8
Innovation to global solutions wind turbine towers and offshore foundations

Innovation to global solutions - Windar Renovables · 04 05 wind turbine towers and offshore foundations anholt transformer substation Transformer substation height 15 m Plate thickness

Embed Size (px)

Citation preview

Innovation toglobal solutions

wind turbine towers and offshore foundations

02 03wind turbine towers and offshore foundations

AEMSA

SANTANA

APOYOS

METÁLICOS

TADARSA

EÓLICA I

TADARSA

EÓLICA II

WINDAR

W. SERVICESWINDARMEX TORREBRAS

WINDAR

RENEWABLETOTAL

spain spain spain spain spain mexico brazil india

Total surface / m2 46.800 14.000 25.000 16.000 15.610 100.000 100.000 150.000 467.410

Covered area / m2 9.150 6.600 18.850 16.000 12.360 12.000 9.100 17.000 101.060

Warehouse area / m2 23.700 2.000 200.000 - - 3.250 95.000 90.000 120.000 533.950

Bays / number 1 3 3 2 1 2 2 4 18

Thickness / max 80 mm 60 mm 120 mm 50 mm 60 mm 60 mm 60 mm 70 mm 120 mm

Cranes / units 8 7 14 8 9 8 6 9 69

Blasting Booth / No & m 1 (8x8x34) 1 (6x6x32) 2 (9x8x39) 1 (9x9x40) 1 (7x7x32) 1 (7x8x40) 1 (6x6x40) 2 (7x6x35) 10

Painting Booth / No & m 1 (8x8x34) 2 (6x6x32) 3 (9x8x39) 1 (9x9x40) 1 (7x7x32) 2 (8x8x40) 2 (6x6x40) 4 (7x6x35) 16

Thanks to our historical progress

and sustainable experience in the

manufacturing of tubular steel

structures, WINDAR RENOVABLES, has

become a global leader.

Due to our expertise, we are a reference company ahead of the most important wind turbine manufacturers in the world.

factories

asturia

s

windar renovables

2012 2013 2014 2015 2016 2012 2013 2014 2015 2016

120 117

166209

284

1.937

2.560

3.6853.851

4.357

Turnover

MILLIONS OF EUROS

Annual sales

SECTIONS

brazil

india

spain

Andalucía 720 sections per year

Navarra 528 sections per year

Asturias 3.030 sections per year

Galicia 1 foundation per week

India 1 1.680 sections per year

India II Next investment

700 sections per year

Brazil 680 sections per year

mexico

Mexico Under construction until 2017

720 sections per year

Global capacities

gijónavilés

04 05wind turbine towers and offshore foundations

anholt transformer substation

Transformer substation height 15 m

Plate thickness 60 mm max.

Steel jacket structure 800 Tn

Weight of the structure > 545 Tn

Weight (steel + concrete) > 800 Tn

OWF projects Race Bank Owf 16 towers

Hywind Scotland Pilot Park 5 spar foundations

Belwind Owf 1 Alstom prototype

Wikinger Owf 29 jackets, 70 towers

Anholt Owf 1 substation transformer

West of Duddon Sands Owf 22 towers

Arinaga, Canary Island 1 Gamesa prototype

Block Island Owf 5 towers

Borkum Riffgrund Owf 30 towers

Borkum Riffgat Owf 10 towers

Merkur 66 Mts

Executed

In progress

Future

East Anglia One 34 jackets

Dudgeon Owf 26 towers

windar renovables

wikinger offshore wind project

hywind scotland pilot park

Project 30 mw

Quality material NV36D

Floating foundations spar - floater 5

Operating in waters exceeding 100 m of depth

Foundation length 90 m

Foundation weight 2.200 Tn

Main diameter 14,5 max.

Plate thickness 80 mm max.

Quality material S355NL / S355NL + Z35

Depth range between 36 m - 42 m

Jacket height (total) 59,2 m

Jacket weight (total) 650 Tn

Piles 116

Piles length 59,4 m

Piles weight 167,5 Tn

Piles diameter 2,667 m

06 07wind turbine towers and offshore foundations

OsterildDenmark 2015

Windar

client Alstom / GE

Offshore wind tower

1 x 6 MW - HAL.150 6 MW Offshore Wind Turbine

Diam. = 6 m • Max. weight (per section) = 195 TnMax. length (per section) = 36 mMax. thickness = 71 mm

Block IslandUSA 2015

Windar

client Alstom / GE

Offshore wind tower

5 x 6 MW - HAL.150 6 MW Offshore Wind Turbine

Diam. = 6 m • Max. weight (per section) = 195 TnMax. length (per section) = 36 mMax. thickness = 71 mm

WikingerGermany 2015

Windar

client Adwen

Offshore wind tower

70 x 5 MW - AD 5-135

Diam. = 6 m • Max. weight (per section) = 120 TnMax. length (per section) = 32 mMax. thickness = 50 mm

8 MW - PrototypeGermany 2016

Windar

client Adwen

Offshore wind tower

1 x 8 MW AD 8-180 - T 107 M

Diam. = 6,9 m • Max. weight (per section) = 150 TnMax. length (per section) = 28 mMax. thickness = 72 mm

DudgeonUnited Kingdom 2016

Windar

client Siemens Wind Power

Offshore wind tower

26 x 6.0 MW T84.08 - D491

Diam. = 6 m • Max. weight (per section) = 150 TnMax. length (per section) = 36 mMax. thickness = 71 mm

Race BankUnited Kingdom 2016

Windar

client Siemens Wind Power

Offshore wind tower

16 x 6.0 MW T84.08 - D491

Diam. = 6 m • Max. weight (per section) = 150 TnMax. length (per section) = 36 mMax. thickness = 71 mm

HywindUnited Kingdom 2016 - 2017

JV Windar - Navantia

client Statoil

Offshore foundation

5 x Spar Floating Foundations

Weight = 2.200 Tn • Length = 90 mPlate thickness = 80 mmMax. diameter = 14,5 m

WikingerGermany 2015 - 2016

JV Windar - Navantia

client Iberdrola

Offshore foundation

29 x 4 leg - Jackets + 106 Piles

Jacket weight = 650 Tn • Jacket height = 59,2 mPiles weight = 167 Tn

Piles length = 59,4 m

MerkurGermany 2017

JV Windar - Idesa

client Geosea

Offshore foundation

66 TP´s

Diameter = 6,7 m • Weight = 260 TnMax. length (per section) = 24 mMax. thickness = 90 mm

References

We offer products and services which are adapted to the particular needs of every single client.

windar renovables

Anholt ProjectDenmark 2012

Windar

client Pihl / Zublin

Offshore foundation

Transformer Substation Jacket

Weight = 550 TnHeight = 15 mPlate thickness = 60 mm

Arinaga (Las Palmas)Spain 2013

Windar

client Gamesa

Offshore wind tower

5.0 MW G11X

Diameter = 6 m • Weight = 272 TnTower height = 90 mThickness = 50 mm

Belwind Wind FarmBelgium 2013

Windar

client Alstom

Offshore wind tower

1 x 6 MW - HAL.150 6 MW Offshore Wind Turbine

Diam. = 6 m • Max. weight (per section) = 195 TnMax. length (per section) = 36 mMax. thickness = 71 mm

Borkum RiffgattGermany 2013

Windar

client Siemens Wind Power

Offshore wind tower

10 x 3.6 MW T68.25-06

Diam. = 5 m • Max. weight (per section) = 95 TnMax. length (per section) = 36 mMax. thickness = 52 mm

West of Duddon SandsUnited Kingdom 2013

Windar

client Siemens Wind Power

Offshore wind tower

22 x 3.6 MW T68.25-09

Diam. = 5 m • Max. weight (per section) = 95 TnMax. length (per section) = 36 mMax. thickness = 52 mm

Borkum RiffgrundGermany 2014

Windar

client Siemens Wind Power

Offshore wind tower

30 x 4 MW T68, 25-16

Diam. = 5 m • Max. weight (per section) = 95 TnMax. length (per section) = 36 mMax. thickness = 52 mm

one jacket per week

transition piece

1 piles4lattice structure

1

a c

ompany o

f

WINDAR Avda. Conde Guadalhorce, 57 - 59 • 33401 Avilés, Asturias (Spain)

T. (+34) 985 56 00 90 / (+34) 985 56 72 85

contact: nacho rodríguez / [email protected]

www.windar-renovables.es