W-MIS-CV-0418
GENERAL
2
L FETTKETHER
M RARDIN
INDEX TO DRAWINGS
G THOMPSON
DATE1 ADDENDUM 1 MR LF
1
1
208.345.5310
BOISE, IDAHO 83702-7359
SUITE 200
322 EAST FRONT STREET
8
C
7
6
5
4
3
2
1
A B C
DESIGNED
LINE IS 2-INCHES AT FULL SIZE
(IF NOT 2"-SCALE ACCORDINGLY)
D
CHECKED
PCP FILE
DRAWN
E
VERIFY SCALES
F G
ZONE
H
REV.
REVISIONS
DESCRIPTION
I
DATE
J
BY APP.
K
CAD FILE NO.
NL M O P
DATE
SCALE
8
6
5
D E F G H I J K
4
3
2
NL M O P
1
SHEET.
OF
FILENAME: PLOT DATE: PLOT TIME:W-MIS-CV-0418.DGN 2016\06\13 4:15:33 PM
BOISECITY OF TREES
150 N. CAPITOL BLVD.
BOISE, IDAHO 83702
(208) 384-3900
PUBLIC WORKS DEPARTMENTPROJECT NO.
7
477914
WBP-002
PROJECT
IMPROVEMENTS
FERMENTER
TREATMENT FACILITY
WASTEWATER
WEST BOISE
CITY OF BOISE, IDAHO
PROJECT NO.
45
MAY 2016
CH2MHILL, BOISE ID
ORIGINAL DOCUMENT STORED AT
REGISTRANT, MAY 2016.
ORIGINAL DOCUMENT SIGNED BY
3755
OH
A
DI FO E
TA
TS
DERETSIGER R
EE
NIGNE LANOISSE
F
OR
P
RE
HT
EKTTEF .M
ECN
E
RW
AL
INDEX TO DRAWINGS
DRAWING NO.
GENERAL
CIVIL/SITE ELECTRICAL
DESCRIPTION
GENERAL
CIVIL
ELECTRICAL
DRAWING NO. DESCRIPTION
W-YRD-EL-0435
INSTRUMENTATION AND CONTROL
INSTRUMENTATION AND CONTROL
THICKENING BUILDING
PROCESS MECHANICAL
W-AER-EL-0363 AERATION BASINS 1 AND 2 DIVISION STRUCTURE LOWER LEVEL PLAN
SITE LOCATION PLAN
YARD PIPING DETAILS
YARD PIPING PLAN AREA 13
CIVIL SITE DETAILS
LOCATION AND GRADING PLAN AREA 13
SITE LOCATION PLAN
W-YRD-ME-0448
W-YRD-ME-0447
W-YRD-GR-0451
W-YRD-GR-0450
W-YRD-GR-0449
W-MIS-LG-0444
W-MIS-LG-0443
W-MIS-LG-0442
W-MIS-LG-0441
W-MIS-LG-0440
W-MIS-LG-0439
W-MIS-CV-0418
W-MIS-CV-0417
DESIGN DETAILS
MISCELLANEOUS
ELECTRICAL
W-AER-ME-0346
W-AER-ME-0345
AERATION BASINS 5 AND 6 DIVISION STRUCTURE PARTIAL TOP LEVEL PLAN
AERATION BASINS 1 AND 2 DIVISION STRUCTURE LOWER LEVEL PLAN
PROCESS MECHANICAL
ABBREVIATIONS AND GENERAL LEGEND
ELECTRICAL LEGEND 2
ELECTRICAL LEGEND 1
I&C LEGEND 2
I&C LEGEND 1
CIVIL/MECHANICAL LEGEND
INDEX TO DRAWINGS
COVER SHEET, LOCATION AND VICINITY MAPS W-MIS-SD-0227
W-MIS-SD-0226
DESIGN DETAILS
DESIGN DETAILS
W-PID-PI-0483
W-PID-PI-0482
W-PID-PI-0481
W-PID-PI-0480
W-PID-PI-0479
W-PID-PI-0478
W-PID-PI-0477
W-PID-PI-0476
W-PID-PI-0475
P&ID - TEMPORARY CARBON STOCK CHEMICAL FEED
P&ID - PFLT PUMPING
P&ID - VFLT PUMPING
P&ID - DIGESTER FEED
P&ID - ROTARY SCREEN THICKENING
P&ID - FERMENTATION TRANSFER PUMPING AND SCUM CONTROL
P&ID - FERMENTED PRIMARY SLUDGE PUMPING
P&ID - FERMENTED PRIMARY SLUDGE TRANSFER IMPROVEMENTS
P&ID - AERATION BASINS 1 AND 2 DIVISION STRUCTURE
W-THK-ME-0077
W-THK-ME-0076
W-THK-ME-0075
W-THK-ME-0074
W-THK-ME-0073
W-THK-ME-0072
W-THK-ME-0071
W-THK-ME-0070
DETAILS
DETAILS
SECTIONS
SECTIONS
FERMENTER MECHANICAL SECTIONS
ABOVE DECK PLAN
THICKENING BUILDING FIRST FLOOR PLAN
BELOW DECK PLAN
W-THK-EL-0171
W-THK-EL-0170
W-THK-EL-0169
W-THK-EL-0168
W-THK-EL-0167
W-THK-EL-0166
W-THK-EL-0165
W-THK-EL-0164
W-THK-EL-0163
W-THK-EL-0162
W-THK-EL-0161
W-THK-EL-0160
W-THK-EL-0159
W-THK-EL-0158
W-THK-EL-0157
VFLT AER BASINS 5 AND 6 FLOW CONTROL - LOOP 63042
RECUPERATIVE TS FERM TANK 2 - LOOP 71192
RECUPERATIVE TS FERM TANK 1 - LOOP 71191
RECUPERATIVE TS 2 FLOW VALVE - LOOP 63372
RECUPERATIVE TS 1 FLOW VALVE - LOOP 63371
FERMENTATION TRANSFER PUMP - LOOP 71181
FERMENTATION TANK 2 MIXING PUMP - LOOP 71172
FERMENTATION TANK 1 MIXING PUMP - LOOP 71171
PFLT SPRAY PUMP - LOOP 63331
VFLT SPRAY PUMP - LOOP 63321
WIRING DIAGRAM GENERAL NOTES
SECOND FLOOR PROCESS PLAN NORTHWEST
FIRST FLOOR PROCESS PLAN SOUTHEAST
FIRST FLOOR PROCESS PLAN NORTHEAST
THK-MCC-001 AND THK-PNL-002 ONE-LINE DIAGRAMS
PK IN PAVE.
EL. 2,578.65'
N 17,215.911'
E 14,235.357'
C.P. #122
BUIL
DIN
G
CO
NT
RO
L
DIG
ES
TE
R
BUILDING
HEADWORKS
NO. 1
DIGESTER
ANAEROBIC
NO. 2
DIGESTER
ANAEROBIC
TANK
BLEND
NO. 3
CLARIFIER
SECONDARY
NO. 1
CLARIFIER
SECONDARY
NO. 2
CLARIFIER
SECONDARY
NO. 4
CLARIFIER
SECONDARY
NO. 3
DIGESTER
ANAEROBIC
NO. 1
CLARIFIER
PRIMARY
NO. 2
CLARIFIER
PRIMARY
NO. 3
CLARIFIER
PRIMARY
AERATION BASIN NO. 5
FILTRATE STORAGE
BUILDING
PUMPING
SLUDGE
BUILDING
DEWATERING
FLARE
GAS
WASTE
STATION
PUMP
WATER
W2 WELL
NO. 5
CLARIFIER
SECONDARY
NO. 6
CLARIFIER
SECONDARY
STRUCTURE
DIVISION
CLARIFIER
SECONDARY
BIOFILTERS
STRUCTURE
EFFLUENT
CLARIFIER
SECONDARY
CONTROL BUILDING
SOUTH PLANT
NO. 2
BASIN
AERATION
NO. 1
BASIN
AERATION
STRUCTURE
DIVISION
CLARIFIER
PRIMARY
STATION
PUMP
DRAIN
PLANT
BUILDING
ADMINISTRATION
NO. 1
THICKENER
GRAVITY
NO. 2
THICKENER
GRAVITY
LABORATORY
TO J
OP
LIN R
OA
D
STATION
PUMP
WATER
W2 WELL
TRAILER
CITY
STATION
LOADING
FUEL
BUIL
DIN
G
MAIN
TE
NA
NC
E
BUILDING
OPERATIONS
BLOWER GALLERY
EA
ST G
ALLE
RY
WE
ST G
ALLE
RY
AERATION BASIN NO. 6
STATION
PUMP
THICKENER
GRAVITY
SPHERE
STORAGE
GAS
BUILDING
MAINTENANCE
GROUNDS
BUILDING
T-CHLORINE
UNLOADING
BUILDING
TECH
INSTRUMENT
BUILDING
DAFT
S/E WALL
TOS 2568.9'
MH-21
WELL
H20 V
DRAIN
DRAIN
SECONDARY CLARIFIER #4
SECONDARY CLARIFIER #2
SECONDARY CLARIFIER #1
SECONDARY CLARIFIER #3
SECONDARY CLARIFIER #5
GROUNDS MAINTENANCE BUILDING
17
T-CHLORINE BUILDING
15
OPERATIONS BUILDING
16
SECONDARY CLARIFIER #6
AERATION BASIN #6
AERATION BASIN #5
HEADWORKS BUILDING
20
PRIMARY CLARIFIER #3
AERATION BASIN #2
PRIMARY CLARIFIER #2
PRETREATMENT BUILDING
04
AERATION BASIN #1
PRIMARY CLARIFIER #1
PLANT DRAIN PUMP STATION
03
INSTRUMENT TECH. BLDG.
21
MAINTENANCE BUILDING
22
09 SLUDGE PUMPING STATION
BUILDING
DEWATERING
&
DAFT
08
DIGESTER CONTROL BUILDING
11
DWN
DWN
TOP 2578.4'MH D-4
654
657
MH-D2
TOP 2582.5'
MH-D14
950
TOP 2579.2'
MH D-15
951
TOP 2580.7'
MH-D13
927
657
MH-D2
TOP 2578.1'
MH-D3TOP 2578.3'656
T.O. PIPE 2570.95
MH-7
RIM 2578.39
124
MH D-1
2585.3'
MH-14
1270
T.O. PIPE 2569.36
RIM 2576.63MH
T.O. PIPE 2570.21
RIM 2578.45MH
TOP 2581.29'
125
3922
40
BIOFILTERS
MH
MH-1
07
DIGESTER CONTROL BUILDING
12
18 W
EST
GALL
ERY
19 W
EST
GALL
ERY
WATERSHED COMPLEX
FUTURE
FILTRATE
FUTURE
DIGESTER
2588.16
FF=2588.67
FF=2583.16
2587.71
FUTURE
DIGESTER
FUTURE
DIGESTER
BIOFILTERS
FUTURE STRUVITE PRODUCTION CACILITY
GB
RELEASE FACILITY
WAS PHOSPHATE
CLARIFIER NO. 2
PRIMARY
CLARIFIER NO. 1
PRIMARY STATION
RAS PUMP
UTILIDOR D
UTILIDOR A
UTILIDOR B
UTILIDOR C
FLT UTILIDOR
UTILIDOR
NORTH PLANT
UTILIDOR
NORTH PLANT
UTILIDOR A
PK IN CURB
EL. 2,578.90'
N 17,609.916'
E 14,564.521'
C.P. #120
STATION (NIC)
TRANSFER PUMP
MIXED LIQUOR
SOUTH PLANT
BLOWER GALLERY
NO. 5 AND NO. 6
AERATION BASINS
FILTRATE STORAGE
FILTRATE STORAGE
208.345.5310
BOISE, IDAHO 83702-7359
SUITE 200
322 EAST FRONT STREET
8
C
7
6
5
4
3
2
1
A B C
DESIGNED
LINE IS 2-INCHES AT FULL SIZE
(IF NOT 2"-SCALE ACCORDINGLY)
D
CHECKED
PCP FILE
DRAWN
E
VERIFY SCALES
F G
ZONE
H
REV.
REVISIONS
DESCRIPTION
I
DATE
J
BY APP.
K
CAD FILE NO.
NL M O P
DATE
SCALE
8
6
5
D E F G H I J K
4
3
2
NL M O P
1
SHEET.
OF
FILENAME: PLOT DATE: PLOT TIME:W-YRD-GR-0449.DGN 2016\06\14 12:24:18 PM
BOISECITY OF TREES
150 N. CAPITOL BLVD.
BOISE, IDAHO 83702
(208) 384-3900
PUBLIC WORKS DEPARTMENTPROJECT NO.
7
477914
WBP-002
PROJECT
IMPROVEMENTS
FERMENTER
TREATMENT FACILITY
WASTEWATER
WEST BOISE
CITY OF BOISE, IDAHO
PROJECT NO.
45
MAY 2016
CH2MHILL, BOISE ID
ORIGINAL DOCUMENT STORED AT
REGISTRANT, MAY 2016.
ORIGINAL DOCUMENT SIGNED BY
3755
OH
A
DI FO E
TA
TS
DERETSIGER R
EE
NIGNE LANOISSE
F
OR
P
RE
HT
EKTTEF .M
ECN
E
RW
AL
7 8 9
121110
13 14 15
JOPLIN ROAD
ENTRANCE FROM
CONSTRUCTION
STAGING AREA
CONTRACTOR'S
BUILDING
THICKENING
KEY PLAN
321
4 5 6
987
10 11 12
151413
AS NOTED
W-YRD-GR-0449
CIVIL
A TOLMAN
SITE LOCATION PLAN
N
SCALE IN FEET
500 100 150
6
THK-ME-0076
9
A THOMPSON
A TOLMAN
BASIN 2
AERATION
BASIN 1
AERATION
BUILDING
THICKENING
DWG W-THK-ME-0076
AND THICKENING FACILITIES SEE
MODIFICATIONS TO FERMENTATION
INSIDE PFLT HOLDING TANK SEE DETAIL
MODIFICATIONS TO STANDPIPE
STRUVITE PRODUCTION FACILITY.
PFLT HOLDING TANK AT
AND PIPING, SEE DWG W-AER-ME-0346
CSC METERING SYSTEM
AND PIPING, SEE DWG W-AER-ME-0345
CSC METERING SYSTEM
BASIN 6
AERATION
BASIN 5
AERATION
1
1
1
1
1 ADDENDUM 1 JP LF6/2016
1
1
TO CONSTRUCTION.
AND STAGING AREA WITH OWNER PRIOR
LOCATION OF CONSTRUCTION ENTRANCE
JOPLIN ROAD. COORDINATE EXACT
CONSTRUCTION ENTRANCE TO BE OFF
CONSTRUCTION IS COMPLETE.
BETTER CONDITION AFTER
STAGING AREA BACK TO ORIGINAL OR
CONTRACTOR IS REQUIRED TO RETURN
STAGING AREAS ARE APPROXIMATE.
CONTRACTOR MATERIALS DISPOSAL AND 4.
CONSTRUCTION.
LOCATION WITH OWNER PRIOR TO
JOPLIN ROAD. COORDINATE EXACT
CONSTRUCTION ENTRANCE TO BE OFF
STAGING AREAS ARE APPROXIMATE.
CONTRACTOR MATERIALS DISPOSAL AND 3.
ORIGINAL CONDITION.
AND SURFACE RESTORATION TO MATCH
REROUTING EXISTING PIPES, BACKFILL,
LIMITED TO, EXCAVATION, PLACING PIPES,
INSTALLATION INCLUDING BUT NOT
COMPONENTS OF BURIED PIPE
CONTRACTOR IS RESPONSIBLE FOR ALL
TRENCH PIPELINE LOCATIONS.
DASHED LINES REPRESENT BURIED 2.
AERATION BASINS.
CARBON STOCK CHEMICALS (CSC) TO
METERING SYSTEM AND PIPING TO METER
PROVIDE SKID MOUNTED CHEMICAL 1.
GENERAL NOTES:
THK-LCP-001
PRIMARY SLUDGE FERMENTATION LOCAL CONTROL PANEL
04 PI-0477
SLUDGE PUMPING
FPS
F
YL
ON
HS
SS
FIT
.
FE
.
71021
PV
(TYP OF 3)
F
FE
71031 7103171021
71021
71022
WATER
PLANT
FIT
71121
.
PV
71121
OP
71121
FE
71121
.
.
(SIMILAR TO ABOVE)
(SIMILAR TO ABOVE)
TPS
ZS
71111
OC
HS
OP CL
71111 71111
71111
OSC
(TYP OF 2)
RC RO OP CL RE
71031 71031 71031 71031 71031
ZS
71031
OC
HS
OC
HS
LSR71031
71031
71022
PV
TO FOUL AIR SYSTEM
FAFA
THK-PLC-001
WET WELL 2
WET WELL 1
FPS
W3
W3
FPS
FPS FPS
FPS
FPS
FPS
FPS
FV
71121
.
W3 W3
W3
FIT
71162
.
FIT
71161
.
71161
PV
71162
PV MO
71162
FV
71031
.
FV
71032
.
FV
71033
.
FCV
71161
.
FCV
71162
.
W3
W3 W3
W3
PCV
71121
.
PCV
71122
.
OC
TO FOUL AIR SYSTEM
FA
FE
71162
.
120V
120V
FE
71161
.
VENT
2
2
LSH
71061
.
LSH
71062
.
TO ABOVE)
(SIMILAR
HI
71061
LIT
71011
.
F
13
6
LIT
71012
.
F
7
71011
PV
6
71012
PV
7
FPS
PUMP 2
FERMENTATION MIXING
PUMP 1
FERMENTATION MIXING
PUMP 3
FERMENTATION MIXING
LE
71012
.
LE
71011
.
FLP
FLP
FLP
FLP
VENT
TANK 1
FERMENTATION
TANK 2
FERMENTATION
W3
FPS
HS
LR
71031
HIM
HS
71081
ZS
71081
THK-GTE-P-71081
OP CL
71071 71071
OP CL
5
71161
YA
4
71161
PV
HS
71162
ZS
71162
.
RST
4 3 5
AE
71071
AIT
71071
71071
PV
120V
HS
71161
ZS
71161
.
RST
71161
AV
71161
PV
71161
MO
TPS
TPS
LSR
FPS
06 PI-0477
SLUDGE PUMPING
03PI-0477
TPS
TSS
TSS
05PI-0479
TO PLANT DRAIN
TPS
TO FERMENTED PRIMARY
TO FERMENTED PRIMARY
FPS
71011
PV
8
71012
PV
9
8
LSL
71011
.
LSL
.
9
71012
THK-MCC-002VFD
1
FIT
71022
.
M
M
M
M
M
M
M
S
M
M
M M
M
M
M
M
120V
SLUDGE PUMPING
TO FERMENTED PRIMARY
480V
THK-GTE-P-71111
THK-GTE-P-71111
480V
(2) (2)
480V
480V
480V480V
480V
480V 480V
THK-PMP-P-71033
THK-PMP-P-71032
THK-PMP-P-71031
120V
(2)
(2)
120V
480V
M
120V
120V
SLUDGE PUMPING
THICKENED PRRIMARY
M RARDIN
T PALIN
W-PID-PI-0476
P&ID
INSTRUMENTATION AND CONTROL AS NOTED
FERMENTED PRIMARY
16
TO RUN HOSE TO TRENCH DRAIN.
PROVIDE CAM-LOCK CONNECTION1.
NOTES:
SLUDGE TRANSFER IMPROVEMENTS 1 ADDENDUM 1 MR TP6/2016
1
1
208.345.5310
BOISE, IDAHO 83702-7359
SUITE 200
322 EAST FRONT STREET
8
C
7
6
5
4
3
2
1
A B C
DESIGNED
LINE IS 2-INCHES AT FULL SIZE
(IF NOT 2"-SCALE ACCORDINGLY)
D
CHECKED
PCP FILE
DRAWN
E
VERIFY SCALES
F G
ZONE
H
REV.
REVISIONS
DESCRIPTION
I
DATE
J
BY APP.
K
CAD FILE NO.
NL M O P
DATE
SCALE
8
6
5
D E F G H I J K
4
3
2
NL M O P
1
SHEET.
OF
FILENAME: PLOT DATE: PLOT TIME:W-PID-PI-0476.dgn 2016\06\13 4:27:55 PM
BOISECITY OF TREES
150 N. CAPITOL BLVD.
BOISE, IDAHO 83702
(208) 384-3900
PUBLIC WORKS DEPARTMENTPROJECT NO.
7
477914
WBP-002
PROJECT
IMPROVEMENTS
FERMENTER
TREATMENT FACILITY
WASTEWATER
WEST BOISE
CITY OF BOISE, IDAHO
PROJECT NO.
45
MAY 2016
CH2MHILL, BOISE ID
ORIGINAL DOCUMENT STORED AT
REGISTRANT, MAY 2016.
ORIGINAL DOCUMENT SIGNED BY
11623
OH
A
DI FO E
TA
TS
DERETSIGER R
EE
NIGNE LANOISSE
F
OR
P
NILAP YBO
T INSTRUMENTATION AND CONTROL AS NOTED
TO RUN HOSE TO TRENCH DRAIN.
PROVIDE CAM-LOCK CONNECTION1.
NOTES:
.
FLP
.
K
K
K
KINLET
HIGHER
INLET
LOWER
INLET
LOWER
INLET
HIGHER
AS
AS
F
AS
F
FLP
FLP
FLP
FLP
01PI-0480TS
FEED PUMPING
FROM THICKENED SLUDGE
02PI-0480TS
FEED PUMPING
FROM THICKENED SLUDGE
WET WELL
SLUDGE
THICKENED
THK-LCP-001
DIGESTERS
ANAEROBIC
TS
PV PV
70100
PV63111
POWER
HS
63111
SS
THK-MCC-002 VFD
YL
63111
ON
M
FIT
120V
T
PI PSH
PE
FE
63111 63111
63111THK-PMP-P-63111
(TYPICAL OF 4)
63151
63151
63161
(SIMILAR TO ABOVE)
THK-PMP-P-63112
(SIMILAR TO ABOVE)
THK-PMP-P-63113
480V
120V
63091
63091
TSS
AE
TS
TS
TS
AIT
CONTROLNET
HS
63111
LR
HIM
09
THICKENING
PI-0479
ROTARY SCREEN
10
THICKENING
PI-0479
ROTARY SCREEN
V
63111
LO
PE
63113
PI PSH
63113 63113
PE
63112
PI PSH
63112 63112
F F
FEED PUMP 1THICKENED SLUDGE
FEED PUMP 2THICKENED SLUDGE
FEED PUMP 3THICKENED SLUDGE
TS
(SIMILAR TO ABOVE)
THK-PMP-P-63114
PE
63114
PI PSH
63114 63114
FEED PUMP 4THICKENED SLUDGE
63112 63112 63112
LSL LIT LE
THK-HPR-P-63114
THK-HPR-P-63113
THK-HPR-P-63112
63111
63111
63111a
LSL
LIT
LE
W3
63113 63113 63113
LSL LIT LE
63114 63114 63114
LSL LIT LE
TS
TS
TS
05
THICKENING
PI-0479
ROTARY SCREEN
TS
11
THICKENING
PI-0479
TS
ROTARY SCREEN
TS
TS
OF
OF
OF
OF
OF
THK-HPR-P-63111
HOPPER 1THICKENED SLUDGE
HOPPER 2THICKENED SLUDGE
HOPPER 3THICKENED SLUDGE
HOPPER 4THICKENED SLUDGE
THICKENING BUILDING CONTROL PANEL
THK-PLC-001
TS
63111
OP
SV
63111
.
63112a
LE
63113a
LE
63114a
LE
63111
LE
63112
SV
63113
SV
63114
SV
W3
THK-PCV-P-63061
W3
W3
W3
PI
63110
.
M
S
S
M RARDIN
T PALIN
P&ID
INSTRUMENTATION AND CONTROL AS NOTED
W-PID-PI-0480
DIGESTER FEED
M
480V
HS
63372
LSR
HS
63372
OC
ZS
63372
OC
FV
63372
.
FV
63371
. M
480V
HS
63371
LSR
HS
63371
OC
ZS
63371
OC
RE
63371
RO
63371
RC
63371
OP
63371
CL
63371
23
RE
63372
RO
63372
RC
63372
OP
63372
CL
63372
123
PI-047601
M
RE
71192
RO
71192
RC
71192
OP
71192
CL
71192
HS
71192
LSR
HS
71192
OC
ZS
71192
OC
TANK 1
TO FERMENTATION
TS
480V
PI-047601
TANK 2
TO FERMENTATION
TS
M480V
HS
71191
LSR
HS
71191
OC
ZS
71191
OC
4
56
FV
71192
.
FV
71191
.
RE
71191
RO
71191
RC
71191
OP
71191
CL
71191
456
1
J O'CONNOR1 ADDENDUM 1 MR 6/2016 TP
F
1
208.345.5310
BOISE, IDAHO 83702-7359
SUITE 200
322 EAST FRONT STREET
8
C
7
6
5
4
3
2
1
A B C
DESIGNED
LINE IS 2-INCHES AT FULL SIZE
(IF NOT 2"-SCALE ACCORDINGLY)
D
CHECKED
PCP FILE
DRAWN
E
VERIFY SCALES
F G
ZONE
H
REV.
REVISIONS
DESCRIPTION
I
DATE
J
BY APP.
K
CAD FILE NO.
NL M O P
DATE
SCALE
8
6
5
D E F G H I J K
4
3
2
NL M O P
1
SHEET.
OF
BOISECITY OF TREES
150 N. CAPITOL BLVD.
BOISE, IDAHO 83702
(208) 384-3900
PUBLIC WORKS DEPARTMENTPROJECT NO.
7
477914
WBP-002
PROJECT
IMPROVEMENTS
FERMENTER
TREATMENT FACILITY
WASTEWATER
WEST BOISE
CITY OF BOISE, IDAHO
PROJECT NO.
45
MAY 2016
CH2MHILL, BOISE ID
ORIGINAL DOCUMENT STORED AT
REGISTRANT, MAY 2016.
ORIGINAL DOCUMENT SIGNED BY
11623
OH
A
DI FO E
TA
TS
DERETSIGER R
EE
NIGNE LANOISSE
F
OR
P
NILAP YBO
T
M M
M M
M M
M M
M RARDIN
T PALIN
W-PID-PI-0483
P&ID
INSTRUMENTATION AND CONTROL AS NOTED
23
TEMPORARY CARBON STOCK
CHEMICAL FEED
1 ADDENDUM 1 MR 6/2016 TP
1
208.345.5310
BOISE, IDAHO 83702-7359
SUITE 200
322 EAST FRONT STREET
8
C
7
6
5
4
3
2
1
A B C
DESIGNED
LINE IS 2-INCHES AT FULL SIZE
(IF NOT 2"-SCALE ACCORDINGLY)
D
CHECKED
PCP FILE
DRAWN
E
VERIFY SCALES
F G
ZONE
H
REV.
REVISIONS
DESCRIPTION
I
DATE
J
BY APP.
K
CAD FILE NO.
NL M O P
DATE
SCALE
8
6
5
D E F G H I J K
4
3
2
NL M O P
1
SHEET.
OF
FILENAME: PLOT DATE: PLOT TIME:W-PID-PI-0483.dgn 2016\06\13 4:34:41 PM
BOISECITY OF TREES
150 N. CAPITOL BLVD.
BOISE, IDAHO 83702
(208) 384-3900
PUBLIC WORKS DEPARTMENTPROJECT NO.
7
477914
WBP-002
PROJECT
IMPROVEMENTS
FERMENTER
TREATMENT FACILITY
WASTEWATER
WEST BOISE
CITY OF BOISE, IDAHO
PROJECT NO.
45
MAY 2016
CH2MHILL, BOISE ID
ORIGINAL DOCUMENT STORED AT
REGISTRANT, MAY 2016.
ORIGINAL DOCUMENT SIGNED BY
11623
OH
A
DI FO E
TA
TS
DERETSIGER R
EE
NIGNE LANOISSE
F
OR
P
NILAP YBO
T
AER-LCP-004
VALVE
ISOLATION
COLUMN WITH
CALIBRATION
PUMP
METERING
M
120V
VALVE
RELIEF
PG
.
.
GAUGE
PRESSURE
VALVE
PRESSURE
BACK
VALVE
ISOLATION
D
FOR CSC
TUBING
SUPPLY
CSC TOTE
AERATION BASIN 1
AERATION BASIN 2
AERATION BASIN 5
AERATION BASIN 6
STOCK SYSTEM
TEMPORARY CARBON FEED
AERATION BASIN 2
STOCK SYSTEM
TEMPORARY CARBON FEED
AERATION BASIN 5
STOCK SYSTEM
TEMPORARY CARBON FEED
AERATION BASIN 6
FLOW
BASIN 1
AERATION
FLOW
BASIN 2
AERATION
FLOW
BASIN 5
AERATION
FLOW
BASIN 6
AERATION
AERATION BASIN DIVISION STRUCTURE LOCAL CONTROL PANEL
HDW-LCP-001
HEADWORKS BUILDING LOCAL CONTROL PANEL
CSC
CSC
PIPES
OUTER
CSC
PIPE
OUTER
CSC
MIXER
EXISTING
MIXER
EXISTING
MIXER
EXISTING
MIXER
EXISTING
MIXER
EXISTING
MIXER
EXISTING
MIXER
EXISTING
MIXER
EXISTING
(TYPICAL OF 4)
(SIMILAR TO ABOVE)
(SIMILAR TO ABOVE)
(SIMILAR TO ABOVE)
TUBING
CSC PIPE
OUTER
CSC
PIPE
OUTER
CSC
PIPE
OUTER
CSC
PLC-10 PLC-01
AEROBIC ZONE 5
ANOXIC
ZONE 2ANAEROBIC
ZONE 3
ANAEROBIC
ZONE 2ANAEROBIC
ZONE 1ANOXIC ZONE 1
AEROBIC
ZONE 5
ANOXIC
ZONE 1ANAEROBIC
ZONE 1
ANAEROBIC
ZONE 2
ANOXIC
ZONE 2ANAEROBIC
ZONE 3
AS NOTED
J PIGMAN
W-AER-ME-034524
MECHANICAL
DIVISION STRUCTURE
LOWER LEVEL PLAN
AERATION BASINS 1 AND 2
1/8"=1'-0"
N
PLAN
4 4
33
3
2
5
1
1
2
3
5
44
3
3
MIXER, TYP
L FETTKETHER
L LEI
THE ENGINEER.
COORDINATE OUTER PIPE AND TUBING ROUTING WITH
WITH ZIP TIES AND TO AERATION WALL AS NOTED.
ATTACH CSC OUTER PIPES PER SPECS TO HANDRAIL
INSTALL CSC PIPING AND TUBING AS SHOWN AND PER SPECS.2.
APPROVAL.
SYSTEMS AT AERATION BASINS 1 AND 2. SUBMIT FOR
CHEMICAL (CSC). FURNISH A TOTAL OF TWO (2) SKID
AT EACH LOCATION SHOWN TO METER CARBON STOCK
INSTALL A SKID MOUNTED CHEMICAL METERING SYSTEM1.
GENERAL NOTES:1
1 ADDENDUM 1 JP LF6/2016
OF THE ACTIVE TOTE AND STORED TOTES WITH THE ENGINEER.
TO THIS AREA, AT THE QUANTITY AS SPECIFIED. COORDINATE LOCATION
FURNISH TOTES THAT CONTAIN AT MINIMUM 265 GALLON CSC AND DELIVER6.
SUPPORT PIPE PER DETAIL 4005-507.
ROUTE CSC OUTER PIPE ALONG AERATION BASIN WALL.5.
END PIPE AT APPROX EL 2595.5.
ROUTE CSC OUTER PIPE DOWN NEAR THE CENTER OF MIXERS.4.
ATTACH CSC OUTER PIPE ALONG LOWER RAIL OF HANDRAIL.3.
INSTALL CSC OUTER PIPE UNDER WALKWAY.2.
INSTRUMENTATION DIAGRAM.
MFR. SEE W-PID-PI-0482 FOR CSC METERING SYSTEM PROCESS
EQUAL, WHICH SHALL BE SET AT 5 PSI OR AS RECOMMENDED BY PUMP
AND A ½” SERIES RVDT BACK PRESSURE VALVE BY PLAST-O-MATIC ORA PRESSURE GAUGE CAPABLE OF MONITORING 0 TO 60 PSIG PRESSURE,
WHICH SHALL BE SET AT 29 PSIG OR AS RECOMMENDED BY PUMP MFR,
SERIES RVDT PRESSURE RELIEF VALVE BY PLAST-O-MATIC OR EQUAL,
5-ML INCREMENTS MAX. ON PUMP DISCHARGE SIDE, FURNISH A ½”30-SECOND DRAW DOWN FOR THE PUMP AND BE GRADUATED IN
SUCTION SIDE, FURNISH A CALIBRATION COLUMN THAT SHALL PROVIDE MIN
THE PUMP SHALL BE SUITABLE TO METER CSC AS SPECIFIED. ON PUMP
IN TERMS OF THE FLOW SET POINT THROUGH ENTIRE FLOW RANGE.
BY VARYING PUMP SPEED ONLY, AND WITH AT LEAST A 2% ACCURACY
METERING 0.5 TO 10.5 GPH CARBON STOCK CHEMICAL AT 29 PSIG MAX,
FROM SCADA TO SET SPEED OF PUMP. PUMP SHALL BE CAPABLE OF
A NEMA 4X ENCLOSURE AND BE ABLE TO ACCEPT A 4-20MA SIGNAL
INTERNATIONAL, INC. IN JACKSONVILLE, FL. THE PUMP SHALL HAVE
SIMILAR TO ULTRA-HARD TOP P2 PLUS SPILL PALLET BY ULTRATECH
PROVIDED INTEGRAL TO THE SKID SYSTEM, OR BY ENCLOSURE
MARLOW OR EQUAL. SUN AND WEATHER PROTECTION SHALL BE
BY PROMINENT OR EQUAL, OR A PERISTALTIC PUMP BY WATSON
PIPED, FULLY FUNCTIONAL, AND COMPRISED OF A DIAPHRAGM PUMP
SKID MOUNTED CHEMICAL METERING SYSTEM. EACH SKID SHALL BE1.
KEY NOTES:
6
6
208.345.5310
BOISE, IDAHO 83702-7359
SUITE 200
322 EAST FRONT STREET
8
C
7
6
5
4
3
2
1
A B C
DESIGNED
LINE IS 2-INCHES AT FULL SIZE
(IF NOT 2"-SCALE ACCORDINGLY)
D
CHECKED
PCP FILE
DRAWN
E
VERIFY SCALES
F G
ZONE
H
REV.
REVISIONS
DESCRIPTION
I
DATE
J
BY APP.
K
CAD FILE NO.
NL M O P
DATE
SCALE
8
6
5
D E F G H I J K
4
3
2
NL M O P
1
SHEET.
OF
FILENAME: PLOT DATE: PLOT TIME:W-AER-ME-0345.DGN 2016\06\14 12:34:38 PM
BOISECITY OF TREES
150 N. CAPITOL BLVD.
BOISE, IDAHO 83702
(208) 384-3900
PUBLIC WORKS DEPARTMENTPROJECT NO.
7
477914
WBP-002
PROJECT
IMPROVEMENTS
FERMENTER
TREATMENT FACILITY
WASTEWATER
WEST BOISE
CITY OF BOISE, IDAHO
PROJECT NO.
45
MAY 2016
CH2MHILL, BOISE ID
ORIGINAL DOCUMENT STORED AT
REGISTRANT, MAY 2016.
ORIGINAL DOCUMENT SIGNED BY
3755
OH
A
DI FO E
TA
TS
DERETSIGER R
EE
NIGNE LANOISSE
F
OR
P
RE
HT
EKTTEF .M
ECN
E
RW
AL
KEY PLAN
N
AEROBIC ZONE 2
AEROBIC ZONE 3AEROBIC ZONE 4
AEROBIC ZONE 2
AEROBIC ZONE 1
AEROBIC ZONE 1
ANOXIC ZONE 2 ANOXIC ZONE 1
ANOXIC ZONE 1ANOXIC ZONE 2
ANAEROBIC ZONE 2
ANAEROBIC ZONE 2 ANAEROBIC ZONE 1
ANAEROBIC ZONE 1
ANAEROBIC ZONE 3
ANAEROBIC ZONE 3
AS NOTED
J PIGMAN
W-AER-ME-034625
MECHANICAL
DIVISION STRUCTURE
AERATION BASINS 5 AND 6
1/8"=1'-0"
N
PLAN
L FETTKETHER
L LEI
4
4 4
4
3
3
3
3
3
3
3
1
1
PARTIAL TOP LEVEL PLAN
2
2
MIXER, TYP
THE ENGINEER.
COORDINATE OUTER PIPE AND TUBING ROUTING WITH
WITH ZIP TIES AND TO AERATION WALL AS NOTED.
ATTACH CSC OUTER PIPES PER SPECS TO HANDRAIL
INSTALL CSC PIPING AND TUBING AS SHOWN AND PER SPECS.2.
APPROVAL.
SYSTEMS AT AERATION BASINS 5 AND 6. SUBMIT FOR
CHEMICAL (CSC). FURNISH A TOTAL OF TWO (2) SKID
AT EACH LOCATION SHOWN TO METER CARBON STOCK
INSTALL A SKID MOUNTED CHEMICAL METERING SYSTEM1.
GENERAL NOTES:
1 ADDENDUM 1 JP LF6/2016
1
OF THE ACTIVE TOTE AND STORED TOTES WITH THE ENGINEER.
TO THIS AREA, AT THE QUANTITY AS SPECIFIED. COORDINATE LOCATION
FURNISH TOTES THAT CONTAIN AT MINIMUM 265 GALLON CSC AND DELIVER6.
SUPPORT PIPE PER DETAIL 4005-507.
ROUTE CSC OUTER PIPE ALONG AERATION BASIN WALL.5.
END PIPE AT APPROX EL 2595.5.
ROUTE CSC OUTER PIPE DOWN NEAR THE CENTER OF MIXERS.4.
ATTACH CSC OUTER PIPE ALONG LOWER RAIL OF HANDRAIL.3.
INSTALL CSC OUTER PIPE UNDER WALKWAY.2.
INSTRUMENTATION DIAGRAM.
MFR. SEE W-PID-PI-0482 FOR CSC METERING SYSTEM PROCESS
EQUAL, WHICH SHALL BE SET AT 5 PSI OR AS RECOMMENDED BY PUMP
AND A ½” SERIES RVDT BACK PRESSURE VALVE BY PLAST-O-MATIC ORA PRESSURE GAUGE CAPABLE OF MONITORING 0 TO 60 PSIG PRESSURE,
WHICH SHALL BE SET AT 29 PSIG OR AS RECOMMENDED BY PUMP MFR,
SERIES RVDT PRESSURE RELIEF VALVE BY PLAST-O-MATIC OR EQUAL,
5-ML INCREMENTS MAX. ON PUMP DISCHARGE SIDE, FURNISH A ½”MIN 30-SECOND DRAW DOWN FOR THE PUMP AND BE GRADUATED IN
SUCTION SIDE, FURNISH A CALIBRATION COLUMN THAT SHALL PROVIDE
THE PUMP SHALL BE SUITABLE TO METER CSC AS SPECIFIED. ON PUMP
IN TERMS OF THE FLOW SET POINT THROUGH ENTIRE FLOW RANGE.
BY VARYING PUMP SPEED ONLY, AND WITH AT LEAST A 2% ACCURACY
METERING 0.5 TO 10.5 GPH CARBON STOCK CHEMICAL AT 29 PSIG MAX,
FROM SCADA TO SET SPEED OF PUMP. PUMP SHALL BE CAPABLE OF
A NEMA 4X ENCLOSURE AND BE ABLE TO ACCEPT A 4-20MA SIGNAL
INTERNATIONAL, INC. IN JACKSONVILLE, FL. THE PUMP SHALL HAVE
SIMILAR TO ULTRA-HARD TOP P2 PLUS SPILL PALLET BY ULTRATECH
PROVIDED INTEGRAL TO THE SKID SYSTEM, OR BY ENCLOSURE
MARLOW OR EQUAL. SUN AND WEATHER PROTECTION SHALL BE
BY PROMINENT OR EQUAL, OR A PERISTALTIC PUMP BY WATSON
PIPED, FULLY FUNCTIONAL, AND COMPRISED OF A DIAPHRAGM PUMP
SKID MOUNTED CHEMICAL METERING SYSTEM. EACH SKID SHALL BE1.
KEY NOTES:
6
6
208.345.5310
BOISE, IDAHO 83702-7359
SUITE 200
322 EAST FRONT STREET
8
C
7
6
5
4
3
2
1
A B C
DESIGNED
LINE IS 2-INCHES AT FULL SIZE
(IF NOT 2"-SCALE ACCORDINGLY)
D
CHECKED
PCP FILE
DRAWN
E
VERIFY SCALES
F G
ZONE
H
REV.
REVISIONS
DESCRIPTION
I
DATE
J
BY APP.
K
CAD FILE NO.
NL M O P
DATE
SCALE
8
6
5
D E F G H I J K
4
3
2
NL M O P
1
SHEET.
OF
FILENAME: PLOT DATE: PLOT TIME:W-AER-ME-0346.DGN 2016\06\14 12:31:52 PM
BOISECITY OF TREES
150 N. CAPITOL BLVD.
BOISE, IDAHO 83702
(208) 384-3900
PUBLIC WORKS DEPARTMENTPROJECT NO.
7
477914
WBP-002
PROJECT
IMPROVEMENTS
FERMENTER
TREATMENT FACILITY
WASTEWATER
WEST BOISE
CITY OF BOISE, IDAHO
PROJECT NO.
45
MAY 2016
CH2MHILL, BOISE ID
ORIGINAL DOCUMENT STORED AT
REGISTRANT, MAY 2016.
ORIGINAL DOCUMENT SIGNED BY
3755
OH
A
DI FO E
TA
TS
DERETSIGER R
EE
NIGNE LANOISSE
F
OR
P
RE
HT
EKTTEF .M
ECN
E
RW
AL
KEY PLAN
N
208.345.5310
BOISE, IDAHO 83702-7359
SUITE 200
322 EAST FRONT STREET
8
C
7
6
5
4
3
2
1
A B C
DESIGNED
LINE IS 2-INCHES AT FULL SIZE
(IF NOT 2"-SCALE ACCORDINGLY)
D
CHECKED
PCP FILE
DRAWN
E
VERIFY SCALES
F G
ZONE
H
REV.
REVISIONS
DESCRIPTION
I
DATE
J
BY APP.
K
CAD FILE NO.
NL M O P
DATE
SCALE
8
6
5
D E F G H I J K
4
3
2
NL M O P
1
SHEET.
OF
FILENAME: PLOT DATE: PLOT TIME:W-THK-ME-0071.DGN 2016\06\13 3:18:09 PM
BOISECITY OF TREES
150 N. CAPITOL BLVD.
BOISE, IDAHO 83702
(208) 384-3900
PUBLIC WORKS DEPARTMENTPROJECT NO.
7
477914
WBP-002
PROJECT
IMPROVEMENTS
FERMENTER
TREATMENT FACILITY
WASTEWATER
WEST BOISE
CITY OF BOISE, IDAHO
PROJECT NO.
45
MAY 2016
CH2MHILL, BOISE ID
ORIGINAL DOCUMENT STORED AT
REGISTRANT, MAY 2016.
ORIGINAL DOCUMENT SIGNED BY
3755
OH
A
DI FO E
TA
TS
DERETSIGER R
EE
NIGNE LANOISSE
F
OR
P
RE
HT
EKTTEF .M
ECN
E
RW
AL
w-mis-cv-0408
AS SHOWN
W-THK-ME-0071 L FETTKETHER
G THOMPSON
J PIGMAN
MECHANICAL
1/4"=1'-0"
N
THICKENING BUILDING
FIRST FLOOR PLAN
4027-183
6" V405
12"x12"x6" TEE
H
THK-ME-0075
J
THK-ME-0075
L
THK-ME-0075
8" V405
K
THK-ME-0075
4" OF
THK-TNK-P-632911
FLUSHING CONNECTION
4027-182 ,TYP
GENERAL NOTES:
KEY NOTES:
LT
63301EXIST FLUSHING CONNECTION
12"x8" ECC RDCR, TIE INTO EXIST 12" TEE AFTER REMOVING
12" PFLT
OR NEW, TYP
USE EXIST PIPE SUPPORT
4005-555
12" FPS
4
ME-0076
TYP 4 PLCS
12" FPS TO MIXING PUMPS
VALVE INSTALLATION, SEE5
ME-0076
FIRST FLOOR PLAN
1/2" AHP
1/2" AHP
8" FPS
1/2" AHP
1/2" AHP
12" FPS TO MIXING PUMPS
12" FPS
12" VFLT
PIPE
EXISTING
MATCH
CLDI TO
12" VFLT
6" VFLT
4027-607 , TYP 2
8" PFLT
8" V405, USE GROOVED END-FLANGE ADAPTER AS NECESSARY
6" V405
INSTALL THROUGH A 2" HOLE
TANK COVER WITH 17" MIN DIA
PVC
PIPE
EXISTING
MATCH
CLDI TO
TEE CONNECTING TO PUMP
SAMPLE VALVE AND SPOOL PIPE TO THE EAST OF 6"
6" V405, TIE INTO EXST 6" VFLT AFTER REMOVING THE
6" VFLT
FLUSHING CONNECTION
5
ME-0076
N
THK-ME-0075
2
3"x3"x1" PFLT TEE
THROUGH HOSE, AND A 6"x6"x4" TEE
4" PVC VENT, FIELD CONNECT TO EXST 6" V AT 2ND FLOOR
4027-610
26
4" W3
FOR CONTINUATION.
AND
WALL. SEE YRD-ME-0437
4" W3 OUT THROUGH
EXST 8" W3
4" V500
8" 45° ELB
8" 90° ELB ROLLED DOWN 45°
PFLT WET WELLVFLT WET WELLWELL
WET
FPS
WELL
WET
FPS
5
ME-0076
5
ME-0076
DETAIL
PHOTO
1" AHP
1" AHP
8" PFLT
TYP 2
A CHAIN. COORDINATE TYPE WITH OWNER,
COUPLING WITH A CAP ATTACHED WITH
4" 316 SST MALE QUICK CONNECT HOSE
4" V405 (NORMALLY CLOSED), TYP 2
6"x4" ECC RDCR, TYP 2
BYPASS TANK PROVISIONS
LIMITS OF TEMPORARY VFLT
RELOCATED FLUSHING CONNECTION
REMOVING THE SAMPLE VALVE
PUMP SUCTION, AFTER
CONNECT TO EXISTING 6" VFLT
LOCATION FOR TIE-IN OF 4" VENT HOSE FROM TANK
6" V UP TO 2ND FLOOR. ADD A 6"x6"x4" TEE AT A CONVENIENT
THK-TNK-P-63291
OTHERWISE NOTED ON DRAWINGS.
3. ALL PROCESS PIPING SHALL BE ACCORDING TO SPECS, UNLESS
NEW PIPE ROUTING TO AVOID EXISTING OBJECTS AS NECESSARY.
FITTINGS, AND VALVES. MAKE NECESSARY MODIFICATIONS TO
FIELD LOCATE EXISTING PIPING FOR THE TIE-IN OF NEW PIPING,
EXISTING PIPING SHOWN ARE AT APPROXIMATE LOCATIONS.
2. FOR CLARITY, NOT ALL EXISTING PIPING SHOWN.
1. CONNECT PVC AND DI PIPES WITH PVC/CLDI FLANGE ADAPTERS.
RELOCATED SAMPLING CONNECTION
JUST ABOVE 8" VALVE
4" OUTLET TAPPING SADDLE
MATCHLINE, SEE ME-0070
DETAIL, SIM
PHOTO
6" VFLT
3" TEFLON BELLOWS CONNECTOR
PVC
DETAIL
MANUAL AIR VALVE PER SPECS, SEE
GAUGE, AND A 5 PORT, 2 POSITION,
BALL VALVE, AIR REGULATOR, PRESSURE
TO VALVE CYLINDER THROUGH A V303
OTHER OBJECTS. FIELD ROUTE 1/2" AHP
ROTATE AS NEEDED TO AVOID
12" V150 WITH 3" LAYING LENGTH,
4
ME-0076 ME-0076
DETAIL
MANUAL AIR VALVE PER SPECS, SEE
GAUGE, AND A 5 PORT, 2 POSITION,
BALL VALVE, AIR REGULATOR, PRESSURE
TO VALVE CYLINDER THROUGH A V303
OTHER OBJECTS. FIELD ROUTE 1/2" AHP
ROTATE AS NEEDED TO AVOID
12" V150 WITH 3" LAYING LENGTH,
5
PIPE SUPPORT3
1" FPS VENT PIPE 3
3
1
2
3
5
4
4
5
8" V4058" V608
M M
4" TS
8"x4" TEE
1 JP LF
1
1
FV
63372FV
63371
ADDENDUM 1 6/2016
FV
711914" V405
FV
711924" V405
1
1
WITH ENGINEER ABOUT THE NEW LOCATION.
NEW 12" FPS PENETRATION PER DWG W-THK-EL-0158. COORDINATE
RELOCATE HOTSY CONTROL STATION OUT OF THE WAY FROM THE
RETAIN AND PROTECT JUNCTION BOX THK-LJB-71031.
WAY FROM THE NEW 12" FPS PIPE PENETRATION.
RELOCATE VENT PIPES AND PIPE SUPPORTS AS SHOWN OUT OF THE
TEE ON 6" V AT 2ND FLOOR.
BLIND FLANGES AT THE NEW 6" V405 ON 6" VFLT (2 PLCS) AND AT 6"
TANK PROVISIONS WITHIN THE LIMITS AS SHOWN. CAP OR INSTALL
CONSTRUCTION, DISASSEMBLE AND SALVAGE TO OWNER TEMPORARY
MAINTAIN VFLT PUMPING DURING CONSTRUCTION. AT THE END OF
INSTALL TEMPORARY VFLT BYPASS TANK, PIPING AND VALVES TO
AND SUBMITTED FOR APPROVAL.
PROFESSIONAL ENGINEER REGISTERED WITH STATE OF IDAHO,
TO THE EXIST SLAB SHALL BE SIGNED AND STAMPED BY A
ON A POLYETHYLENE TANK PAD. SEISMIC ANCHORAGE OF THE PAD
DISCHARGE AND TANK COVER AS SHOWN. TANK SHALL BE MOUNTED
STRAIGHT SHELL LENGTH, WITH NOZZLES FOR FILL, OVERFLOW,
FRP OR PE TANK OF MIN 545 GALLONS AND 4'-0" OD MAX AND MIN 5'-11"
8" TS
4027-205
4" TSPIPE VENT 4027-205
PIPE VENT
4027-205
4027-205
CLEAR CABLE TRAY
DROP 4" TS TO
4005-550
PIPE SUPPORT
TYP
SAMPLING CONNECTION
REROUTE EXISTING
SUPPORT FROM FLOOR
3/4" V300 VENT VALVE
SADDLE TRAP WITH
M
ME-0071
8" V405
3" VFLT
1/2" W3 VENT PIPE
8" V405
8" TS
3'-0"3'-0"
PIPE VENT
PIPE VENT
208.345.5310
BOISE, IDAHO 83702-7359
SUITE 200
322 EAST FRONT STREET
8
C
7
6
5
4
3
2
1
A B C
DESIGNED
LINE IS 2-INCHES AT FULL SIZE
(IF NOT 2"-SCALE ACCORDINGLY)
D
CHECKED
PCP FILE
DRAWN
E
VERIFY SCALES
F G
ZONE
H
REV.
REVISIONS
DESCRIPTION
I
DATE
J
BY APP.
K
CAD FILE NO.
NL M O P
DATE
SCALE
8
6
5
D E F G H I J K
4
3
2
NL M O P
1
SHEET.
OF
FILENAME: PLOT DATE: PLOT TIME:W-THK-ME-0075.DGN 2016\06\13 3:19:30 PM
BOISECITY OF TREES
150 N. CAPITOL BLVD.
BOISE, IDAHO 83702
(208) 384-3900
PUBLIC WORKS DEPARTMENTPROJECT NO.
7
477914
WBP-002
PROJECT
IMPROVEMENTS
FERMENTER
TREATMENT FACILITY
WASTEWATER
WEST BOISE
CITY OF BOISE, IDAHO
PROJECT NO.
45
MAY 2016
CH2MHILL, BOISE ID
ORIGINAL DOCUMENT STORED AT
REGISTRANT, MAY 2016.
ORIGINAL DOCUMENT SIGNED BY
3755
OH
A
DI FO E
TA
TS
DERETSIGER R
EE
NIGNE LANOISSE
F
OR
P
RE
HT
EKTTEF .M
ECN
E
RW
AL
w-mis-cv-0408
AS SHOWN
W-THK-ME-0075 L FETTKETHER
G THOMPSON
J PIGMAN
MECHANICAL
SECTIONS
HSECTION3/8"=1'-0"
THK-ME-0071J
SECTION3/8"=1'-0"
THK-ME-0071
KSECTION3/8"=1'-0"
THK-ME-0071
LSECTION3/8"=1'-0"
THK-ME-0071
THK-TNK-P-63291
12" PFLT
6" VFLT
CONNECT TO EXISTING 6" VFLT
CONNECTION
1" FLUSHING
4027-182
MSECTION3/8"=1'-0"
THK-ME-0071
4" OF
LT
63301
8" PFLT8" V405
CONNECTION
1" FLUSHING
4027-182
8" TEE
8" 90° ELB
8" TEE
8" V405
8" PFLT
6" 90° ELB
SENSOR INSTALLATION
PROVIDE 2" HOLE FOR LEVEL
PLASTIC OR EQUAL
COUPLER END BY RYAN HERCO INDUSTRIAL
DISCONNECT COUPLING WITH A MALE
4" OF WITH A 4" POLYPROPYLENE QUICK
THROUGH A 8" TEE
TIE INTO EXST 8" PFLT THROUGH A 8" TEE
TIE INTO EXST 8" PFLT
12" VFLT
12" x12"x6" TEE
6" VFLT
6" VFLT
6" FPS6" FPS
6" FPS 6" FPS
KEY NOTES:
1
2 1/2" VFLT TO NORTH PLANT
PHOSPHATE TANKS
1 1/2" VFLT TO WAS
3" VFLT TO SOUTH PLANT
PVCxCLDI ADAPTER FLANGE
2
4" VFLT
PIPE VENT
4027-205 1
NSECTION3/8"=1'-0"
THK-ME-0071
FCV
63042
MIN
VENT PIPES, SEE
CONNECTION
1" FLUSHING
4027-183
30
12"x12"x8" TEE
12"x12"x8" TEE
CONNECTION
FLUSHING
RELOCATED
4027-205
PIPE VENT
4027-205
2
6" VENT
1 1/2" VFLT
1 1/2" VFLT
1" VFLT
4027-205 1
2ND FLOOR
6" VENT UP TO
SINK
PORT RE-ROUTE TO
RELOCATED SAMPLE
CONNECTOR
BELLOWS
3" TEFLON
TO VERTICAL 6" FPS AS SHOWN
6" V405, RELOCATE 6" V405
6" PIPE SPOOL TO REPLACE
RELOCATED 6" V405, TYP 2
6" VFLT
HOSE ADAPTER.
6"x4" TEE AND A 4" FEMALE NPT BY MALE QUICK CONNECT
FIELD CONNECT 4" V TO EXIST 6" V USING HOSE THROUGH A3
ADAPTER.
CONNECT TANK DISCHARGE TO 6" V405 THROUGH A HOSE
TO THE EXISTING 6" VFLT, AS SHOWN OR USE 6" HOSE TO
TANK DISCHARGE 3" MIN, INCREASE TO 6" BEFORE TIE-IN2
ALONG THE WEST PUMP ROOM WALL.
ROUTE DOWN TO TRENCH DRAIN
TWO 1 1/2" VFLT PIPES AS SHOWN IN
INSTALL PIPE VENT AT HIGH POINTS OF 3", 2 1/2", 4" AND1
1 1/2" V400
EL 2586.44
1 ADDENDUM 1 JP LF6/2016
14" TS
VENT PIPE
4027-205
4" 45° ELB
PIPE SUPPORT
4005-550
WITH 6" FPS VERTICAL PIPE
NECCESSARY TO ALIGN 6" TEE
SPOOL OR FILLER FLANGE AS
REPLACE 6" ELB WITH 6" TEE, ADD
COORDINATE TYPE WITH OWNER, TYP
THE COUPLING WITH A CHAIN.
WITH 316 SST CAP ATTACHED TO
QUICK CONNECT HOSE ADAPTER,
4" 316 SST FEMALE NPT BY MALE
6" V405
3OR EQUAL
BY RYAN HERCO INDUSTRIAL PLASTIC
COUPLING WITH A MALE COUPLER END
POLYPROPYLENE QUICK DISCONNECT
(BEYOND) 4" PVC VENT WITH A 4"
4005-555
7'-4"
MIN S
HE
LL L
EN
GT
H
9"
OR EQUAL
BY RYAN HERCO INDUSTRIAL PLASTIC
COUPLING WITH A MALE COUPLER END
POLYPROPYLENE QUICK DISCONNECT
(BEYOND) 4" PVC VENT WITH A 4"
6"x4" ECC RDCR, TYP 2
4" V405, TYP 2
4" GROOVED FLANGE, TYP 2
PER
PIPE SUPPORT AS NECESSARY
8'-6"
MA
X O
VE
RA
LL H
EIG
HT
6" V405
12" VFLT
8" TS
8"
EL 2587.66
w-mis-cv-0408
AS SHOWN
W-THK-ME-0076 L FETTKETHER
G THOMPSON
J PIGMAN
MECHANICAL
HDPE LINER
THICKNESS ~ 0.1"
EPDM WASHER, OD ~ 2xID,
SUPPORT BASEPLATE
PIPE OR EQUIPMENT
MATCH BASEPLATE HOLES
EPOXY ANCHOR SIZE TO
1DETAIL6"=1'-0"
PIPE IN WALL OR DECK
COREDRILL HOLE FOR
2DETAIL
LINER PENETRATION
1'-8"
DETAILS
1 1/2"=1'-0"
PENETRATION PIPE
HDPE FLANGE
UNDRILLED 3/4"
OR WET WELL LINER
EXST HDPE FERMENTER
2"
TYP OF 4
2 1/2" EMBEDMENT
EPOXY ANCHOR
5/8" 316 SST
316L SSTx3'4"L
8" SCH 10
ELBOW
LR 316L SST
8" SCH 10
1/8" EPDM GASKET
EL 2578.0
EL 2575.0
CL EL 2579.84
EL 2575.5
A
3DETAIL
ASECTION
1/2"=1'-0"
1/2"=1'-0"CIRCLE
ON 11 5/8" BOLT
4 EA 3/4" HOLES
FLANGE W/
316L SST PL
1/2"x14"OD
ELBOW
8" SCH 10 LR 316L SST
4DETAIL3"=1'-0"
1/2" AHP
3'-0"
AFF
VALVE SPEED CONTROL AND SILENCER
EXHAUST PORT WITH PNUEMATIC
VALVE CYLINDER
1/2" AHP TO PNEUMATIC
1/2" V303
5DETAIL3"=1'-0"
5
4
3
2
1
PENETRATION OF HDPE LINER
AROUND EPOXY ANCHOR AT
APPLY CAULK (SIKAFLEX 1A)
OF HDPE LINER
ANCHOR BOLT PENETRATION
ME-0072
ME-0070
ME-0071
ME-0071
ME-0074
ME-0072
INSTALL INSIDE HDPE LINER
LINK SEAL WITH 316 SST HARDWARE.
AND WELD TO EXST LINER.
3/16" HDPE LINER MATERIAL
LINE NEW PENETRATION WITH
31
(WALL OR ROOF)
CONCRETE
8" FPS
12" FPS FROM FERMENTATION TANK 1. USE ADDITIONAL GASKETS AS NECESSARY.
THICKNESS SHALL BE APPROX 1 1/2" FOR 12" FPS FROM FERMENTATION TANK 2 AND 1/2" FOR
GASKETS PER SPECIFICATIONS TO REPLACE EXISTING VICTAULIC COUPLING. FILLER FLANGE
AWWA C115/A21.15 FILLER FLANGE BY STAR PIPE PRODUCTS OR EQUAL, WITH 1/8" THICK
REMOVE PIPE SPOOL AND INSTALL WAFER TYPE 12" V150.
PNEUMATIC CYLINDER ROTATED TO AVOID OBJECTS.
LOCATION. SALVAGE VICTAULIC COUPLING TO OWNER.
RELOCATE VICTAULIC FLANGE TO REPLACE THE VICTAULIC COUPLING AT THIS
REMOVE MATING VICTAULIC FLANGE AND RELOCATE PER NOTE 2.
INTO 1" AHP
TEE TIE
1" x 1"x1/2"
PARKER, OR EQUAL
MODEL 7649AN2NN00 BY
SPECS WITHOUT SPRING RETURN.
OPERATED SOLENOID VALVE PER
5-WAY, 2 POSITION HAND LEVER
0-160 PSIG PRESSURE
WITH A PRESSURE GAUGE THAT MEASURES
AIR REGULATOR SHALL BE PRE-ASSEMBLED
THE PNEUMATIC VALVE CYLINDER MFR.
PRESSURE TO 80 PSI OR AS REQUIRED BY
TO REGULATE 90PSI TO 115 PSI SUPPLY AIR
AIR REGULATOR BY WILKENSON OR EQUAL,
1
2
3
4
5
12" FPS
12" TEE
12" FPS
12" VICTAULIC FLANGES
12" PIPE SPOOL
12" TEE
COUPLING
12" VICTAULIC
3 7/8" ± FOR 12" FPS FROM FERMENTATION TANK 1
4 5/8" ± FOR 12" FPS FROM FERMENTATION TANK 2
CURRENT CONDITION AFTER GATE VALVE INSTALLATION
1
1 ADDENDUM 1 JP LF6/2016
208.345.5310
BOISE, IDAHO 83702-7359
SUITE 200
322 EAST FRONT STREET
8
C
7
6
5
4
3
2
1
A B C
DESIGNED
LINE IS 2-INCHES AT FULL SIZE
(IF NOT 2"-SCALE ACCORDINGLY)
D
CHECKED
PCP FILE
DRAWN
E
VERIFY SCALES
F G
ZONE
H
REV.
REVISIONS
DESCRIPTION
I
DATE
J
BY APP.
K
CAD FILE NO.
NL M O P
DATE
SCALE
8
6
5
D E F G H I J K
4
3
2
NL M O P
1
SHEET.
OF
FILENAME: PLOT DATE: PLOT TIME:W-THK-ME-0076.DGN 2016\06\13 3:21:40 PM
BOISECITY OF TREES
150 N. CAPITOL BLVD.
BOISE, IDAHO 83702
(208) 384-3900
PUBLIC WORKS DEPARTMENTPROJECT NO.
7
477914
WBP-002
PROJECT
IMPROVEMENTS
FERMENTER
TREATMENT FACILITY
WASTEWATER
WEST BOISE
CITY OF BOISE, IDAHO
PROJECT NO.
45
MAY 2016
CH2MHILL, BOISE ID
ORIGINAL DOCUMENT STORED AT
REGISTRANT, MAY 2016.
ORIGINAL DOCUMENT SIGNED BY
3755
OH
A
DI FO E
TA
TS
DERETSIGER R
EE
NIGNE LANOISSE
F
OR
P
RE
HT
EKTTEF .M
ECN
E
RW
AL
13 June, 2016
#4/0 BARE
800 AF
800 AS
#4/0 BARE
#4/0 BARE
NTS
THICKENING BUILDING ONE-LINE DIAGRAM
AS NOTED
M RARDIN
T PALIN
W-THK-EL-015734
ELECTRICAL
ONE-LINE DIAGRAMS
THK-MCC-001 AND THK-PNL-002
1 ADDENDUM 1 MR TP6/2016
208.345.5310
BOISE, IDAHO 83702-7359
SUITE 200
322 EAST FRONT STREET
8
C
7
6
5
4
3
2
1
A B C
DESIGNED
LINE IS 2-INCHES AT FULL SIZE
(IF NOT 2"-SCALE ACCORDINGLY)
D
CHECKED
PCP FILE
DRAWN
E
VERIFY SCALES
F G
ZONE
H
REV.
REVISIONS
DESCRIPTION
I
DATE
J
BY APP.
K
CAD FILE NO.
NL M O P
DATE
SCALE
8
6
5
D E F G H I J K
4
3
2
NL M O P
1
SHEET.
OF
FILENAME: PLOT DATE: PLOT TIME:W-THK-EL-0157.DGN 2016\06\13 3:49:38 PM
BOISECITY OF TREES
150 N. CAPITOL BLVD.
BOISE, IDAHO 83702
(208) 384-3900
PUBLIC WORKS DEPARTMENTPROJECT NO.
7
477914
WBP-002
PROJECT
IMPROVEMENTS
FERMENTER
TREATMENT FACILITY
WASTEWATER
WEST BOISE
CITY OF BOISE, IDAHO
PROJECT NO.
45
MAY 2016
CH2MHILL, BOISE ID
ORIGINAL DOCUMENT STORED AT
REGISTRANT, MAY 2016.
ORIGINAL DOCUMENT SIGNED BY
11623
OH
A
DI FO E
TA
TS
DERETSIGER R
EE
NIGNE LANOISSE
F
OR
P
NILAP YBO
T
PNL
THK-MCC-001
DPM
TS-C
TS-P
TH
K-P
NL-0
02
PA
NE
LB
OA
RD 2
VFD
5
THK-MCC-003
PNL
TH
K-P
NL-0
01
AHC
TH
K-E
XF-P-6
3101
BL
OW
ER 1
FO
UL AIR
15
VFD
15
VFD
15
VFD
BIO-B
LW-P-8
4011
BL
OW
ER 1
BIO
FIL
TE
R
BIO-B
LW-P-8
4012
BL
OW
ER 2
BIO
FIL
TE
R
BIO-B
LW-P-8
4013
BL
OW
ER 3
BIO
FIL
TE
R
1000A, 480V, 3PH, 3W, 65KAIC
THK-LCP-001
800A, 3-POLE
THK-ATS-001
480Y/277
450KW
THK-GEN-E-1
800A, 480V, 3PH, 3W, 65KAIC
TH
K-A
HC-E-1
CO
NDITIO
NE
R
AC
TIV
E H
AR
MO
NIC
(6 H
P)
TH
K-L
CP-P-6
3141
PR
EP S
YS
TE
M 1
PO
LY
ME
R
(6 H
P)
TH
K-L
CP-P-6
3142
PR
EP S
YS
TE
M 2
PO
LY
ME
R
20 20 20
20 30 30 30125 20
VFD
5
TH
K-E
XF-P-6
3102
BL
OW
ER 2
FO
UL AIR
(60 H
P)
TH
K-E
RV-B-1
MA
KE-U
P AIR U
NIT
3PH, 4W
208Y/120V
480V-
30KVA
THK-TRX-3
20
TH
K-G
TE-P-7
1111
TH
K-G
TE-P-7
1112
TH
K-G
TE-P-7
1071
20
(7.5 H
P)
TH
K-W
SH-B-1
HO
T P
RE
SS
UR
E W
AS
HE
R
20
(3/4 H
P)
TH
K-M
TR-B-1
RO
LL-U
P D
OO
R
125
(5 H
P)
TH
K-C
VS-B-1
VA
CU
UM S
YS
TE
M
(FU
TU
RE)
TH
K-S
YS-P-6
3143
SY
ST
EM 3
PO
LY
ME
R
(FU
TU
RE)
TH
K-S
YS-P-6
3144
SY
ST
EM 4
PO
LY
ME
R
60
THK-DSC-E-1
2020
(3/4 H
P)
TH
K-M
TR-B-2
RO
LL-U
P D
OO
R
TS-C
100 TS-C
(6 k
W)
TH
K-W
TR-B-1
WA
TE
R H
EA
TE
R
20
(3/4 H
P)
TH
K-M
TR-B-1
RO
LL-U
P D
OO
R
SP
ECIA
L R
EC
EP
TA
CLE
S
30 20 2030
(6 H
P)
TH
KK-H
ST-1
TH
K-F
V-P-6
3171
TH
K-F
V-P-6
3172
TH
K-F
V-P-6
3281
TH
K-F
V-P-6
3282
TH
K-F
V-P-6
3191
TH
K-F
V-P-6
3201
TH
K-F
V-P-6
3211
TH
K-F
V-P-7
1031
TH
K-F
V-P-7
1032
TH
K-F
V-P-7
1033
THK-TJB-71031THK-TJB-63171
TH
K-F
V-P-6
3221
THK-TJB-63211
800 AF
800 ASLSIG
LSIG
LSIG
800 AF
800 AS
3PH, 4 WIRE
480V-208Y/120V
75KVA
THK-TRX-2
800 AF
800 ASLSIG
LSIG1200 AF
1000 AS
60
TO THK-MCC-002
TR
AN
SF
ER P
UM
P
FE
RM
EN
TA
TIO
N T
AN
K 1
(20 H
P)
(20 H
P)
(20 H
P)
(5 H
P)
(5 H
P)
2 1 1 2 2
50/M 50/M 50/M15/M 15/M
TH
K-P
MP-P-7
1181
TH
K-P
MP-P-6
3331
TH
K-P
MP-P-6
3321
TH
K-P
MP-P-7
1171
TH
K-P
MP-P-7
1172
PF
LT S
PR
AY P
UM
P
55
VF
LT S
PR
AY P
UM
P
MIXIN
G P
UM
P
FE
RM
EN
TA
TIO
N T
AN
K 1
MIXIN
G P
UM
P
FE
RM
EN
TA
TIO
N T
AN
K 2
20
THK-TJB-63371
TH
K-F
V-P-6
3371
TH
K-F
V-P-6
3372
1
1/4" = 1'-0"
N
AS NOTED
W-THK-EL-0158
ELECTRICAL
THICKENING BUILDING
NORTHEAST
K BARTLETT
T PALIN FIRST FLOOR PROCESS PLAN
FIRST FLOOR PROCESS PLAN - NORTHEAST
KEY PLAN N
35
1 ADDENDUM 1 MR TP6/2016
VIA POWER PORTION OF CABLE TRAY.
ROUTE CABLE TO THK-MCC-001 OR THK-PNL-001 6.
DISCONNECT POWER TO
PROVIDE A LOCKABLE MOTOR-RATED SWITCH TO 5.
BOX.
120V POWER IN EXISTING TERMINAL JUNCTION
PROVIDE ADDITIONAL TERMINAL BLOCKS AND TAP 4.
THE WAY FROM THE NEW FPS PIPE PENETRATION.
RELOCATE HOTSY CONTROL STATION UP OUT OF 3.
PORTION OF CABLE TRAY.
ROUTE CABLE TO THK-LCP-001 VIA CONTROL 2.
OWNER WHEN TANK IS REMOVED.
INSTRUMENT CABLE. SALVAGE INSTRUMENT TO
TE-11 TERMINATION ENCLOSURE, AND 30 FEET OF
PROVIDE PMC MODEL VL2123-10PSIG. PROVIDE
TRANSDUCER FOR TEMPORARY VFLT TANK.
INSTALL TEMPORARY SUBMERSIVE LEVEL 1.
NOTES:
1
1
208.345.5310
BOISE, IDAHO 83702-7359
SUITE 200
322 EAST FRONT STREET
8
C
7
6
5
4
3
2
1
A B C
DESIGNED
LINE IS 2-INCHES AT FULL SIZE
(IF NOT 2"-SCALE ACCORDINGLY)
D
CHECKED
PCP FILE
DRAWN
E
VERIFY SCALES
F G
ZONE
H
REV.
REVISIONS
DESCRIPTION
I
DATE
J
BY APP.
K
CAD FILE NO.
NL M O P
DATE
SCALE
8
6
5
D E F G H I J K
4
3
2
NL M O P
1
SHEET.
OF
FILENAME: PLOT DATE: PLOT TIME:W-THK-EL-0158.DGN 2016\06\13 3:51:03 PM
BOISECITY OF TREES
150 N. CAPITOL BLVD.
BOISE, IDAHO 83702
(208) 384-3900
PUBLIC WORKS DEPARTMENTPROJECT NO.
7
477914
WBP-002
PROJECT
IMPROVEMENTS
FERMENTER
TREATMENT FACILITY
WASTEWATER
WEST BOISE
CITY OF BOISE, IDAHO
PROJECT NO.
45
MAY 2016
CH2MHILL, BOISE ID
ORIGINAL DOCUMENT STORED AT
REGISTRANT, MAY 2016.
ORIGINAL DOCUMENT SIGNED BY
11623
OH
A
DI FO E
TA
TS
DERETSIGER R
EE
NIGNE LANOISSE
F
OR
P
NILAP YBO
T
THK-WSH-HS-3
THK-LCP-001
NOTE 1
THK-LT-P-63301
THK-LCP-001
NOTE 2
THK-FCV-P-63042
THK-TJB-P-63041
(EXISTING) NOTE 4
M
NOTE 5
NOTE 5
[1/2"C-1 TYPE 3]
TRAY
CABLE
[1"C- 2 TYPE 3][1"C-1 3C TYPE 1],
NOTE 2
NOTE 3
THK-FCV-7119THK-LCP-001
THK-LCP-001
THK-PNL-001
THK-FCV-71192
THK-FV-P-63372THK-FV-P-63371
[1"C-1(12C) TYPE 1][1"C-1(12C) TYPE 1]
THK-TJB-63371
1
1
THK-LCP-001 (NOTE 2) THK-LCP-001 (NOTE 2)
[3/4"C-1(3#12,1#12G) TYPE 2]
(NOTE 6)
THK-MCC-001
[1"C-1(12C) TYPE 1] (NOTE 2)
[1"C-1(12C) TYPE 1] (NOTE 2)
(NOTE 6)
[3/4"C-1(3C#12, 1#12G) TYPE 2]
THK-TJB-71191
(NOTE 6)
[3/4"C-1(3C#12, 1#12G) TYPE 2]
MMM
M M M JJ
J J
J
208.345.5310
BOISE, IDAHO 83702-7359
SUITE 200
322 EAST FRONT STREET
8
C
7
6
5
4
3
2
1
A B C
DESIGNED
LINE IS 2-INCHES AT FULL SIZE
(IF NOT 2"-SCALE ACCORDINGLY)
D
CHECKED
PCP FILE
DRAWN
E
VERIFY SCALES
F G
ZONE
H
REV.
REVISIONS
DESCRIPTION
I
DATE
J
BY APP.
K
CAD FILE NO.
NL M O P
DATE
SCALE
8
6
5
D E F G H I J K
4
3
2
NL M O P
1
SHEET.
OF
FILENAME: PLOT DATE: PLOT TIME:W-THK-EL-0159.DGN 2016\06\13 3:52:34 PM
BOISECITY OF TREES
150 N. CAPITOL BLVD.
BOISE, IDAHO 83702
(208) 384-3900
PUBLIC WORKS DEPARTMENTPROJECT NO.
7
477914
WBP-002
PROJECT
IMPROVEMENTS
FERMENTER
TREATMENT FACILITY
WASTEWATER
WEST BOISE
CITY OF BOISE, IDAHO
PROJECT NO.
45
MAY 2016
CH2MHILL, BOISE ID
ORIGINAL DOCUMENT STORED AT
REGISTRANT, MAY 2016.
ORIGINAL DOCUMENT SIGNED BY
11623
OH
A
DI FO E
TA
TS
DERETSIGER R
EE
NIGNE LANOISSE
F
OR
P
NILAP YBO
T
N
3/16" = 1'-0"
AS NOTED
W-THK-EL-015936
ELECTRICAL
SOUTHEAST
THICKENING BUILDING
T PALIN FIRST FLOOR PROCESS PLAN
KEY PLAN N
THK-VFD-P-63101
THK-VFD-P-63102
THK-MCC-002
THK-LCP-001
THK-MCC-001
NOTE 2
M RARDIN
FIRST FLOOR PROCESS PLAN - SOUTHEAST
EXISTING
NOTE 1
THK-PNL-001
EXISTING
NOTE 4
1 ADDENDUM 1 MR TP6/2016
1
1
NOTES 3, 5
INPUT CARD.
PREWIRED 1492 WIRING SYSTEM WITH DIGITAL
THK-PLC-001. PROVIDE ALLEN-BRADLEY IFM
DIGITAL INPUT CARD IN RACK 1, SLOT 8 OF
PROVIDE ONE NEW ALLEN-BRADLEY 1756-IA16I 5.
VALVE ACTUATORS.
PROVIDE 20A, 1PH BREAKER IN PANEL FOR NEW 4.
TAG NUMBER.
TERMINATED CONDUCTOR BASED ON EQUIPMENT
DESIGNATION. PROVIDE WIRE LABELS FOR EACH
ENGINEER WILL PROVIDE I/O TERMINATION
TERMINAL BLOCKS. DURING CONSTRUCTION
TERMINATE FIELD CONDUCTORS ON EXISTING 3.
TO THK-LCP-001 VIA CABLE TRAY.
ROUTE (5) 12C TYPE 1 CABLES FROM THK-MCC-001 2.
SECTION.
PROVIDE ALL PUMP STARTERS IN EXISTING MCC 1.
NOTES:
1
M RARDIN
W-THK-EL-0167
AS NOTED
WIRING DIAGRAM
FLOW VALVE
T PALIN
43
G THOMPSON 1 ADDENDUM 1 TP 6/2016 GT
LOOP 63371
RECUPERATIVE TS 1
1
A
8
B C
7
6
5
4
3
2
1
A B C
DESIGNED
LINE IS 2-INCHES AT FULL SIZE
(IF NOT 2"-SCALE ACCORDINGLY)
D
CHECKED
PCP FILE
DRAWN
E
VERIFY SCALES
F G
ZONE
H
REV.
REVISIONS
DESCRIPTION
I
DATE
J
BY APP.
K
CAD FILE NO.
NL M O P
DATE
SCALE
8
6
5
D E F G H I J K
4
3
2
NL M O P
1
SHEET.
OF208.345.5310
BOISE, IDAHO 83702-7359
SUITE 200
322 EAST FRONT STREET PROJECT NO.
BOISECITY OF TREES
150 N. CAPITOL BLVD.
BOISE, IDAHO 83702
(208) 384-3900
PUBLIC WORKS DEPARTMENTPROJECT NO.
7
WBP-002
DRAWING NUMBER
ELEMENTARY DIAGRAMINTERCONNECTION REPORT
FILENAME: PLOT DATE: PLOT TIME:W-THK-EL-0167.DGN 2016\06\13 4:48:23 PM
45
477914
PROJECT
IMPROVEMENTS
FERMENTATION
TREATMENT FACILITY
WASTEWATER
WEST BOISE
CITY OF BOISE, IDAHO
BID D
OC
UM
EN
TS
MAY 2016
CH2MHILL, BOISE ID
ORIGINAL DOCUMENT STORED AT
REGISTRANT, MAY 2016.
ORIGINAL DOCUMENT SIGNED BY
11623
OH
A
DI FO E
TA
TS
DERETSIGER R
EE
NIGNE LANOISSE
F
OR
P
NILAP YBO
T
OPEN
CLOSE
CLOSED
N
2A
L
3PH
480V
RC
RO
[XX]
[EQUIPMENT TAG]DISCONNECT[TERMINAL JUNCTION BOX]
[XX]
[XX]
[LOOP]
[LOOP]
[LOOP]
[XX]
[XX]
[XX]
[XX]
[XX]
[XX]
[XX]
[XX] [XX]
[XX]
[ADDRESS]
[ADDRESS]
[ADDRESS]
[VOLTAGE]
CLOSED
[XX][XX] [XX] [XX]
[XX][XX]
N
2A
L
[LOOP]
[ADDRESS]
[XX][XX] [XX] [XX]
[XX][XX]
OPEN OPEN
REMOTE
N
2A
L
[LOOP]
[ADDRESS]
REMOTE
[XX][XX] [XX] [XX]
[XX][XX]
M RARDIN
W-THK-EL-0168
AS NOTED
WIRING DIAGRAM
FLOW VALVE
T PALIN
43
G THOMPSON 1 ADDENDUM 1 TP 6/2016 GT
LOOP 63372
RECUPERATIVE TS 2
1
A
8
B C
7
6
5
4
3
2
1
A B C
DESIGNED
LINE IS 2-INCHES AT FULL SIZE
(IF NOT 2"-SCALE ACCORDINGLY)
D
CHECKED
PCP FILE
DRAWN
E
VERIFY SCALES
F G
ZONE
H
REV.
REVISIONS
DESCRIPTION
I
DATE
J
BY APP.
K
CAD FILE NO.
NL M O P
DATE
SCALE
8
6
5
D E F G H I J K
4
3
2
NL M O P
1
SHEET.
OF208.345.5310
BOISE, IDAHO 83702-7359
SUITE 200
322 EAST FRONT STREET PROJECT NO.
BOISECITY OF TREES
150 N. CAPITOL BLVD.
BOISE, IDAHO 83702
(208) 384-3900
PUBLIC WORKS DEPARTMENTPROJECT NO.
7
WBP-002
DRAWING NUMBER
ELEMENTARY DIAGRAMINTERCONNECTION REPORT
FILENAME: PLOT DATE: PLOT TIME:W-THK-EL-0168.DGN 2016\06\13 4:47:21 PM
45
477914
PROJECT
IMPROVEMENTS
FERMENTATION
TREATMENT FACILITY
WASTEWATER
WEST BOISE
CITY OF BOISE, IDAHO
MAY 2016
CH2MHILL, BOISE ID
ORIGINAL DOCUMENT STORED AT
REGISTRANT, MAY 2016.
ORIGINAL DOCUMENT SIGNED BY
11623
OH
A
DI FO E
TA
TS
DERETSIGER R
EE
NIGNE LANOISSE
F
OR
P
NILAP YBO
T
OPEN
CLOSE
CLOSED
N
2A
L
3PH
480V
RC
RO
[XX]
[EQUIPMENT TAG]DISCONNECT[TERMINAL JUNCTION BOX]
[XX]
[XX]
[LOOP]
[LOOP]
[LOOP]
[XX]
[XX]
[XX]
[XX]
[XX]
[XX]
[XX]
[XX] [XX]
[XX]
[ADDRESS]
[ADDRESS]
[ADDRESS]
[VOLTAGE]
CLOSED
[XX][XX] [XX] [XX]
[XX][XX]
N
2A
L
[LOOP]
[ADDRESS]
[XX][XX] [XX] [XX]
[XX][XX]
OPEN OPEN
REMOTE
N
2A
L
[LOOP]
[ADDRESS]
REMOTE
[XX][XX] [XX] [XX]
[XX][XX]
M RARDIN
W-THK-EL-0169
AS NOTED
WIRING DIAGRAM
FLOW VALVE
T PALIN
43
G THOMPSON 1 ADDENDUM 1 TP 6/2016 GT
LOOP 71191
RECUPERATIVE TS FERM TANK 1
1
A
8
B C
7
6
5
4
3
2
1
A B C
DESIGNED
LINE IS 2-INCHES AT FULL SIZE
(IF NOT 2"-SCALE ACCORDINGLY)
D
CHECKED
PCP FILE
DRAWN
E
VERIFY SCALES
F G
ZONE
H
REV.
REVISIONS
DESCRIPTION
I
DATE
J
BY APP.
K
CAD FILE NO.
NL M O P
DATE
SCALE
8
6
5
D E F G H I J K
4
3
2
NL M O P
1
SHEET.
OF208.345.5310
BOISE, IDAHO 83702-7359
SUITE 200
322 EAST FRONT STREET PROJECT NO.
BOISECITY OF TREES
150 N. CAPITOL BLVD.
BOISE, IDAHO 83702
(208) 384-3900
PUBLIC WORKS DEPARTMENTPROJECT NO.
7
WBP-002
DRAWING NUMBER
ELEMENTARY DIAGRAMINTERCONNECTION REPORT
FILENAME: PLOT DATE: PLOT TIME:W-THK-EL-0169.DGN 2016\06\13 4:49:35 PM
45
477914
PROJECT
IMPROVEMENTS
FERMENTATION
TREATMENT FACILITY
WASTEWATER
WEST BOISE
CITY OF BOISE, IDAHO
MAY 2016
CH2MHILL, BOISE ID
ORIGINAL DOCUMENT STORED AT
REGISTRANT, MAY 2016.
ORIGINAL DOCUMENT SIGNED BY
11623
OH
A
DI FO E
TA
TS
DERETSIGER R
EE
NIGNE LANOISSE
F
OR
P
NILAP YBO
T
OPEN
CLOSE
CLOSED
N
2A
L
1PH
120V
RC
RO
[EQUIPMENT TAG]DISCONNECT[TERMINAL JUNCTION BOX]
[XX]
[XX]
[LOOP]
[LOOP]
[LOOP]
[XX]
[XX]
[XX]
[XX]
[XX]
[XX]
[XX] [XX]
[XX]
[ADDRESS]
[ADDRESS]
[ADDRESS]
[VOLTAGE]
CLOSED
[XX][XX] [XX] [XX]
[XX][XX]
N
2A
L
[LOOP]
[ADDRESS]
[XX][XX] [XX] [XX]
[XX][XX]
OPEN OPEN
REMOTE
N
2A
L
[LOOP]
[ADDRESS]
REMOTE
[XX][XX] [XX] [XX]
[XX][XX]
M RARDIN
W-THK-EL-0170
AS NOTED
WIRING DIAGRAM
FLOW VALVE
T PALIN
43
G THOMPSON 1 ADDENDUM 1 TP 6/2016 GT
LOOP 71192
1
RECUPERATIVE TS FERM TANK 2
A
8
B C
7
6
5
4
3
2
1
A B C
DESIGNED
LINE IS 2-INCHES AT FULL SIZE
(IF NOT 2"-SCALE ACCORDINGLY)
D
CHECKED
PCP FILE
DRAWN
E
VERIFY SCALES
F G
ZONE
H
REV.
REVISIONS
DESCRIPTION
I
DATE
J
BY APP.
K
CAD FILE NO.
NL M O P
DATE
SCALE
8
6
5
D E F G H I J K
4
3
2
NL M O P
1
SHEET.
OF208.345.5310
BOISE, IDAHO 83702-7359
SUITE 200
322 EAST FRONT STREET PROJECT NO.
BOISECITY OF TREES
150 N. CAPITOL BLVD.
BOISE, IDAHO 83702
(208) 384-3900
PUBLIC WORKS DEPARTMENTPROJECT NO.
7
WBP-002
DRAWING NUMBER
ELEMENTARY DIAGRAMINTERCONNECTION REPORT
FILENAME: PLOT DATE: PLOT TIME:W-THK-EL-0170.DGN 2016\06\13 4:50:12 PM
45
477914
PROJECT
IMPROVEMENTS
FERMENTATION
TREATMENT FACILITY
WASTEWATER
WEST BOISE
CITY OF BOISE, IDAHO
BID D
OC
UM
EN
TS
MAY 2016
CH2MHILL, BOISE ID
ORIGINAL DOCUMENT STORED AT
REGISTRANT, MAY 2016.
ORIGINAL DOCUMENT SIGNED BY
11623
OH
A
DI FO E
TA
TS
DERETSIGER R
EE
NIGNE LANOISSE
F
OR
P
NILAP YBO
T
OPEN
CLOSE
CLOSED
N
2A
L
1PH
120V
RC
RO
[EQUIPMENT TAG]DISCONNECT[TERMINAL JUNCTION BOX]
[XX]
[XX]
[LOOP]
[LOOP]
[LOOP]
[XX]
[XX]
[XX]
[XX]
[XX]
[XX]
[XX] [XX]
[XX]
[ADDRESS]
[ADDRESS]
[ADDRESS]
[VOLTAGE]
CLOSED
[XX][XX] [XX] [XX]
[XX][XX]
N
2A
L
[LOOP]
[ADDRESS]
[XX][XX] [XX] [XX]
[XX][XX]
OPEN OPEN
REMOTE
N
2A
L
[LOOP]
[ADDRESS]
REMOTE
[XX][XX] [XX] [XX]
[XX][XX]
E SCHULZ
T PALIN
W-THK-EL-017164
WIRING DIAGRAM
LOOP 63042
FLOW CONTROL
NTS
M RARDIN
1 ADDENDUM 1 TP 6/2016 GT
1
VFLT AER BASINS 5 AND 6
A
8
B C
7
6
5
4
3
2
1
A B C
DESIGNED
LINE IS 2-INCHES AT FULL SIZE
(IF NOT 2"-SCALE ACCORDINGLY)
D
CHECKED
PCP FILE
DRAWN
E
VERIFY SCALES
F G
ZONE
H
REV.
REVISIONS
DESCRIPTION
I
DATE
J
BY APP.
K
CAD FILE NO.
NL M O P
DATE
SCALE
8
6
5
D E F G H I J K
4
3
2
NL M O P
1
SHEET.
OF208.345.5310
BOISE, IDAHO 83702-7359
SUITE 200
322 EAST FRONT STREET PROJECT NO.
BOISECITY OF TREES
150 N. CAPITOL BLVD.
BOISE, IDAHO 83702
(208) 384-3900
PUBLIC WORKS DEPARTMENTPROJECT NO.
7
WBP-002
DRAWING NUMBER
CONTROL PANELFIELD
[CONTROL PANEL NAME]
FILENAME: PLOT DATE: PLOT TIME:W-THK-EL-0171.DGN 2016\06\13 4:51:06 PM
45
477914
PROJECT
IMPROVEMENTS
FERMENTATION
TREATMENT FACILITY
WASTEWATER
WEST BOISE
CITY OF BOISE, IDAHO
BID D
OC
UM
EN
TS
MAY 2016
CH2MHILL, BOISE ID
ORIGINAL DOCUMENT STORED AT
REGISTRANT, MAY 2016.
ORIGINAL DOCUMENT SIGNED BY
11623
OH
A
DI FO E
TA
TS
DERETSIGER R
EE
NIGNE LANOISSE
F
OR
P
NILAP YBO
T
-
C
+
SCALE: [XX]
-
C
+
[CIRCUIT NAME]
[XX]
[XX]
[XX]
[XX]
ADDRESS: [ADDRESS]
5 AMP
N
L[XX]
[XX]
[XX]
[XX]
[TAG NUMBER]
[XX]
[XX][XX][XX]
[XX]
[XX]
[XX]
[CIRCUIT NAME]
[XX]
N
2A
L
[XX]
[XX] [XX]
[XX][ADDRESS]
[LOOP]
FAULT
VALVE ACTUATOR
+
-
24V[XX]
[XX]
[XX]
[XX]
[XXX]
[XX]
[XX]
SCALE: [XX]
ADDRESS: [ADDRESS]
[TERMINAL JUNCTION BOX]
J PIGMAN
AS NOTED
W-MIS-SD-0226
GENERAL
44
L FETTKETHER
G THOMPSON
DESIGN DETAILS
1
1 ADDENDUM 1 JP LF6/2016
208.345.5310
BOISE, IDAHO 83702-7359
SUITE 200
322 EAST FRONT STREET
8
C
7
6
5
4
3
2
1
A B C
DESIGNED
LINE IS 2-INCHES AT FULL SIZE
(IF NOT 2"-SCALE ACCORDINGLY)
D
CHECKED
PCP FILE
DRAWN
E
VERIFY SCALES
F G
ZONE
H
REV.
REVISIONS
DESCRIPTION
I
DATE
J
BY APP.
K
CAD FILE NO.
NL M O P
DATE
SCALE
8
6
5
D E F G H I J K
4
3
2
NL M O P
1
SHEET.
OF
FILENAME: PLOT DATE: PLOT TIME:W-MIS-SD-0226.dgn 2016\06\13 3:12:50 PM
BOISECITY OF TREES
150 N. CAPITOL BLVD.
BOISE, IDAHO 83702
(208) 384-3900
PUBLIC WORKS DEPARTMENTPROJECT NO.
7
477914
WBP-002
PROJECT
IMPROVEMENTS
FERMENTER
TREATMENT FACILITY
WASTEWATER
WEST BOISE
CITY OF BOISE, IDAHO
PROJECT NO.
45
MAY 2016
CH2MHILL, BOISE ID
ORIGINAL DOCUMENT STORED AT
REGISTRANT, MAY 2016.
ORIGINAL DOCUMENT SIGNED BY
3755
OH
A
DI FO E
TA
TS
DERETSIGER R
EE
NIGNE LANOISSE
F
OR
P
RE
HT
EKTTEF .M
ECN
E
RW
AL
2605-008
NTS
DEVICE MOUNTING, EQUIPMENT PEDESTAL
TYP3/16
3/16
SEE NOTE 3
3/4" RADIUS, TYP
NON-SHRINK GROUT
NOTE 2
PLATFORM,
FLOOR OR
1/2" RADIUS, TYP
10", TYP
1 1/4", TYP
3" 3"48" MAX
6'-0"
MA
X
NO
TE 3
ALUMINUM AND CONCRETE
BITUMASTIC COATING BETWEEN
PROVIDE FELT SPACER OR
(TYP OF 4 EACH BASE)
WITH LEVELING NUTS,
ANCHORS OR ANCHOR BOLTS
1/2" STAINLESS STEEL CONCRETE
PLATE
1/2" ALUMINUM
SIZE PER EQUIPMENT REQUIREMENTS
1/4" ALUMINUM PLATE, ROUND EDGES,
SECTION
NOTES:
3.
2.
1.
LENGTH PER EQUIPMENT REQUIREMENTS
ALUMINUM CHANNEL (4x2.16)
ELECTRICAL CONSTRUCTION NOTES ON DRAWINGS.
200 LBS, SIZE POSTS AND CONNECTIONS FOR LATERAL LOADS. SEE GENERAL
FOR HEIGHTS EXCEEDING 5'-0" OR WEIGHT OF MOUNTED EQUIPMENT EXCEEDING
ABOVE FINISHED GRADE. MINIMUM WIDTH 24 INCHES.
THAN THE MOUNTING PLATE BY ONE HALF THE HEIGHT OF THE MOUNTING PLATE
#4 BAR @ 12" OC EACH WAY, CENTERED. THE PAD SHALL BE 12 INCHES LONGER
FOR YARD LOCATIONS PROVIDE A 6 INCH THICK CONCRETE PAD AT GRADE WITH
LOCK WASHER UNDER ALL NUTS.
USE STAINLESS STEEL MOUNTING HARDWARE. USE WASHER AND SPLIT
CONDUIT
1" MIN
WALL
CONCRETE
IMMERSIBLE SEALANT
POLYURETHANE
PACK WITH ONE PART
SEEP RING
PIPE SLEEVE WITH
GALVANIZED STEEL
PLUS 1" MIN
OD OF CONDUIT
2605-307
NTS
CONDUIT UNDERGROUND ENTRANCE
2605-310
NTS
SLAB PENETRATION
:NOTES
SPECIFICATIONS
REQUIRED, SEE
CONDUIT. FOR TYPE
THROUGH SLAB
CONDUIT PASSES
COMPOUND WHERE
PLASTIC EXPANDABLE
AND FILL WITH A SUITABLE
PROVIDE A PVC SLEEVE
DETAIL.
ACCORDANCE WITH THIS
SHALL BE INSTALLED IN
AND EQUIPMENT PADS
CONCRETE FLOOR SLABS
1. ALL CONDUITS THROUGH
SLAB
STRUCTURAL
NTS4027-182
TYPE 2 FLUSHING CONNECTION
AS SHOWN ON PLANS
TEE, WYE OR CROSS
NIPPLE
1" THREADED SST
FOR 1" NIPPLE
DRILLED & TAPPED
BLIND FLANGE
NIPPLE
1" SST
HOSE ADAPTER
STANDARD THREAD -
1" FEMALE NATIONAL
1" V308
NTS4005-507
PIPE SUPPORT - WALL MOUNTED
SIDE BOLTPRE-ENGINEERED
MASONRY WALLCONCRETE OR
BY CALCULATIONS
SIZE AS REQUIRED
MASONRY ANCHOR,
CONCRETE OR
PIPE RINGADJUSTABLEPRE-ENGINEERED
1/2" THRU 4" PIPE
AS SPECIFIED.
SUBMIT FINAL DESIGN AND CALCULATIONS FOR SUPPORT AND ANCHORAGE
PROVIDE PIPE PROTECTION BARRIER AS SPECIFIED.
2.
1.
NOTES:
NTS4005-550
OVERHEAD PIPE HANGER
24" DIA PIPE
4" DIA TO
6"
MIN
MIN
1.0
1.0
AS SPECIFIED
CONC ANCHORS
MIN 1 UNDERCUT
AND LONGITUDINAL BRACES
AS REQUIRED TO RECEIVE TRANSVERSE
EMBED ASSEMBLY, ADAPT ASSEMBLY
OR U-BOLT, CLEVIS ROD AND
PRE-ENGINEERED PIPE STRAP
CONC SLAB
NOTES:
2.
1.
AS REQD
STIFFENER
ROD
BY CALCULATIONS
AND TYPE AS REQUIRED
TRANSVERSE BRACE, SIZE
CALCULATIONS.
LONGITUDINAL BRACE BEYOND (NOT SHOWN) AS REQUIRED BY
AND ANCHORS AS SPECIFIED.
SUBMIT FINAL DESIGN DRAWINGS AND CALCULATIONS OF SUPPORTS
CONTINUOUS INSERTS
PROVIDE ADDITIONAL TYP BARS EW AT
2 - #4 x 5'-0" EW AT ISOLATED INSERTS,
NTS4005-555
STACKED TRAPEZE PIPE HANGER
AS REQUIRED
AS R
EQ
UIR
ED
PIPE
AS SPECIFIED
AND PIPE CLAMPS
STRUT CHANNEL
VARIES
PIPE SIZE
TYPICAL
INSERTS,
CONCRETE
EMBEDDED
MIN5"
MIN
1'-0"
MIN5"
MIN
1'-0"
AS SPECIFIED
HANGER RODS
NTS4027-183
TYPE 3 FLUSHING/DRAIN CONNECTION
1.
NOTES:
POINT HOSE CONNECTION TOWARDS THE FLOOR, AWAY FROM OPERATOR.1.
NOTES:
POINT HOSE CONNECTION TOWARDS THE FLOOR, AWAY FROM OPERATOR.
1" V330PVC PIPE
TEE
CONNECTION
1" HOSE
NOTE 1
1" V330
NOTE 1
CONNECTION
1" HOSE
TEE
PVC PIPE