Upload
lillie-whitcher
View
217
Download
0
Tags:
Embed Size (px)
Citation preview
INFRA DREDGE SERVICES PVT. LTD.
1-35, 3rd Floor, Shroff Bhavan, Next to Yellow Gate Police Station, Carnac Bunder. PD Mello Road. Masjid Bunder (East), Mumbai- 400 001, India.
Tel: 022 4295 9957/58/59 Fax: 022 4295 9960 Email: [email protected]
COMPANY PROFILE
INTRODUCTION Infra Dredge Services Pvt. Ltd. (IDS) was incorporated in the year 2006.
IDS provides international standard dredging services at indigenous costs.
The Promoter Directors of IDS have headed with international dredging companies in Indian Subcontinent and have an experience of executing dredging works as per international standards.
It has acquired the suitable dredgers for maintenance and capital dredging.
There is a significant increase in dredging requirements in India and Asian region as new port expansion projects are being taken up.
MISSION AND OBJECTIVES
Our mission is
“To be a prominent dredging company equipped with international standards of dredging and be an integral part of port development activities in the continent of Asia.”
“To support development of inland waterways and participate in inland waterways transportation infrastructure in India.”
TECHNICAL SKILLS
Capital and Maintenance Dredging and Reclamation
Dredging harbors and waterways
Laying underwater cable
Dredging sand for land reclamation
Beach and foreshore replenishment
Construction of artificial islands
Environmental dredging
AVAILABILITY OF DREDGERS
IDS has taken on charter three dredgers and owns one dredger :
Aru II : A trailing suction hopper dredger. She is currently executing Dredging contract at Kaoh Suing Harbor, Taiwan.
Bali II : A trailing suction hopper dredger. Currently in Battam Indonesia.
Irian Jaya : A trailing suction hopper dredger. Currently at Karaikal port, India
Sea Diamond : Cutter Suction dredger owned by Infra Dredge Services Pvt. Ltd is under dry dock at Hong Kong Shipyard.
ARU II : TRAILING SUCTION HOPPER DREDGER
Capacity : 5000 cu.mLength Overall : 124.40 mBreadth : 18.00 mDepth : 10.30 m
Dredging Depth : 30.0 m
Gross /Net Tonnage : 6603/ 1981
Ship yard : Volswerft GMBH, Stralsund Germany
TECHNICAL DETAILS OF DREDGERS
TECHNICAL DETAILS OF DREDGERS
BALI II : TRAILING SUCTION HOPPER DREDGER
Capacity : 5000 cu.mLength Overall : 124.40 mBreadth : 18.00 mDepth : 10.30 m
Dredging Depth : 30.0 m
Gross /Net Tonnage : 6603/ 1981
Ship yard : Volswerft GMBH, Stralsund Germany
TECHNICAL DETAILS OF DREDGERS
IRIAN JAYA : TRAILING SUCTION HOPPER DREDGER
Capacity : 4000 cu.mLength Overall : 109.88 mBreadth : 18.02 mDepth : 18.13 m
Dredging Depth : 20.0 m
Gross /Net Tonnage : 5029/1509
Ship yard : O&K , West Germany
SEA DIAMOND : CUTTER SUCTION DREDGER
Length Overall/ Hull : 77.0 m (incl. protrusions)Breadth : 14.02 mDepth : 2.02 m
Total Installed power : 8000 hpDredge Pump : 5000 hpCutter Power : 800 hp
Dredging Capacity : 1000 to 1200 cu. m per hr solidsPumping Distance : 3000 m (2 pumps in series)Pipeline Diameter : 750 mmSuction pipe diameter : 800 mm
Gross /Net Tonnage : 847/ 816
TECHNICAL DETAILS OF DREDGERS
PROJECTS COMPLETED 1. International Container Transshipment Terminal,
Vallarpadam, Kochi, India
Quantity : 6,00,000 cu. m silt and hard clay dredging under jetty.
Value of contract : Rs. 35.00 crores
Operated by : Dubai Port World
Work period : 8 months
Work area : Alongside berth and jetty area
PROJECTS COMPLETED
2. Ennore Port, Tamil Nadu, India
Quantity : 4,03,000 cu. metre clay and sand dredging
Value of contract : Rs. 7.04 crores
Operated by : Ennore Port Ltd.
Work period : 60 days
Work area : (i) Access Channel and (ii) Port basin alongside berth at Ennore Port
3. Karaikal Port, Pondicherry, India
Quantity : 15,55, 804 cu. metre clay and sand dredging
Value of contract : Rs. 30.00 crores
Operated by : Marg Limited
Work period : 180 days
Work area : (i) Channel, turning circle and (ii) Basin at Karaikal port
PROJECTS COMPLETED
PROJECT COMPLETED4. Kaohsiung Harbor Bureau, Taiwan
Scope of Job : Sand dredging of 1st Port entrance, 2nd Port entrance, channel
Quantity: 2 millions cubic meters sand dredging work 160,000 square meters reclamation area
Value of contract : USD 12.00 million
Employer: I SAN Construction Co. Ltd.
Contract period: 300 calendar days
PROJECTS IN PROGRESS
5. Gopalpur Port, Orissa, India
Scope of Job : Capital Dredging and Shore Nourishment – Contract Package No. GPL/ C-04.
Quantity : 8.00 million cu. metre clay and sand dredging
Value of contract : Rs. 175.00 Crores
Employer: Gopalpur Port Limited
Contract period : Approx. 8 months
Kaohsiung Harbor Bureau and Taipei Port, Taiwan Scope of Job : Capital Dredging works and reclamation work. Quantity:
Contract A – 7 million cu. m at Kaohsiung Harbor (KAHB) Contract B – 72 million cu. m at International Container Terminal, KAHB Contract C – 4 million cu. m at Taipei Port
Value of contract : Contract A – $84 million (Rs. 386.40 crores) Contract B – $360 million (Rs.1656 crores) Contract C – $18.60 million (Rs.85.56 crores)
Employer : I SAN Construction Co. Ltd.
Contract period: 5 years, starting from January, 2014
PROJECT AWARDED
1-35, 3rd Floor, Shroff Bhavan, Next to Yellow Gate Police Station,
Carnac Bunder. PD Mello Road. Masjid Bunder (East),
Mumbai- 400 001, India.Tel: 022 4295 9957/58/59
Fax: 022 4295 9960 Email: [email protected]
INFRA DREDGE SERVICES PVT. LTD.