PSN 17166, ROW OCS-G28764 FD 06/27/2017 A/m In Reply Refer To: GE 1035A June 27, 2017 Mr. Tod Darcey Rooster Oil & Gas, LLC. 16285 Park Ten Place, Suite 1200 Houston, Texas 77042 Dear Mr. Darcey: Reference is made to Rooster Oil & Gas, LLC's (Rooster) Right-of-way (ROW) relinquishment and decommissioning application dated September 30, 2016, received by our office on October 20, 2016, for ROW No. OCS-G28764, Pipeline Segment Number (PSN) 17166. Rooster requests to relinquish the pipeline ROW in its entirety and decommission PSN 17166 in place. On April 17, 2017, this office sent a Request For Information (RFI) to Rooster and asked that Rooster amend the application to include the pigging ofthe line. In addition, the amendment should indicate that the pipeline will be flushed and filled with uninhibited seawater. On May 26, 2017, via a telephone conversation with Ms. Natalie Martin of Stokes and Spiehler (S&S), this office reminded Rooster to submit the amendment. On June 7, 207, this office issued a notice to Rooster to submit the amended application by June 20, 2017. Rooster still did not comply or contacted this office. In accordance with 30 CFR 250.1751, Roosters application to decommission PSN 17166 in place is hereby denied. Rooster must submit a decommissioning application that addresses the deficiencies outlined by the RFI within 15 days from the date of this letter. If Rooster fails to submit the application, an Incident of Non Compliance (INC) will be issued. Additionally, our records indicate thai the pipeline has been out of service since January 27, 2016. Since Rooster did not apply for and receive approval to maintain the subject pipeline Right-of-way grant in effect beyond tie 90 days provided for by a temporary cessation of operations, please be advised that pipeline ROW No. OCS-G28358 expired effective April 26, 2016, pursuant to 30 CFR 250.1014. Hence, Rooster's request to relinquish ROW No.OCS- G28358 cannot be addressed.

In Reply Refer To: GE 1035A June 27, 2017 · Per your phone call, attached please find a replacement cover letter for the application referenced above that was submitted on September

  • Upload
    others

  • View
    2

  • Download
    0

Embed Size (px)

Citation preview

Page 1: In Reply Refer To: GE 1035A June 27, 2017 · Per your phone call, attached please find a replacement cover letter for the application referenced above that was submitted on September

PSN 17166, ROW OCS-G28764 FD 06/27/2017 A/m

In Reply Refer To: GE 1035A June 27, 2017

Mr. Tod Darcey Rooster Oil & Gas, LLC. 16285 Park Ten Place, Suite 1200 Houston, Texas 77042

Dear Mr. Darcey:

Reference is made to Rooster Oil & Gas, LLC's (Rooster) Right-of-way (ROW) relinquishment and decommissioning application dated September 30, 2016, received by our office on October 20, 2016, for ROW No. OCS-G28764, Pipeline Segment Number (PSN) 17166. Rooster requests to relinquish the pipeline ROW in its entirety and decommission PSN 17166 in place.

On April 17, 2017, this office sent a Request For Information (RFI) to Rooster and asked that Rooster amend the application to include the pigging ofthe line. In addition, the amendment should indicate that the pipeline will be flushed and filled with uninhibited seawater. On May 26, 2017, via a telephone conversation with Ms. Natalie Martin of Stokes and Spiehler (S&S), this office reminded Rooster to submit the amendment. On June 7, 207, this office issued a notice to Rooster to submit the amended application by June 20, 2017. Rooster still did not comply or contacted this office.

In accordance with 30 CFR 250.1751, Roosters application to decommission PSN 17166 in place is hereby denied. Rooster must submit a decommissioning application that addresses the deficiencies outlined by the RFI within 15 days from the date of this letter. If Rooster fails to submit the application, an Incident of Non Compliance (INC) will be issued.

Additionally, our records indicate thai the pipeline has been out of service since January 27, 2016. Since Rooster did not apply for and receive approval to maintain the subject pipeline Right-of-way grant in effect beyond tie 90 days provided for by a temporary cessation of operations, please be advised that pipeline ROW No. OCS-G28358 expired effective April 26, 2016, pursuant to 30 CFR 250.1014. Hence, Rooster's request to relinquish ROW No.OCS-G28358 cannot be addressed.

Page 2: In Reply Refer To: GE 1035A June 27, 2017 · Per your phone call, attached please find a replacement cover letter for the application referenced above that was submitted on September

Page 2

If you have any questions concerning this approvai letter, please contact Mr. Forna Diphicyl at (504) 736-2659 or by e-mail at forna.diphicvKg.bsee.gov or Ms. Angie Gobert at (504) 736-2876 or by e-mail at [email protected].

Sincerel

For: Bfyan ̂ Domangue Acting Regional Supervisor Regional Field Operations

bc: 1502-01 Segment No. 17166, ROW OCS-G28764 (GE 1035A) 1502-01 ROW OCS-G28764 (Scanning-update) (GE 274E) DiphicyF:G\FO\Pipeline\Letlers\ATyped\Foma\RO W_Dccommissions\PSN 17166

Page 3: In Reply Refer To: GE 1035A June 27, 2017 · Per your phone call, attached please find a replacement cover letter for the application referenced above that was submitted on September

S T O K E S

SPIEHLER

October 19.2016

Bureau of Safety & Environmental Enforcement Pipeline Section 1201 Elmwood Park Blvd. New Orleans. Louisiana 70123

K t> C E J V E D OCT 20 2016

Office of Field Operations Pipeline Section

ATTN: Cissy Marshall (MS GH 1035A)

RE: Application to Decommission a Pipeline and Relinquish Right-of-Way 4.5" O.D. Pipeline - Segment No. 17166 / ROW OCS-G 28358 Originating - El 28, OCS-G 05479. "A" Platform Terminating - EI 27. OCS-G 23853. 12" SSTI

Ms. Marshall.

Per your phone call, attached please find a replacement cover letter for the application referenced above that was submitted on September 30. 2016. The attached cover will add the reference to the Right-of-Way relinquishment.

Ifyou have any questions or require any additional information, please contact me at CRo^rs^stokesandspiehler.com or phone (337) 344-4230.

Regards.

Cindy Rogers ^ Sr. Regulatory Specialist

110 Rue Jean Lafitte Suite 100

Lafayette, LA 70508 337'233'6871

337'233'7198 Fax

9720 Cypresswcxxl Dr. Suitc 160

Houston, TX 77070 281*444*8395

281•444*8681 Fax

14579 Berklee Dr. Suite 600

Addision,TX 75001 214*561'8751 Office 214'561'8745 Fax

Page 4: In Reply Refer To: GE 1035A June 27, 2017 · Per your phone call, attached please find a replacement cover letter for the application referenced above that was submitted on September

If ROOSTHR PETROLEUM, LLC

Burecij ol Soier/ and InfaHBHWi tnSonenisnl [h'd

September 30. 2016 R E C E I V E D

Bureau of Safety & Environmental Enforcement OCT 2 0 2016 Pipeline Seclion rtr^fir.ric

Office of Field Operations 1201 Elmwood Park Blvd. Pipeline Section New Orleans. Louisiana 70123

ATTN: Angie Gobert (MS GE 1035A)

RE: Applicalion to Decommission a Pipeline and Relinquish Right-of-Way 4.5" O.D. Pipeline - Segment No. 17166 / ROW OCS-G 28358 Originating - EI 28. OCS-G 05479. "A" Platform Terminating - EI 27. OCS-G 23853. 12" SSTI

Ms. Gobert.

Rooster Oil & Gas. LLC (Rooster) hereby respectfully requests approval to flush, disconnect, and abandon in place 18.881" of one 4.5" oil pipeline (Segment No. 17166) and relinquish the Right-of-Way OCS-G 28358.. Rooster has terminated production from its Eugene Island Block 28 "A" facility.

The pipeline originates at Rooster's Eugene Island Block 28 (OCS-G 05479) "A" Platform and terminates at a 12" SSTI in Eugene Island Block 27 (OCS-G 23853). Please see the attached as­built for details related to the origination and termination points ofthe pipeline.

Rooster also requests the use of alternate compliance from 30 CFR 250.1751 (b). in order to Hush the pipeline in lieu of pigging. Rooster's procedure lo Hush the pipeline with 1.5 volumes of seawater will achieve results equivalent to pigging and will provide a level of safety and environmental protection that meets or exceeds current BSEE requirements.

Attached for additional information and included as part of this request is the proposed abandonmenl procedure for pipeline Segment No. 17166. Confirmation ofthe Pay.Gov application fee in the amount of $2.170.00 will be provided at a later date, due to the outage of fees for services as per fiscal year-end closeout

16285 Park Tei Place, Suite 120, Houston, TX 77084 Telephone (83::) 772-6313 2 Facsimile (832) 772-6314

Page 5: In Reply Refer To: GE 1035A June 27, 2017 · Per your phone call, attached please find a replacement cover letter for the application referenced above that was submitted on September

I fyou have any questions or require any additional information, please contact Rooster's

regulatory agents, Natalie Martin (nnKirtintostokesandspiehler.com) / Cindy Rogers

(CRogerstostokesandspiehler.com), with Stokes & Spiehler Regulatory Services, LLC at (337)

233-6871.

Tod Darcey

Vice President - Operations

cc: Brandon Lege

Natalie Martin

16285 Park Ten Place, Suite 120, Houston, TX 77084 Telephone (832) 772-6313 0 Facsimile (832) 772-6314

Page 6: In Reply Refer To: GE 1035A June 27, 2017 · Per your phone call, attached please find a replacement cover letter for the application referenced above that was submitted on September

TO:

FROM:

DATE:

SUBJECT:

Natalie Martin

Brandon Lege

September 29, 2016

Stokes and Spiehler

Rooster Petroleum, LLC

Eugene Island Block 28 "A" 4" Sales Pipeline Abandonment Segment # 17166 OCS-G-05479

Specifications of Pipeline: Pipeline size: Location: To: Length:

Line Terminal ons:

MAOP

4.5" O.D , X-42 From: El 28-A Platform WD = 12" El 27 Subsea Tie-in, W.D. = 12' 18,881 ft. El 28 "A" - Riser El 27 SSTI into 12" Crimson Gulf P/L 1,440 psig

Proiect Summarv:

Rooster Petroleum has terminated production f-om its El 28 "A" Facility. Rooster plans to flush and abandon the 4" Oil Pipeline during a shared campaign with Crimson Gulf. Crimson is planning to begin abandonment of their 12" Segment 15083 in late September.

Pipeline Abandonment Plan:

Mobilize Liftboat to El 27 SSTI location.

Set up Liftboat at the El 27 SSTI over the 4" SSTI.

Using divers, locate and remove Submar nats off the top of SSTI.

Divers will locate the two 4" ball valves on P/L Segment #17166 from 12" Crimson Gulf P/L.

Rooster will mobilize a work boat with purrp equipment on board to flush from El 28 "A" to the SSTI

Set up Work boat El 28 A and tie in to the departing Riser downstream of Departing Check valve.

Once the pumping equipment is hooked up and leak checked, the flush operation will begin

Pumping crew will flush two pipeline volumes (538 BBLS) with inhibited Sea water to the SSTI.

Once two pipeline volumes is pumped divor will close the two 4" valve on the SSTI.

When the SSTI is fully closed the pressu "e will be bled down at the platform and confirm the SSTI valves are holding.

Rig down pump equipment and demobilize pumping equipment.

Divers will disconnect the P/L from the 4" SSTI and install a 4" 600 RTJ blind flange with W NPT Tap. A W Bleeder and plug will be installing in blind. (A pollution dome will be utilized during this operation)

Diver will make a cold cut approximately 2J;' from the SSTI on the 4" P/L and retrieve that section of pipe to surface.

A 4" plumbers plug will be installed on the ond of P/L and buried at least 3' BML. Sand bags will be installed on end of P/L and insure proper cover.

Survey shot will be recorded for end of pipe location.

Submar mats will be reinstalled over SSTI

1 | P a g e

Page 7: In Reply Refer To: GE 1035A June 27, 2017 · Per your phone call, attached please find a replacement cover letter for the application referenced above that was submitted on September

Relocate Liftboat to El 28 "A".

Divers will locate Riser and Jet approx. 30' from Base of Jacket.

Diver will make a cold cut above the tube tum on the riser.

Divers will make a second cut on P/L approx. 25' from base of Jacket.

25" cut section of pipeline will be retrieved to Liftboat.

Plumbers plugs will be install on Riser and Pipeline (buried at least 3' BML).

Sand bags will be installed on End of P/L to ensure proper cover.

Demobilize Liftboat.

2 | P a g e

Page 8: In Reply Refer To: GE 1035A June 27, 2017 · Per your phone call, attached please find a replacement cover letter for the application referenced above that was submitted on September
Page 9: In Reply Refer To: GE 1035A June 27, 2017 · Per your phone call, attached please find a replacement cover letter for the application referenced above that was submitted on September

Paygov Receipt

Your payment is complete Pay.gov Tracking ID: 25U90V3M Agency Tracking ID: 75104324902 Form Name: Application to Decommission a pipeline - ROW Application Name: BSEE Application to Decommission a ROW Pipeline - BU

Payment Information Payment Type: Debit or credit card Payment Amount: $2,170.00 Transaction Date: 10/04/2016 12:59:16 PM EDT Payment Date: 10/04/2016 Region: Gulf of Mexico Contact: Natalie Martin 337-550-5238 Company Name/No: Rooster Petroleum, LLC, 02871 Pipeline Segment No: 17166 Originating Area/Block: Eugene Island El, 28 Terminating Area/Block: Eugene Island El, 27

Account Information Cardholder Name: J.V. Delcambre Card Type: Visa Card Number: * ™ * * 2 6 1 6

Email Confirmation Receipt Confirmation Receipts have been emailed to: [email protected]

Page 10: In Reply Refer To: GE 1035A June 27, 2017 · Per your phone call, attached please find a replacement cover letter for the application referenced above that was submitted on September

i i ROOSTHR PITROHEUM, .LC

September 30, 2016

Bureau of Safety & Environmental Enf< i cement Pipeline Seclion 1201 Elmwood Park Blvd. New Orleans, Louisiana 70123

R E C E I V E OCT 20 2016

Office of Field Operations P,peline Section

ATTN: Angie Ciobert (MS GH 1()35A)

Kl Applicalion to Decommission a Pipeline and Relinquish Righl-of-Way 4.5" O.D. Pipeline-Segment No. 17166/ROW OCS-G 28358 Originating - HI 28. OCS-G 05479, "A" Platform Terminating - EI 27, OCS-G 23853, 12" SSTI

Ms. Gobert.

Rooster Oil & Gas, LLC (Rooster) hereby respectfully requests approval to Hush, disconnect, and abandon in place 18.881" of one 4.5" oil pipeline (Segmenl No. 17166) and relinquish the Right-of-Way OCS-G 28358.. Rooster has terminated produclion from its Eugene Island Block 28 -A" facility.

The pipeline originates al Rooster's Hugcnc Island Block 28 (OCS-G 05479) "A"" Platform and terminates at a 12" SSTI in Eugene Island Bloek 27 (OCS-G 23853). Please sec the attached as-buill for delails related to the origination and termination points oflhe pipeline.

Rooster also requests the use of alternate compliance from 0̂ CFR 250.1751(b ), in order to flush the pipeline in lieu of pigging. Rooster's procedure to flush the pipeline with 1.5 volumes of seawater will achieve results equivalent to pigging and will provide a level of safety and environmental protcclion thai meets or exceeds currenl BSHH requirements.

Attached for additional information and included as part of this request is the proposed abandonment procedure for pipeline Se^nicnt No. 17166. Confirmation of the Pay.Gov application fee in thc amounl of $2,170.00 vvill be provided at a later date, due to the outage of fees for services as per fiscal year-end closeout

16285 Park Ten Place, Suite 120, Houston, TX 77084 Telephone (832) 772-6313 [3 Facsimile (832) 772-6314

Page 11: In Reply Refer To: GE 1035A June 27, 2017 · Per your phone call, attached please find a replacement cover letter for the application referenced above that was submitted on September

If you have any questions or require any additional information, please contact Rooster's regulatory agents, Natalie Martin (nrrartintoslokesandspiehler.com) / Cindy Rogers (CRogerstoistokesandspiehler.com), v/ith Stokes & Spiehler Regulatory Services, LLC at (337) 233-6871.

Tod Darcey Vice President - Operations

cc: Brandon Lege Natalie Martin

16285 Park Tei Place, Suite 120, Houston, TX 77084 Telephone (832) 772-6313 0 Facsimile (832) 772-6314

Page 12: In Reply Refer To: GE 1035A June 27, 2017 · Per your phone call, attached please find a replacement cover letter for the application referenced above that was submitted on September

TO:

FROM:

DATE:

SUBJECT:

Natalie Martin

Brandon Lege

September 29, 2016

Stokes and Spiehler

Rooster Petroleum, LLC

Eugene Island Block 28 "A" 4" Sales Pipeline Abandonment Segment # 17166 OCS-G-05479

Specifications of Pipeline: Pipeline size: Location: To: Length:

Line Terminations:

MAOP

4.5" 0 D., X-42 From: El 28-A Platform WD = 12' El 27 Subsea Tie-in, W.D. = 12' 18,881 ft. El 28 "A" - Riser El 27 SSTI into 12" Crimson Gulf P/L 1,440 psig

Project Summarv:

Rooster Petroleum has terminated production from its El 28 "A" Facility. Rooster plans to flush and abandon the 4" Oil Pipeline during a shared campaign with Crimson Gulf. Crimson is planning to begin abandonment of their 12" Segment 15083 in late September.

Pipeline Abandonment Plan:

Mobilize Liftboat to El 27 SSTI location.

Set up Liftboat at the El 27 SSTI over the 4" SSTI

Using divers, locate and remove Submar mats off the top of SSTI.

Divers will locate the two 4" ball valves on P/L Segment #17166 from 12" Crimson Gulf P/L.

Rooster will mobilize a work boat with purr p equipment on board to flush from El 28 "A" to the SSTI

Set up Work boat El 28 A and tie in to the departing Riser downstream of Departing Check valve

Once the pumping equipment is hooked UID and leak checked, the flush operation will begin.

Pumping crew will flush two pipeline volumes (538 BBLS) with inhibited Sea water to the SSTI.

Once two pipeline volumes is pumped diver will close the two 4" valve on the SSTI.

When the SSTI is fully closed the pressure will be bled down at the platform and confirm the SSTI valves are holding.

Rig down pump equipment and demobilize pumping equipment.

Divers will disconnect the P/L from the 4" SSTI and install a 4" 600 RTJ blind flange with %' NPT Tap A %' Bleeder and plug will be installing in blind, (A pollution dome will be utilized during this operation)

Diver will make a cold cut approximately 25' from the SSTI on the 4" P/L and retrieve that section of pipe to surface.

A 4" plumbers plug will be installed on the ond of P/L and buried at least 3' BML. Sand bags will be installed on end of P/L and insure proper cover.

Survey shot will be recorded for end of pipe location.

Submar mats will be reinstalled over SSTI.

1 | P ;

Page 13: In Reply Refer To: GE 1035A June 27, 2017 · Per your phone call, attached please find a replacement cover letter for the application referenced above that was submitted on September

Relocate Liftboat to El 28 "A".

Divers will locate Riser and Jet approx. 30' from Base of Jacket.

Diver will make a cold cut above the tube turn on the riser.

Divers will make a second cut on P/L approx. 25' from base of Jacket.

25' cut section of pipeline will be retrieved io Liftboat.

Plumbers plugs will be install on Riser and Pipeline (buried at least 3' BML).

Sand bags will be installed on End of P/L to ensure proper cover.

Demobilize Liftboat.

2 | P a g e

Page 14: In Reply Refer To: GE 1035A June 27, 2017 · Per your phone call, attached please find a replacement cover letter for the application referenced above that was submitted on September

EI27 OCS-G-23853

En Partners

? 0

c /»

J 7

V v/1 . p

• 5

EI28 Or.5^n-n.S479

Rooster Petroleum. LLC"

EI46 EMS OCS-G-19785

Rooster Petroleum, LLC

% . n s o

BASE MAP BLOCK 28

EUGENE ISLAND AREA GULF OF MEXICO

EI44 OCS-G-19784

Page 15: In Reply Refer To: GE 1035A June 27, 2017 · Per your phone call, attached please find a replacement cover letter for the application referenced above that was submitted on September

Paygov Receipt

Your payment is complete Pay.gov Tracking ID: 25U90V3M Agency Tracking ID: 75104324902 Form Name: Application to Decommission a pipeline - ROW Application Name: BSEE Application to Decommission a ROW Pipeline - BU

Payment Information Payment Type: Debit or credit card Payment Amount: $2,170.00 Transaction Date: 10/04/2016 12:59:16 PM EDT Payment Date: 10/04/2016 Region: Gulf of Mexico Contact : Natalie Martin 337-550-5238 Company Name/No: Rooster Petroleum, LLC, 02871 Pipeline Segment No: 17166 Originating Area/Block: Eugene Island El. 28 Terminating Area/Block: Eugene Island El, 27

Account Information Cardholder Name: J.V. Delcambre Card Type: Visa Card Number: " " 2 6 1 6

Email Confirmation Receipt Confirmation Receipts have been emailed to: [email protected]

Page 16: In Reply Refer To: GE 1035A June 27, 2017 · Per your phone call, attached please find a replacement cover letter for the application referenced above that was submitted on September

1/23/2017 DEPARTMENT OF THE INTERIOR Mail - RFI PSN 17166 Rooster ROW

'JSL CONNECT

RFI PSN 17166 Rooster ROW

Diphicyl, Forna <[email protected]>

Natalie Martin <[email protected]> Thu, Dec 1, 2016 at 3:12 PM To: "[email protected]" <[email protected]> Cc: Cindy Rogers <[email protected]>

Foma,

Please note the following as requested:

1. What is the anchor radius and plot proposed for each vessel used? Liftboat

2. What arc the chemicals to be used in the inhibited seawater for filling after flushing? Sentry 13

3. What shorebase(s) will be used? Broussard ICY

4. What is the area of the sand/cement bags to be used at each end? Sand bags will be used to ensure proper cover of the end of lines

5. Will jelting be required for culting the end sections: yes lines are currently buried

Thank you,

Natalie N. Martin

Sr. Regulatory Specialist

Stokes & Spiehler Regulatory Services, LLC 110 Rue Jean Lafitte Lafayette, Louisiana 70508 Office: (337) 233-6871 Fax: (337) 408-9300 Cell: (337) 550-5238 [email protected] www.stokesandspiehler.com

From: Diphicyl, Forna [mailto:[email protected]]

Sent: Wednesday, November 09, 2016 10:1)8 AM

To: Cindy Rogers <[email protected]>

Subject: RFI PSN 17166 Rooster ROW

Dear Mr. Roger.

https://mail.google.com/mail/^^ 1 / 3

Page 17: In Reply Refer To: GE 1035A June 27, 2017 · Per your phone call, attached please find a replacement cover letter for the application referenced above that was submitted on September

1/23/2017 DEPARTMENT (DF THE INTERIOR Mail - RFI PSN 17166 Rooster ROW

Please see below an RFI concerning PSN 17166

Good Af ternoon Forna,

I hope that you are having a good Tuesday.

I am rev iewing the proposed in-place decommiss ion ing f r om Rooster Oil & Gas LLC and I have a few quest ions/RFI for the Operator :

1. What is the anchor radius and plot proposed for each vessel u s e d 7

2. What are the chemicals to be used in the inhibited seawater for filling after f lushing 7

3. What shorebase(s) will be used?

4. What is the area o f t h e sand/cement bags to be used at each end?

5. Will je t t ing be required fcr cutt ing the end sections

Thank you

" Fake leaders claim thrones without building Kingdoms."

Tanya Stephens

FORNA DIPHICYL

Petroleum Engineer

U.S Department of Interior

Bureau of Safety and Environmental Enfor(;ement(BSEE)

Production and Development

1201 Elmwood Park Boulevard New Orleans, Louisiana 70123

https :/ /mall.gcx)gle.caTi/mail/^ 2 / 3

Page 18: In Reply Refer To: GE 1035A June 27, 2017 · Per your phone call, attached please find a replacement cover letter for the application referenced above that was submitted on September

1/23/2017 DEPARTMENT OF THE INTERIOR Mail - RFI PSN 17166 Rooster ROW

. • Phone: (504) 736 - 2659

Email: [email protected]

hltps://mail.google c o m / m a i l / ^ ^ 158bc3b05e84690f 3/3