INDIAN VALLEY COMMUNITY SERVICES DISTRICT

Page 2: INDIAN VALLEY COMMUNITY SERVICES DISTRICTcloud2.snappages.com/14694d9d5e0e722731c9a38ca07276495d3755a5/2007... · Leak Repair The average leak consists of a 2’x3’ excavation 3’

It is my goal to present to the Board, and Community, not only clear justification for this proposed acquisition, but to demonstrate the fact that it would be mush less cost effective to go without.

I will compare the cost of our current maintenance practices with the cost of our proposed practices.

I will identify some benefits in the way of safety, and Emergency Response for both IVCSD crew and the Community.

I have tried to identify all cons, undefined costs, and realize that there will always be unforeseen events.

Page 3: INDIAN VALLEY COMMUNITY SERVICES DISTRICTcloud2.snappages.com/14694d9d5e0e722731c9a38ca07276495d3755a5/2007... · Leak Repair The average leak consists of a 2’x3’ excavation 3’

Leak Repair The average leak consists of a 2’x3’ excavation 3’ deep

Required Materials $100.00 0.1 yards shade material, $5.00

0.3 yards base gravel, $10.00

200lbs cold patch asphalt, $10.00

Full sleeve repair clamp, $75.00

Page 4: INDIAN VALLEY COMMUNITY SERVICES DISTRICTcloud2.snappages.com/14694d9d5e0e722731c9a38ca07276495d3755a5/2007... · Leak Repair The average leak consists of a 2’x3’ excavation 3’

LABOR, 16 man-hours ($22/hr loaded rate) $352.00 Cut Asphalt Excavate by hand Pump water from excavation Clean/Inspect area Install repair clamp Load shade/gravel/asphalt by hand Unload shade/gravel/asphalt by hand Compact to 95% by hand Re-Pave Load spoils by hand Unload spoils by hand Clean up Flagging considerations if required

Page 5: INDIAN VALLEY COMMUNITY SERVICES DISTRICTcloud2.snappages.com/14694d9d5e0e722731c9a38ca07276495d3755a5/2007... · Leak Repair The average leak consists of a 2’x3’ excavation 3’

Frequency of Repairs Average two repairs a week

Number will continue to rise as existing infrastructure continues to deteriorate

Currently spending $904.00/week

Excavations usually expose multiple repair clamps from previous leaks

Page 6: INDIAN VALLEY COMMUNITY SERVICES DISTRICTcloud2.snappages.com/14694d9d5e0e722731c9a38ca07276495d3755a5/2007... · Leak Repair The average leak consists of a 2’x3’ excavation 3’

Spoils/Shade/Backfill/Asphalt Material is loaded/unloaded and placed by hand

creating significant costs with multiple trips and labor intensive shoveling.

Loads are limited by light duty pick-up volume capacities and weight limits.

Page 7: INDIAN VALLEY COMMUNITY SERVICES DISTRICTcloud2.snappages.com/14694d9d5e0e722731c9a38ca07276495d3755a5/2007... · Leak Repair The average leak consists of a 2’x3’ excavation 3’

Snow removal is currently contracted out @95.00/hr

Approximately 6 hours are needed to clear the Civic Center parking lot, Greenville and Crescent Mills water treatment plant access roads, and Greenville waste water ponds access road.

Clearing of fire hydrants, Taylorsville lift station, and Taylorsville leach field access road is also required.

Page 8: INDIAN VALLEY COMMUNITY SERVICES DISTRICTcloud2.snappages.com/14694d9d5e0e722731c9a38ca07276495d3755a5/2007... · Leak Repair The average leak consists of a 2’x3’ excavation 3’

Man handling heavy storage vessels creates a safety hazard for employees and a potential hazard to the community in the event of a ruptured Chorine Gas Cylinder or Polymer Drum

Maintenance crew is currently unable to handle large castings, lengths of pipe, and heavy valves safely.

ANY INJURY TO A IVCSD CREWMEMBER, OR ESPECIALLY A COMMUNITY MEMBER, IS BEYOND MEASURING IN DOLLARS. CHLORINE GAS CAN BE EXTREMLY HAZARDOUS.

Page 9: INDIAN VALLEY COMMUNITY SERVICES DISTRICTcloud2.snappages.com/14694d9d5e0e722731c9a38ca07276495d3755a5/2007... · Leak Repair The average leak consists of a 2’x3’ excavation 3’

15 Emergency call outs in the past three years have totaled nearly $10,000.00 in contracted backhoe service charges.

Page 10: INDIAN VALLEY COMMUNITY SERVICES DISTRICTcloud2.snappages.com/14694d9d5e0e722731c9a38ca07276495d3755a5/2007... · Leak Repair The average leak consists of a 2’x3’ excavation 3’

Estimates Are Based On 24,000 Linear Feet Of Water Main And 600 Service Connections

(1 Service Every 40 Feet Of Main)

Page 11: INDIAN VALLEY COMMUNITY SERVICES DISTRICTcloud2.snappages.com/14694d9d5e0e722731c9a38ca07276495d3755a5/2007... · Leak Repair The average leak consists of a 2’x3’ excavation 3’

Materials $824.00 2 yards shade $40.00

5 yards gravel $100.00

2000lbs hot patch asphalt delivered $400.00

20 feet 4” C-900 PVC water main $50.00

4” Romac coupling (2ea) $160.00

1” saddle $25.00

1” corporation stop $25.00

¾” curb stop (meter valve) $20.00

10’ SDR-9 .125 wall polyethylene 1” CTS tubing $4.00

Page 12: INDIAN VALLEY COMMUNITY SERVICES DISTRICTcloud2.snappages.com/14694d9d5e0e722731c9a38ca07276495d3755a5/2007... · Leak Repair The average leak consists of a 2’x3’ excavation 3’

Labor, 24 man-hours, $528.00 Cut asphalt Excavate main Excavate service laterals Isolate zone (close valves) Remove existing installation Clean and inspect area Install new main Install new service laterals Test/Inspect/Flush/Return to Service Shade main/lateral Backfill, base/slurry Compact to 95% Re-Pave Remove spoils Clean-up Flagging considerations if required

Page 13: INDIAN VALLEY COMMUNITY SERVICES DISTRICTcloud2.snappages.com/14694d9d5e0e722731c9a38ca07276495d3755a5/2007... · Leak Repair The average leak consists of a 2’x3’ excavation 3’

Other Considerations Notifying affected consumers, temporary outages.

Transporting large amounts of spoils

If job cannot be completed in work day, costs of trench plate, backfilling/re-excavating, and overtime must be compared

Replacing 20 feet of water main at a time will quickly reduce the number of failures per week.

Page 14: INDIAN VALLEY COMMUNITY SERVICES DISTRICTcloud2.snappages.com/14694d9d5e0e722731c9a38ca07276495d3755a5/2007... · Leak Repair The average leak consists of a 2’x3’ excavation 3’

Material will be handled entirely by the loader, significantly reducing the number of times the same material is handled and reducing wear on pick-up fleet

Page 15: INDIAN VALLEY COMMUNITY SERVICES DISTRICTcloud2.snappages.com/14694d9d5e0e722731c9a38ca07276495d3755a5/2007... · Leak Repair The average leak consists of a 2’x3’ excavation 3’

Snow removal will be accomplished by in house labor

Fork equipped loader will enable safe loading and unloading of heavy or awkward items.

Page 16: INDIAN VALLEY COMMUNITY SERVICES DISTRICTcloud2.snappages.com/14694d9d5e0e722731c9a38ca07276495d3755a5/2007... · Leak Repair The average leak consists of a 2’x3’ excavation 3’

Much improved response time to line breaks, such as the raw water line failure last winter and any future sewer problems.

In house labor will be used much more effectively

Emergency contractor rates will be avoided

Page 17: INDIAN VALLEY COMMUNITY SERVICES DISTRICTcloud2.snappages.com/14694d9d5e0e722731c9a38ca07276495d3755a5/2007... · Leak Repair The average leak consists of a 2’x3’ excavation 3’

Currently we have a cost of $452.00/leak

$904.00/week based on 2 repairs a week

About $45,000/year to maintain. Will continue to rise with time.

$3,000+/year in subcontracted backhoe services

Heavy wear on light duty vehicles

Questionable practices in regard to safety

Page 18: INDIAN VALLEY COMMUNITY SERVICES DISTRICTcloud2.snappages.com/14694d9d5e0e722731c9a38ca07276495d3755a5/2007... · Leak Repair The average leak consists of a 2’x3’ excavation 3’

$1352.00/leak, while making positive gains on the distribution system

The number of leaks will decline quickly as problem area are replaced

Emergencies will be handled in a timelier, more cost effective manner

Possible reduction in vehicle fleet

Possible reduction in workforce

For the same $48,000/year spent on treading water with the old system we could maintain the system, purchase the backhoe, AND replace 500+ feet of water main in the process.

Page 19: INDIAN VALLEY COMMUNITY SERVICES DISTRICTcloud2.snappages.com/14694d9d5e0e722731c9a38ca07276495d3755a5/2007... · Leak Repair The average leak consists of a 2’x3’ excavation 3’

Operator training costs, changes in insurance and fuel costs, equipment maintenance costs are undefined at this time.

There will be unforeseen problems on this antiquated system, existing plans are unreliable .

Page 20: INDIAN VALLEY COMMUNITY SERVICES DISTRICTcloud2.snappages.com/14694d9d5e0e722731c9a38ca07276495d3755a5/2007... · Leak Repair The average leak consists of a 2’x3’ excavation 3’

COMPLETE DISTRIBUTION SYSTEM REPLACEMENT

Page 21: INDIAN VALLEY COMMUNITY SERVICES DISTRICTcloud2.snappages.com/14694d9d5e0e722731c9a38ca07276495d3755a5/2007... · Leak Repair The average leak consists of a 2’x3’ excavation 3’
Page 22: INDIAN VALLEY COMMUNITY SERVICES DISTRICTcloud2.snappages.com/14694d9d5e0e722731c9a38ca07276495d3755a5/2007... · Leak Repair The average leak consists of a 2’x3’ excavation 3’

Previous main replacement by Hat Creek Construction totaled 1.1 million dollars to replace 16,000 feet. Walters Engineering estimated 1.5 million dollars to replace the remaining 8000 feet.

It is our goal that the distribution system could be replaced in under 10 years using the same dollars we are currently using to continually patch our existing system.

After the first year larger gains on the remaining 7500 feet of remaining main replacement could be made per year because of the decline in the number of system failures (leaks).

Page 23: INDIAN VALLEY COMMUNITY SERVICES DISTRICTcloud2.snappages.com/14694d9d5e0e722731c9a38ca07276495d3755a5/2007... · Leak Repair The average leak consists of a 2’x3’ excavation 3’

It is in the districts best interest to be proactive in the maintenance and repair of the community’s degrading utility systems.

Possession of the proper tools and equipment will provide for the most efficient, safe, and cost effective maintenance practices.

Use of mechanized equipment will minimize damages from catastrophic failures by reducing the repair time.

Repair of distribution system will minimize water usage allowing for increased water reserves.

As repairs are completed less man power will be required to operate and maintain systems.

A properly operated and maintained tractor will serve the community for decades to come.