[Type text]
POWER TRANSFORMER INDUCE TESTDOCUMENT
ISSUED DATE
APPROVED BY:
PAGE1 of 8REVISION
TABLE OF CONTENTS No.DescriptionsPage
TABLE OF CONTENS 1
1TITLE 2
2SCOPE 2
3OBJECTIVE 2
4REFERENCE 2
5RISK AND SAFETY PRECAUTION2
6TEST ITEMS3
7TEST PROCEDURE3
8TEST FORM7-8
POWER TRANSFORMER INDUCE TESTDOCUMENT
ISSUED DATE
APPROVED BY: PAGE2 of 8REVISION
1. TITLE TRANSFORMER WITHSTAND TEST
2. SCOPE
TRANSFORMER INDUCE TEST3. OBJECTIVE
This is to assure that the requirements of electrical individual test works are meets the codes requirements and contract specifications. To make sure, the works are carried out in acceptable workmanship and follow the requirements in the quality manual.
4. REFERENCE4.1 Reference Manual
4.2 Applicable Manufacturers Manuals/Standards
4.3 Contract Specifications and Construction Drawing
4.4 Standard for hand-over test of electric equipment electric equipment installation engineering ( GB Standard 50150-2006 ). 4.5 Transformer JEAC-5001-845. RISK AND SAFETY PRECAUTION
5.1 Everyone must wear safety helmet when come into construction site and tie safety belt when work at height.
5.2 High voltage testing area should be circled by rail with warning board and make special person to watch.POWER TRANSFORMER INDUCE TEST DOCUMENT
ISSUED DATE
APPROVED BY: CHIEF ENGINEERPAGE3 of 8REVISION
5.3 If happen anything abnormal, the testing must be stopped, and strengthen test warding.
5.4 Clean all tools and instruments, prevent something to leave on instrument after test; if some wires are changed, it need be restored after test.
6. TRANSFORMER TEST ITEM 6.1 Visual Inspection 6.2 Insulation resistance test6.3 Transformer Induce Test6.4 Secondary winding Withstand test6.5 Primary neutral point withstand test7. TRANSFORMER TEST PROCEDURE
7.1 Visual Inspection
7.1.1 Check the nameplate of Transformer is identical or not 7.1.2 Check oil level, has been filled to transformer and conservator of
main tank and OLTC 7.1.3 Check grounding connection good or not7.1.4Transformer must be freely from external connection, primary and secondary connection.7.2.4 Insulation resistance - Use 5000V insulation resistance tester, record the environment temperature and moisture while measuring, the value should be not less than 1M/kilo Volt in normal temperature condition. POWER TRANSFORMER INDUCE TESTDOCUMENT
ISSUED DATE
APPROVED BY: PAGE4 of 8REVISION
- PI value of the machine = 10 minute / 1 minute value.
( PI value shall not less than 1.2 and the unballance result value
of each phase must not more than twist / 2x ).
Insulation resistance must be measured before and after applied voltage test.
7.3 Power Frequency Induce Test7.3.1` Precaution Transformer oil in good condition.
Insulation resistance of the all winding must have value 1M/kiloVolt or more and have IP 1.2 or more.
During testing, excitation current must be constant.
OLTC on highest voltage tap position
7.3.2
Induce test Voltage ( Specification )
Test Voltage
0,64 x Highest Voltage Tap
Test Frequency
50 Hz
Test Duration
15 minute
7.3.3 Application / Test circuit
POWER TRANSFORMER INDUCE TESTDOCUMENT
APPROVED BY: PAGE7 of 8REVISION
8
Test Form.
TRANSFORMER AC VOLTAGE WITHSTAND TESTPower Plan/Substation: Tanjung Priok ( Pelindo )
Equipment
: Power Transformer
Number of Unit
: ....
Manufacture
: UnindoModel / Type
: Power Rating
: 60 MVA
Operating Voltage
: 150 kV / 20kV
Nominal current
: Amp
Cooling system
: ONAFSerial Number
:
Year
: 20
HV Wind Ins Level :
kV
HV neutral Ins Level :
kVInduce test Test PointTEST VOLTAGE ( kV )
Time DurantionTEST RESULT
R phase10715 minute
S phase
T phase
POWER TRANSFORMER INDUCE TESTDOCUMENT
ISSUED DATE
APPROVED BY:
PAGE8 of 8REVISION
INSULATION RESISTANCE (BEFORE APPLIED VOLTAGE TEST)
Meausere PointINSULATION RESISTANCE ( M )Absorbtion
R1/R15PI
R10/R1REMARK
15 Second60 second10 minute
HV LV
HV - TV
HV - Ground
LV - Ground
TV - Ground
LV - TV
Remark :
INSULATION RESISTANCE (AFTER APPLIED VOLTAGE TEST)Meausere PointINSULATION RESISTANCE ( M )Absorbtion
R1/R15PI
R10/R1REMARK
15 Second60 second10 minute
HV LV
HV - TV
HV - Ground
LV - Ground
TV - Ground
LV - TV
Remark :Tested byWitneesed bySupervised by
Signature
Name
Date
Time duration
15
minute
Test Voltage
kV
EMBED Visio.Drawing.11
[Type text]
_1172154935.vsdkVmeter
Trafo Regulator0 - 240 V/ 2 X 30 kVA
Power input
Trafo Step up400 V / 20 kV
Amp
Vin
Test set
LV
HV
a
b
c
A
B
C
N
TRANSFORMER UNDER TEST
V Test
V Test = 0,64 Vp-p Tap 1