43
1 OCTOBER 2015 SOCIAL DEVELOPMENT PLAN For Legaspi City Open Dumpsite INFORMAL WASTE SECTOR (IWS) SFG1850 V1 Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized

INFORMAL WASTE SECTOR (IWS) - World Bank€¦ · INFORMAL WASTE SECTOR (IWS) ... Figure No. 3 Drawing of Design of sidecar and motorcycle 32 ... Attachment A Affidavit of Quitclaims

Embed Size (px)

Citation preview

1

OCTOBER 2015

SOCIAL DEVELOPMENT PLAN

For Legaspi City Open Dumpsite INFORMAL WASTE SECTOR (IWS)

SFG1850 V1P

ublic

Dis

clos

ure

Aut

horiz

edP

ublic

Dis

clos

ure

Aut

horiz

edP

ublic

Dis

clos

ure

Aut

horiz

edP

ublic

Dis

clos

ure

Aut

horiz

ed

2

TABLE OF CONTENTS

SOCIAL DEVELOPMENT PLAN FOR LEGAZPI CITY OPEN DUMPSITE INFORMAL WASTE SECTOR (IWS)

SAFE CLOSURE AND REHABILITATION OF DUMPSITE

SECTION PAGE EXECUTIVE SUMMARY 5 1.0 INTRODUCTION 6 2.0 PROJECT DESCRIPTION OF SAFE CLOSURE AND REHABILITATION OF

DUMPSITE 7-9

A. Description of Existing Dumpsite 7 B. The Proposed Safe Closure and Rehabilitation of Dumpsite 8-9 3.0 SOCIAL IMPACTS 9-10 4.0 IR AND IP POLICY FRAMEWORKS 11-14 A. Eligibility 11-12 B. Mitigating Measures 12 C. Process 12-14 5.0 THE SOCIAL DEVELOPMENT PLAN 14-43 A. Profile of Affected Waste Pickers 14-19 B. Livelihood, Employment and Educational Assistance for IWS 20-36 B.1 List of Affected IWS 20-23 B.2 Livelihood Project Details 24-36 B.2.1 Crop/Vegetables Production Project 24-31 B.2.2 Buy and Sell of Scraps Project 31-33 B.2.3 Educational Support to IWS in-school Youth 34-35 B.2.4 Access to Employment and Buy and Sell Project 36 C. Project Management and Sustainability 36-39 C.1 Institutional Arrangement 36 C.2 Project Organizational Structure 37-38 C.3 Implementation Plan 39 39 D. Budget 40 E. Monitoring and Evaluation 40 F. Grievance and Redress Mechanism 41-43 LIST OF TABLES and FIGURES Table No. 1 Description of Activities of Safe Closure and Rehabilitation of Dumpsite 8 Table No. 2 Activities to be Undertaken in the Formulation of SDP 12-13 Table No. 3 Waste Pickers Place of Residence 14 Table No. 4 Sex and Age Group of Waste Pickers 14 Table No. 5 Population By Sex, Age Group and Marital Status 16 Table No. 6 Educational Attainment of Waste Pickers by Age Group 16-17 Table No. 7 Household Size 17 Table No. 8 Main Sources of Income of IWS 18 Table No. 9 Supplementary Sources of Income of IWS 18 Table No. 10 Monthly Income of IWS Households from Waste picking and Other Sources 19

3

Table No. 11 Updated List and Status of IWS 20-23 Table No. 12 Summary of Livelihood Projects for IWS by Gender Disaggregation 23 Table No. 13 Income from Farming of 37 IWS-Farmers 25-26 Table No. 14 Profile of IWS Farmer showing farm lot & details of crop production 27 Table No. 15 Farm Inputs and Projected Income of IWS under Crop Production 28-29 Table No. 16 Project Cost and Funding Sources (Crop Production) 30 Table No. 17 Implementation Schedule (Crop Production) 31 Table No. 18 List of IWS under Buy and Sell of Scrap 32 Table No. 19 Project Cost and Source of Funds (Buy and Sell of Scrap) 33 Table No. 20 Implementation Schedule (Buy and Sell of Scrap) 33-34 Table No. 21 List of IWS Youth/Student 34 Table No. 22 Cost of Education per school level 35 Table No. 23 Estimated Items Cost of Education required per School Year 35 Table No. 24 Project Cost and source of Funds (Education assistance) 36 Table No. 25 Implementation Plan for SDP 39 Table No. 26 Budgetary Requirement 40 Figure No. 1 Photos of Existing Dumpsite 7 Figure No. 2 Photo of makeshift sheds built and used by waste pickers 8 Figure No. 3 Drawing of Design of sidecar and motorcycle 32

ATTACHMENTS

Attachment A Affidavit of Quitclaims and Barangay Certifications

Attachment B Waste Pickers’ Profile Legazpi City Open Dumpsite (March 2014)

Attachment C Profile of 37 IWS-Farmers under Crop Production Project (Brief 1)

Attachment D Project Performance Report

Attachment E Monthly Report on Income

Attachment F Minutes of Consultation Meeting with Attendance

4

Acronyms

AECID Agencia Espańola de Cooperacion Internacional para el Desarrollo BAT/BEP Best Available Technologies and Best Environmental Practices BCDI Bicol Consortium for Development Initiatives CAO City Agriculture Office CNC Certificate of Non-Coverage CVO City Veterinary Office DSWD Department of Social Welfare and Development ESMP Environmental and Social Management Plan 4P Pantawid Pamilya Pilipino Program IEC Information Education Campaign IP Indigenous People IPOPs Integrated Persistent Organic Pollutants IWS Informal Waste Sector JSDF Japan Social Development Fund LGU Local Government Unit NGO Non-Government Organization NSO National Statistics Office OCENR Office of the City Environment and Natural Resources ROI Return of Investment SBPA Samahang Bagong Pag-unlad Association SLF Sanitary Landfill Facility SWAPP Solid Waste Management Association of the Philippines WB-JSDF World Bank-Japan Social Development Fund

5

SOCIAL DEVELOPMENT PLAN FOR LEGAZPI CITY OPEN DUMPSITE INFORMAL

WASTE SECTOR (IWS): SAFE CLOSURE AND REHABILITATION OF DUMPSITE

EXECUTIVE SUMMARY

The City of Legaspi is participating in the Integrated Persistent Organic Pollutants (IPOPs) Management Project, under Component 2, Reduction of Releases of Unintentional Persistent Organic Pollutants, specifically, in Activity 2.3 Investments in BAT/BEP Demonstration for the Solid Waste, by virtue of a Memorandum of Agreement entered into by and between the Local Government Unit of Legaspi City and the Department of Environmental and Natural Resources, Central Office on October 4, 2012. Activities to be undertaken are works to stop burning at the dumpsite, dumpsite closure, improvement in landfill operation to prevent burning and advocacy to stop burning in the community.

The closure of city’s open dumpsite will affect the livelihoods of waste pickers scavenging in the area. In 2013 the City of Legaspi through the Office of the City Environment and Natural Resources (OCENR) conducted baseline survey and interviews to gather demographic information and determine the social impact of the project in compliance to IPOPS Environment and Social Assessment Framework (ESAF). This activity identified around 95 waste pickers who are coming in to the dumpsite to retrieve and recover waste materials including food waste for use as animal feeds. Retrieved or recovered materials are generally classified as recyclables and reusable are eventually sold to junk buyers for monetary returns. The City of Legaspi drafted a Social Development Plan (SDP) to address the identified impacts. The SDP prepared, however is revised through time, to incorporate improvement based on review findings, additional information and data on profile of IWS and other updates as parallel activities of project development and preparation are likewise ensuing. Latest series of consultation meetings conducted in the second quarter of 2015 noted around 71 IWS who signified their interests to participate in the livelihood projects offered to 95 IWS in the SDP. Employment is the main reason for the reduction in number of interested IWS. This SDP aside from the baseline data and demographic profile focuses on the livelihood intervention for the 71 affected IWS of the City of Legaspi. The City allocated an amount of P1.4 million pesos for the implementation of SDP. SDP addresses loss of source of incomes and other disturbances of affected 71 IWS through alternative livelihoods, employment and educational assistance projects: 1.) Crop Production; 2.) buy and sell of scraps; 3.) educational support to IWS Youth; 4.) food vending/buy and sell; and 5.) access to employment. The City Government of Legaspi through the Office of the City Environment and Natural Resources, the City Agriculture Office (CAO) and the DSWD-Pantawid Pamilya Pilipino Program (4Ps), and the IWS beneficiaries will be key implementers of the SDP. SDP also provides supporting documents the IWS who are no longer interested to participate in the livelihood projects. Resettlement of waste pickers is not applicable in Legaspi City since all of them have their own dwellings in their respective barangays surrounding the dumpsite. Further, Legaspi City has no records of Indigenous Peoples (IPs) who are living in the vicinity of the existing open dumpsite. Thus, the focus of this social development plan is the provision of alternative livelihoods for the 71 affected waste pickers.

6

1.0 INTRODUCTION Legaspi City is a component city found in the province of Albay in the Bicol Region. It is centrally located at the heart of the Bicol Region and considered as the regional administrative center for the reason that 90% of government regional offices are situated. The city is 532 kilometers south of Metro Manila and is accessible through all modes of transportations. A total of 70 barangays comprised the city, wherein 45 are urban and 25 are rural which are further classified into as northern, southern and urban barangays. Demographically, it has a population of 179,481 based on the latest census (2007 NSO Census) and estimated at present to have reached to 210,608 (CY 2013) based on an intercensal projection of 2.3% population growth rate. Major economic activity of the city is trade and commerce where the occupation of the populace is generally salary/wage workers. Solid waste management services of the City Government is presently handled by the Office of the City Environment and Natural Resources, one of the city offices in charge of the environment and natural resources undertakings. The approach of the city towards solid waste management from merely garbage collection and disposal has evolved into a paradigm shift in a manner called Ecological Solid Waste Management system. This approach is in pursuance to Republic Act 9003 otherwise known as the “The Ecological Solid Waste Management Act of 2000.” Various solid waste management programs and projects were initiated and introduced to properly handle solid waste problems. One major endeavor that happened to the Legaspi City’s waste management undertaking happened in 2009, when the city received a subsidy grant amounting to 1.7 million Euros from a Spanish Cooperation in the Philippines through the Agencia Espańola de Cooperacion Internacional para el Desarrollo (AECID) by virtue of a Protocol Agreement to support the City Government of Legaspi in the improvement of the environmental and social life conditions through the sustainable implementation of an ecological solid waste management system. The subsidy grant has extended enormous assistance addressing solid waste management concerns comprehensively and sustainably in accordance with R.A. 9003. The project was implemented through the political, social and technical strategies in order to stir public participation and instill the shared responsibility among concerned stakeholders. With this, waste management in the city evolved into an ecological solid waste management, which adheres to the systematic administration of activities, which provide for segregation at source, segregated transportation, storage, transfer, processing, treatment, and disposal of solid waste and all other waste management activities, which do not harm the environment. On October 4, 2012, a Memorandum of Agreement was executed by and between the Department of Environment and Natural Resources-Environment and Management Bureau (DENR-EMB) and City Government of Legaspi as one of the pilot cities of the Integrated Persistent Organic Pollutants Management Project (IPOPs) under Component 2, Activity 2.3 Investment in BAT/BEP Demonstration for the Solid Waste Sector. Under this activity, it will cover demonstration of BAT/BEP to stop burning at dumpsites, more specifically dumpsite closure, and improved landfill operations. One of the issues that surfaced in implementing the above sub-activities relates to social development of waste pickers. The Social Development Plan (SDP) is prepared to address the adverse impacts (closure of dumpsite) on waste pickers who derived their livelihood from the dumpsite. It is likewise meant to guide the

7

city government, partner national agencies, private sector organizations and non-government organizations in the implementation of mitigating measures 2.0 PROJECT DESCRIPTION OF SAFE CLOSURE AND REHABILITATION OF DUMPSITE

A. Description of Existing Dumpsite Legaspi City’s dumpsite is located at Sitio Caridad in Barangay Banquerohan on a 16-hectare city owned property where the sanitary landfill is likewise located. The locations of nearest institutions are school (3 km), chapel (1 km) and barangay health center (5 km). The city has been using the open dumpsite since 1998. Dumpsite is around 25 kilometers away from the city proper. From the main road, there is an access (although not concrete) road leading to the open dumpsite. The area occupied by the dumpsite is around five (5) hectares in which some portions have thinly scattered waste (now vegetated). The target area for closure is about 2.322 hectares upon waste consolidation. Average waste fill height is estimated to be between 8 and 15 m. Of immediate concern is the 0.840-hectare area within this section where most recent waste had been dumped. Figure No. 1 below shows photos of the north, east, west and south face of the dumpsite, respectively. Figure No. 1. Photos of the existing dumpsite (from left to right and down are north, east, west and south faces of dumpsite).

During heavy rains and rainy season, waste collected by trucks is diverted to the dumpsite instead, as garbage trucks are stalled due to the thick clayey soil cover at sanitary landfill cells. Internal access roads are not yet completely in place. Available daily soil cover material is also too clayey and application may be thicker than expected. It was also observed that current sanitary landfill cells have limited capacity despite very good waste diversion achieved by the LGU. Although it is apparent that there are still biodegradables being delivered to the landfill cells, most of it comes from market waste, which could easily be addressed by working with the market administrator. Legaspi City intends to fully cease in using the dumpsite once the implementation of safe closure and rehabilitation plan (SCRP) commences. The SCRP of the city’s open dumpsite was prepared in 2009 and submitted to DENR-EMB Region 5 in September 2009 for evaluation. Acknowledgement of the plan was duly received by the city in October 2009. The SCRP was prepared in compliance to the mandate of RA 9003 for LGUs to close dumpsites and use an engineered sanitary landfill instead. The closure plan enumerated appropriate measures to be undertaken to prevent environmental pollution caused by leachate or methane gas

8

resulting from the decomposition of waste. Slope stabilization and gradient control of the disposal area as well as the quantity of the solid waste deposited were taken into consideration in the plan preparation. Other engineering interventions necessary for the closure and rehabilitation of the open dumpsite are: site preparation, roads construction, leachate collection system, slope protection system, Erosion control/flood control/drainage system, gas venting, soil covering/final capping, buffer zones, aesthetic improvement/landscaping.

B. The Proposed Safe Closure and Rehabilitation of Dumpsite

The City Government intends to minimize environmental impacts, including the reduction of UPOPs emissions from unintentional waste burning, by applying BAT/BEP in the closure and rehabilitation of the Banquerohan Dumpsite. This includes access road with drainage system, site clearing, waste profiling, application of clay and topsoil cover, perimeter slope protection, leachate collection and recirculation, gas venting, monitoring wells and perimeter fencing. Table No. 1 below indicates the description of activities to be undertaken in the proposed safe closure and rehabilitation of dumpsite. Table No.1 Description of Activities of Safe Closure and Rehabilitation of Dumpsite

Activities Description

Construction of access road with drainage system

An internal access road will be concreted to support smooth closure and rehabilitation works as well as for future use/development, e.g., centralized composting facility. It will include a drainage system to divert surface runoff away from the dumpsite. Activities include sub-grade preparation, base correction and shoulder construction as well as pouring of 0.20-m thick concrete over 540 m2 road.

Trench excavation and backfill

As part of site preparations, about 1,612.50 m3 of earth will be excavated and backfilled. This is done primarily in preparation for laying out the leachate collection and recirculation system and partly for clearing waste deposits.

Site clearing and waste profiling: Gathering, re-grouping, grading and sub-grade preparation

The site will be cleared while waste deposits will be consolidated. Waste will be pushed to a manageable area of 2.322 hectares for final closure activities. Cut-and-fill method of grading of waste will apply. Total amount of spilled waste will still have to be estimated but target final slope will be 1:3. Whenever applicable, IWS will be hired to provide unskilled manpower.

Application of intermediate/final soil cover (clay and topsoil)

Final cover consists of a 45-cm compacted soil and 15cm thick loose topsoil. Clayey soil is available at the site. A backhoe and a truck will be used to excavate and haul these inert materials for use as intermediate/final soil cover. A bulldozer will be used to apply, spread and compact clayey soil for top/side embankment over 8,395.56 m2 of dumpsite area with recent waste dumping. Other sections within the 23,220 m2 dumpsite is already covered with clayey soil and will just be subject to waste compaction. A 0.15-cm of topsoil will then be loosely applied to the entire area.

Perimeter slope protection To further protect slope stability, a 3-m bench will be graded and planted with wedella grass (also known as creeping peanut) over 972.2 lineal meters of dumpsite perimeter. This will be applied from 0 to 3m along the slope from the base, which covers an area of 2,916.60 m2.

Leachate collection system The design of leachate collection and gas extraction system is done in

9

Activities Description

with HDPE pipes and fittings, manhole and leachate recirculation

one module, i.e., gas extraction pipes are mounted over and along leachate drainage lines. A manhole will be provided to allow for leachate recirculation thereby allowing for earlier gas production.

Installation of gas venting system

As shown in Figure 6, nine (9) units of perforated 100 mm diameter schedule 20 G.I. landfill gas extraction pipes will be placed about 50 m apart (or less) from each other. Estimated length of these pipes is 6 m but may vary depending on actual depth of the waste, which includes the portions buried in waste, soil cover layers and the exposed venting section. Each pipe is placed in concentricity with a gravel-filled dry well for protection and enhanced gas collection.

Installation of two (2) units of monitoring wells

Upstream and downstream monitoring wells shall be installed at the site to monitor any environmental impacts caused by the development works during closure. The wells will have concrete apron and barrier post. These wells will also serve for long-term post-closure monitoring of water quality around the site in preparation for future land use plans.

Installation of boundary (perimeter) fence

About 300 lineal meters of fence will be installed along the southern and eastern periphery of the dumpsite. The fence will also serve as demarcation line of the boundary of the government property. This will consist of concrete post spaced 3 m apart with barbwires placed at 0.2 to 0.3 m intervals.

The post-closure management activities will be carried out continuously after dumpsite closure such as the monitoring of the environmental condition within and the surrounding areas in order to control the potential hazard of the dumpsite. Specifically, the post closure management activities include leachate re-circulation system, gas extraction and management as well as monitoring of the soil cover. Proper recording shall be maintained. On funding, other open dumpsite closure activities not covered by the IPOPs shall be assumed by LGU- Legaspi City.

3.0 SOCIAL IMPACT/S The open dumpsite is situated in a remote location and it is devoid of community residents. There are no informal settlers residing or “squatting” in the area, thus, no residential structures either permanent or temporary in nature exists. The presence of the waste pickers in the dumpsite is limited only to a situation where the sanitary landfill facility could not be operated due to heavy rainfall occurrence. The practice of scavenging by the waste pickers according to them is centered mainly on two reasons: 1.) to search for recyclable materials to be sold to junk buyers, and 2.) to retrieve biodegradable kitchen wastes/food scraps to serve as animal feeds for swine backyard raising.

10

Makeshift resting/waiting shed out of scrap materials like tarpaulin, plastics, sacks or any related material are used and some just make use of the present naturally shaded areas to protect them from the weather elements while waiting for the expected wastes that are to be disposed. Recovered waste materials are temporarily stored on site while waiting for the junk buyers. These waste materials which are typically recyclable wastes are immediately sold to junk buyers at the end of the working day. There are about four local junk buyers from the barangay who directly transact to the waste picker to buy the retrieved recyclable wastes. While the biodegradable feedstuff are brought to their places of abode for animal feeds.

Figure No. 2: Makeshift sheds built and used by waste pickers as temporary shelter and storage area

Income gained by each waste picker from waste picking of recyclables at the dumpsite of Legaspi varies which ranges from P10.00 to 200.00 pesos per day plus food scraps for animal feeds gathered by some of them. This gain of the waste pickers from the dumpsite will cease once the open dumpsite is closed. However, social impact to the economic aspect of the waste picker will be experienced by them due to a direct loss of a certain amount which used to be a supplementary to their other income sources. Impacts to the waste pickers when closure activities of the dumpsite commence, will have minimal to significant economic effect to their lives as waste pickers will not be allowed to go to the site during the construction and engineering works for safety and health reasons thus depriving them their source of livelihood. Significant social impacts of open dumpsite closure to the affected waste pickers can be summarized as follows:

Loss of source of livelihood for 91 waste pickers who are completely or partially dependent on continued dump site operations.

Deterioration of already poor economic status of the whole family of waste pickers who sourced their means of living from waste picking; and,

Loss of financial source for 11 students to support their studies who are deriving school allowances from waste picking.

11

4.0 IR and IP POLICY FRAMEWORK

The Integrated Persistent Organic Pollutants Project (IPOPS) is a World-Bank -- Global Environment

Facility assisted project, implemented by the Environmental Management Bureau (EMB) of the

Department of Environment and Natural Resources (DENR). The IPOPs has five components, one of

which is financing the safe closure of dumpsites and implementation of measures to stop backyard

and open burning under Component 2: Reduction of Releases of Unintentional Persistent Organic

Pollutants, specifically, in Activity 2.3 Investments in BAT/BEP Demonstration for the Solid Waste.

The primary social impact of the closure is the direct loss of livelihoods of waste pickers and

scavengers working on the dumpsite. To address the social impact, an Environment and Social

Assessment Framework (ESAF) for the IPOPS Project is prepared, in which a Social Development

Framework (SDF) is formulated. This Social Development Framework is the equivalent of the

Resettlement Policy Framework required by the Bank’s Social Safeguard Policy O.P.4.12. IPOPS

Project Social Development Plan Framework is used for concerns on waste pickers; IPOPS Project IP

Policy Framework is used for issue on indigenous peoples and IPOPS Project Land Acquisition and

Resettlement Policy Framework is used for issues on resettlement.

A. Eligibility

Waste pickers, also called scavengers in some places, are known to retrieve recyclable and reusable

materials form mixed wastes (whether at fixed sites, such as dumps or transfer stations, or through

itinerant scavenging). Waste pickers are among the key stakeholders in solid waste management

(SWM) interventions. They usually reside in shanties located around the dump site, often are

insufficiently educated. They have limited access to basic needs such as food, clothing, shelter,

education and water. Men, women and children constitute scavengers. There are three impacts of

the project on waste pickers, these are:

1. Loss of temporary structures, and resting places. This may result from the removal of the structures in the dump site, in order to restrict access to the site; also per Philippine Laws, structures located in dump sites are illegal.

2. Loss of permanent structures and residential relocation (rare but can happen). Permanent structures, such as residences, in rare instances may be found within the boundaries of the dump site, or would be land fill site for example. In such cases, humane means of eviction, transfer, and relocation should be observed.

3. Loss of livelihoods. Where possible, full restoration of livelihoods should be observed, where it is not feasible, a number of options can be explored including prompt payment of just compensation, or replacement with comparable means of livelihood, among others.

Identification of the waste pickers is one of the activities in order to determine the qualified affected beneficiaries regarding dumpsite closure. On-site visits at the dumpsite are conducted, and necessary coordination with the key persons assigned at the disposal site is also done to provide additional information regarding the presence of waste pickers and their identification. Waste pickers were assessed through an interview with the use of a survey assessment profile questionnaire. Survey questionnaires were processed and analyzed to come-up with social characteristics information. This information were used during the conduct of a consultation meeting with them and also as basis for identification of possible government and non-government entities that would be of help in the different areas/stages of the program/project. Participatory

12

discussions were made to gather the information needed to design the appropriate and sustainable intervention to mitigate the impact of dumpsite closure on them. The City Government has spearheaded and facilitated all pertinent activities relative to this undertaking with participation and involvement of identified concerned stakeholders. The city came up with the criteria to identify who are eligible beneficiaries for this Social Development Plan particularly the livelihood projects that will be provided to them. The following are the set of criteria formulated to identify the eligible waste pickers of this Plan:

a. He/She should be waste picking for the last six (6) months at the Legaspi City Open Dumpsite;

b. He/She should be present during the social assessment activity and in at least one (1) consultation meetings conducted with the waste pickers;

c. The group of scavengers as well as the personnel at the Sanitary Landfill could attest that the person or group of persons are actually waste picking at the dumpsite; and

d. The identified waste picker is picking waste either on a regular or irregular basis.

B. Mitigating Measures

There is no land taking for the closure of the dumpsite neither any permanent structures such as

residential present. The City does not have any record of indigenous peoples (IPs) present, working

or scavenging in the dumpsite. Hence the IPOPS Project IP Policy Framework and Land Acquisition

and Resettlement Policy Framework are not applicable particular for this sub project. The social

Development Plan (SDP) however is applicable as there are around 95 waste pickers identified by

the OCENR during its baseline survey. Access to dumpsite and incomes derived from waste picking

will be lost once closed. The SDP will address the situation of the waste pickers or those engaged in

the informal collection of recyclable materials, for sale or re-use, at open dump sites, and other

points of collection, transfer and disposal through livelihood interventions and in ensuring waste

picker participation in the process of livelihood restoration.

In a series of dialogues and consultations with the affected waste pickers, livelihood projects,

employment and other alternative sources of income were explored to replace what will be lost due

to the closure of dumpsite. The following projects will be implemented: Crop Production; Buy and

sell of scraps; educational support to IWS Youth; food vending/buy and sell; and access to

employment.

C. Process The closure of the open dumpsite will entail various activities that will take into social and environmental considerations. Hereunder are activities that are necessary in the formulation of a social development and management plan for the affected waste pickers: Table No. 2 Activities to be undertaken in the formulation of SDP

Activities Done On-going

For Execution

1. Baseline Survey Updating of Current Waste Pickers

2. Assessment Study of Previous Waste Pickers LGU Legazpi City-AECID ESWMP Livelihood

13

Beneficiaries and Current Waste Pickers

3. Consultation/Dialogue/Meeting with Waste Pickers

4. Preparation of Key Results Areas Activity Details for Inclusion in the Social Development Plan

5. Conduct of Social Assessment Survey √

6. Skills and Capacity Development and Enhancement of Waste Pickers

7. IEC Campaign on IPOPs Management Project √ X

8. Formation/Organization of Implementation Team for Projects to Waste Pickers

9. Organization of Waste Pickers and Organizational Strengthening

10. Strategic Development Planning √

11. Preparation of Detailed Engineering Design of Closure of the Dumpsite

12. Bidding and Procurement √

13. Engineering and Construction Works √

14. Conduct of Regular Consultation/Coordination Meeting

15. Monitoring and Evaluation √

16. Progress Report Preparation √

Baseline survey conducted to waste pickers last January 31, February 21, and February 27, 2013 showed that there are a total of 95 waste pickers in the dumpsite, a number which has decreased by almost 21% compared to the previous baseline profile survey conducted in 2009. Results of the decrease in the number of waste pickers is due to the intervention of the LGU Legaspi City-AECID ESWM Project by including the livelihood component for dumpsite waste pickers displaced due to the operation of the Sanitary Landfill Facility. Last March 14, 2014 an interview with the waste pickers to obtain additional information such as the total household income, income from waste picking, other sources of income and preferred livelihood activities in replacement to waste picking activity was done by the OCENR staff. This latest data gathering activity revealed that four (4) of the ninety-five (95) waste pickers are not anymore into waste picking activity because three (3) of them have found work already in Manila while the other one has stopped scavenging because of old age. This leaves behind 91 waste pickers that the city will be giving intervention by providing livelihood projects, employment and other alternative sources of income in replacement to the waste picking activity that they consider as their main or additional source of income in order to address the basic needs of their everyday living. The SDP for waste pickers was updated to incorporate the data and information gathered and likewise prepared livelihood assistance to 91 IWS. In April, May and July 2015, the OCENR conducted series of consultations and field validation activities to finalize the SDP prepared. These series of activities (parallel to sub project procurement) noted 71 of the 91 waste pickers are willing to participate in the livelihood, educational and employment projects prepared in the SDP. A total of 19 IWS are no longer interested to participate, and 1 IWS is deceased. For various reasons, the 19 IWS are already employed; students completed vocational courses and are already working; some are no longer residing in the barangay and cannot be located.

14

The SDP is again updated to address loss of source of incomes and other disturbances of affected IWS. It accounts for 71 (of the 91) IWS by implementing five (5) projects namely: 1.) Crop Production; 2.) buy and sell of scraps; 3.) educational support to IWS Youth; 4.) food vending/buy and sell; and 5.) access to employment. The remaining 19 IWS, for various personal reasons, who are no longer interested were consulted and coordinated to their respective barangays to re-confirm their decision not to participate in the livelihood project. Affidavits of Quitclaim were executed for those who are no longer interested while certifications from the Barangays were issued for those who can no longer be located (see Attachment A: Affidavit of Quitclaim and Barangay Certifications)

5.0 THE SOCIAL DEVELOPMENT PLAN

A. PROFILE OF THE AFFECTED IWS The succeeding discussions below presents the profile of the 91 waste pickers based on the baseline surveys, interviews, focus group discussions and field validation activities conducted by the city through OCENR. The waste pickers come from the four (4) barangays surrounding the dumpsite namely Banquerohan, San Francisco, Bariis and Cagbacong, all of which are barangays of Legaspi City. Among the 4 barangays, Banquerohan, where the OPEN DUMPSITE is located, has the highest number of waste pickers having 38 out of 91 total waste pickers while Cagbacong, the farthest among the 4 barangays, has the lowest having only 6 waste pickers. The succeeding table (Table 3) shows the place of residence of the 91 Banquerohan IWS. Table No. 3 Waste Pickers’ Place of Residence

BARANGAY MALE FEMALE TOTAL

San Francisco 21 11 32

Banquerohan 20 18 38

Bariis 3 12 15

Cagbacong 5 1 6

TOTAL 49 42 91

Forty-nine (49) out of 91 waste pickers are male while 42 are female. Their age ranges between 10 to 65 years old, 10 being the youngest and 65 as the oldest among the waste pickers. Majority of them (77 waste pickers) falls between the ages of 18 to 59 years old while 9 waste pickers are considered as minors with ages 10 to 17 years old. On the other hand, 5 waste pickers belong to the senior citizens group with ages 60 years old and above. Table No. 4 below shows the Sex and Age of the IWS. Table No. 4 Sex and Age of Waste pickers

AGE GROUP MALE FEMALE BOTH SEXES

10 1 - 1

11 - - -

12 1 - 1

13 - - -

14 2 - 2

15 - - -

15

16 2 1 3

17 1 1 2

18 2 - 2

19 3 - 3

20 - 1 1

21 4 - 4

22 1 - 1

23 4 1 5

24 1 1 2

25 - - -

26 1 - 1

27 1 - 1

28 1 - 1

29 1 4 5

30 - 2 2

31 2 2 4

32 - 1 1

33 - 3 3

34 1 1 2

35 - 1 1

36 1 1 2

37 3 1 4

38 2 - 2

39 1 2 3

40 - 2 2

41 4 2 6

42 1 - 1

43 - - -

44 - 1 1

45 1 - 1

46 - 2 2

47 - - -

48 - - -

49 - 1 1

50 - 1 1

51 2 - 2

52 - 2 2

53 1 2 3

54 2 1 3

55 - - -

56 - - -

57 - 1 1

58 - - -

59 - 1 1

60 1 - 1

61 - - -

62 1 - 1

63 - 1 1

64 - 1 1

65 - 1 1

66 - - -

67 - - -

68 - - -

69 - - -

70 - - -

TOTAL 49 42 91

16

For the marital status, 61 of them are married while 28 are single, including the 13 youths with ages 19 years old and below. While the widower and separated has the least number with 1 each. Please see Table No. 5 below shows the IWS’ Population by Age Group and Marital Status. Table No. 5 Population By Age Group and Marital Status

AGE GROUP

MARITAL STATUS

SINGLE MARRIED WIDOWER DIVORCED/ SEPARATED

COMMON LAW/LIVE-IN

TOTAL

Below 10 years old

0 0 0 0 0 0

10-14 4 0 0 0 0 4

15-19 9 1 0 0 0 10

20-24 11 2 0 0 0 13

25-29 1 7 0 0 0 8

30-34 1 10 0 1 0 12

35-39 0 12 0 0 0 12

40-44 1 9 0 0 0 10

45-49 0 4 0 0 0 4

50-54 1 9 1 0 0 11

55-59 0 2 0 0 0 2

60-64 0 4 0 0 0 4

65 and above 0 1 0 0 0 1

TOTAL 28 61 1 1 0 91

As to the educational attainment of the waste pickers, majority or 52 of them attained only 5th-7th grade while only 2 of them attained post-secondary level (1 finished a vocational/technical course and another 1 is a college undergraduate). The next table (Table No. 6) shows the Educational Attainment of Waste pickers by Age Group. Table No.6 Educational Attainment of Waste Pickers by Age Group

HIGHEST EDUCATIONAL ATTAINMENT

AGE GROUP

Below 10

10 - 14

15-19

20-24

25-29

30-34

35-39

40-44

45-49

50-54

55-59

60-64

65 & above

TOTAL

No Grade Completed 0 0 0 0 0 0 0 0 0 0 0 0 0 0

Pre-School 0 0 0 0 0 0 0 0 0 0 0 0 0 0

Elementary

1st-4th Grade 0 2 0 5 0 2 1 2 2 1 1 2 0 18

5th-7th Grade 0 2 4 6 5 5 8 8 2 8 1 2 1 52

High School

Undergraduate 0 0 3 1 1 1 2 0 0 0 0 0 0 8

Graduate 0 0 3 1 1 3 1 0 0 2 0 0 0 11

17

Post-Secondary (Voc./Technical)

Undergraduate

0 0 0 0 0 0 0 0 0 0 0 0 0 0

Graduate 0 0 0 0 0 1 0 0 0 0 0 0 0 1

College Undergraduate

0 0 0 0 1 0 0 0 0 0 0 0 0 1

Academic Degree Holder

0 0 0 0 0 0 0 0 0 0 0 0 0 0

TOTAL 0 4 10 13 8 12 12 10 4 11 2 4 1 91

Of the 91 waste pickers, majority or 52 of them have a household size ranging from 6 to 10 and above, 36 of them have 3-5 members, while 3 waste pickers have only two (2) members in their household. Table No. 7 shows the waste pickers’ household size.

Table No. 7 Household Size

HOUSEHOLD SIZE NUMBER OF HOUSEHOLD

1 0

2 3

3 7

4 14

5 15

6 11

7 6

8 10

9 12

10 4

Above 10 9

TOTAL 91

IWS HOUSEHOLD INCOME & INCOME SOURCES Table No. 8 shows that of the 91 waste pickers, forty-four (44) of them consider waste picking as their principal source of income while forty-seven (47) responded that waste picking is not their principal source of income. However, of the 47 respondents who go to the open dumpsite to support their main source of income, seven (7) of them go to the open dumpsite to recover food scraps for their pigs, if not sell the recovered feeds to some individuals raising hogs in their backyards, while 11 of them are students who come to the site to recover recyclable materials that could be converted into cash to sustain their studies. On the other hand, Table No.9 shows that almost all of the waste pickers have other economic activities where they could gain additional income to support the basic needs of their family. These supplementary sources of income of the IWS (and actually even their main sources of income) are not always available since almost all of them are seasonal/occasional in nature such as in farming (farm laborers are only needed during

18

planting season), labor works (construction works in the barangays are seldom available), handicraft making (only if there is a job order) and livestock/hog raising (generates an income only during production period or when the fattened hogs is ready for market), among others. Table No. 8 Main Sources of Income of IWS

Sources of Income No.

Waste Picking 44

Farming 9

Livestock/Hog Raising 5

Livestock/Hog Raising & Farming 6

Laborer (Farm/Construction) 8

Copra Making 2

Employed/Copra Making 1

Driver 1

Junkshop/Buy & Sell of Scraps 2

Soft broom/Nigo Making 2

Students 11

Total 91

Table No.9 Supplementary Sources of Income of IWS

Other Sources of Income No.

Waste Picking 47

Farming 8

Livestock/Hog Raising 2

Laborer (Farm/Construction) 8

Copra Making 1

Handicraft (Abaca Twining) 3

Laundry Services 1

Shoe Repair 1

Sari-Sari Store 1

Hair Cutting 1

Carpentry 1

None 17

Total 91

For the combined household income of the waste pickers, majority or 55 of the 64 households fall between the income brackets of below Php. 7,500.00. These 55 households are considered earning income below the poverty threshold which is Php. 7,821.00 per month for a family size of 5. Surprisingly, ten (10) households are earning above Php.10,000.00 per month, the highest income of

19

which is Php. 34,749.00 by a household whose sources of income are: farming, employment of 3 members of the family and income from waste picking. On income from waste picking, twenty (20) waste pickers are gaining the amount of below Php. 1,000.00 per month only. However, 9 of these are students earning below P500 in their waste picking work to address their needs in their studies. The following table, (Table No. 10), shows the total monthly household income of IWS households as well as their monthly income from waste picking activity. Table No. 10 Monthly Income of IWS Households from Waste Picking and Other Sources

INCOME BRACKET (In Php.)

TOTAL HOUSEHOLD INCOME INCOME FROM WASTE PICKING

Below 1,000 5 20

1,000 - 1,500 10 19

1,501 - 2,000 5 3

2,001 - 2,500 4 8

2,501 - 3,000 8 7

2,001 - 3,500 5 1

3,501 - 4,000 6 1

4,001 - 4,500 3 -

4,501 - 5,000 2 2

5,001 - 5,500 1 -

5,501 - 6,000 - 1

6,001 - 6,500 2 -

6,501 - 7,000 1 1

7,001 - 7,500 2 -

7,501 - 8,000 2 -

8,001 - 8,500 - -

8,501 - 9,000 1 -

9,001 - 9,500 1 1

9,501 - 10,000 - -

Above 10,000 6 -

TOTAL 64 64

For a more detailed information regarding the profile of individual waste picker, attached is the Wastepickers Profile presented in matrix form in Attachment B. With the upcoming closure of the open dumpsite of Legaspi City, these 91 IWS will no longer be able to gather/pick wastes, hence, a need to provide them with a livelihood based on their skills and experience. Through these alternative livelihoods, they can earn income equal to or more than the income they earn from waste picking in order to support the basic needs in terms of food, shelter and education

20

B. LIVELIHOOD, EMPLOYMENT and EDUCATIONAL ASSISTANCE for the IWS

B.1 List of Affected IWS

In April 2015, OCENR conducted consultation meeting with the affected IWS. During this meeting, it was noted that not all of the 91 IWS will participate in the livelihood, employment and educational assistance as planned by them during SDP preparation. As such, the OCENR conducted series of reviews, field work and consultations with IWS and key implementers in the succeeding months to follow through inventory of IWS and re-affirm their interest to participate in the planned projects. These follow through activities confirmed that 71 (out of the 91) IWS will participate in the planned projects in the SDP. In addition to consultation-meetings, the OCENR with the assistance of the barangay officials sought the 19 IWS who are no longer interested to participate and were asked again of their interest to join but to no avail as they reiterated their dis interest to the assistance offered to them. Table No. 11 shows the complete accounting of 91 IWS and their updated status in relation to their chosen livelihood and re-affirmed interest to participate. This updated list is a result of a series of consultation-meetings with the IWS and coordination with barangay officials where they reside. The OCENR took the lead in conducting the activities. Supporting documents such as affidavits and certifications were gathered for the purpose.

Table No. 11. Updated List and Status of IWS

No. Name of IWS Barangay Gender Project Remarks/Status

1 Abadeza Beverly San Francisco F Crop Production Active/interested

2 Alcantara Dennis Banquerohan M Crop Production Active/interested

3 Alcantara Joel Banquerohan M Crop production Certification from the Barangay/no longer residing in the barangay/already working

4 Agripa Darwin San Francisco M Access to employment Active/interested

5 Agripa Violeta San Francisco F Crop Production Active/interested

6 Alba Albert Banquerohan M Access to employment Active/interested

7 Alba Gemma Banquerohan F Crop Production Active/interested

8 Alba Angelica Banquerohan F Educational Support Affidavit of Quitclaim/graduated high school and is already working full time in a bakery in Albay

9 Alba Gilberto Cagbacong M Access to employment Active/interested

10 Alba Jonathan Banquerohan M Access to employment Affidavit of Quitclaim/already working as a construction worker on a regular basis

11 Alba Joselito Cagbacong M Access to employment Active/interested

12 Alcera Cyra*** Banquerohan F Food Vending/Buy & Sell

Active/interested. Landless IWS; Preferred to engage in Food Vending/Buy & Sell for reasons that she can be flexible in using her time both in livelihood activities and attending to her family

13 Alcera Norma San Francisco F Crop Production Active/interested

14 Alcera Sonia Banquerohan F Crop Production Active/interested

15 Alcera Jesebel San Francisco F Educational Support Affidavit of Quitclaim/Graduated in Vocational Course and is

21

already employed full time and on a regular basis in Laguna

16 Alegre Jaycelyn Banquerohan F Food Vending/buy & sell

Active/interested

17 Alejo Jocelyn Banquerohan F Crop Production Active/interested

18 Alejo Maria Banquerohan F Crop Production Active/interested

19 Alfaro Sarah San Francisco F Food Vending/buy & sell

Active/interested

20 Andes Analyn Bariis F Food Vending/buy & sell

Active/interested

21 Andes Marvin Bariis M Educational Support Affidavit of Quitclaim/Not interested to study

22 Andes Prescilla Bariis F Food Vending/buy & sell

Active/interested

23 Arcinue Marina Bariis F Crop Production Active/interested

24 Arena Christian Banquerohan M Educational Support Active/interested

25 Arena Judith Banquerohan F Food Vending/buy & sell

Active/interested

26 Ariola Ernesto Banquerohan M Crop Production Active/interested

27 Ariola Ramon San Francisco M Crop Production Active/interested

28 Armero Maryjoy Banquerohan F Educational Support Affidavit of Quitclaim/not interested to study

29 Aycardo Romeo Bariis M Crop Production Affidavit of Quitclaim/not interested in the project; working in his farm

30 Aycardo Victoria Bariis F Crop Production Active/interested

31 Azores Nelly Bariis F Buy & Sell of Scrap Affidavit of Quitclaim/not interested in the project; wants to focus in farming her own farm lot

32 Azuela Jason Banquerohan M Access to employment Affidavit of Quitclaim/already working as construction worker in Legaspi

33 Azuela Lydia Banquerohan F Food Vending/buy & sell

Active/interested

34 Azuela Rodrigo Banquerohan M Crop Production Active/interested

35 Belludo Natividad Bariis F Food Vending/buy & sell

Active/interested

36 Botalon Lenie Banquerohan F Crop Production Active/interested

37 Botalon Reymart Banquerohan M Educational Support Certification from the barangay/no longer residing in the barangay/ presently working as welder in Naga City

38 Botalon Salvador Banquerohan M Food Vending/buy & sell

Active/interested

39 Botin Oliver San Francisco M Access to employment

Affidavit of Quitclaim/not interested in the livelihood and is presently working as bags repairman on a regular basis

40 Claro Marvin Banquerohan M Access to employment

Certification from the barangayNo longer residing in the area and cannot be located

41 Cruz Josephine Banquerohan F Access to employment

Certification from the barangayNo longer residing in the area and cannot be located

42 Cruz Veronica Banquerohan F Buy & Sell of Scrap Certification from the barangayNo longer residing in

22

the area and cannot be located

43 Daniel Jocelyna San Francisco F Crop Production Active/interested

44 Dominguez Marissa***

San Francisco F Food vending/buy & sell

Active/interested; Landless IWS; Preferred to engage in Food Vending/Buy & Sell for reasons that she can be flexible in using her time both in livelihood activities and attending her family

45 Dominguez Marlon San Francisco M Educational Support DECEASED

46 Gonzales Romeo San Francisco M Crop Production Active/interested

47 Gonzales Alvin San Francisco M Crop Production Certification from the barangay/ no longer residing in the barangay

48 Gonzales Arlene San Francisco F Crop Production Active/interested

49 Gonzales Nicky San Francisco M Crop Production Active/interested

50 Gonzales Rommel San Francisco M Crop Production Active/interested

51 Guerrero Arjay San Francisco M Buy & Sell of Scrap Active/interested

52 Guerrero Fernando San Francisco M Buy & Sell of Scrap Active/interested

53 Guerrero Lilia San Francisco F Buy & Sell of Scrap Active/interested

54 Leron Aike San Francisco M Crop Production Active/interested

55 Leron Vicente San Francisco M Crop Production/Access to employment

Participates in 2 livelihood projects

56 Lola Perpetua Bariis F Crop Production Active/interested

57 Lonosa Joel Bariis M Buy & Sell of Scrap Active/interested

58 Loquinario Gina Bariis F Crop Production Active/interested

59 Loquinario Maryann

Bariis F Food Vending/buy & sell

Active/interested

60 Losabia Prescilla Banquerohan F Buy & Sell of Scrap Active/interested

61 Losabia Ricardo Banquerohan M Buy & Sell of Scrap Active/interested

62 Lotino Ariel San Francisco M Crop Production Active/interested

63 Lovendino Joey San Francisco M Crop Production Active/interested

64 Macasinag Evangeline***

Bariis F Food vending/buy & sell

Active/interested; Landless IWS; Preferred to engage in Food Vending/Buy & Sell for reasons that she can be flexible in using her time both in livelihood activities and attending her family

65 Macasinag Juliana Banquerohan F Crop Production Active/interested

66 Macasinag Julius Banquerohan M Educational Support Active/interested

67 Macasinag Karlo Banquerohan M Educational Support Active/interested

68 Mapolon Dario Cagbacong M Access to employment Affidavit of Quitclaim/With big farm lot

69 Marcaida Nilda Cagbacong F Crop Production Active/interested

70 Marbella Aljon Banquerohan M Access to employment Active/interested

71 Marbella Mark Joseph

Banquerohan M Educational Support Affidavit of Quitclaim/No longer residing in the barangay/Finished High school and is presently working in a construction in Naga City

23

72 Marantal Joseph Cagbacong M Crop Production Active/interested

73 Marco Gloria Bariis F Crop Production Active/interested

74 Marigondon Danilo San Francisco M Crop Production Active/interested

75 Marigondon Sandy San Francisco F Access to employment Active/interested

76 Merilles Wenceslao Bariis M Access to employment Active/interested

77 Mirabel Benedicto San Francisco M Access to employment Active/interested

78 Mirabel Daisy San Francisco F Food Vending/buy & sell

Active/interested

79 Mirabel Jonathan San Francisco M Buy & Sell of Scrap Affidavit of Quitclaim/not interested in the livelihood/ already a recipient of previous livelihood project funded by AECID

80 Mirabel Romeo San Francisco M Crop Production Active/interested

81 Mirabel Tobias San Francisco M Crop Production Active/interested

82 Nacion Irene Bariis F Food Vending/buy & sell

Active/interested

83 Obido Samuel San Francisco M Access to employment Active/interested

84 Obido Yolanda Cagbacong F Crop Production Active/interested

85 Reales Aiza Banquerohan F Crop Production/Access to employment

Participates in 2 livelihood projects

86 Reales Allan Banquerohan M Access to employment Certification from the barangay/No longer residing in the barangay/already working in Manila

87 Reales Argie Banquerohan M Educational Support Active/interested

88 Reales Emiliana Banquerohan F Crop Production Active/interested

89 Sevilla Consolacion Cagbacong F Crop Production Active/interested

90 Sevilla Wenifredo Cagbacong M Access to employment Active/interested

91 Sumulat Valeriano Cagbacong M Crop Production Active/interested

NOTE:***Landless IWS previously identified under Crop Production Project but preferred to be engaged in food vending/buy & sell upon consultation.

Table No. 12, shows the summary of the identified livelihood intervention for the IWS by gender disaggregation. Slightly, more female IWS or a total of 36 out of 71 (52%) participates in the livelihood projects under SDP while male IWS or a total of 35 out of 71 (49%). More female population will participate and benefit from the crop production. Table No. 12. Summary of LIVELIHOOD PROJECTS for IWS by Gender Disaggregation

Livelihood Projects No. of IWS-Gender Disagregation

Male Female Sub-total

Crop Production (Project No.1) 17 20 37

Buy and Sell of Scrap/Junkshop (Project No. 2) 4 2 6

Educational Support (Project No. 3) 3 1 4

Access to Employment (Project No. 4) 10 0 10

Food Vending/ Buy and Sell (Project No. 5) 1 13 14

TOTAL 35 36 71

Percentage (%) 49 51 100%

24

B.2 Livelihood Project Details

B.2.1 CROP/VEGETABLES PRODUCTION

The crop/vegetables production project will support a total of 37 (out of 71) IWS whose main source

of income is farming. Their farm lots are located in four (4) barangays, Banquerohan, Bariis,

Cagbacong and San Francisco, in the same areas where they likewise reside.

During consultations-meetings, the IWS-farmers expressed their interests to participate in the crop/vegetable production project since they already have experience in farming and mostly have their own farm lots. Group discussions indicated that their farm lot is not yet maximized, meaning not all of the plots are planted or farmed due to lack of capital and farm inputs. Aside from skills and experience in farming, most of these IWS-farmers are recipients of the Comprehensive Agrarian Reform Program (CARP) implemented by the Department of Agrarian Reform (DAR) hence they have their own farm lots to cultivate. The IWS-farmers were likewise asked of their preferred crops/vegetables to be planted and identified cassava, peanut, palay and eggplant. According to them, these crops/vegetables are easier to market/sell (some already have established buyers) and they are not perishable and can be processed, hence they can be stored for a certain time and wait for a higher market price. The IWS-farmers refused to plant pechay and okra because based from their previous experience they are highly perishable and hence are forced to sell them at the market price dictates, in which most of the time very cheap. The OCENR and CAO likewise discussed and deliberated based on the current programs and projects

conducted by the agriculture office. It was noted in these consultation meetings that around 23 IWS-

farmers are identified beneficiaries of the 4Ps Program, where they will be given cash for work

assistance for cultivating cassava.

The OCENR Staff in coordination with the CAO Agriculture Technician conducted field visits to gather

additional information on the current incomes of IWS from farming and to confirm the availability of

farm lots. Of the 37 IWS around 31 IWS are currently engaged in farming rice and other crops such

sweet potato (camote), cassava, corn and chilli pepper. Harvests from rice and crops planted by the

farmer-IWS are used for personal consumption and some converted to cash or both. The remaining

6 IWS are engaged in construction and buy and sell of scraps. Of the 37 IWS beneficiaries, 23 have

farm lots under the CARP program of the DAR, 9 are tenants of private farm owner and 5 already

own their farm lots. Of the 37 IWS-farmers, eight of them are already regular beneficiaries of the

City Agriculture Office (CAO).

Table No. 13 details income from farming of waste pickers (crops currently cultivated, area/portion

of farm lot being cultivated, yield and income per cropping cycle). Based on the information

gathered, the highest IWS-farmer earns an amount of P 85,000.00 pesos per cropping cycle while

the lowest earns an amount of P 1,000.00 pesos per cropping cycle.

25

Table No. 13 Income from Farming of 37 IWS-Farmers NAME CROPS

CURRENTLY PLANTED

AREA/PORTION OF FARMLOT CURRENTLY

CULTIVATED

YIELD

INCOME per CROPPING

1.Abadeza, Beverly Rice (Rainfed) (Irrigated) Camote Cassava

1.0 ha. .4 ha. .5 ha. .5 ha.

10 sacks 20 sacks 10 cans/150kls 10 cans/150 kls

4,500.00 9,000.00 1000.00 1000.00 P15,500

2. Agripa, Violeta Rice (Rainfed) Chili Pepper(Sili) Cucumber Corn

.75 ha. 1250 sq.m. 1250 sq.m. 1250 sq.m.

90 sacks 500 kls. 150 kls. 200 kls.

45,000.00 10,000.00 1,500.00 5,000.00 P85,000

3. Alba, Gemma Rice (Irrigated) Camote Cassava

.50 ha.

.25 ha.

.25 ha.

50 sacks 4 cans/60 kls 7 cans/105 kls

17,000.00 400.00 700.00 P18,100

4.Alcantara, Dennis Rice (Rainfed) .125 ha.

6 sacks

For family consumption

5.Alcera, Norma Rice (Rainfed) Camote Cassava

.125 ha. 1000 sq.m. 1000 sq.m.

2 sacks 2 cans/30 kls 3 cans/45 kls

P1,500 For consumption For consumption

6.Alcera, Sonia Presently not engage in farming instead into Charcoal/buy & sell.

7.Alejo, Jocelyn Presently not engage in farming but leased her farm.

8. Alejo, Maria Rice (Irrigated) .5 ha. 20 sacks For consumption

9. Arcinue, Marina Rice (Irrigated) Camote

.25 ha. 2000 sq.m.

10 sacks 5 cans/75 kls

For consumption P500.00

10.Ariola, Ernesto Presently not engaged in farming instead working in construction.

11.Ariola, Ramon Presently engaged in copra making.

12. Aycardo, Victoria Presently not engaged in farming because her husband was employed in the construction.

13.Azuela, Rodrigo Camote/Cassava 1000 sq.m. 15 kls. For consumption

14.Botalon, Lenie Cassava .50 ha. 10 cans/150 kls For hog raising foodstuff /consumption.

15.Daniel, Jocelyna Rice (Rainfed) .125 ha. 5 sacks For consumption

16.Gonzales, Arlene 17.Gonzales, Romeo 18.Gonzales, Nicky

Rice (Rainfed)

1 ha.

30 sacks

For consumption

19. Gonzales, Rommel

Rice (Rainfed) .125 ha. 5 sacks For consumption

20.Leron, Aike 21.Leron, Vicente

Rice (Rainfed) .125 ha 6 sacks For consumption

22.Lola, Perpetua Rice (Rainfed) Camote Cassava

.75 ha

.125 ha.

.125 ha.

5 sacks 4 cans/60 kls. 6 cans/90 kls.

For consumption 400.00 600.00 P1,000.00

23.Loquinario, Gina Irrigated rice .50 ha. 40 sacks P15,000.00

24.Lotino, Ariel Rice (Rainfed) .20 ha. 8 sacks For consumption

26

25.Lovendino, Joey Rice (Rainfed) Camote

.25 ha. 1250 sq.m. 1250 sq. ml

5 sacks For consumption

26.Macasinag, Juliana Rice (Rainfed) .25 ha.(nakikitanim) 15 sacks For consumption

27.Marantal, Joseph Rice (Rainfed) Camote Cassava

1 ha. .25 ha. .25 ha.

15 sacks 15 cans/150 kls. 5 cans/75 kls.

7,500.00 500.00 200.00 P8,200.00

28.Marcaida, Nilda Rice (Rainfed) .50 ha. 25 sacks For consumption

29.Marco, Gloria Rice (Rainfed) Camote Cassava

.25 ha. 1250 sq.m. 1250 sq.m.

13 sacks 10 cans/150 kls. 10 cans/150 kls.

For consumption 1,000.00 1,000.00 P2,000

30.Marigondon, Danilo

Rice (Rainfed) Camote Cassava

.50 ha. 1250 sq.m. 1250 sq.m.

25 sacks 10 cans/150 kls. 10 cans/150 kls.

For consumption 1,000.00 1,000.00 P2,000

31.Mirabel, Romeo Rice (Rainfed) Camote Cassava

.125 ha.

.25 ha.

.25 ha.

20 sacks 6 cans/90 kls. 6 cans/90kls.

For consumption 600.00 600.00 P1,200

32.Mirabel, Tobias Rice (Rainfed) .50 ha. (nakikitanim) 30 sacks For consumption

33.Obido, Yolanda Rice (Rainfed) .50 ha. For consumption

34.Reales, Aiza 35.Reales, Emiliana

Rice (Rainfed) .25 ha. 10 sacks For consumption

36.Sevilla, Concepcion

Presently not engaged in farming instead into scrap buying.

37.Sumulat, Valeriano

Rice (Rainfed) .125 ha. 10 sacks For consumption

Crop/vegetable production livelihood project will involve provision of farm inputs and farm

techniques to maximize the potential of farm lots of the IWS in order to increase or augment their

incomes from farming to support their respective families and replace (and/or restore) incomes lost

due to closure of dumpsite.

The following are the objectives set for the Crops/Vegetables Production Project:

To provide the 37 IWS an alternative livelihood project who have the interest and skills in

farming to support their families’ needs;

To provide the 37 IWS with farm inputs such as seeds, cuttings, insecticides and fertilizer

equivalent to one (1) cropping cycle;

To provide cash assistance to indigent IWS-farmers through conditional cash

transfer/Pantawid Pamilya Pilipino Program or (4Ps); and

To provide the 37 IWS with proper technology on farming for their identified

crops/vegetables in order to meet the desired income for their products.

Under Crop/Vegetable Production Project, the 37 IWS-farmers will plant or cultivate four (4) types of

crops or vegetables production:

Cassava – 23 IWS-farmers

27

Rice/Palay -8 IWS-farmers

Peanut -21 IWS-farmers

Eggplant -3 IWS-farmers

For IWS-farmers who will be engaged in cultivating rice, peanut and eggplant, seed, fertilizer and

pesticides equivalent to one (1) cropping cycle will be provided. For IWS-farmers who are also 4Ps

beneficiaries and who will be engaging in the cassava production, they will be provided not only with

farm inputs but also with cash for work for the labor that will be required in the cassava production

through the DSWD 4Ps. Income derived from the harvest are expected to be re-used as seed capital

for the next cropping cycle and the succeeding cycles.

The DSWD 4Ps allocated a budget of Php 20,000.00 per IWS/4Ps beneficiaries who will be engaging

in cassava production while the city allocates at least Php 4,000.00 per IWS.

Table No. 14 Profile of IWS-Farmer showing farm lot and details of crop/vegetable production project

3. ALBA, GEMMMA Address: Banquerohan, Legazpi City Loss of Income from Waste Picking: Php. 800.00/mo. Total Area of Farm Lot: 1 hectare Area Available for Income Restoration Project: 1.1 has. Status of Lot: Type of Crop/Vegetable to be planted:

Cassava (1 ha.) No. of Months per Cropping Cycle: 9 mos. Yield per Cropping: 15,000 kgs. Income: Per Cropping Cycle: P 21,255.00 Per Month: P 2,361.70

Peanut (1,000 sqm.) No. of Months per Cropping Cycle: 3.5 mos. Yield per Cropping: 170 kgs. Income: Per Cropping Cycle: P 4,540.00 Per Month: P 541.40

Inputs Needed/Volume: Cassava: 1 ha. (c/o 4Ps) > Cuttings - 2,500 pcs. @ .75 >Fertilizer: Organic - 10 bags @ 350.00 14-14-14 - 3 bags @ 1,285.00

P 1,875.00 3,500.00 3,855.00 Subtotal: 9,230.00

Land Preparation: (c/o 4Ps) > Plowing - 60 liter diesel @ 32.00/liter > Harrowing – 350 man/animal day x 2 days

P 1,920.00 700.00 Subtotal: 2,620.00

Planting: Cutting: 250/ man day x 1 day (c/o 4Ps) Planting: 200/man day x 8 days

250.00 1,600.00 Subtotal: 1,850.00

Cultivation: Off-barring – 350/man day x 2 days (c/o 4Ps) Hilling-up: 200/man day x 6 days Side dressing: 200/man day x 2 days

P 700.00 1,200.00 400.00 Subtotal: 2,300.00

Weeding: 200/man day x 10 days (c/o 4Ps) P 2,000.00

Harvesting: 200/man day x 10 days (c/o 4Ps) P 2,000.00

Inputs Needed/Volume: Peanut: 1,000 sq.m. (c/o LGU) >Seeds: 15 kg. @ 20.00

P 300.00

>Fertilizer: Organic: 5 sacks @ 250.00 Complete: .5 bag @ 1,200.00

P 1,250.00 1,200.00 Subtotal: 2,450.00

>Insecticide: .5 pack @ 600.00 P 600.00

>Plastic Runner: 100 pcs. @ 2.00 P 200.00

Total LGU Counterpart P 3,550.00

Total 4Ps Counterpart P 20,000.00

28

Table No.15 shows the farm inputs and projected (additional) income under crop/vegetables

production. Loss of income from waste picking will be replaced through expected yield from one (1)

cropping cycle. Also refer to attached Profiles of 37 IWS in Attachment C for detailed information of

project.

Table No.15 Farm Inputs and Projected Income of IWS under Crop Production

No. Name of IWS Loss of Income per month

Expected Income per month

Crop to be planted

Area (has.)

Crop Cycle (mos.)

LGU Counter-

Part

Cash for work (4Ps) Counter-

part

Expected Yield

Market Price

1 Abadeza Beverly

320.00 2,361.70 Cassava 1 9 00.00 20,000.00 15,000kgs 21,255.00

2 Agripa Violeta 960.00 2,361.70 Cassava 1 9 00.00 20,000.00 15,000kgs 21,255.00

2,234.70 Palay .25 4 5,722.00 00.00 1,380kgs 8,938.75

3 Alba Gemma 800.00 2,361.70 Cassava 1 9 00.00 20,000.00 15,000kgs 21,255.00

541.40 Peanut .10 3.5 3.550.00 00.00 170 kgs 4,540.00

4 Alcantara Dennis

1,250.00 2,361.70 Cassava 1 9 00.00 20,000.00 15,000kgs 21,255.00

541.40 Peanut .10 3.5 3.550.00 00.00 170 kgs 4,540.00

5 Alcera Norma 600.00 1,082.80 Peanut .20 3.5 3.550.00 00.00 340kgs 9,040.00

6 Alcera Sonia 1,000.00 2,361.70 Cassava 1 9 00.00 20,000.00 15,000kgs 21,255.00

541.40 Peanut .10 3.5 3.550.00 00.00 170 kgs 4,540.00

7 Alejo Jocelyn 480.00

2,361.70 Cassava 1 9 00.00 20,000.00 15,000kgs 21,255.00

541.40 Peanut .10 3.5 3.550.00 00.00 170 kgs 4,540.00

8 Alejo Maria 1,400.00 2,361.70 Cassava 1 9 00.00 20,000.00 15,000kgs 21,255.00

2,234.70 Palay .25 4 5,722.00 00.00 1,380kgs 8,938.75

9 Arcinue Marina

840.00 2,361.70 Cassava 1 9 00.00 20,000.00 15,000kgs 21,255.00

541.40 Peanut .10 3.5 3,550.00 00.00 170 kgs 4,540.00

10 Ariola Ernesto 1,400.00 4,872.60 Peanut .30 3.5 5,520.00 00.00 510kgs 13,620.00

11 Ariola Ramon 1,200.00 2,361.70 Cassava 1 9 00.00 20,000.00 15,000kgs 21,255.00

541.40 Peanut .10 3.5 3,550.00 00.00 170 kgs 4,540.00

12 Aycardo Victoria

1,600.00 2,361.70 Cassava 1 9 00.00 20,000.00 15,000kgs 21,255.00

541.40 Peanut .10 3.5 3,550.00 00.00 170 kgs 4,540.00

13 Azuela Rodrigo

1,120.00 2,361.70 Cassava 1 9 00.00 20,000.00 15,000kgs 21,255.00

541.40 Peanut .10 3.5 3,550.00 00.00 170 kgs 4,540.00

14 Botalon Lenie 1,120.00 2,361.70 Cassava 1 9 00.00 20,000.00 15,000kgs 21,255.00

15 Daniel Jocelyna

600.00 2,234.70 Palay .25 4 5,722.00 00.00 1,380kgs 8,938.75

541.40 Peanut .10 3.5 3,550.00 00.00 170 kgs 4,540.00

16 Gonzales Rommel

270.00 895.57 Eggplant .1 3.5 2,650.00 00.00 1,000kgs 3,134.50

17 Gonzales Arlene

600.00 2,361.70 Cassava 1 9 00.00 20,000.00 15,000kgs 21,255.00

18 Gonzales Nicky

270.00 541.40 Peanut .10 3.5 3,550.00 00.00 170 kgs 4,540.00

19 Gonzales Romeo

270.00 2,234.70 Peanut .10 3.5 3,550.00 00.00 170 kgs 4,540.00

29

20 Leron Aike 280.00 541.40 Peanut .10 3.5 3,550.00 00.00 170 kgs 4,540.00

21 Leron Vicente 560.00 2,361.70 Cassava 1 9 00.00 20,000.00 15,000kgs 21,255.00

22 Lola Perpetua 1,200.00 2,361.70 Cassava 1 9 00.00 20,000.00 15,000kgs 21,255.00

541.40 Peanut .10 3.5 3,550.00 00.00 170 kgs 4,540.00

23 Loquinario Gina

400.00 2,361.70 Cassava 1 9 00.00 20,000.00 15,000kgs 21,255.00

541.40 Peanut .10 3.5 3,550.00 00.00 170 kgs 4,540.00

24 Lotino Ariel 320.00 2,234.70 Palay .25 4 5,722.00 00.00 1,380kgs 8,938.75

25 Lovendino Joey

1,200.00 2,361.70 Cassava 1 9 00.00 20,000.00 15,000kgs 21,255.00

541.40 Peanut .10 3.5 3,550.00 00.00 170 kgs 4,540.00

26 Macasinag Juliana

600.00 2,361.70 Cassava 1 9 00.00 20,000.00 15,000kgs 21,255.00

27 Marcaida Nilda

1,120.00 2,234.70 Palay .25 4 5,722.00 00.00 1,380kgs 8,938.75

28 Marantal Joseph

1,120.00 2,234.70 Palay .25 4 5,722.00 00.00 1,380kgs 8,938.75

29 Marco Gloria 2,400.00 2,361.70 Cassava 1 9 00.00 20,000.00 15,000kgs 21,255.00

541.40 Peanut .10 3.5 3,550.00 00.00 170 kgs 4,540.00

30 Marigondon Danilo

840.00 2,234.70 Palay .25 4 5,722.00 00.00 1,380kgs 8,938.75

31 Mirabel Romeo

1,400.00 2,361.70 Cassava 1 9 00.00 20,000.00 15,000kgs 21,255.00

541.40 Peanut .10 3.5 3,550.00 00.00 170 kgs 4,540.00

32 Mirabel Tobias

600.00 2,361.70 Cassava 1 9 00.00 20,000.00 15,000kgs 21,255.00

33 Obido Yolanda 160.00 2,361.70 Cassava 1 9 00.00 20,000.00 15,000kgs 21,255.00

541.40 Peanut .10 3.5 3,550.00 00.00 170 kgs 4,540.00

34 Reales Aiza 280.00 541.40 Peanut .10 3.5 2,650.00 00.00 170 kgs 4,540.00

35 Reales Emiliana

300.00 2,361.70 Cassava 1 9 00.00 20,000.00 15,000kgs 21,255.00

541.40 Peanut .10 3.5 3,550.00 00.00 170 kgs 4,540.00

36 Sevilla Consolacion

1,400.00 1,791.14 Eggplant .2 3.5 5,300.00 00.00 1,000kgs 6,269.00

37 Sumulat Valeriano

960.00 1,970.25 Eggplant .220 3.5 5,830.00 00.00 1,000kgs 6,895.00

Trainings and seminars will also be conducted to equip the IWS-farmers with the necessary

knowledge and skills. To equip the beneficiaries of the livelihood projects with the necessary

knowledge and skills in order to carry out their projects effectively and efficiently, necessary

capability-building activities will be conducted to them such as mentoring/coaching, on-job trainings

and exposure trip to model farms in the area. Technology and expertise of some government

agencies and NGOs in the area will also be tapped. The city allocated Php 50,000.00 pesos for

capacity-building for crop/vegetable production project.

And other than the formal trainings, IWS-farmers will be guided and monitored in the entire cycle of

crop/vegetable production as they will be given technical knowledge (and equipment if necessary) in

land preparation, planting, cultivation, weeding and harvesting.

The following are the capacity building activities that will be conducted under the project:

Project Orientation and Planning Workshop

30

Training on Farm Technology

Training on Enterprise Development and Financial Management with Simplified Bookkeeping

Values Formation Training Strict guidance and assistance will be given to the IWS-farmers to ensure a good yield of crops

planted and likewise its marketing. The OCENR in partnership with the DSWD and CAO, jointly

implements the SDP. These 37 IWS, even after the cropping cycle will be considered as recipients

(and farmer partners) of CAO’s regular project activities being implemented. To reiterate

commitment of the city, it will continue to support livelihood support to IWS in the event

projected/target incomes will not be achieved. Through regular programs implemented by the city

government IWS and their families will be continuously supported, specifically and in

integrating/linking them as beneficiaries in the regular program of the City Agriculture Office, City

Social Welfare and Development Office and other government or private agencies which could

provide them with livelihood or other economic enterprise.

The city earmarked a total of Php 1.4 million pesos for the SDP implementation. For crop/vegetables

production project, the city allocated at least Php 280,000.00 and the DSWD’s conditional cash

transfer (4Ps) allocated Php 460,000.00. The overall cost is Php 742,070.00. Table No. 16 shows the

estimated cost for the Crop/Vegetable Production Project.

Table No. 16 PROJECT COST AND FUNDING SOURCES

PARTICULARS ESTIMATED

COST

LGU COUNTERPART

DSWD 4Ps

IWS BENEFICIARIES

1. Agricultural Inputs

a. Rice Farming 45,770.00 45,770.00

b. Peanut 63,600.00 63,600.00

c. Eggplant 22,700.00 22,700.60

d. Cassava 460,000.00 460,000.00

Sub-Total 592,070.00 132,070.00 460,000.00

2. Capability-Building Activities/ Trainings

50,000.00 50,000.00

3. Pre-Implementation Cost

50,000.00 50,000.00

4. Monitoring and Evaluation

50,000.00 50,000.00

Sub-Total 150,000.00 150,000.00

TOTAL 742,070.00 282,070.00 460,000.00

31

The following will be the implementation schedule of the Crop/Vegetable Production Project. Month

1 or M1 will commence upon issuance of no objection/notice to proceeds from WB.

Table No. 17 IMPLEMENTATION SCHEDULE

ACTIVITY/PARTICULARS

TIMETABLE RESPONSIBLE PERSON/ GROUP

M1

M2 M3 M4 M5 M6 Onward

I. PRE-IMPLEMENTATION PHASE

1. Consultation Meeting with the IWS

OCENR & CAO

2. Organizational Development OCENR, CAO

3. Project Planning Workshop with target beneficiaries

OCENR, CAO

4. Preparation of farm lot for temporary distribution to target beneficiaries

CAO

II. IMPLEMENTATION PHASE

1. Conduct of Training on Crop/Vegetable Farming

CAO

2. Purchase of farm planting materials such as seeds, fertilizer,insecticides etc.

CAO

3. Preparation of farm lot for planting

IWS

4. Start of vegetables/crops production - planting, weeding, application of fertilizer & pesticides, and harvesting

IWS, CAO

III. MONITORING, EVALUATION AND REPORTING

1. Conduct of Monitoring & Evaluation of Project Activities

CAO, OCENR, DENR-EMB, WB

2. Reporting Activities CAO, OCENR, DENR-EMB, WB

B.2.2 BUY AND SELL OF SCRAPS

There are three (3) IWS households composed of six (6) IWS individuals participating in the buy and sell of craps project. These IWS are presently engaged in the buy and sell of scrap on a small scale basis. They buy scraps within their barangay and the neighboring barangays using only a rented “padjak” (three-wheeled bicycle). With this scheme, their capacity to generate income is limited and cannot suffice the financial requirement of their respective families. During consultation meetings they identified and requested a motorized vehicle with fabricated sidecar so they can be more mobile and are able to expand their buying area for scraps thereby increasing their daily sales being sold to junkshop owners. This project estimates to replace loss of income from waste picking (2,400-6,800) amounting to Php 9,000.00.

32

Table No. 18 List of IWS under Buy & Sell of Scrap

Name Skills Income from Waste Picking

(Monthly)

Target Income from Livelihood Intervention

(Monthly)

1. Fernando Guerrero 2. Lilia Guerrero 3. Arjay Guerrero

Buy & Sell of Scrap; Soft-broom Making 6,680 Minimum 9,000

4.Ricardo Losabia 5.Prescilla Losabia

Hog Raising; Handicraft; Buy & Sell of Scrap

2,800 Minimum 9,000

6.Joel Loñosa Buy & Sell of Scrap; Farming

2,400 Minimum 9,000

The following are the objectives of the project:

To replace the income from waste picking and buying and selling of scraps within the open dumpsite which will be lost due to the closure of the open dumpsite;

To level up their status from waste picking and small-time buyer of scraps in the dumpsite and their neighborhood into itinerant buyers/small-scale businessmen in their community; and

To increase their income and improve the quality of life of their respective families. The buy and sell of scraps project will replace the IWS’ rented three-wheel bicycle (padyak) into a motorcycle with a built-in sidecar that will be fabricated for the purpose. In the meetings conducted with the IWS, they are agreeable to the terms and conditions of the project such as in acquiring a motorcycle which they will amortize through a financing institution. On the other hand, the City will provide the fabricated cart that will be built-in with the motorcycle as a grant to the beneficiaries.

Figure No. 3. Drawing of design of sidecar and motorcycle

To ensure that the project will be sustained by the IWS beneficiaries particularly the amortization of the motorcycle, there will be an agreement between the City Government and the IWS beneficiaries. One of the conditions to be included in the agreement will be that once the vehicle will be pulled-out by the financing institution due to non-payment of the amortization, the sidecar will also be automatically returned to/pulled out also by the City Government. It is however noted that such event will be last recourse after all efforts and assistance been explored.

33

Buy and Sell of Scrap Project cost estimate is Php 245,615.00. The LGU will provide 3 units of fabricated side car amounting to Php 36,000.00 pesos while 3 unit-motorcycles will be procured and coordinated to financing institutions (or directly at motorcycle shops/stores) amounting to Php 192,000.00. Table No. 6.8 provide details project cost and of funds. Table No. 19 PROJECT COST AND SOURCE OF FUNDS

Project Activity Project

Cost

Fund Sources

LGU Beneficiary Financing

Institution/Others

1. Conduct of Meetings and Consultations with target beneficiaries

1,000 1,000

2. Securing of Personal Record/Documents

1,000

1,000

3. Coordination with Financing Institution

1,000

1,000

4. Procurement of 3 units motorcycle @ Php.64,305.00

192,915

192,915

5. Fabrication of 3 units sidecar @ Php.12,000.00

36,000 36,000

6. Distribution of Equipment 1,000 1,000

7. Operation of Buy & Sell of scrap using the Motorized Vehicle (Estimated cost for 1 month (26 days) @ 150 per day x 3 vehicles

11,700

11,700

8. Monitoring and Evaluation 1,000

1,000

TOTAL

245,615

40,000

12,700

192,915

The following is the timetable of activities of the project. Month 1 or M1 likewise commence upon issuance of no objection letter/notice to proceed from WB.

Table No. 20 IMPLEMENTATION SCHEDULE

PROJECT ACTIVITIES

MONTH 1 MONTH 2 MONTH 3 MONTH 4

W1

W2

W3

W4

W1

W2

W3

W4

W1

W2

W3

W4

W1

W2

W3

W4

1. Conduct of meetings with the identified IWS beneficiaries

2. Securing of personal records/documents

3. Coordination with financing institution

4. Procurement of motorcycle units

5. Fabrication of Sidecar

6. Distribution of Equipment

7. Operation of Buy &

34

Sell of Scrap using the Motorized Vehicle

8. Monitoring and Evaluation

B.2.3 EDUCATIONAL SUPPORT TO IWS IN-SCHOOL YOUTH

With the goal in mind of ensuring the education of the identified in-school youth waste pickers after the closure of the dumpsite, the project intends to provide financial assistance to them through scholarship grants that could be provided to them in coordination with various institutions such as the CHED, TESDA, Alternative Learning System of Dep-Ed, Don Bosco Agro-Mechanical Technology Center and other private institutions or individuals. In the social assessment conducted to waste pickers present at the Legaspi City Open Dumpsite in 2013, there were eleven (11) identified youths that were enrolled or studying either in the public elementary, secondary, vocational course and college within the city. They do waste picking usually on weekends to defray the cost of their studies. Sometimes they even assist to the other needs of their families.

But after almost 2 years before the project will be implemented, there were only four (4) of them remaining who are interested to be assisted with their studies. The other seven (7) IWS youth either graduated already with their studies, regularly working, no longer interested to pursue his studies and the other one (1) is deceased (refer to Table 6.1 for updated list of IWS).

Hence, the following is the list (Table No. 21) of the four (4) in-school youths who will be the beneficiaries of this Educational Support Project as part of the Social Development Plan of the IWS with their income derive from waste picking and their level of education: Table No. 21 List of IWS Youth/Student

Name Educational

Level Completed

Income from Waste picking

(Monthly)

Educational Level (For enrollment)

1. Christian Arena Ist Year College 240 2st Year College

2. Julius Macasinag Grade 4 400 Gr. 5

3. Karlo Macasinag Grade 6 240 1st Year HS

4. Argie Reales 1stYr HS 800 2ndYear HS

The following are the objectives of the project:

To ensure the continued education of the IWS youth after they are displaced in waste picking where they derive their daily school allowances;

To facilitate the enrollment of the IWS youth in the schools for their continued studies; and

To provide them with financial support such as in the payment of school fees, school supplies and transportation to defray the expenses incurred in their education.

35

In order to get the necessary possible expenses that will be incurred by each IWS student in their education, the city through the OCENR Staff conducted initial meetings/consultations with them to itemize the cost that they will incur for the project. Four major school expenses will be covered by the project namely transportation, food, school uniform/supplies and school fees. Each school year level has different cost. The city in partnership with private individuals and/or scholarship grants provided by learning institutions will be providing funds to shoulder the school expenses of the 4 IWS Youth. Table No. 22 shows the items and estimated cost of education required per school year. Table No. 22 Estimated Items Cost of Education required per school year

Item Elementary High School College Total

Transportation 2,800 2,800 12,000 22,600

Food (Snacks & Lunch) 3,000 6,000 10,000 23,000

School Uniform/Supplies 1,500 2,000 2,000 5,500

School Fees 529 600 8,129

TOTAL EXPENSES 7,829 11,400 24,000 59,229

Table No. 23 shows the cost of educational assistance to be provided to 4 IWS Youth under educational assistance to in-school youth IWS. Table No. 23 Cost of education per school level

Educational Level No. of IWS Youth Cost of Education

per student Total

Elem. Grade 1 7,829 7,829

Secondary 2 11,400 22,800

College 1 24,000 24,000

TOTAL 4 54,629

The scheme in providing the students with their allowances based on the identified cost of their education will depend on the concerned agency, institution or individual that will provide the necessary educational assistance. Some costs such as food or other incidental expenses may be shouldered by the parents of the IWS youth. Table No. 24 Project cost and source of funds

Project Activity Project

Cost

Fund Sources

LGU Beneficiary CHED/DEP-ED/TESDA/ OTHER INSTITUTIONS/

INDIVIDUALS

Meetings & Consultations 1,000 1,000

Coordination with schools 1,000 1,000

Provision of Financial Assistance to IWS youth

54,629

54,629

Monitoring and Evaluation 1,000 1,000

TOTAL 57,629 3,000 - 54,629

36

B.2.4 Access to Employment and Buy and Sell Projects Other than the project interventions presented above, the city will also provide other interventions to identified IWS so that their income derived previously from waste picking be replaced and, if possible, be augmented in order to improve the socio-economic life of their respective families/households. The other identified income sources are the following: Access to Employment and Buy and Sell. In Access to Employment, at least ten (10) IWS individuals will be accommodated by the city for employment in some of its facilities such as in the Organic Fertilizer Plant, and the Cassava Drying Plant. But meanwhile that these two (2) projects/plants are being processed, they will first be accommodated in the closure and rehabilitation works that will take place in the Open Dumpsite. While in Vending or Buy & Sell, there will be ten (10) IWS who will be involved. They will either sell/vend cooked or preserved food, fresh vegetables, fish, meat and other items. The city will provide each of them a seed capital amounting to Php 1,000.0 to be rolled out in order for them to generate an income for their family. It is expected that each one of them will generate an income of at least Php. 100.00 per day.

C. PROJECT MANAGEMENT AND SUSTAINABILITY

C.1 Institutional Arrangement The planned livelihood project for waste pickers will be implemented by the City through the Office of the City Environment and Natural Resources (OCENR). Although the implementation of one of the livelihood interventions, the Vegetable/Crop Production Project, will be done by the City Agriculture Office (CAO) and DSWD’s 4Ps but still, the over-all supervision and management of the SDP for the IWS will be done by the OCENR. Hence it will closely work with the CAO regarding the implementation of the said project particularly in the aspect of monitoring and supervision. Since there are two (2) existing IWS groups in the area, one was organized by CAO under a project organized by an international NGO in 2010 and another one was organized by SWAPP for its project, hence this will be re-organized/merged or separate group will be organized to serve the interests of this Plan. The ultimate goal of which is in order to sustain the projects that will be implemented. For the identified Junkshop or Buy & Sell of Scrap, the city will also establish a partnership with junk buyers within the city. On the other hand, the city will ensure that the skilled IWS particularly the youth who graduated in agro-mechanical and other courses will be employed by the city where their skill is needed.

Regular and strict monitoring and supervision to the implementation of the projects will also be conducted in order to ensure the success of the Plan. To reiterate commitment of the city, it will continue to support livelihood support to IWS in the event projected/target incomes will not be achieved. Through regular programs implemented by the city government IWS and their families will be continuously supported, specifically and in integrating/linking them as beneficiaries in the regular program of the City Agriculture Office, City Social Welfare and Development Office and other government or private agencies which could provide them with livelihood or other economic enterprise.

The following is the proposed Project Organizational Structure to be implemented under the Social development Plan

37

C.2 PROJECT ORGANIZATIONAL STRUCTURE

a. FUNCTIONS AND RESPONSIBILITIES

i. City Government of Legaspi The City Government of Legaspi through the City Mayor will act as the overall in-charge for the supervision and management of the Social Development Plan for the Legaspi City IWS Beneficiaries. As such, he will designate the city offices that will be involved in carrying-out activities necessary for the successful implementation of the Plan, to wit:

ii. Office of City Environment and Natural Resources (OCENR) As the city office that will be directly in-charge of the implementation of the Plan, the following are its specific functions:

Co-implement the Plan with CAO based on the approved Social Development Plan for Legazpi City IWS Beneficiaries;

Develop specific policies and procedures to guide the implementation the various implementation of livelihood projects/activities;

Follow-up/Coordinate with the City Budget Office the downloading of fund for the project;

Facilitate the process of preparing the fund for the procurement of necessary materials, supplies and equipment as well as for the payment of capability building and other activities to be implemented as specified in the approved Social Development Plan for IWS;

Provide personnel who will handle both the technical and social aspects of the Plan;

Conduct regular monitoring and periodic evaluation of the implementation of the Plan; and

Prepare the necessary documents and reports pertaining to the implementation of the Plan.

CITY GOVERNMENT OF LEGAZPI

OCENR (Office of City Environment

& Natural Resources)

IWS Association

IWS Beneficiaries

CAO (City Agriculture

Office)

38

iii. City Agriculture Office (CAO)

Co-implement the Plan particularly the Vegetables/Crop Production Project;

Develop specific policies and guidelines to guide the implementation of the project;

Conduct the project/organizational meetings with the IWS beneficiaries together with the OCENR;

Procure the supplies and materials such as feeds and veterinary supplies that will be needed in the project;

Provide personnel preferably technical person/s who will be directly involved/take charge of the actual implementation and monitoring of the project; and

Prepare and submit documents and reports regarding the implementation of the project for consolidation by the OCENR.

iv. IWS Association

As the umbrella organization of the IWS in Legazpi City, the following are its functions and responsibilities to the project and its IWS members:

Develop policies that will serve as guide for the organization and the operation of its projects/activities;

Safeguard the dues paid by their individual members;

Plan and implement projects/activities that will further promote the interests and/or uplift the socio-economic condition of the IWS sector and the community;

Assist in the conduct of monitoring and evaluation activities; and

Establish linkages with government and private agencies for the development of their organization.

v. IWS Project Beneficiaries

Implement the specific livelihood project/s that they will engage in such as the Vegetable/Crop Production, Junkshop and/or Buy & Sell;

Follow faithfully the policies and guidelines that will required of them in implementing their project;

Give their time, skills and proper values to their livelihood project to ensure the success of the project thereby improve their socio-economic life of their respective families and communities;

Cooperate in the monitoring and evaluation activities to be conducted; and

Actively participate in all the activities that the project or association will require from them. The implementation of the Plan of the IWS will commence once the World Bank had issued a “No Objection Letter” (NOL) which signals that the LGU can go now with its implementation side by side with the closure of the Open Dumpsite commence. The implementation of the livelihood projects will continue and will be sustained through the regular monitoring and evaluation that will be done by the city together with the IWS Association.

39

Table No. 25 Implementation Plan for SDP

ACTIVITIES Year 1 MONTH 4

ONWARD RESPONSIBLE

PERSON/GROUP M1 M2 M3 M4

A. Pre-Implementation Phase

1. Project Orientation and Planning Workshops (2 batches - for agri. & non-agri. project)

OCENR, CAO, IWS Project

Beneficiaries

2. Organizational Development OCENR, CAO, IWS Beneficiaries

3. Preparatory activities for the implementation of the projects:

CAO

a. Preparation of area/lot for distribution to beneficiaries of Veg./Crop Production project

b. Preparation for the implementation of other projects - buy & sell of scrap & food items/etc., employment and educational support

4. Formulation of project policies and guidelines; Preparation of MOA

OCENR, CAO, IWS Association

B. Implementation Phase

1. MOA Signing; Distribution of farm lot, seed capital for buy and sell, etc.

LGU-LCE, OCENR, CAO, IWS

Beneficiaries

2. Preparation of farm lot for planting Concerned IWS Beneficiaries

3. Conduct of capability-building activities/trainings:

a. Farm Technology CAO, Concerned IWS Beneficiaries

b. Enterprise Development and Financial Management with Simplified Bookkeeping

OCENR, CAO, Concerned Assoc.

Officers/IWS Beneficiaries c. Values Formation Training

4. Procurement Process LGU

5. Actual Implementation of IWS’ various projects

OCENR, CAO, IWS Beneficiaries

c. Sustainability Phase

1. Project Monitoring and Evaluation OCENR, CAO, IWS Association

2. Report Preparation and submission OCENR, CAO

3. Linkaging and Networking OCENR, CAO, IWS Association

4. Market Development OCENR, CAO, Association

40

D. BUDGET The city earmarked a total of Php 1.4 million pesos for the SDP implementation and to ensure that funds will be available in case of unforeseen events. Presented in Table 8.1 is the estimated needed budget for all the IWS project intervention including its fund sources amounting to Php 1,061,314.

Table No. 26. BUDGETARY REQUIREMENT

PROJECT ESTIMATED

COST

FUND SOURCES

LGU IWS

DSWD 4Ps/CHED/DEP-

ED/ TESDA/OTHER INSTITUTIONS/ INDIVIDUALS

1. Vegetable/Crop Production 742,070 282,070 - 460,000

2. Buy & Sell of Scraps 245,615 40,000 12,700 192,915

3. Educational Support to IWS Youth

57,629

3,000

-

54,629

4. Buy & Sell 16,000 16,000 - -

TOTAL 1,061,314 341,070 12,700 707,544

E. MONITORING AND EVALUATION To ensure the success and sustainability of the IWS Banquerohan Livelihood projects as possible source of income in replacement to their waste picking activities, a monthly project performance monitoring report will be carried out by the project management through the Livelihood Officer of OCENR. Together with the monthly performance monitoring report, the Livelihood In-Charge will also accomplish a monthly report on income generated by the IWS on livelihood project implementation in order to determine whether the lost income in waste picking was replaced. Attached, the pro-forma monitoring report forms (Attachment D & E).

F. GRIEVANCE REDRESS MECHANISM

The implementation of the Social Development Plan (SDP) intends to be fully compliant to World Bank’s safeguards requirement on grievance redress mechanism. Through this mechanism, queries, problems and complaints about the social and environmental performance of the proposed project in its preparatory, actual and post-implementation phases are answered, resolved and addressed effectively and expeditiously. Below is the structure to illustrate the handling of grievance that might arise in project implementation:

41

GRIEVANCE REDRESS MECHANISM ORGANIZATIONAL STRUCTURE

STEPS IN HANDLING GRIEVANCE A grievance redress mechanism for the project is necessary for addressing legitimate concerns of

affected individuals and groups who may consider themselves deprived of appropriate treatment

under the project. Legaspi City LGU, through the Office of City Environment and Natural Resources

(OCENR) will address all complaints and grievances received from the project-affected-persons

and/or the public. Complaints and grievances related to any aspect of the IPOPs subproject, including

environmental and social safeguards issues, will be addressed as follows:

Step 1: As a first stage, IWS project beneficiary complainant and/or the public will present their

complaints and grievances to the Barangay officials for onward transmission of complaints to

the Legaspi City LGU specifically to the OCENR’s Grievance Redress Monitoring Officer (GRMO) .

The OCENR staff together with the LGU officials, will make every attempt to resolve the

grievances at the local level.

Contact Persons in OCENR:

Project Manager Mrs. Salve B. Corral City ENRO

Office of the City Environment & Natural Resources (OCENR), Motorpool Compound, Airport Road, Legazpi City Tel. No.-480-3349 CP No.- 09088679837

GRMO Ms. Lilian P. Calla Proj. Devt, Officer/ Livelihood Officer

Step 2: If the complaint is not addressed to the satisfaction of the IWS project beneficiary and/ or the

public, or this remains unresolved, for 15 days from the date of first submission (from Step1),

the Complainant may then submit his/her complaint directly to the Legazpi City Legal Office

DENR-EMB V

LGU-LEGAZPI/

PMO

GRIEVANCE

REDRESS FACT-

FINDING GROUP

CITY LEGAL OFFICE

OFFICE OF THE CITY

ENVIRONMENT AND NATURAL

RESOURCES

(GRMO)

42

through the PMO. A Grievance Redress Fact Finding Group (GRFFG) will undertake an

investigation of the complaint and recommend resolution of the complain/grievance.

Step 3: If the complaints/grievances are not addressed to the satisfaction of the Complainant within 15

days from the date of submission to the Legazpi City Legal Office, or remain unresolved, the

Complainant can approach the EMB-DENR Region 5 Office .

The following principles will apply to address complaints and grievances in the project:

IWS Project Beneficiary Complainant will be exempted from all administrative and legal fees incurred in pursuant to the grievance redress procedures.

All complaints would be written, if received verbally, and documented properly;

Designated staff with responsibility to address complaints would be appointed at various levels;

OCENR will maintain proper documentation of all complaints received and actions taken. The format for documentation is below.

The functioning of the grievance redress mechanism will be regularly monitored and evaluated

by the Borrower, DENR-EMB, during project implementation.

Below are the forms to be used:

COMPLAINT/GRIEVANCE INTAKE FORM

Q/C Intake Form No. _____ Date_____________________

Name of Complainant/_________________________________ Address: __________________________________________________________________ Who is complaining? IWS Project Beneficiary ______ Community Member: ______ Other Project Stakeholder ______ Others (Pls. specify) : _____________ Complaint/Grievance: ________________________________________________________ _______________________________________________________________________________ Recommended Action: ________________________________________________________ _______________________________________________________________________________ _____________________________________________________ __________________ Name & Signature of Complainant/Person with Query Date

43

GRIEVANCE REDRESS MONTHLY REPORT FORM For the Month of _______________, 20___

1. Complaints/Grievances

1.1 No. of complaints/grievances received: _______________________

1.2 Who was approached for the complaint/grievance? o Barangay Captain/Barangay Councilor_____ o Project Staff ______ o Legazpi City LGU Staff _____ o Others ____, specify______________________________________

1.3 No. of complaints/grievances resolved/addressed: ____________ 1.4 No. of complaints/grievances unresolved: ____________________ 2. Summary of Complaints and Grievances

Complaint/ Grievance

Status (Resolved/ Unresolved)

Number of Days Until Complaints was Resolved/Addressed

Step where Complaint/Grievance was resolved/ addressed

Remarks

3. Recommendation ____________________________________________________________________________________________________________________________________________________________________ __________________________________________________________________________________ Prepared By:

___________________________________ __________________________ Name & Signature of Preparer Designation

Date: __________________ Concurred By:

_______________________________________ ________________________ Name & Signature of Approving Person Designation

Date: _________________