INFRASTRUCTURE DATA SUSTAINABILITY
Agenda
I. The Issue
II. IDS Overview
III. Data Sustainability Solution
IV. The Impact
THE ISSUE
City of ChicagoCDOT Streetlight Database Development & GIS Mapping
Resolving billing conflicts– Unmetered electrical assets– Immediate/ongoing resolution
Develop an accurate asset inventory– Street lights– Traffic signals
Atlas Transition to GIS Database– Spatial representation– Feature attribution & relational database
Maintenance & Planning– Improve capital improvement planning– Enhance maintenance intel
Electrical Asset Inventory
City of ChicagoCDOT Streetlight Database Development & GIS Mapping
How do we develop a sustainable solution to maintaining accurate and up-to-date information?
Cobra Fixtures by Wattage and Type
Number of Street Light Fixtures by Component Wattage
9 0%
2,523 1%
13,930 5%
39,567 16%
3,476 1%
111,796 45%
47,888 19%
1,739 1%
29,235 12%
92 0%
wattage 20,no lamptypewattage 90,MHwattage 140,MHwattage 150,HPSwattage 210,MHwattage 250,HPSwattage 310,HPS
6% 1%1%
11%
4%
15%
1%34%
16%
1%10%
0%
13 Watts 135
20 Watts 9
23 Watts 177
45 Watts1,15950 Watts20,51960 Watts4,18670 Watts 80
90 Watts2,648
Street Lights Inventory
IDS OVERVIEW
Infrastructure Data Sustainability
Infrastructure Data Sustainability (IDS) is a strategy ofcollection and distribution of data through a central GIS datarepository where asset lifecycle information may be sharedamongst constituents seamlessly.
Planning
Design
Construction
Maintenance,Asset Mgmt. GIS
Financial Managers
Agencies & Authorities
Contractors
Construction Inspectors
Design Engineers
Environmental Engineers
Surveyors
Record Keepers
GIS Staff
Operation Managers
Infrastructure Data Sustainability
Infrastructure Planners
Program Managers
As-Built Data Collectors
Cross-Disciplinary
Program Managers
EnterpriseGIS
Financial Managers
Engineers
Surveyors
PlannersInspectors
Operation Managers
Maintenance Managers
Multi-Agency Coordination
Other
Railway
Aviation
Transit
Roads&
Highways
UtilitiesTollways
IDOT
Regional GIS
IntegrysCCHD
CDOT
ComEd
Nicor
OEMC
MWRD
Comcast
AT&T
CTA
Metra RTA
PACE
ICC
IDOT
Skyway
ISTHA
CDAFAA
Muni’s
SSMMA
Private
CMAP
Town-ships
DATA SUSTAINABILITY SOLUTION
DATA UPDATE EVENTS
Activities– Installation, removal, or replacement of any assets– Change in materials– Change in alignment, dimensions, lengths, sizes, depth of
wires/cables/circuits, location of utilities and physical features, vertical/horizontal clearances
– Change involving deletion of work originally planned– Obstructions encountered in the field
Feature Type Attribute Values
Controller Controller Type Residential
Street Controller Pole
Mounted
Street Controller
Pedestal/Base Mounted
Traffic Signal Controller
Transclosure
Other
Install Date
Remove Date
Light Structure Install Date
Removal Date
Structure Type Pole
Viaduct
Other
Location Type Street
Alley
Underpass
CTA
Aviation
Other
Foundation Type Controller Pedestal
Traffic Controller
Traffic Type “P”
Controller Street Light
Transclosure
Other
Ballast Housing Type Round Ballast Housing
Steel Ballast Housing
3 GA Ballast
Other
Height (ft)
Feature Type Attribute Values
Light Structure Pole Category City Steel
City Aluminum
Wood
Foundation With Elbows
Ornamental
Other
Fixtures Install Date
Removal Date
Fixture Type Cobra
Coach
Ornamental
Flood
Viaduct
Aviation
Bulb Type MV (Mercury Vapor)
HPS (High Pressure Sodium)
MH (Metal Halide)
LED
Wattage
Photocell Flag
Service Service Type Pole
Hole
Other
Junction Junction Type T-Tap
Hop
Hold
Hole Hole Type Manhole
Handhole
Hole Owner E (Commonwealth Edison)
T (IL Bell Tele)
G (Peoples Gas)
W (Chicago Water)
P (Chicago Park District)
S (Sewer)
CTA (Chicago Transit Authority)
City Requests Design Drawings from Consultant
Consultant Creates Requested Drawings
Consultant Submits Design Drawings to City
• Recommendation: Use Data Design Standards
City Approves or Denies Submitted
Drawings
Construction of Approved Designs
Begin
As-Built Data is Collected During
and After Construction
Consultants Create As-Built Drawings
• Recommendation: Consultant Applies Data Submittal Standards to Digital Files
Consultant Submits As-Built Files
City Approves or Denies Submitted As-Built Files
• Recommendation: Check Submissions Against Requirements Checklist
As-Built Files Are Approved and Translated
• Recommendation: Run Approved Files through Data Translation Tool
QA/QC on Results, Post-Process as
Needed
Final Database Integration
CONVERSION PROCESS
Receive Design Files
(.dgn)
Add Tags to Features
Input Attribute Data into
Excel
Convert CAD/.xlsx to
GIS
Edit per As-Built
Changes
Integrate into System-wide Feature
Class
THE IMPACT
Current Impact
Simple & Effective Approach
Leverage Esri Tools
Update & Maintain with Limited Resources
Reduce Turn-Around on Updates
Little-to-No Loss of Institutional Knowledge
Improved Coordination & Accuracy with Utility Billing
Improved Coordination & Process among Departments
Future Impact
Electronic As-Builts
Automated Data Conversion (CAD-GIS)
Enhance & Automate QA/QC Tools
Date update tools for traffic signals
Leveraging other Workflows for Data Maintenance
DICUSSION