovers & Constructions (Pvt. Ltd.)

    Sr.

    No.

    Inspection Items Checking Record

    Concrete Quantity_____________Cum

    RECTIFICATION COMPLIANCE STATUS

    Checking Status Signature

    Ok Rectification

    Required

    OkRectification

    Required

    OkRectification

    Required