Infra Manual v2(Forms) - Edited(1)

Embed Size (px)

Citation preview

  • 8/20/2019 Infra Manual v2(Forms) - Edited(1)

    1/24

    CBIM 

    Form 

    A-1

    KALAHI-CIDSS NATIONAL COMMUNITY DRIVEN DEVELOPMENT PROJECT

    INVENTORY OF EXISTING INFRASTRUCTURES1

    Municipality  : ____________________________ 

     

    Classification: 

     ________ No. of  Barangays: ____________________________ Province : ____________________________   Region:  _____________ 

    A. Rural Acce!

    i. Municipal Roads: Paved =  ______  kms. Gravel =  ______  kms.ii.  Barangay Roads: Paved =  ______  kms. Gravel =  ______  kms.iii. Bridges: Concrete =  ______  ln.m Bailey = _______  ln.m Suspension =  _____  ln.miv.  t!er  Structures:  ___________________ 

    ". S#c$al I%&ra'ruc'ure!

    i. Rural "ealt! #nit:  ____  $arangayii. Barangay

     

    "ealt! Station:  ____  $arangaysiii. %ay Care Center:  ____  $arangays

    iv. Sc!ool 

    Buildings: 

    &lementary 

    =  ______  

    Barangays No. of  Classrooms 

    =  ________ "ig! Sc!ool =  _____  Barangays No. of  Classrooms =  ________ 

    v. Pota$le 'ater  Supply: (evel ) =  _____  Barangays(evel )) =  _____  Barangays(evel ))) =  _____  Barangays

    vi. t!ers:  *Brgy+ "all,  _____  $arangays

    C. A(r$cul'ural ) Tra*e Fac$l$'$e!

    i.  Post-!arvest facilities*'are!ouseStorage,: _____  $arangays

    ii. /raining Center: _____   $arangays

    iii. Markets /rading Center: _____   $arangaysiv. 

    Ra0 materials: 

     ____________________________________ 

    Pre+are* ,! Val$*a'e* ,!

       

    MC/-/1 2C/-/1

    50  4,380

    ALEGRIA 4TH9

    CEBU  VII

    1,100 0

    2,650

    0 0

    Covered Courts 9!

    18

    99 to "ou#t4 to "ou#t099

    9

    41

    3$%&$oo, 'e(u&es)eeds!

    E*GR+ A- C+ .ERRARE* E*GR+ LEAH A/R + /A/A*A

    Position &mployment Status

    /ype of  Skill No. of  3ears of  'ork&4perience

    &mploymentStatus

    /ype Current

    Condition

    Current

    Capa$ility 

    per "our 

    1uel 5 P(

    ProductConsumption

    Prevailing

    Rental Rates

  • 8/20/2019 Infra Manual v2(Forms) - Edited(1)

    2/24

    CBIM 

    Form 

    A-2

    KALAHI-CIDSS NATIONAL COMMUNITY DRIVEN DEVELOPMENT PROJECT

    INVENTORY OF AVAILA"LE TECHNICAL RESOURCES

    Na/e #&  "ara%(a! 

    Mu%$c$+al$'! 

      Pr#0$%ce 

      Re($#%!   Mu%$c$+al Cla!   

    Pre+are* ,! C#%curre*!

     ______________________ _______________________ MC/-/1 Municipal &ngineer 

    6

    CBIM 

    Form 

    A-2

    KALAHI-CIDSS NATIONAL COMMUNITY DRIVEN DEVELOPMENT PROJECT

    INVENTORY OF AVAILA"LE TECHNICAL RESOURCES

    Na/e #&  "ara%(a! Mu%$c$+al$'!   Pr#0$%ce  !   Re($#%!   Mu%$c$+al Cla!   

    A. Hea0 Eu$+/e%'

    ". Tec2%$cal a%* S3$lle* Ma%+#4er 

    C. La,#r  F#rce 5"ara%(a6

    Position &mployment Status

    /ype of  Skill No. of  3ears of  'ork&4perience

    &mploymentStatus

    /ype Current

    Condition

    Current

    Capa$ility 

    per "our 

    1uel 5 P(

    ProductConsumption

    Prevailing

    Rental Rates

  • 8/20/2019 Infra Manual v2(Forms) - Edited(1)

    3/24

    Pre+are* ,! C#%curre*!

     ______________________ _______________________ MC/-/1 Municipal &ngineer 

    6

    CBIM Form 

    A-2

    KALAHI-CIDSS NATIONAL COMMUNITY DRIVEN DEVELOPMENT PROJECT

    INVENTORY OF AVAILA"LE TECHNICAL RESOURCES

    Na/e #&  "ara%(a! Mu%$c$+al$'!   Pr#0$%ce  !   Re($#%!   Mu%$c$+al Cla!   

    Pre+are* ,! C#%curre*!

     ______________________ _______________________ MC/-/1 Municipal &ngineer 

    A. Hea0 Eu$+/e%'

    ". Tec2%$cal a%* S3$lle* Ma%+#4er 

    C. La,#r  F#rce 5"ara%(a6

    Position &mployment Status

    /ype of  Skill No. of  3ears of  'ork&4perience

    &mploymentStatus

    /ype CurrentCondition

    CurrentCapa$ility

     

    per "our 

    1uel 5 P(Product

    Consumption

    PrevailingRental Rates

    A. Hea0 Eu$+/e%'

    ". Tec2%$cal a%* S3$lle* Ma%+#4er 

    C. La,#r  F#rce 5"ara%(a6

  • 8/20/2019 Infra Manual v2(Forms) - Edited(1)

    4/24

    6

    CBIM Form A-2

    KALAHI-CIDSS NATIONAL COMMUNITY DRIVEN DEVELOPMENT PROJECT

    INVENTORY OF AVAILA"LE TECHNICAL RESOURCES

    Na/e 

    #&  

    "ara%(a! Mu%$c$+al$'!   Pr#0$%ce  !   Re($#%!   Mu%$c$+al Cla!   

    Pre+are* ,! C#%curre*!

     ______________________ _______________________ MC/-/1 Municipal &ngineer 

    6

    CBIM Form A-2

    KALAHI-CIDSS NATIONAL COMMUNITY DRIVEN DEVELOPMENT PROJECT

    INVENTORY OF AVAILA"LE TECHNICAL RESOURCES

    8 Position &mployment Status

    /ype of  Skill No. of  3ears of  'ork&4perience

    &mploymentStatus

    /ype CurrentCondition

    CurrentCapa$ility per 

    "our 

    1uel 5 P(Product

    Consumption

    PrevailingRental Rates

    A. Hea0 Eu$+/e%'

    ". 

    Tec2%$cal 

    a%* 

    S3$lle* 

    Ma%+#4er 

    C. La,#r  F#rce 5"ara%(a6

    Position &mployment Status

    /ype of  Skill No. of  3ears of  'ork&4perience

    &mploymentStatus

    /ype Current

    Condition

    Current

    Capa$ility 

    per "our 

    1uel 5 P(

    ProductConsumption

    Prevailing

    Rental Rates

  • 8/20/2019 Infra Manual v2(Forms) - Edited(1)

    5/24

    Na/e #&  "ara%(a! Mu%$c$+al$'!   Pr#0$%ce  !   Re($#%!   Mu%$c$+al Cla!   

    Pre+are* ,! C#%curre*!

     ______________________ _______________________ MC/-/1 Municipal &ngineer 

    6

    CBIM Form A-2

    KALAHI-CIDSS NATIONAL COMMUNITY DRIVEN DEVELOPMENT PROJECT

    INVENTORY OF AVAILA"LE TECHNICAL RESOURCES

    Na/e #&  "ara%(a! Mu%$c$+al$'!   Pr#0$%ce  !   Re($#%!   Mu%$c$+al Cla!   

    A. Hea0 Eu$+/e%'

    ". Tec2%$cal a%* S3$lle* Ma%+#4er 

    C. La,#r  F#rce 5"ara%(a6

    Position &mployment Status

    /ype of  Skill No. of  3ears of  'ork&4perience

    &mploymentStatus

    /ype CurrentCondition CurrentCapa$ility 

    per "our 

    1uel 5 P(ProductConsumption

    PrevailingRental Rates

  • 8/20/2019 Infra Manual v2(Forms) - Edited(1)

    6/24

    Pre+are* ,! C#%curre*!

     ______________________ _______________________ MC/-/1 Municipal &ngineer 

    6

    CBIM Form A-2

    KALAHI-CIDSS NATIONAL COMMUNITY DRIVEN DEVELOPMENT PROJECT

    INVENTORY OF AVAILA"LE TECHNICAL RESOURCES

    Na/e 

    #&  

    "ara%(a! Mu%$c$+al$'!   Pr#0$%ce  !   Re($#%!   Mu%$c$+al Cla!   

    A. Hea0 Eu$+/e%'

    ". Tec2%$cal a%* S3$lle* Ma%+#4er 

    C. La,#r  F#rce 5"ara%(a6

    Position &mployment Status

    /ype of  Skill No. of  3ears of  'ork&4perience

    &mploymentStatus

    /ype CurrentCondition

    CurrentCapa$ility

     

    per "our 

    1uel 5 P(Product

    Consumption

    PrevailingRental Rates

  • 8/20/2019 Infra Manual v2(Forms) - Edited(1)

    7/24

    Pre+are* ,! C#%curre*!

     ______________________ _______________________ MC/-/1 Municipal &ngineer 

    6

    CBIM 

    Form 

    A-2

    KALAHI-CIDSS NATIONAL COMMUNITY DRIVEN DEVELOPMENT PROJECT

    INVENTORY 

    OF 

    AVAILA"LE 

    TECHNICAL 

    RESOURCES

    Na/e #&  "ara%(a! Mu%$c$+al$'!   Pr#0$%ce  !   Re($#%!   Mu%$c$+al Cla!   

    Pre+are* ,! C#%curre*!

     ______________________ _______________________ MC/-/1 Municipal &ngineer 

    A. Hea0 Eu$+/e%'

    ". Tec2%$cal a%* S3$lle* Ma%+#4er 

    C. La,#r  F#rce 5"ara%(a6

    8 Position &mployment Status

    /ype of  Skill No. of  3ears of  'ork&4perience

    &mploymentStatus

    /ype CurrentCondition CurrentCapa$ility 

    per "our 

    1uel 5 P(ProductConsumption

    PrevailingRental Rates

    A. Hea0 Eu$+/e%'

    ". Tec2%$cal a%* S3$lle* Ma%+#4er 

    C. La,#r  F#rce 5"ara%(a6

  • 8/20/2019 Infra Manual v2(Forms) - Edited(1)

    8/24

    6

    CBIM 

    Form 

    A-2

    KALAHI-CIDSS NATIONAL COMMUNITY DRIVEN DEVELOPMENT PROJECT

    INVENTORY OF AVAILA"LE TECHNICAL RESOURCES

    Na/e #&  "ara%(a! Mu%$c$+al$'!   Pr#0$%ce  !   Re($#%!   Mu%$c$+al Cla!   

    Pre+are* ,! C#%curre*!

     ______________________ _______________________ MC/-/1 Municipal &ngineer 

    8 Position &mployment Status

    /ype of  Skill No. of  3ears of  'ork&4perience

    &mploymentStatus

    /ype CurrentCondition

    CurrentCapa$ility

     

    per "our 

    1uel 5 P(Product

    Consumption

    PrevailingRental Rates

    A. Hea0 Eu$+/e%'

    ". 

    Tec2%$cal 

    a%* 

    S3$lle* 

    Ma%+#4er 

    C. 

    La,#r  

    F#rce 

    5"ara%(a6

  • 8/20/2019 Infra Manual v2(Forms) - Edited(1)

    9/24

    6

    CBIM Form A-3

    KALAHI-CIDSS NATIONAL COMMUNITY DRIVEN DEVELOPMENT PROJECT

    INVENTORY 

    OF 

    AVAILA"LE 

    SERVICE 

    PROVIDERS7

    Na/e #&  "ara%(a! 

    Mu%$c$+al$'!   Pr#0$%ce  !   Re($#%!   Mu%$c$+al Cla!   

    MATRIX OF NON-REGISTERED SUPPLIERS

    Pre+are* ,! N#'e*!

     __________________________ ____________________________________________________ M/1 andor   2C//1 Regional Community )nfrastructure Specialist

    Note: /o $e conducted in coordination 0it! market survey of  availa$le suppliers and contractors prepared $yt!eProcurement /eam

    7 ne t!at can provide tec!nical assistance suc! as survey 0orks+ engineering design and plan preparations+ la$oratory testresults8 '!et!er  !ard0 are store+ electrical store+ lum$eryard+ sand 5 gravel supplier+ etc

    9

    CBIM Form 

    A-3

    KALAHI-CIDSS NATIONAL COMMUNITY DRIVEN DEVELOPMENT PROJECT

    INVENTORY OF AVAILA"LE SERVICE PROVIDERS7

    Na/e #&  "ara%(a! Mu%$c$+al$'!   Pr#0$%ce  !   Re($#%!   Mu%$c$+al Cla!   

    Name of  &sta$lis!ment Postal  2ddress   Category8 ProductsMaterials Sup

    Name of  Supplier Postal  2ddress Category

    Postal  2ddress Category Classification

    Name 2ddress 1ield of  &4pertise

    A. ENGINEERS7ARCHITECTS

    ".  CONTRACTORS

    C. SUPPLIERS

    Name of  &sta$lis!ment Postal  2ddress   Category8 ProductsMaterials Sup

    Name of  Supplier Postal  2ddress Category

    Postal  2ddress Category Classification

    Name 2ddress 1ield of  &4pertise

  • 8/20/2019 Infra Manual v2(Forms) - Edited(1)

    10/24

    MATRIX OF NON-REGISTERED SUPPLIERS

    Pre+are* ,! N#'e*!

     __________________________ ____________________________________________________ M/1 andor   2C//1 Regional Community )nfrastructure Specialist

    Note: /o $e conducted in coordination 0it! market survey of  availa$le suppliers and contractors prepared $yt!eProcurement /eam

    7 ne t!at can provide tec!nical assistance suc! as survey 0orks+ engineering design and plan preparations+ la$oratory testresults8 '!et!er  !ard0 are store+ electrical store+ lum$eryard+ sand 5 gravel supplier+ etc

    9

    CBIM 

    Form 

    A-3

    KALAHI-CIDSS NATIONAL COMMUNITY DRIVEN DEVELOPMENT PROJECT

    INVENTORY OF AVAILA"LE SERVICE PROVIDERS7

    Na/e #&  "ara%(a! 

    Mu%$c$+al$'!   Pr#0$%ce  !   Re($#%!   Mu%$c$+al Cla!   

    MATRIX OF NON-REGISTERED SUPPLIERS

    Pre+are* ,! N#'e*!

     __________________________ ____________________________________________________ M/1 andor   2C//1 Regional Community )nfrastructure Specialist

    Note: /o $e conducted in coordination 0it! market survey of  availa$le suppliers and contractors prepared $yt!eProcurement /eam

    7 ne t!at can provide tec!nical assistance suc! as survey 0orks+ engineering design and plan preparations+ la$oratory testresults8 '!et!er  !ard0 are store+ electrical store+ lum$eryard+ sand 5 gravel supplier+ etc

    9

    A. ENGINEERS7ARCHITECTS

    ".  CONTRACTORS

    C. SUPPLIERS

    Postal  2ddress   Category8 ProductsMaterials Sup

    Name of  Construction 1ir Postal  2ddress Category Classification

    Name of  Supplier Postal  2ddress Category

    Name 2ddress 1ield 

    of  &4pertise

    A. ENGINEERS7ARCHITECTS

    ".  CONTRACTORS

    C. SUPPLIERS

  • 8/20/2019 Infra Manual v2(Forms) - Edited(1)

    11/24

    CBIM Form A-3

    KALAHI-CIDSS 

    NATIONAL 

    COMMUNITY 

    DRIVEN 

    DEVELOPMENT 

    PROJECT

    INVENTORY OF AVAILA"LE SERVICE PROVIDERS7

    Na/e #&  "ara%(a! 

    Mu%$c$+al$'!   Pr#0$%ce  !   Re($#%!   Mu%$c$+al Cla!   

    MATRIX OF NON-REGISTERED SUPPLIERS

    Pre+are* ,! N#'e*!

     __________________________ ____________________________________________________ 

    M/1 

    andor   2C//1 Regional 

    Community 

    )nfrastructure 

    Specialist

    Note: /o $e conducted in coordination 0it! market survey of  availa$le suppliers and contractors prepared $yt!eProcurement /eam

    7 ne t!at can provide tec!nical assistance suc! as survey 0orks+ engineering design and plan preparations+ la$oratory testresults8 '!et!er  !ard0 are store+ electrical store+ lum$eryard+ sand 5 gravel supplier+ etc

    9

    CBIM 

    Form 

    A-3

    KALAHI-CIDSS NATIONAL COMMUNITY DRIVEN DEVELOPMENT PROJECT

    INVENTORY OF AVAILA"LE SERVICE PROVIDERS7

    Na/e 

    #&  

    "ara%(a! Mu%$c$+al$'!   Pr#0$%ce  !   Re($#%!   Mu%$c$+al Cla!   

    Postal  2ddress   Category8 ProductsMaterials Sup

    Name of  Construction 1ir Postal  2ddress Category Classification

    Name of  Supplier Postal  2ddress Category

    Name 2ddress 1ield of  &4pertise

    A. ENGINEERS7ARCHITECTS

    ".  CONTRACTORS

    C. SUPPLIERS

    Postal  2ddress   Category8 ProductsMaterials Sup

    Name of  Construction 1ir Postal  2ddress Category Classification

    Name of  Supplier Postal  2ddress Category

    Name 2ddress 1ield 

    of  &4pertise

  • 8/20/2019 Infra Manual v2(Forms) - Edited(1)

    12/24

    MATRIX OF NON-REGISTERED SUPPLIERS

    Pre+are* ,! N#'e*!

     __________________________ ____________________________________________________ M/1 andor   2C//1 Regional Community )nfrastructure Specialist

    Note: /o $e conducted in coordination 0it! market survey of  availa$le suppliers and contractors prepared $yt!eProcurement /eam

    7 ne t!at can provide tec!nical assistance suc! as survey 0orks+ engineering design and plan preparations+ la$oratory testresults8 '!et!er  !ard0 are store+ electrical store+ lum$eryard+ sand 5 gravel supplier+ etc

    9

    CBIM 

    Form 

    A-3

    KALAHI-CIDSS NATIONAL COMMUNITY DRIVEN DEVELOPMENT PROJECT

    INVENTORY OF AVAILA"LE SERVICE PROVIDERS7

    Na/e #&  "ara%(a! 

    Mu%$c$+al$'! 

      Pr#0$%ce 

      Re($#%!   Mu%$c$+al Cla!   

    MATRIX OF NON-REGISTERED SUPPLIERS

    Pre+are* ,! N#'e*!

     __________________________ ____________________________________________________ M/1 andor   2C//1 Regional Community )nfrastructure Specialist

    Note: /o $e conducted in coordination 0it! market survey of  availa$le suppliers and contractors prepared $yt!eProcurement /eam

    7 ne t!at can provide tec!nical assistance suc! as survey 0orks+ engineering design and plan preparations+ la$oratory testresults8 '!et!er  !ard0 are store+ electrical store+ lum$eryard+ sand 5 gravel supplier+ etc

    9

    A. ENGINEERS7ARCHITECTS

    ".  CONTRACTORS

    C. SUPPLIERS

    Postal  2ddress   Category8 ProductsMaterials Sup

    Name of  Construction 1ir Postal  2ddress Category Classification

    Name of  Supplier Postal  2ddress Category

    Name 2ddress 1ield 

    of  &4pertise

    A. ENGINEERS7ARCHITECTS

    ".  CONTRACTORS

    C. SUPPLIERS

  • 8/20/2019 Infra Manual v2(Forms) - Edited(1)

    13/24

    CBIM Form A-3

    KALAHI-CIDSS NATIONAL COMMUNITY DRIVEN DEVELOPMENT PROJECT

    INVENTORY OF AVAILA"LE SERVICE PROVIDERS7

    Na/e #&  "ara%(a! Mu%$c$+al$'!   Pr#0$%ce  !   Re($#%!   Mu%$c$+al Cla!   

    MATRIX OF NON-REGISTERED SUPPLIERS

    Pre+are* ,! N#'e*!

     __________________________ ____________________________________________________ M/1 andor   2C//1 Regional Community )nfrastructure Specialist

    Note: /o $e conducted in coordination 0it! market survey of  availa$le suppliers and contractors prepared $yt!eProcurement /eam

    7 ne t!at can provide tec!nical assistance suc! as survey 0orks+ engineering design and plan preparations+ la$oratory testresults8 '!et!er  !ard0 are store+ electrical store+ lum$eryard+ sand 5 gravel supplier+ etc

    9

    CBIM Form A-3

    KALAHI-CIDSS NATIONAL COMMUNITY DRIVEN DEVELOPMENT PROJECT

    INVENTORY OF AVAILA"LE SERVICE PROVIDERS7

    Na/e #&  "ara%(a! 

    Mu%$c$+al$'! 

      Pr#0$%ce 

      Re($#%!   Mu%$c$+al Cla!   

    Postal  2ddress   Category8 ProductsMaterials Sup

    Name of  Construction 1ir Postal  2ddress Category Classification

    Name of  Supplier Postal  2ddress Category

    Name 2ddress 1ield 

    of  &4pertise

    A. ENGINEERS7ARCHITECTS

    ".  CONTRACTORS

    C. SUPPLIERS

    Postal  2ddress   Category8 ProductsMaterials Sup

    Name of  Construction 1ir Postal  2ddress Category Classification

    Name of  Supplier Postal  2ddress Category

    Name 2ddress 1ield 

    of  &4pertise

  • 8/20/2019 Infra Manual v2(Forms) - Edited(1)

    14/24

    MATRIX OF NON-REGISTERED SUPPLIERS

    Pre+are* ,! N#'e*!

     __________________________ ____________________________________________________ M/1 andor   2C//1 Regional Community )nfrastructure Specialist

    Note: /o $e conducted in coordination 0it! market survey of  availa$le suppliers and contractors prepared $yt!eProcurement /eam

    7 ne t!at can provide tec!nical assistance suc! as survey 0orks+ engineering design and plan preparations+ la$oratory testresults8 '!et!er  !ard0 are store+ electrical store+ lum$eryard+ sand 5 gravel supplier+ etc

    9

    CBIM 

    Form 

    A-3

    KALAHI-CIDSS NATIONAL COMMUNITY DRIVEN DEVELOPMENT PROJECT

    INVENTORY OF AVAILA"LE SERVICE PROVIDERS7

    Na/e #&  "ara%(a! 

    A. ENGINEERS7ARCHITECTS

    ".  CONTRACTORS

    C. SUPPLIERS

    Postal  2ddress   Category8 ProductsMaterials Sup

    Name of  Construction 1ir Postal  2ddress Category Classification

    Name of  Supplier Postal  2ddress Category

    Name 2ddress 1ield 

    of  &4pertise

  • 8/20/2019 Infra Manual v2(Forms) - Edited(1)

    15/24

    Mu%$c$+al$'!   Pr#0$%ce  !   Re($#%!   Mu%$c$+al Cla!   

    MATRIX OF NON-REGISTERED SUPPLIERS

    Pre+are* ,! N#'e*!

     __________________________ ____________________________________________________ M/1 andor   2C//1 Regional Community )nfrastructure Specialist

    Note: /o $e conducted in coordination 0it! market survey of  availa$le suppliers and contractors prepared $yt!eProcurement /eam

    7 ne t!at can provide tec!nical assistance suc! as survey 0orks+ engineering design and plan preparations+ la$oratory testresults8 '!et!er  !ard0 are store+ electrical store+ lum$eryard+ sand 5 gravel supplier+ etc

    9

    CBIM Form A-4

    KALAHI-CIDSS NATIONAL COMMUNITY DRIVEN DEVELOPMENT PROJECT

    SITE VALIDATION REPORT FOR RURAL ROADS

    %ate of  1ield isit:  ______________  Brgy:  _________________  Mun:  _____________________ 

    Name of  Proposed su$-pro;ect:  ____________________________________________________ (ocation: Station (imits  *Sitio or  Brgy,:  __________________________________________ Name of  contact person *PP/BR/ mem$er,:  _________________________________________ 

    No. of  present 

    population 

    of   t!e target 

    area: 

     _________ Male:  ________ 1emale: 

     ________ /otal No.

     

    of  "ouse!olds: 

     __________  

     2ve. 

    No."": 

     ______  

    (For   joint  

    barangay  

     proposal, 

    total  for   the

     participating  barangays)

     Point  *start or  sta. ?@???,  _____________________________________ *end of  sta.  ___,  ________________________________________________________________ 

    8. &4isting road 

    net0ork 

    for   0!ic! 

    t!e proposed 

    road 

    0ill connect: ______  provincial

     

    road  ______  

    $arangay 

    road  _______  

    N)2 access road  _______  

    private road

    A. /ypes of  ve!icles currently passing t!e proposed road: ______  none  ______  motorcycles/ri-cycles  _____  1our-0!eel  _____  6-0!eelers truck t!ers

    . 1reuency count of  ve!icles currently passing t!e proposed road per  day:

    A. ENGINEERS7ARCHITECTS

    ".  CONTRACTORS

    C. SUPPLIERS

  • 8/20/2019 Infra Manual v2(Forms) - Edited(1)

    16/24

     ___  times  for  motorcycles/ri-cycles  ___  times  for  1our-0!eel  ___times for   6-0!eeled 5t!ers

    6. &4isting cost of   fare from t!e area to t!e municipal proper: _____  per  person  _____  per  sack of   farm product

    9. &4isting farm products 0it!in t!e influence area of   t!e proposed road: *e4. Palay+ vegeta$le, _____________________________________________________________________________ 

    D. /opograp!y of   t!e proposed area *route,: ________  flat terrain  ________  flat  to rolling  ________  rolling to !illy  ________  mountainous

    E. 'ill t!e proposed 

    road 

    reuire 

    ma;or  e4cavationF 

     ____  

    3es *estimated 

    vol., 

     ___  

    cu.m  ___  

    No

  • 8/20/2019 Infra Manual v2(Forms) - Edited(1)

    17/24

    E

    CBIM Form A-5

    KALAHI-CIDSS NATIONAL COMMUNITY DRIVEN DEVELOPMENT PROJECT

    SITE VALIDATION REPORT FOR "RIDGES7SPILL8AYS7CULVERTS

    %ate of  1ield visit:  ______________  Brgy:  _________________  Mun:  _____________________ 

    Name of  Proposed su$-pro;ect:  ____________________________________________________ (ocation: Station (imits  *SitioBrgy,:  ________________________________________________ Name of  contact person *PP/BR/ mem$er,:  _________________________________________ No. of  present population of   t!e target area:  _________ Male:  ________ 1emale:  ________ /otal No. of  "ouse!olds:  __________   2ve. No."":  ______  (For   joint  barangay   proposal, total  for   the

     participating  

    barangays)

  • 8/20/2019 Infra Manual v2(Forms) - Edited(1)

    18/24

    E. t!er  $arangay t!at 0ould $enefit t!e proposed structures:  ____________________________ 

  • 8/20/2019 Infra Manual v2(Forms) - Edited(1)

    19/24

  • 8/20/2019 Infra Manual v2(Forms) - Edited(1)

    20/24

    E.  2vaila$ility 

    of  construction materials in t!e area: *distance, ________  0it!in t!e proposed area  ______  -

  • 8/20/2019 Infra Manual v2(Forms) - Edited(1)

    21/24

  • 8/20/2019 Infra Manual v2(Forms) - Edited(1)

    22/24

    egetation cover  of   t!e source:  ____________________________________________________ 

     2ccessi$ility of  t!e source: road  _______________  trail  ______________  none  _____________ 

    %istance of  proposed 0ater  source to t!e target area:  __________________________________ 

    %istance of  t!e 0ater  source to t!e nearest road access:  ________________________________ 

    Presence of  po0er  supply  in t!e area:  ________  %istance of   t!e nearest electric post:  ________ 

    0ners!ip 

    of   t!e 

    source:  __  

    (G# o0ned 

     ___  

    Pu$lic 

    (and 

     ___  

    Privately 

    o0ned 

    /itled 

    3__  

    N  __ 

    Name of  0ner:  ___________________________ 

     2ny potential environmental disaster   risks noted on t!e proposed site:  _____________________  _____________________________________________________________________________ 

     2vaila$le construction materials in t!e area:  __________________________________________ 

    Name of  e4isting association in t!e area:  ____________________________________________ 

    Status of  t!e association: No. of  active mem$ers  ______________  in-active  ________________ 

  • 8/20/2019 Infra Manual v2(Forms) - Edited(1)

    23/24

  • 8/20/2019 Infra Manual v2(Forms) - Edited(1)

    24/24