1
Innovative Bridge Construction WORKSHOP RSVP TODAY Through the link above or visit our hompage www.LHTAC.org 11:30 a.m. to 12:30 p.m. Lunch Showcase Speakers: -FHWA -LHTAC -J-U-B Engineers, Inc. Questions? Contact us at 208-344-0565 [email protected] Lunch & Transportation Provided 1:00 to 3:00 p.m. Site Visit Transportation Provided to Construction Site and Back YOU MUST bring your safety shoes, hard hat, & safety vest! GRS-IBS The Local Highway Technical Assistance Council received funding to provide a demonstration workshop on Geosynthetic Reinforced Soil– Integrated Bridge System (GRS–IBS) bridge construction in southern Idaho. The all-day workshop includes a morning of class instruction using FHWA experts and an afternoon on-site observation of the construction. GRS-IBS is an innovation to help reduce bridge construction time and cost. GRS- IBS projects can be built in weeks instead of months, due to the ease of construction and the use of readily available materials and equipment. Reduced construction schedule translates into less exposure around work zones improving safety. Idaho has adopted GRS-IBS as a focus for the state. Cost of attending this workshop will be funded through the grant. The focus audience for this workshop is roadway supervisors, foreman and employees. At this time, we are limiting attendees to two (2) per agency. If you have more employees that wish to attend, they can be added to a waitlist. Consultants and contractors may be able to attend if spots are not first filled by locals. Note: The grant will not cover the cost of consultants and contractors to attend. Email [email protected] to be placed on the waitlist. RSVP online http://GRSBOISE.rsvpify.com Deadline December 10th. 8:30 to 11:30 a.m. Classroom Hilton Garden Inn Boise Spectrum Kuna Road Project December 18 - 8:30 a.m. to 4 p.m.

Innovative Bridge Construction GRS-IBS WORKSHOP

  • Upload
    others

  • View
    3

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Innovative Bridge Construction GRS-IBS WORKSHOP

Innovative Bridge ConstructionWORKSHOP

RSVP TODAYThrough the link above or visit our hompage www.LHTAC.org

11:30 a.m. to 12:30 p.m. Lunch

Showcase Speakers:-FHWA-LHTAC-J-U-B Engineers, Inc.

Questions?Contact us [email protected]

Lunch & TransportationProvided

1:00 to 3:00 p.m. Site Visit

Transportation Provided to Construction Site and Back

YOU MUST bring your safety shoes, hard hat, & safety vest!

GRS-IBSThe Local Highway Technical Assistance Council received funding to provide a demonstration workshop on Geosynthetic Reinforced Soil–Integrated Bridge System (GRS–IBS) bridge construction in southern Idaho. The all-day workshop includes a morning of class instruction using FHWA experts and an afternoon on-site observation of the construction.

GRS-IBS is an innovation to help reduce bridge construction time and cost. GRS-IBS projects can be built in weeks instead of months, due to the ease of construction and the use of readily available materials and equipment. Reduced construction schedule translates into less exposure around work zones improving safety. Idaho has adopted GRS-IBS as a focus for the state.

Cost of attending this workshop will be funded through the grant. The focus audience for this workshop is roadway supervisors, foreman and employees. At this time, we are limiting attendees to two (2) per agency. If you have more employees that wish to attend, they can be added to a waitlist.

Consultants and contractors may be able to attend if spots are not first filled by locals. Note: The grant will not cover the cost of consultants and contractors to attend.

Email [email protected] to be placed on the waitlist. RSVP online

http://GRSBOISE.rsvpify.com

Deadline December 10th.

8:30 to 11:30 a.m. ClassroomHilton Garden Inn Boise Spectrum

Kuna Road Project

December 18 - 8:30 a.m. to 4 p.m.