16
In Key Number Order FY 2020 - 2026 STIP SUMMARY OF ALL FHWA and FTA STIP AMENDMENTS and ADMINISTRATIVE MODIFICATIONS Updated: 1/4/2021 6:46 AM Federal Approval Document Key Number District Program Year Route, Project Name Program Action MPO Area 2/24/2020 FHWA H04 1004 3 2021 SH 55, SMITH'S FERRY TO ROUND VALLEY Discretionary, Capacity Add AC | Convert in FY21 n/a 1/4/2021 AdMod 20-47 3546 2 2020 SMA-7564, A STREET, MOSCOW, STG 2 STP - Local Urban Release $28k n/a 3/18/2020 AdMod 20-08 7215 3 2020 SH 55, PAYETTE RV BR, HORSESHOE BEND Bridge Restoration Revise Milepost n/a 12/28/2020 AdMod 20-46 7826 3 2017 CORRIDOR STUDY, JCT I-84 TO EAGLE RD Planning and Scoping Increase PE $742 COMPASS 2/24/2020 FHWA H04 9070 2 2020 OFFSYS, CHERRYLANE BR, NEZ PERCE CO (DESIGN ONLY) Bridge - Off System Split out to KN 22638 n/a 5/11/2020 AdMod 20-13 9070 2 2020 OFFSYS, CHERRYLANE BR, NEZ PERCE CO (DESIGN ONLY) Bridge - Off System Increase PC $85k n/a 6/19/2020 AdMod 20-19 9070 2 2020 OFFSYS, CHERRYLANE BR, NEZ PERCE CO (DESIGN ONLY) Bridge - Off System Increase PL $32k n/a 11/18/2020 AdMod 20-36 9070 2 2020 OFFSYS, CHERRYLANE BR, NEZ PERCE CO (DESIGN ONLY) Bridge - Off System Increase PL $30k n/a 12/28/2020 AdMod 20-45 9070 2 2020 OFFSYS, CHERRYLANE BR, NEZ PERCE CO (DESIGN ONLY) Bridge - Off System Increase PL $10k, LP $60k n/a 1/22/2020 FHWA H03 9294 2 2024 US 95, THORN CR RD TO MOSCOW, PH 1 Capacity/Demo/Earmark Delay from FY22 to FY24 n/a 12/15/2020 AdMod 20-42 9894 5 2018 STIC-1701, OLD HWY 37,THE NARROWS, ONEIDA CO STP - Local Rural Decrease $371k n/a 1/16/2020 AdMod 20-01 12009 2 2020 US 12, 18TH ST TO CLEARWATER RV BR, LEWISTON Safety - State Increase UT $75k LCVMPO 11/18/2020 AdMod 20-36 12019 2 2016 OFFSYS, OROFINO CR RD BR, CLEARWATER CO Bridge - Off System Increase CL $20k n/a 11/18/2020 AdMod 20-36 12048 3 2021 STC-3016, S CEMETERY RD; SH 44 TO WILLOW CR, MIDDLETON STP - Local Urban Increase PC $28k COMPASS 7/6/2020 AdMod 20-22 12098 5 2024 NHS-7341, CENTER ST RR BR UPASS, POCATELLO STP - Local Urban Increase PL $10k BTPO 7/6/2020 AdMod 20-22 12099 5 2023 SMA-7031, INT HAWTHORNE & W QUINN RDS, CHUBBUCK STP - Local Urban Increase PL $20k BTPO 7/6/2020 AdMod 20-22 12099 5 2023 SMA-7031, INT HAWTHORNE & W QUINN RDS, CHUBBUCK STP - Local Urban Increase PE $5k BTPO 2/13/2020 AdMod 20-05 12310 1 2022 SMA-7905, RAMSEY RD; WYOMING AVE TO LANCASTER RD STP - Local Urban Decrease RW $760k KMPO 2/13/2020 AdMod 20-05 12310 1 2022 SMA-7905, RAMSEY RD; WYOMING AVE TO LANCASTER RD STP - Local Urban Increase PE/PC $760k KMPO 11/10/2020 AdMod 20-35 12310 1 2500 SMA-7905, RAMSEY RD; WYOMING AVE TO LANCASTER RD STP - Local Urban Increase LP $500 KMPO 2/28/2020 AdMod 20-06 12315 1 2020 STC-5723, KIDD ISLAND RD, KOOTENAI CO STP - Local Rural Increase PC $30k, PL $15k KMPO 2/28/2020 AdMod 20-06 12315 1 2020 STC-5723, KIDD ISLAND RD, KOOTENAI CO STP - Local Rural Increase CN/CC/CE/CL $1.1M KMPO 6/29/2020 AdMod 20-21 12315 1 2020 STC-5743, KIDD ISLAND RD, KOOTENAI CO STP - Local Rural Increase PL $12k KMPO 11/10/2020 AdMod 20-35 12382 3 2018 SMA-8043, S 18TH ST; 6TH ST TO AMERICAN LEGION BLVD STP - Local Urban Decrease $111k n/a 11/25/2020 AdMod 20-38 12382 3 2018 SMA-4083, S 18TH ST; 6TH ST TO AMERICAN LEGION BLVD STP - Local Urban Decrease $370k for closeout n/a 12/8/2020 AdMod 20-41 12995 2 2024 US 12, GREER RD TO KAMIAH, ROCKFALL MITIGATION Safety - State Increase PE/PC $100k n/a 10/30/2020 AdMod 20-33 13008 2 2024 SH 8, MP 5 EB PASSING LN, LATAH CO Capacity Increase CE $90k n/a 6/26/2020 AdMod 20-20 13014 2 2500 SMA-7674, MOUNTAIN VIEW RD, MOSCOW STP - Local Urban Increase PL $10k n/a 11/18/2020 AdMod 20-36 13055 3 2019 NHS-7773, 10TH AVE BR, CALDWELL Bridge - Local Increase CL $10k COMPASS 12/16/2020 AdMod 20-43 13119 5 2017 STP-7151, BENTON ST BR, POCATELLO Bridge - Local Increase UT $123k BTPO 3/11/2020 AdMod 20-07 13135 6 2020 OFFSYS, BEAVER CR BR, CLARK CO Bridge - Off System Increase CN $297, Chgd to GF-BR* n/a 4/29/2020 AdMod 20-11 13419 1 2020 STC-5804, WESTSIDE RD; TROUT CR BRS, BOUNDARY CO Bridge - Local Increase CN $386k n/a 11/18/2020 AdMod 20-36 13445 2 2021 STC-4715, CLEAR CR BR, IDAHO CO Bridge - Local Increase PL $20k n/a 11/5/2020 AdMod 20-34 13463 3 2016 SH 44, JCT I 84 TO STAR Restoration Increase CC $50,000 COMPASS 12/15/2020 AdMod 20-42 13472 3 2016 STATE, FY16 D3 GUARDRAIL UPGRADE Traffic Operations Increase CE $5k n/a *GF-BR, General Funds, Bridge Replacement and Rehabilitation Program Funds Idaho Transportation Department 1 of 16 Financial Planning and Analysis

In Key Number Order FY 2020 - 2026 STIP Updated: 9/21/2020 …€¦ · In Key Number Order FY 2020 - 2026 STIP SUMMARY OF ALL FHWA and FTA STIP AMENDMENTS and ADMINISTRATIVE MODIFICATIONS

  • Upload
    others

  • View
    8

  • Download
    0

Embed Size (px)

Citation preview

Page 1: In Key Number Order FY 2020 - 2026 STIP Updated: 9/21/2020 …€¦ · In Key Number Order FY 2020 - 2026 STIP SUMMARY OF ALL FHWA and FTA STIP AMENDMENTS and ADMINISTRATIVE MODIFICATIONS

In Key Number Order FY 2020 - 2026 STIPSUMMARY OF ALL FHWA and FTA

STIP AMENDMENTS and ADMINISTRATIVE MODIFICATIONS

Updated: 1/4/2021 6:46 AM

Federal

Approval Document

Key

Number District

Program

Year Route, Project Name Program Action MPO Area

2/24/2020 FHWA H04 1004 3 2021 SH 55, SMITH'S FERRY TO ROUND VALLEY Discretionary, Capacity Add AC | Convert in FY21 n/a

1/4/2021 AdMod 20-47 3546 2 2020 SMA-7564, A STREET, MOSCOW, STG 2 STP - Local Urban Release $28k n/a

3/18/2020 AdMod 20-08 7215 3 2020 SH 55, PAYETTE RV BR, HORSESHOE BEND Bridge Restoration Revise Milepost n/a

12/28/2020 AdMod 20-46 7826 3 2017 CORRIDOR STUDY, JCT I-84 TO EAGLE RD Planning and Scoping Increase PE $742 COMPASS

2/24/2020 FHWA H04 9070 2 2020 OFFSYS, CHERRYLANE BR, NEZ PERCE CO (DESIGN ONLY) Bridge - Off System Split out to KN 22638 n/a

5/11/2020 AdMod 20-13 9070 2 2020 OFFSYS, CHERRYLANE BR, NEZ PERCE CO (DESIGN ONLY) Bridge - Off System Increase PC $85k n/a

6/19/2020 AdMod 20-19 9070 2 2020 OFFSYS, CHERRYLANE BR, NEZ PERCE CO (DESIGN ONLY) Bridge - Off System Increase PL $32k n/a

11/18/2020 AdMod 20-36 9070 2 2020 OFFSYS, CHERRYLANE BR, NEZ PERCE CO (DESIGN ONLY) Bridge - Off System Increase PL $30k n/a

12/28/2020 AdMod 20-45 9070 2 2020 OFFSYS, CHERRYLANE BR, NEZ PERCE CO (DESIGN ONLY) Bridge - Off System Increase PL $10k, LP $60k n/a

1/22/2020 FHWA H03 9294 2 2024 US 95, THORN CR RD TO MOSCOW, PH 1 Capacity/Demo/Earmark Delay from FY22 to FY24 n/a

12/15/2020 AdMod 20-42 9894 5 2018 STIC-1701, OLD HWY 37,THE NARROWS, ONEIDA CO STP - Local Rural Decrease $371k n/a

1/16/2020 AdMod 20-01 12009 2 2020 US 12, 18TH ST TO CLEARWATER RV BR, LEWISTON Safety - State Increase UT $75k LCVMPO

11/18/2020 AdMod 20-36 12019 2 2016 OFFSYS, OROFINO CR RD BR, CLEARWATER CO Bridge - Off System Increase CL $20k n/a

11/18/2020 AdMod 20-36 12048 3 2021 STC-3016, S CEMETERY RD; SH 44 TO WILLOW CR, MIDDLETON STP - Local Urban Increase PC $28k COMPASS

7/6/2020 AdMod 20-22 12098 5 2024 NHS-7341, CENTER ST RR BR UPASS, POCATELLO STP - Local Urban Increase PL $10k BTPO

7/6/2020 AdMod 20-22 12099 5 2023 SMA-7031, INT HAWTHORNE & W QUINN RDS, CHUBBUCK STP - Local Urban Increase PL $20k BTPO

7/6/2020 AdMod 20-22 12099 5 2023 SMA-7031, INT HAWTHORNE & W QUINN RDS, CHUBBUCK STP - Local Urban Increase PE $5k BTPO

2/13/2020 AdMod 20-05 12310 1 2022 SMA-7905, RAMSEY RD; WYOMING AVE TO LANCASTER RD STP - Local Urban Decrease RW $760k KMPO

2/13/2020 AdMod 20-05 12310 1 2022 SMA-7905, RAMSEY RD; WYOMING AVE TO LANCASTER RD STP - Local Urban Increase PE/PC $760k KMPO

11/10/2020 AdMod 20-35 12310 1 2500 SMA-7905, RAMSEY RD; WYOMING AVE TO LANCASTER RD STP - Local Urban Increase LP $500 KMPO

2/28/2020 AdMod 20-06 12315 1 2020 STC-5723, KIDD ISLAND RD, KOOTENAI CO STP - Local Rural Increase PC $30k, PL $15k KMPO

2/28/2020 AdMod 20-06 12315 1 2020 STC-5723, KIDD ISLAND RD, KOOTENAI CO STP - Local Rural Increase CN/CC/CE/CL $1.1M KMPO

6/29/2020 AdMod 20-21 12315 1 2020 STC-5743, KIDD ISLAND RD, KOOTENAI CO STP - Local Rural Increase PL $12k KMPO

11/10/2020 AdMod 20-35 12382 3 2018 SMA-8043, S 18TH ST; 6TH ST TO AMERICAN LEGION BLVD STP - Local Urban Decrease $111k n/a

11/25/2020 AdMod 20-38 12382 3 2018 SMA-4083, S 18TH ST; 6TH ST TO AMERICAN LEGION BLVD STP - Local Urban Decrease $370k for closeout n/a

12/8/2020 AdMod 20-41 12995 2 2024 US 12, GREER RD TO KAMIAH, ROCKFALL MITIGATION Safety - State Increase PE/PC $100k n/a

10/30/2020 AdMod 20-33 13008 2 2024 SH 8, MP 5 EB PASSING LN, LATAH CO Capacity Increase CE $90k n/a

6/26/2020 AdMod 20-20 13014 2 2500 SMA-7674, MOUNTAIN VIEW RD, MOSCOW STP - Local Urban Increase PL $10k n/a

11/18/2020 AdMod 20-36 13055 3 2019 NHS-7773, 10TH AVE BR, CALDWELL Bridge - Local Increase CL $10k COMPASS

12/16/2020 AdMod 20-43 13119 5 2017 STP-7151, BENTON ST BR, POCATELLO Bridge - Local Increase UT $123k BTPO

3/11/2020 AdMod 20-07 13135 6 2020 OFFSYS, BEAVER CR BR, CLARK CO Bridge - Off System Increase CN $297, Chgd to GF-BR* n/a

4/29/2020 AdMod 20-11 13419 1 2020 STC-5804, WESTSIDE RD; TROUT CR BRS, BOUNDARY CO Bridge - Local Increase CN $386k n/a

11/18/2020 AdMod 20-36 13445 2 2021 STC-4715, CLEAR CR BR, IDAHO CO Bridge - Local Increase PL $20k n/a

11/5/2020 AdMod 20-34 13463 3 2016 SH 44, JCT I 84 TO STAR Restoration Increase CC $50,000 COMPASS

12/15/2020 AdMod 20-42 13472 3 2016 STATE, FY16 D3 GUARDRAIL UPGRADE Traffic Operations Increase CE $5k n/a

*GF-BR, General Funds, Bridge Replacement and Rehabilitation Program Funds

Idaho Transportation Department

1 of 16Financial Planning and Analysis

Page 2: In Key Number Order FY 2020 - 2026 STIP Updated: 9/21/2020 …€¦ · In Key Number Order FY 2020 - 2026 STIP SUMMARY OF ALL FHWA and FTA STIP AMENDMENTS and ADMINISTRATIVE MODIFICATIONS

In Key Number Order FY 2020 - 2026 STIPSUMMARY OF ALL FHWA and FTA

STIP AMENDMENTS and ADMINISTRATIVE MODIFICATIONS

Updated: 1/4/2021 6:46 AM

Federal

Approval Document

Key

Number District

Program

Year Route, Project Name Program Action MPO Area

8/31/2020 AdMod 20-28 13476 3 2021 SH 44, HALF CFI INT EAGLE RD & SH 44, EAGLE Advanced Construction Add AC | Convert in FY21 COMPASS

11/18/2020 AdMod 20-36 13481 3 2018 STP-7220, INT STATE ST & COLLISTER DR, BOISE STP - TMA Decrease CN $115k COMPASS

2/28/2020 AdMod 20-06 13484 3 2023 STP-710, CENTENNIAL WAY ROUNDABOUT, CALDWELL STP - Local Urban Decrease RW $40k COMPASS

11/18/2020 AdMod 20-36 13484 3 2023 STP-719, CENTENNIAL WAY ROUNDABOUT, CALDWELL STP - Local Urban Increase PC/PE $6k COMPASS

2/28/2020 AdMod 20-06 13492 3 2020 SMA-7169, INT LINDER & DEER FLAT RDS, KUNA STP - Local Urban Increase CN $553k, PC $36k, UT $21k COMPASS

6/19/2020 AdMod 20-19 13492 3 2020 SMA-7169, INT LINDER & DEER FLAT RDS, KUNA STP - Local Urban Decrease CE/CN $411k COMPASS

7/10/2020 AdMod 20-23 13492 3 2020 SMA-7169, INT LINDER & DEER FLAT RDS, KUNA STP - Local Urban Increase UT $19k COMPASS

6/26/2020 AdMod 20-20 13493 3 2021 STC-7169, S JOHNS AVE, E 12TH TO E 4TH ST, EMMETT STP - Local Urban Increase PL $10k n/a

11/10/2020 AdMod 20-35 13493 3 2021 STC-7169, S JOHNS AVE, E 12TH TO E 4TH ST, EMMETT STP - Local Urban Increase PL $20k n/a

6/9/2020 AdMod 20-18 13772 2 2024 LEWISTON ADA COMPLEMENTARY PARATRANSIT SERVICE FTA 5307 - SU Name Change per FTA LCVMPO

6/29/2020 AdMod 20-21 13864 1 2023 STC-5791, INT MEYER RD & BOEKEL RD, RATHDRUM STP - Local Urban Increase RW $92k KMPO

5/12/2020 AdMod 20-14 13873 1 2021 STC-1801, RAILROAD AVE, ST MARIES STP - Local Rural Delay RW $102k to FY21 n/a

11/18/2020 AdMod 20-36 13873 1 2020 STC-1801, RAILROAD AVE, ST MARIES STP - Local Rural Increase PL $20k n/a

11/18/2020 AdMod 20-36 13874 1 2019 STC-5740, W RIVERVIEW DR, POST FALLS HD STP - Local Rural Increase CL $30k KMPO

3/11/2020 AdMod 20-07 13897 2 2020 STC-4734, WINCHESTER RD, EVERGREEN HD STP - Local Rural Increase CE/CN $1.7M n/a

6/19/2020 AdMod 20-19 13897 2 2020 STC-4734, WINCHESTER RD, EVERGREEN HD STP - Local Rural Increase PL $20k n/a

12/28/2020 AdMod 20-45 13897 2 2020 STC-4734, WINCHESTER RD, EVERGREEN HD STP - Local Rural Increase CN $179k n/a

11/18/2020 AdMod 20-36 13905 3 2024 STC-6748, N 10TH AVE ITS & OVERLAY, CALDWELL STP - Local Urban Increase PC $7k COMPASS

1/24/2020 AdMod 20-02 13906 3 2020 LOCAL, FY20 CAPITAL MAINTENANCE, VRT, NAMPA STP - Local Urban Change work class to Pub Trans COMPASS

4/16/2020 AdMod 20-10 13998 4 2021 STC-2822, W GLENDALE RD & CNL BR, BLAINE CO STP - Local Rural Delay to FY21 n/a

5/12/2020 AdMod 20-14 13998 4 2021 STC-2822, W GLENDALE RD & CNL BR, BLAINE CO STP - Local Rural Delay CE/CN $1.6M to FY21 n/a

9/10/2020 AdMod 20-29 13998 4 2020 STC-2822, W GLENDALE RD & CNL BR, BLAINE CO STP - Local Rural Advance from FY21 to FY20 n/a

11/18/2020 AdMod 20-36 13998 4 2020 STC-2822, W GLENDALE RD & CNL BR, BLAINE CO STP - Local Rural Increase PL $12k n/a

6/29/2020 AdMod 20-21 14058 4 2022 STC-6805, A2 HIGHWAY, CLARK CO STP - Local Rural Increase PC $20k n/a

3/11/2020 AdMod 20-07 14060 6 2020 OFFSYS, GREAT WESTERN CNL BR, BONNEVILLE CO Bridge - Off System Increase CN $110k, Chgd to GF-BR* BMPO

6/22/2020 FHWA H09 14060 6 2020 OFFSYS, GREAT WESTERN CNL BR, BONNEVILLE CO Bridge - Off System Increase CN $535k BMPO

6/29/2020 AdMod 20-21 14060 6 2020 OFFSYS, GREAT WESTERN CNL BR, BONNEVILLE CO Bridge - Off System Increase PL $7k BMPO

11/18/2020 AdMod 20-36 14060 6 2020 OFFSYS, GREAT WESTERN CNL BR, BONNEVILLE CO Bridge - Off System Increase PL $3k BMPO

5/27/2020 AdMod 20-16 14210 2 2020 LEWISTON UZA ROLLING STOCK FTA 5339 - SU Advance to FY20 LCVMPO

8/11/2020 FTA T04 14210 2 2020 LEWISTON UZA ROLLING STOCK FTA 5339 - SU Decrease $80k, to KN 23082 LCVMPO

2/28/2020 AdMod 20-06 18716 1 2023 SMA-7505, SPOKANE ST RV BR, POST FALLS Bridge - Local Increase PE $2k, PL $15k KMPO

11/18/2020 AdMod 20-36 18716 1 2020 SMA-7505, SPOKANE ST RV BR, POST FALLS Bridge - Local Increase PL $10k KMPO

6/9/2020 AdMod 20-18 18728 3 2020 LOCAL, FY20 CAPITAL MAINTENANCE, ACHD STP - TMA Decrease CN $1M COMPASS

6/9/2020 AdMod 20-18 18728 3 2020 LOCAL, FY20 CAPITAL MAINTENANCE, ACHD Local Participation Decrease CN $27k COMPASS

11/18/2020 AdMod 20-36 18728 3 2020 LOCAL, FY20 CAPITAL MAINTENANCE, ACHD STP - TMA Increase CC $115k COMPASS

*GF-BR, General Funds, Bridge Replacement and Rehabilitation Program Funds

Idaho Transportation Department

2 of 16Financial Planning and Analysis

Page 3: In Key Number Order FY 2020 - 2026 STIP Updated: 9/21/2020 …€¦ · In Key Number Order FY 2020 - 2026 STIP SUMMARY OF ALL FHWA and FTA STIP AMENDMENTS and ADMINISTRATIVE MODIFICATIONS

In Key Number Order FY 2020 - 2026 STIPSUMMARY OF ALL FHWA and FTA

STIP AMENDMENTS and ADMINISTRATIVE MODIFICATIONS

Updated: 1/4/2021 6:46 AM

Federal

Approval Document

Key

Number District

Program

Year Route, Project Name Program Action MPO Area

8/20/2020 AdMod 20-27 18737 4 2020 US 93, 200 SOUTH RD, JEROME CO Bridge Restoration Increase CN $700k n/a

4/30/2020 AdMod 20-12 18770 2 2021 STC-4792, BEECH/CHESTNUT ST RECONSTRUCTION STP - Local Rural Increase PC $66k n/a

4/30/2020 AdMod 20-12 18770 2 2021 STC-4792, BEECH/CHESTNUT ST RECONSTRUCTION STP - Local Rural Decrease RW $40k n/a

11/18/2020 AdMod 20-36 18770 2 2021 STC-4792, BEECH/CHESTNUT ST RECONSTRUCTION, GENESEE STP - Local Rural Increase PL $20k n/a

3/30/2020 AdMod 20-09 18781 3 2500 TRANSIT ASSET MANAGEMENT, NAMPA FTA 5307 - SU Decrease CN $1,259k COMPASS

3/18/2020 AdMod 20-08 18786 3 2500 OPERATIONS - FIXED LINE & MOBILITY MGT, NAMPA FTA 5307 - SU Increase CN $745k, unprog. & CO COMPASS

3/30/2020 AdMod 20-09 18786 3 2500 OPERATIONS - FIXED LINE & MOBILITY MGT, NAMPA FTA 5307 - SU Increase CN $900k COMPASS

3/30/2020 AdMod 20-09 18788 3 2500 TRANSIT ASSET MANAGEMENT, BOISE FTA 5307 - LU Decrease CN $143k COMPASS

3/18/2020 AdMod 20-08 18842 3 2500 PLANNING & MOBILITY IMPLEMENTATION, NAMPA FTA 5307 - SU Increase CN $1.1M, unprog. & CO COMPASS

3/30/2020 AdMod 20-09 18842 3 2500 PLANNING & MOBILITY IMPLEMENTATION, NAMPA FTA 5307 - SU Increase CN $154k COMPASS

3/30/2020 AdMod 20-09 18854 3 2500 PLANNING & MOBILITY MGT, VRT, BOISE FTA 5307 - LU Increase CN 325k COMPASS

11/18/2020 AdMod 20-36 18905 3 2021 LOCAL, FY21 TRANSIT ASSET MANAGEMENT, VRT STP - TMA Increase CN $954k COMPASS

3/18/2020 AdMod 20-08 18914 3 2500 PREVENTIVE MTCE & DEMAND RESPONSE, NAMPA FTA 5307 - SU Increase CN $844k, unprog. & CO COMPASS

5/12/2020 AdMod 20-14 18933 6 2022 STC-6867, GARDEN CR RD TO CHALLIS CL STP - Local Rural Delay PC/RW $252k to FY21 n/a

11/18/2020 AdMod 20-36 18933 6 2021 STC-6867, GARDEN CR RD TO CHALLIS CL STP - Local Rural Increase PC $17k n/a

6/29/2020 AdMod 20-21 18973 4 2022 LOCAL, 1700 S RD BRIDGE, GOODING HD #1 Bridge - Local Increase UT $23k n/a

3/11/2020 AdMod 20-07 19030 6 2020 STC-6810, PACKSADDLE RD TETON RV BR, TETON CO Bridge - Local Increase CN $61k, Chgd to GF-BR* n/a

4/29/2020 AdMod 20-11 19030 6 2020 STC-6810, PACKSADDLE RD TETON RV BR, TETON CO Bridge - Local Increase PL $1.9k n/a

6/19/2020 AdMod 20-19 19030 6 2020 STC-6810, PACKSADDLE RD TETON RV BR, TETON CO Bridge - Local Increase PL $2k, CN $43k n/a

2/28/2020 AdMod 20-06 19046 1 2021 OFFSYS, RUBY CR #2 BR, BOUNDARY CO Bridge - Off System Delay from FY20 to FY21 n/a

8/31/2020 AdMod 20-28 19046 1 2020 OFFSYS, RUBY CR #2 BR, BOUNDARY CO Bridge - Off System Advance from FY21 to FY20 n/a

11/18/2020 AdMod 20-36 19046 1 2020 OFFSYS, RUBY CR #2 BR, BOUNDARY CO Bridge - Off System Increase PL $12k n/a

12/28/2020 AdMod 20-45 19046 1 2021 OFFSYS, RUBY CR #2 BR, BOUNDARY CO Bridge - Off System Increase CN, CL, PL $410k n/a

6/19/2020 FHWA H08/T02 19057 3 2020 LOCAL, FY20 TRANSIT ASSET MANAGEMENT, VRT STP - TMA Increase $535k FA COMPASS

7/10/2020 AdMod 20-23 19057 3 2020 ROLLING STOCK, INFRASTRUCTURE AND TECHNOLOGY, VRT STP - TMA Name change per FTA COMPASS

10/30/2020 AdMod 20-33 19114 4 2021 SMA-8072, NORTH RD PHASE 3, JEROME HD STP - Local Rural Increase CN $362k n/a

11/18/2020 AdMod 20-36 19114 4 2021 SMA-8072, NORTH RD PHASE 3, JEROME HD STP - Local Rural Increase PL $7k n/a

11/5/2020 AdMod 20-34 19122 3 2025 TRANSIT ASSET MANAGEMENT, BOISE FTA 5339 - LU Move FY20 funding to FY21 COMPASS

5/12/2020 AdMod 20-14 19129 3 2024 STC-8217, COVE RD BRIDGE, WASHINGTON CO Bridge - Local Delay PC/RW $350k to FY21 n/a

12/16/2020 AdMod 20-43 19194 2 2020 LOCAL, FY20 LCVMPO METRO PLANNING Metro Planning Decrease $190k LCVMPO

4/16/2020 AdMod 20-10 19195 2 2021 US 95, DEEP CR BR, LATAH CO Bridge Restoration Increase PE $30k n/a

4/29/2020 AdMod 20-11 19195 2 2021 US 95, DEEP CR BR, LATAH CO Bridge Restoration Increase PE $30k n/a

7/23/2020 AdMod 20-25 19195 2 2021 US 95, DEEP CR BR, LATAH CO Bridge Restoration Increase RW/LP $100k n/a

11/25/2020 AdMod 20-38 19195 2 2022 US 95, DEEP CR BR, LATAH CO Bridge Restoration Increase PC $76k n/a

4/29/2020 AdMod 20-11 19247 5 2500 S FISHER ST; E WALKER ST TO BRIDGE ST, BLACKFOOT STP - Local Urban Revise name n/a

*GF-BR, General Funds, Bridge Replacement and Rehabilitation Program Funds

Idaho Transportation Department

3 of 16Financial Planning and Analysis

Page 4: In Key Number Order FY 2020 - 2026 STIP Updated: 9/21/2020 …€¦ · In Key Number Order FY 2020 - 2026 STIP SUMMARY OF ALL FHWA and FTA STIP AMENDMENTS and ADMINISTRATIVE MODIFICATIONS

In Key Number Order FY 2020 - 2026 STIPSUMMARY OF ALL FHWA and FTA

STIP AMENDMENTS and ADMINISTRATIVE MODIFICATIONS

Updated: 1/4/2021 6:46 AM

Federal

Approval Document

Key

Number District

Program

Year Route, Project Name Program Action MPO Area

6/26/2020 AdMod 20-20 19247 5 2500 SMA-7607, S FISHER ST; E WALKER ST TO E ALICE ST, BLACKFOOT STP - Local Urban Increase PL $20k n/a

11/10/2020 AdMod 20-35 19247 5 2500 SMA-7607, S FISHER AVE; E WALKER ST TO E ALICE ST, BLACKFOOT STP - Local Urban Increase PC/PL $27k n/a

9/10/2020 AdMod 20-29 19248 1 2022 US 95, SANDPOINT LONG BR OVER PEND O'REILLE Advanced Construction Add AC | Convert in FY21 n/a

9/10/2020 AdMod 20-29 19253 9 2020 FY19 DISADVANTAGED BUSINESS ENTERPRISES Other Federal Non-Formula Reduce cost, split off to KN 23087 n/a

6/22/2020 FHWA H09 19261 2 2021 US 95, CULDESAC CANYON PASSING LN PH 2; LAPWAI CR BRIDGES Bridge Restoration/Capacity Increase $1.8M n/a

9/10/2020 AdMod 20-29 19261 2 2021 US 95, CULDESAC CANYON PASSING LN PH 2; LAPWAI CR BRIDGES Bridge Restoration Increase CN $500k n/a

10/30/2020 AdMod 20-33 19261 2 2021 US 95, CULDESAC CANYON PASSING LN PH 2; LAPWAI CR BRIDGES Bridge Restoration Increase CE $177k n/a

5/12/2020 AdMod 20-14 19292 1 2500 STC-5764, MAIN ST/SILER VALLEY RD BRIDGE, PINEHURST Bridge - Local Delay PE/PC $383k to FY21 n/a

6/29/2020 AdMod 20-21 19305 6 2022 STC-6748, ANNIS HWY; RIGBY TO MENAN-LORENZO HWY STP - Local Rural Increase RW $60k n/a

3/18/2020 AdMod 20-08 19312 4 2020 SH 27, POLELINE INT IMPROVEMENT, CASSIA CO Capacity Increase CE/CN $136k n/a

5/11/2020 AdMod 20-13 19312 4 2020 SH 27, POLELINE INT IMPROVEMENT, CASSIA CO Capacity Increase CN $47k n/a

1/24/2020 AdMod 20-02 19344 1 2023 LOCAL, EARLY CORRIDOR ACQUISITION & PRESERVATION STP - Local Urban Decrease PE $10k, PC $240k KMPO

7/10/2020 AdMod 20-23 19376 5 2022 US 91, SHELLEY NCL TO YORK RD, PH2 Advanced Construction Add AC | Convert in FY21 & 22 n/a

11/5/2020 AdMod 20-34 19380 3 2025 D3 5311 STATEWIDE RURAL AREA FORMULA PROGRAM FTA 5311 Rural Move FY20 funding to FY21 COMPASS

9/10/2020 AdMod 20-29 19389 3 2020 LOCAL, FY21 COMPASS PLANNING (3) STP - Local Urban Advance from FY21 to FY20 COMPASS

9/10/2020 AdMod 20-29 19389 3 2020 LOCAL, FY21 COMPASS PLANNING (3) STP - TMA Advance from FY21 to FY20 COMPASS

2/28/2020 AdMod 20-06 19399 3 2021 US 95, LITTLE SALMON RV BR, ADAMS CO Bridge Restoration Increase PE $37k n/a

4/16/2020 AdMod 20-10 19399 3 2021 US 95, LITTLE SALMON RV BR, ADAMS CO Bridge Restoration Increase PE $25k n/a

6/2/2020 AdMod 20-17 19431 1 2020 I 90, BLUE CR BAY BR, KOOTENAI CO Bridge Restoration Increase CC $250k KMPO

2/28/2020 AdMod 20-06 19434 6 2022 NHC-6854, 45TH W; 49TH S TO US-20, BONNEVILLE CO STP - Local Rural Increase PL $20k BMPO

11/18/2020 AdMod 20-36 19513 1 2021 STC-5770, WISCONSIN ST; HIGH ST TO US-2, PRIEST RIVER STP - Local Rural Increase PL $25k n/a

1/24/2020 AdMod 20-02 19518 1 2020 LOCAL, FY20 KMPO METRO PLANNING STP - Local Urban Increase PE $10k, PC $240k KMPO

12/3/2020 AdMod 20-40 19518 1 2020 LOCAL, FY20 KMPO METRO PLANNING STP - Local Urban Decrease CN $155k KMPO

7/23/2020 AdMod 20-25 19526 2 2021 US 95, JCT SH 6 TURNBAY, LATAH CO Safety - State Increase RW/LP $100k n/a

12/16/2020 AdMod 20-43 19527 5 2020 LOCAL, FY20 BTPO METRO PLANNING Metro Planning Decrease $62k BTPO

2/28/2020 AdMod 20-06 19530 6 2022 STC-6707, 97 S; IDAHO CANAL BRIDGE, BONNEVILLE CO Bridge - Local Increase PC $40k BMPO

11/18/2020 AdMod 20-36 19530 6 PREL STC-6707, 97 S; IDAHO CANAL BRIDGE, BONNEVILLE CO Bridge - Local Increase PL $25k BMPO

12/21/2020 AdMod 20-44 19530 6 2500 STC-6707, 97 S; IDAHO CANAL BRIDGE, BONNEVILLE CO Bridge - Local Increase PE $800 BMPO

12/21/2020 AdMod 20-44 19530 6 2500 STC-6707, 97 S; IDAHO CANAL BRIDGE, BONNEVILLE CO Bridge - Local Increase PC $25k BMPO

12/21/2020 AdMod 20-44 19566 6 2024 OFFSYS, FUN FARM BRIDGE, FREMONT CO Bridge - Off System Increase 3k n/a

9/10/2020 AdMod 20-29 19571 3 2020 LOCAL, PLANNING, COMMUNITIES IN MOTION MAJOR UPDATE STP - TMA Advance from FY21/22 to FY20 COMPASS

9/16/2020 AdMod 20-30 19605 5 2022 I 86B, INT POCATELLO AVE, POWER CO Capacity Increase LP $125k n/a

8/6/2020 AdMod 20-26 19622 5 2024 STC-1705, BANNOCK ST, MALAD CITY STP - Local Rural Increase PC $4k n/a

5/12/2020 AdMod 20-14 19637 4 2023 STC-2837, YALE RD STG 4; MP 12.1 TO 13.7 STP - Local Rural Delay RW $225k to FY21 n/a

6/19/2020 AdMod 20-19 19673 2 2020 SH 3, N OF BOVILL, POTLATCH RV BR, LATAH CO Bridge Restoration Increase CN $250k n/a

*GF-BR, General Funds, Bridge Replacement and Rehabilitation Program Funds

Idaho Transportation Department

4 of 16Financial Planning and Analysis

Page 5: In Key Number Order FY 2020 - 2026 STIP Updated: 9/21/2020 …€¦ · In Key Number Order FY 2020 - 2026 STIP SUMMARY OF ALL FHWA and FTA STIP AMENDMENTS and ADMINISTRATIVE MODIFICATIONS

In Key Number Order FY 2020 - 2026 STIPSUMMARY OF ALL FHWA and FTA

STIP AMENDMENTS and ADMINISTRATIVE MODIFICATIONS

Updated: 1/4/2021 6:46 AM

Federal

Approval Document

Key

Number District

Program

Year Route, Project Name Program Action MPO Area

8/20/2020 AdMod 20-27 19682 1 2021 SH 41, MULLAN AVE TO PRAIRIE AVE, POST FALLS Advanced Construction Add AC | Convert in FY21 KMPO

3/30/2020 AdMod 20-09 19691 3 2500 ACQUISITION OF SERVICE, BOISE FTA 5310 >200k Increase CN $17k COMPASS

11/5/2020 AdMod 20-34 19693 6 2016 US 26, SLOPE MONITORS MP 373 TO 402 Restoration Increase PC $30k n/a

5/12/2020 AdMod 20-14 19718 1 2500 STC-5750, PINE CR RD BRIDGE, SHOESHONE CO Bridge - Local Delay PE/PC $260k to FY21 n/a

4/16/2020 AdMod 20-10 19725 2 2021 SH 3, MIDDLE FK POTLATCH CR BR, LATAH CO Bridge Restoration Increase PE/PC $35k n/a

7/6/2020 FTA T03 19735 4 2024 D4 5339 BUS AND BUS FACILITY FTA 5339 - Rural Break out RW, revise description n/a

6/29/2020 AdMod 20-21 19749 1 2020 STC-5829, RIVERVIEW DR GUARDRAIL INSTALL, POST FALLS HD Safety - Local Increase PL $1k KMPO

1/4/2021 AdMod 20-47 19749 1 2018 STC-5829, RIVERVIEW DR GUARDRAIL INSTALLATION, POST FALLS HD Safety - Local Increase CL $10k KMPO

12/21/2020 AdMod 20-44 19838 5 2022 STC-1809, DINGLE E SHORE; BEACH TO CEMETERY, BEAR LAKE CO STP - Local Rural Increase PC $38k n/a

3/30/2020 AdMod 20-09 19847 3 2020 LOCAL, FY20 CAPITAL MAINTENANCE, PH 3, ACHD STP - TMA Decrease CE $39k, CN $254k COMPASS

3/30/2020 AdMod 20-09 19847 3 2020 LOCAL, FY20 CAPITAL MAINTENANCE, PH 3, ACHD Local Participation Increase CE $39k, CN $254k COMPASS

5/11/2020 AdMod 20-13 19847 3 2020 LOCAL, FY20 CAPITAL MAINTENANCE, PH 3, ACHD Local Participation Decrease CE/CC/CN $53k COMPASS

5/11/2020 AdMod 20-13 19847 3 2020 LOCAL, FY20 CAPITAL MAINTENANCE, PH 3, ACHD STP - TMA Increase CE/CC/CN $53k COMPASS

6/9/2020 AdMod 20-18 19847 3 2020 LOCAL, FY20 CAPITAL MAINTENANCE, PH 3, ACHD STP - TMA Increase CN $241k COMPASS

6/9/2020 AdMod 20-18 19847 3 2020 LOCAL, FY20 CAPITAL MAINTENANCE, PH 3, ACHD Local Participation Decrease CN $241k COMPASS

6/19/2020 AdMod 20-19 19847 3 2020 LOCAL, FY20 CAPITAL MAINTENANCE, PH 3, ACHD STP - TMA Increase CN $153k COMPASS

12/2/2020 AdMod 20-38 19847 3 2020 LOCAL, FY20 CAPITAL MAINTENANCE, PH 3, ACHD STP - TMA Increase CN $153k COMPASS

4/16/2020 AdMod 20-10 19861 2 2022 SH 13, CURVE IMPROVEMENT, NR KOOSKIA Safety - State Increase PE $20k n/a

10/15/2020 AdMod 20-32 19861 2 2023 SH 13, CURVE IMPROVEMENT, NR KOOSKIA Safety - State Delay from FY22 to FY23 n/a

1/24/2020 AdMod 20-02 19867 5 2020 STATE, FY20 N BANNOCK CO PAVEMENT PRESERVATION Pave. Preservation (Com.) Increase CN $1.2M BTPO

3/30/2020 AdMod 20-09 19887 3 2020 LOCAL, FY20 CAPITAL MAINTENANCE, PH 2, ACHD STP - TMA Decrease CN $767k COMPASS

3/30/2020 AdMod 20-09 19887 3 2020 LOCAL, FY20 CAPITAL MAINTENANCE, PH 2, ACHD STP - TMA (Gen. Funds) Increase CN $751k COMPASS

3/30/2020 AdMod 20-09 19887 3 2020 LOCAL, FY20 CAPITAL MAINTENANCE, PH 2, ACHD Local Participation Increase CN $16k COMPASS

5/11/2020 AdMod 20-13 19887 3 2020 LOCAL, FY20 CAPITAL MAINTENANCE, PH 2, ACHD Local Participation Decrease CN $16k COMPASS

5/11/2020 AdMod 20-13 19887 3 2020 LOCAL, FY20 CAPITAL MAINTENANCE, PH 2, ACHD STP - TMA Increase CN $16k COMPASS

12/15/2020 AdMod 20-42 19921 4 2017 OFFSYS, FY18 MOUNTAIN RIDES SR2S COORDINATOR TAP - Urban Increase $28 n/a

2/28/2020 AdMod 20-06 19941 2 2021 US 95, RIVERSIDE NB PASSING LN, LATAH CO Safety - State Increase RW $20k, LP $40k n/a

12/3/2020 AdMod 20-40 19941 2 2021 US 95, RIVERSIDE NB PASSING LN, LATAH CO Safety - State Increase CN $511kk n/a

1/8/2020 FHWA H01 19944 3 2020 US 20/26, CHINDEN; LOCUST GROVE TO EAGLE Safety - State Increase CN $3.6M COMPASS

5/11/2020 AdMod 20-13 19944 3 2020 US 20/26, CHINDEN; LOCUST GROVE TO EAGLE Capacity Decrease CC/CN $11.3M COMPASS

5/11/2020 AdMod 20-13 19944 3 2020 US 20/26, CHINDEN; LOCUST GROVE TO EAGLE Safety - State Increase CC/CN $11.3M COMPASS

5/11/2020 AdMod 20-13 19944 3 2020 US 20/26, CHINDEN; LOCUST GROVE TO EAGLE Safety - State Increase PE/RW/LP $307k COMPASS

12/16/2020 AdMod 20-43 19952 5 2021 LOCAL, FY21 BTPO METRO PLANNING Metro Planning Increase $62k BTPO

9/10/2020 AdMod 20-29 19955 1 PREL SMA-7515, CHASE RD BNSF RRX, CITY OF POST FALLS STP - Local Urban Advance (design) from FY22 to FY20 KMPO

9/10/2020 AdMod 20-29 19993 3 2023 FY23 ROADWAY AND ADA IMPROVEMENTS, PART 2, BOISE AREA STP - TMA Chg name, Adv (design) from FY21 to FY20 COMPASS

*GF-BR, General Funds, Bridge Replacement and Rehabilitation Program Funds

Idaho Transportation Department

5 of 16Financial Planning and Analysis

Page 6: In Key Number Order FY 2020 - 2026 STIP Updated: 9/21/2020 …€¦ · In Key Number Order FY 2020 - 2026 STIP SUMMARY OF ALL FHWA and FTA STIP AMENDMENTS and ADMINISTRATIVE MODIFICATIONS

In Key Number Order FY 2020 - 2026 STIPSUMMARY OF ALL FHWA and FTA

STIP AMENDMENTS and ADMINISTRATIVE MODIFICATIONS

Updated: 1/4/2021 6:46 AM

Federal

Approval Document

Key

Number District

Program

Year Route, Project Name Program Action MPO Area

11/18/2020 AdMod 20-36 20003 3 2019 LOCAL, FY19 CAPITAL MAINTENANCE, PH 2, ACHD STP - TMA Increase CC $30/CN $270k COMPASS

2/13/2020 AdMod 20-05 20034 1 2022 SH 1, US-95 JCT SPRING HILL RD SEALCOAT, BOUNDARY CO Pave. Preservation (Non-Com.) Increase PE $6k, PC $4k n/a

3/30/2020 AdMod 20-09 20034 1 2022 SH 1, US-95 JCT SPRING HILL RD SEALCOAT, BOUNDARY CO Pave. Preservation (Non-Com.) Revise Milepost n/a

5/21/2020 FHWA H06 20038 1 2023 STC-5727, RAMSEY RD; CHILCO TO SCARCELLO, LAKES HD STP - Local Rural Increase $750k KMPO

6/2/2020 AdMod 20-17 20048 1 2020 SH41, FY21 D1 ADA IMPROVEMENTS, RATHDRUM Traffic Operations Advance to FY20 KMPO

1/22/2020 FHWA H03 20051 5 2020 US 30, CARIBOU CO LN TO GEORGETOWN SUMMIT, BEAR LAKE CO Restoration Increase CN $1.9M n/a

10/15/2020 AdMod 20-32 20053 6 2025 US 20, CHESTER TO ASHTON , FREMONT CO Restoration Increase PC $2M, offset from KN 20581 n/a

3/11/2020 AdMod 20-07 20060 3 2021 I 84, SAND HOLLOW IC TO FARMERS SEBREE CANAL Pave. Preservation (Com.) Increase PE $10k COMPASS

11/18/2020 AdMod 20-36 20060 3 2021 I 84, SAND HOLLOW IC TO FARMERS SEBREE CANAL Pave. Preservation (Com.) Increase CE/CN $421k COMPASS

10/30/2020 AdMod 20-33 20065 6 2020 STATE, I-15/US-20 CONNECTOR STUDY Planning and Scoping Increase PC $1.1M BMPO

9/10/2020 AdMod 20-29 20080 3 2023 FY23 ROADWAY AND ADA IMPROVEMENTS, PART 3, BOISE AREA STP - TMA Chg name, Adv (design) from FY21 to FY20 COMPASS

7/21/2020 FHWA H10 20088 HQ 2020 STATE, FY20 NAT'L SUMMER TRANS INSTITUTE Other Federal Non-Formula Remove from program n/a

9/17/2020 FHWA H13 20094 1 2020 STC-1698, FRENCH GULCH/FERNAN HILL RD, EASTSIDE HD STP - Local Rural Add to program KMPO

11/18/2020 AdMod 20-36 20095 3 2018 LOCAL, BOISE STATE UNIVERSITY SECURE BIKE FACILITIES STBG - TMA Increase PL $.5k/CC $10k COMPASS

1/16/2020 FHWA H02 20098 1 2021 SH 41, E PRAIRIE AVE TO BOEKEL RD, KOOTENAI CO Capacity/Freight Includes KN 20120 KMPO

4/16/2020 AdMod 20-10 20098 1 2021 SH 41, E PRAIRIE AVE TO BOEKEL RD, KOOTENAI CO Capacity Increase PE $5k KMPO

4/29/2020 AdMod 20-11 20098 1 2021 SH 41, E PRAIRIE AVE TO BOEKEL RD, KOOTENAI CO Capacity Increase UT $532k KMPO

4/29/2020 AdMod 20-11 20098 1 2021 SH 41, E PRAIRIE AVE TO BOEKEL RD, KOOTENAI CO Capacity Increase PE $25k KMPO

5/21/2020 FHWA H06 20098 1 2021 SH 41, E PRAIRIE AVE TO BOEKEL RD, KOOTENAI CO Capacity Increase $3.2M KMPO

7/10/2020 AdMod 20-23 20098 1 2021 SH 41, E PRAIRIE AVE TO BOEKEL RD, KOOTENAI CO Capacity Increase LP $80k KMPO

7/16/2020 AdMod 20-24 20098 1 2021 SH 41, E PRAIRIE AVE TO BOEKEL RD, KOOTENAI CO Capacity Increase LP $327k KMPO

2/5/2020 AdMod 20-03 20114 6 2023 US 20, EXPRESSWAY MEDIAN CABLE BARRIER, BONNEVILLE CO Safety - State Increase PE $30k BMPO

6/2/2020 AdMod 20-17 20114 6 2023 US 20, EXPRESSWAY MEDIAN CABLE BARRIER, BONNEVILLE CO Safety - State Increase PE $30k BMPO

1/16/2020 FHWA H02 20120 1 2021 SH 41, LANCASTER RD TO BOEKEL RD, RATHDRUM, DESIGN ONLY Safety/Restoration Move CE/CC/CN to KN 20098 KMPO

7/16/2020 AdMod 20-24 20120 1 2021 SH 41, LANCASTER RD TO BOEKEL RD, RATHDRUM, DESIGN ONLY Restoration Decrease LP $327k KMPO

9/16/2020 AdMod 20-30 20120 1 2021 SH 41, LANCASTER RD TO BOEKEL RD, RATHDRUM, DESIGN ONLY Safety - State Increase UT $115k KMPO

10/30/2020 AdMod 20-33 20120 1 2021 SH 41, LANCASTER RD TO BOEKEL RD, RATHDRUM, DESIGN ONLY Restoration Increase LP $297k KMPO

11/5/2020 AdMod 20-34 20136 3 2025 D3 BUS & BUS FACILITIES FTA 5339 Rural Move FY20 funding to FY21 COMPASS

11/18/2020 AdMod 20-36 20141 3 2020 OFFSYS, INDIAN CR PATH EXT; TAFFY TO PEPPERMINT, NAMPA TAP - Urban Decrease CN $32k COMPASS

1/24/2020 AdMod 20-02 20143 3 2021 SMA-7179, MAIN ST; AVENUE C TO AVENUE A, KUNA TAP - TMA Increase CN $54k COMPASS

9/10/2020 AdMod 20-29 20143 3 2020 SMA-7179, MAIN ST; AVENUE C TO AVENUE A, KUNA STP - TMA Convert LP to STP-TMA COMPASS

9/10/2020 AdMod 20-29 20143 3 2020 SMA-7179, MAIN ST; AVENUE C TO AVENUE A, KUNA Local Participation Increase PC $130k COMPASS

4/29/2020 AdMod 20-11 20146 3 2500 OFFSYS, MISSION ST; SCL TO DEINHARD LN, MCCALL STP - Local Rural Increase PC $198k n/a

12/16/2020 AdMod 20-43 20154 2 2021 LOCAL, FY21 LCVMPO METRO PLANNING Metro Planning Increase $190k LCVMPO

12/2/2020 AdMod 20-38 20159 3 2021 LOCAL, FY21 CAPITAL MAINTENANCE, PHASE 3, BOISE AREA Local Participation Decrease CN $314k COMPASS

*GF-BR, General Funds, Bridge Replacement and Rehabilitation Program Funds

Idaho Transportation Department

6 of 16Financial Planning and Analysis

Page 7: In Key Number Order FY 2020 - 2026 STIP Updated: 9/21/2020 …€¦ · In Key Number Order FY 2020 - 2026 STIP SUMMARY OF ALL FHWA and FTA STIP AMENDMENTS and ADMINISTRATIVE MODIFICATIONS

In Key Number Order FY 2020 - 2026 STIPSUMMARY OF ALL FHWA and FTA

STIP AMENDMENTS and ADMINISTRATIVE MODIFICATIONS

Updated: 1/4/2021 6:46 AM

Federal

Approval Document

Key

Number District

Program

Year Route, Project Name Program Action MPO Area

12/2/2020 AdMod 20-38 20159 3 2021 LOCAL, FY21 CAPITAL MAINTENANCE, PHASE 3, BOISE AREA STBG - TMA Increase CN $458k COMPASS

11/24/2020 AdMod 20-37 20164 1 2020 OFFSYS, MOUNTAIN VIEW DR BNSF RRX, BONNER CO Rail Crossing Increase PE $27k n/a

1/22/2020 FHWA H03 20171 4 2025 I 84, KASOTA IC TO BURLEY IC WBL, MINIDOKA CO Restoration Delay from FY24 to FY25 n/a

3/18/2020 AdMod 20-08 20171 4 2025 I 84, KASOTA IC TO BURLEY IC WBL, MINIDOKA CO Restoration Increase PC $100k n/a

2/5/2020 AdMod 20-03 20189 6 2021 STATE, FY21 D6 BRIDGE REPAIR Bridge Preservation Increase PE $125k BMPO

1/16/2020 AdMod 20-01 20191 4 2021 I 84, DECLO POE WB, CASSIA CO Freight Increase LP $20k n/a

8/6/2020 AdMod 20-26 20191 4 2021 I 84, DECLO POE WB, CASSIA CO Advanced Construction Add AC | Convert in FY21 n/a

10/30/2020 AdMod 20-33 20191 4 2021 I 84, DECLO POE WB, CASSIA CO Freight Increase CC/CN $741k n/a

4/16/2020 AdMod 20-10 20193 2 2021 US 95, LAWYERS CR BR TO LAUER RD, LEWIS CO Pave. Preservation (Com.) Increase PE $6k n/a

9/10/2020 AdMod 20-29 20198 1 2021 LOCAL, FY21 KMPO METRO PLANNING STP - Local Urban Advance from FY21 to FY20 KMPO

12/3/2020 AdMod 20-40 20198 1 2021 LOCAL, FY21 KMPO METRO PLANNING STP - Local Urban Increase CN $155k KMPO

1/16/2020 AdMod 20-01 20203 3 2020 I 84, EISENMAN IC TO MP 70 AND MP 82 TO MOUNTAIN HOME Pave. Preservation (Com.) Decrease CN 597k COMPASS

1/16/2020 AdMod 20-01 20203 3 2020 I 84, EISENMAN IC TO MP 70 AND MP 82 TO MOUNTAIN HOME Pave. Preservation (Com.) Increase PE $3k COMPASS

3/30/2020 AdMod 20-09 20207 1 2500 OFFSYS, RAPID LIGHTNING CR BR #5, BONNER CO Bridge - Off System Increase CN $379, $130k - GF-BR* n/a

4/22/2020 FHWA H05 20212 3 2025 I 84, GARRITY IC TO TEN MILE IC, NAMPA Pave. Preservation (Com.) Remove from program COMPASS

8/6/2020 AdMod 20-26 20215 1 2022 STC-5804, DEEP CR LOOP; JCT US-95 TO LIONS DEN, BOUNDARY CO STP - Local Rural Increase PL $6.6k n/a

10/30/2020 AdMod 20-33 20222 HQ 2018 STATE, SAGE JCT POE NB WEIGH-IN-MOTION Freight Increase CE $275k n/a

3/30/2020 AdMod 20-09 20230 3 2024 OFFSYS, EASTSIDE DR BR, VALLEY CO Bridge - Off System Increase CN $454k - GF-BR* n/a

5/12/2020 AdMod 20-14 20242 3 2500 STC-3945, E LAKE FR RD; E LAKE FR CR BR TO SH 55 STP - Local Rural Delay PE/PC/PL $122k to FY21 n/a

5/12/2020 AdMod 20-14 20243 6 2500 FAS-6722, 45TH E (CROWLEY RD) BR, BONNEVILLE CO Bridge - Local Delay PE/PC/PL $282k to FY21 BMPO

1/16/2020 AdMod 20-01 20251 3 2021 I 84, FY21 D3 E BRIDGE REPAIR Bridge Preservation Add MPO ID COMPASS

12/2/2020 AdMod 20-38 20251 3 2021 I 84, FY21 D3 E BRIDGE REPAIR, NAMPA Bridge Preservation Decrease $291k COMPASS

9/10/2020 AdMod 20-29 20259 3 2023 FY23 ROADWAY AND ADA IMPROVEMENTS, PART 1, BOISE AREA STP - TMA Chg name, Adv (design) from FY21 to FY20 COMPASS

9/10/2020 AdMod 20-29 20260 3 2020 LOCAL, FY21 ACHD COMMUTERIDE STP - Local Urban Advance from FY21 to FY20 COMPASS

9/10/2020 AdMod 20-29 20260 3 2020 LOCAL, FY21 ACHD COMMUTERIDE STP - TMA Advance from FY21 to FY20 COMPASS

1/16/2020 AdMod 20-01 20266 3 2023 SH 44, INT SH-16 TO LINDER RD, ADA CO Capacity Decrease RW $700k COMPASS

1/16/2020 AdMod 20-01 20266 3 2023 SH 44, INT SH-16 TO LINDER RD, ADA CO Capacity Increase PC $50k COMPASS

1/16/2020 FHWA H02 20350 1 2023 US 95, GRANITE NORTH & FRONTAGE RDS, BONNER CO GARVEE/Others Decrease net of $0.7M n/a

3/18/2020 AdMod 20-08 20350 3 2023 US 95, GRANITE NORTH & FRONTAGE RDS, BONNER CO GARVEE Revise Milepost n/a

12/3/2020 AdMod 20-40 20352 1 2019 US 95, JCT SH 53 IC, GARWOOD RD, UPRR BR, & FRONTAGE RDS Bridge Restoration Decrease $2.1M KMPO

12/3/2020 AdMod 20-40 20352 1 2019 US 95, JCT SH 53 IC, GARWOOD RD, UPRR BR, & FRONTAGE RDS GARVEE Increase $3.1M KMPO

8/20/2020 AdMod 20-27 20355 3 2021 OFFSYS, LOOK LN UPRR RRX, CALDWELL Rail Crossing Delay from FY20 to FY21 COMPASS

8/20/2020 AdMod 20-27 20364 3 2020 OFFSYS, N WARDELL AVE INPR RRX, EMMETT Rail Crossing Advance from FY22 to FY20 n/a

9/16/2020 AdMod 20-30 20364 3 2020 OFFSYS, N WARDWELL AVE INPR RRX, EMMETT Rail Crossing Minor name change n/a

4/16/2020 AdMod 20-10 20367 3 2023 US 20, PHYLLIS CANAL BR TO SH-16, ADA CO Capacity Decrease PC $100k COMPASS

*GF-BR, General Funds, Bridge Replacement and Rehabilitation Program Funds

Idaho Transportation Department

7 of 16Financial Planning and Analysis

Page 8: In Key Number Order FY 2020 - 2026 STIP Updated: 9/21/2020 …€¦ · In Key Number Order FY 2020 - 2026 STIP SUMMARY OF ALL FHWA and FTA STIP AMENDMENTS and ADMINISTRATIVE MODIFICATIONS

In Key Number Order FY 2020 - 2026 STIPSUMMARY OF ALL FHWA and FTA

STIP AMENDMENTS and ADMINISTRATIVE MODIFICATIONS

Updated: 1/4/2021 6:46 AM

Federal

Approval Document

Key

Number District

Program

Year Route, Project Name Program Action MPO Area

4/16/2020 AdMod 20-10 20367 3 2023 US 20, PHYLLIS CANAL BR TO SH-16, ADA CO Capacity Increase LP $50k COMPASS

4/16/2020 AdMod 20-10 20367 3 2023 US 20, PHYLLIS CANAL BR TO SH-16, ADA CO Capacity Increase PC $100k COMPASS

4/16/2020 AdMod 20-10 20367 3 2023 US 20, PHYLLIS CANAL BR TO SH-16, ADA CO Capacity Increase RW $50k COMPASS

4/29/2020 AdMod 20-11 20383 1 2500 STC-5758, 6TH ST; S FK CDA RV BR, WALLACE Bridge - Local Increase PC $430k n/a

11/18/2020 AdMod 20-36 20383 1 PREL STC-5758, 6TH ST; S FK CDA RV BR, WALLACE Bridge - Local Increase PL $40k n/a

5/14/2020 AdMod 20-15 20402 1 2020 SMA-5719, INT PLEASANT VIEW RD & PRAIRIE AVE Safety - Local Increase CN $235k KMPO

5/14/2020 AdMod 20-15 20402 1 2020 SMA-5719, INT PLEASANT VIEW RD & PRAIRIE AVE Local Participation Increase CN $300k KMPO

4/29/2020 AdMod 20-11 20428 3 2022 SH 21, TECHNOLOGY WAY TO SURPRISE WAY, BOISE Safety - State Revise Milepost COMPASS

1/4/2021 AdMod 20-47 20430 3 2021 STC-7821, INT N MIDDLETON RD & CORNELL ST, MIDDLETON Safety - Local Increase PL $7k COMPASS

5/12/2020 AdMod 20-14 20438 6 2500 LOCAL, 45TH E; WILLOW CR BR, BONNEVILLE CO Bridge - Local Delay PE/PC/PL $338k to FY21 BMPO

12/2/2020 AdMod 20-38 20453 1 2024 SH 200, MCGHEE TO KOOTENAI ST, BONNER CO Safety - State Increase PE $100k, PC $70,000 n/a

3/18/2020 AdMod 20-08 20456 4 2023 SH 27, G CANAL BR, CASSIA CO Bridge Restoration Increase PC $50k n/a

1/4/2021 AdMod 20-47 20483 2 2021 SH 8, 3RD ST SAFETY IMPRV PH 1, MOSCOW Safety - Local Increase PL $7k n/a

10/30/2020 AdMod 20-33 20486 6 2023 US 20, PINEHAVEN TO BUFFALO RV BR OVERLAY, FREMONT CO Restoration Decrease PC $1.1M n/a

2/28/2020 AdMod 20-06 20499 6 2020 LOCAL, THERMOPLASTIC & ADA IMPRV, IDAHO FALLS Safety - Local Increase PL $2k BMPO

2/13/2020 AdMod 20-05 20508 3 2022 SH 55, DONNELLY TO DEINHARD, VALLEY CO Pave. Preservation (Com.) Change Mileposts n/a

3/11/2020 AdMod 20-07 20513 2 2024 US 12, CLEARWATER RV MEMORIAL BR, NEZ PERCE CO Bridge Restoration Increase PC $655k LCVMPO

8/20/2020 AdMod 20-27 20516 6 2020 OFFSYS, E RV RD (N 5TH W) CURVE IMPRV, BONNEVILLE CO STP - Local Rural Increase PL $5k BMPO

9/16/2020 AdMod 20-30 20535 6 PREL SMA-7166, 1ST ST; AMMON TO 45TH E WIDENING, BONNEVILLE CO STP - Local Urban Advance (design) from FY21 to FY20 BMPO

11/10/2020 AdMod 20-35 20535 6 2500 SMA-7166, 1ST ST; AMMON TO 45TH E WIDENING, BONNEVILLE CO STP - Local Urban Increase PC $15k BMPO

2/10/2020 AdMod 20-04 20536 3 2022 SH 44, FY22 MICROSEALS, ADA CO Pave. Preservation (Com.) Change to STATE funded COMPASS

1/24/2020 AdMod 20-02 20559 4 2021 I 84, JEROME IC TO TWIN FALLS IC WBL, JEROME CO Restoration Advance from FY22 to FY21 n/a

2/5/2020 AdMod 20-03 20559 4 2021 I 84, JEROME IC TO TWIN FALLS IC WBL, JEROME CO Advanced Construction Add AC | Convert in FY21 n/a

2/5/2020 AdMod 20-03 20559 4 2021 I 84, JEROME IC TO TWIN FALLS IC WBL, JEROME CO Restoration Increase CN $1.3M n/a

2/13/2020 AdMod 20-05 20572 1 2022 STATE, FY22 D1 ADA IMPROVEMENTS Traffic Operations Increase PC $2k n/a

6/2/2020 AdMod 20-17 20572 1 2020 STATE, FY22 D1 ADA IMPROVEMENTS Traffic Operations Advance to FY20 n/a

1/16/2020 AdMod 20-01 20574 3 2024 SH 44, STAR RD TO SH-16, ADA CO Capacity Increase PC $600k COMPASS

1/16/2020 AdMod 20-01 20574 3 2024 SH 44, STAR RD TO SH-16, ADA CO Capacity Increase PE $100k, PC $200k COMPASS

5/14/2020 AdMod 20-15 20575 1 2022 SH 53, HAUSER LAKE RD TO N BRUSS RD Restoration/Safety - State Revise Milepost KMPO

7/16/2020 AdMod 20-24 20575 1 2022 SH 53, HAUSER LAKE RD TO N BRUSS RD, KOOTENAI CO Restoration Increase UT $600k KMPO

7/16/2020 AdMod 20-24 20575 1 2022 SH 53, HAUSER LAKE RD TO N BRUSS RD, KOOTENAI CO Restoration Increase PE $35k KMPO

8/20/2020 AdMod 20-27 20578 3 2020 OFFSYS, N JOHNS AVE INPR RRX, EMMETT Rail Crossing Advance from FY22 to FY20 n/a

9/21/2020 AdMod 20-31 20578 3 2020 OFFSYS, N JOHNS AVE INPR RRX, EMMETT Rail Crossing Increase UT $212k n/a

10/15/2020 AdMod 20-32 20581 6 2022 US 20, SHEEP FALLS TO PINEHAVEN PASSING LNS, FREMONT CO Restoration Decrease PC $2M, offset to KN 20053 n/a

3/18/2020 AdMod 20-08 20583 4 2025 US 93, HOLLISTER NCL TO 3250 N, TWIN FALLS CO Capacity Increase PC $250k n/a

*GF-BR, General Funds, Bridge Replacement and Rehabilitation Program Funds

Idaho Transportation Department

8 of 16Financial Planning and Analysis

Page 9: In Key Number Order FY 2020 - 2026 STIP Updated: 9/21/2020 …€¦ · In Key Number Order FY 2020 - 2026 STIP SUMMARY OF ALL FHWA and FTA STIP AMENDMENTS and ADMINISTRATIVE MODIFICATIONS

In Key Number Order FY 2020 - 2026 STIPSUMMARY OF ALL FHWA and FTA

STIP AMENDMENTS and ADMINISTRATIVE MODIFICATIONS

Updated: 1/4/2021 6:46 AM

Federal

Approval Document

Key

Number District

Program

Year Route, Project Name Program Action MPO Area

1/24/2020 AdMod 20-02 20589 5 2024 STATE, I-86/I-15 SYSTEM IC, POCATELLO Bridge Restoration Increase PC $650k BTPO

10/30/2020 AdMod 20-33 20589 5 2025 STATE, I-86/I-15 SYSTEM IC, POCATELLO Bridge Restoration Increase PE/PC $180k BTPO

1/22/2020 FHWA H03 20596 4 2020 I 84, JEROME IC TO TWIN FALLS IC EBL, JEROME CO Restoration Advance from FY25 to FY20 n/a

2/5/2020 AdMod 20-03 20596 4 2020 I 84, JEROME IC TO TWIN FALLS IC EBL, JEROME CO Restoration Decrease CN $1.3M n/a

11/5/2020 AdMod 20-34 20604 4 2020 STATE, FY20 D5 MONUMENT PRESERVATION Roadside Items Increase PC $700k n/a

4/16/2020 AdMod 20-10 20605 2 2020 STC-4771, SOUTHWICK RD SAFETY IMPRV, NEZ PERCE CO Safety - Local Increase CN $245k n/a

4/29/2020 AdMod 20-11 20608 6 2022 US 20, DIVIDED HWY RRX CLOSURE Rail Crossing Increase PC $40k n/a

7/10/2020 AdMod 20-23 20613 3 2020 SMA-8383, INT LONE STAR & MIDDLETON RD Safety - Local Increase PL $5k COMPASS

8/20/2020 AdMod 20-27 20613 3 2020 INT LONE STAR & MIDDLETON RD Local Participation Increase CN $1.1M COMPASS

1/24/2020 AdMod 20-02 20639 3 2020 LOCAL, FAIRVIEW AVE GREENBELT RAMP, BOISE TAP - TMA Increase CN $9k COMPASS

1/24/2020 AdMod 20-02 20641 1 2022 SH 53, INT N RAMSEY RD, KOOTENAI CO Safety - State Increase PE $120k KMPO

4/29/2020 AdMod 20-11 20641 1 2022 SH 53, INT N RAMSEY RD, KOOTENAI CO Safety - State Increase PC $25k KMPO

7/10/2020 AdMod 20-23 20645 1 2022 I 90, CEDARS TO DUDLEY RD, KOOTENAI CO Safety - State Increase PC $80k KMPO

11/24/2020 AdMod 20-37 20656 1 2024 OFFSYS, WOODLAND DR BNSF RRX, SANDPOINT Rail Crossing Increase PE $27k n/a

2/13/2020 AdMod 20-05 20660 1 2025 US 95, BROWN CR PASSING LN TO COMANCHE ST, BOUNDARY CO Pave. Preservation (Com.) Increase PC $50k n/a

3/30/2020 AdMod 20-09 20662 1 2023 US 95, MCARTHUR LAKE, BOUNDARY CO Safety - State Increase PC $25k n/a

8/31/2020 AdMod 20-28 20662 1 2023 US 95, MCARTHUR LAKE, BOUNDARY CO Safety - State Increase PC $10k n/a

10/30/2020 AdMod 20-33 20662 1 2023 US 95, MCARTHUR LAKE, BOUNDARY CO Safety - State Increase PE $10k n/a

5/11/2020 AdMod 20-13 20666 4 2500 STC-2777, SHOE STRING RD REHAB., GOODING HD STP - Local Rural Increase PC $29.5k n/a

5/11/2020 AdMod 20-13 20675 4 2024 I 84, KIMBERLY IC (SH 50), JEROME CO Bridge Restoration Revise Milepost n/a

2/13/2020 AdMod 20-05 20676 1 2022 SH 200, PACK RV TO TRESTLE CR, BONNER CO Pave. Preservation (Com.) Increase PC $32k n/a

6/22/2020 FHWA H09 20682 2 2020 LOCAL, DYNAMIC SPEED LIMIT SIGNS, LAPWAI Safety - Local Add to program n/a

5/14/2020 AdMod 20-15 20695 1 2022 SH 53, N LATAH ST TO MP 9.3, RATHDRUM Restoration/Safety - State Revise Milepost KMPO

6/29/2020 AdMod 20-21 20699 4 2500 STC-2793, CRESTVIEW RD REHABILITATION PH 1, HILLSDALE HD STP - Local Rural Increase PC $51k n/a

4/16/2020 AdMod 20-10 20735 6 2023 US 20B, YELLOWSTONE HWY & HOLMES MICROSEAL Pave. Preservation (Com.) Increase PE $15k BMPO

2/10/2020 AdMod 20-04 20738 3 2021 I 84, BROADWAY TO EISENMAN, BOISE Pave. Preservation (Com.) Increase PE $2.5k COMPASS

3/30/2020 AdMod 20-09 20738 3 2021 I 84, BROADWAY TO EISENMAN, BOISE Pave. Preservation (Com.) Revise Milepost COMPASS

3/30/2020 AdMod 20-09 20738 3 2021 I 84, BROADWAY TO EISENMAN, BOISE Pave. Preservation (Com.) Increase CN $125k COMPASS

8/31/2020 AdMod 20-28 20738 3 2021 I 84, BROADWAY TO EISENMAN, BOISE Advanced Construction Add AC | Convert in FY21 COMPASS

12/28/2020 AdMod 20-46 20738 3 2021 I 84, BROADWAY TO EISENMAN, BOISE Pavement Preservation Increase CN $272k COMPASS

6/22/2020 FHWA H09 20748 5 2020 STC-1809, N BEACH RD & DINGLE E SHORE RD, BEAR LAKE CO Safety - Local Add to program n/a

1/16/2020 FHWA H02 20788 3 2021 SH 16, I 84 TO US 20/26 & SH 44 IC, ADA & CANYON COS GARVEE/Others Change name and milepost COMPASS

6/16/2020 FHWA H07 20788 3 2021 SH 16, I 84 TO US 20/26 & SH 44 IC, ADA & CANYON COS GARVEE/Others Increase PC $14M, RW $20M COMPASS

3/30/2020 AdMod 20-09 20789 3 2020 NAMPA TRANSIT ORIENTED DEVELOPMENT (DESIGN ONLY) FTA 5307 - SU Decrease PC $1k COMPASS

12/3/2020 AdMod 20-40 20794 1 2019 US 95, JCT SH 53 IC, UPRR BR, KOOTENAI CO Bridge Restoration Increase $175k KMPO

*GF-BR, General Funds, Bridge Replacement and Rehabilitation Program Funds

Idaho Transportation Department

9 of 16Financial Planning and Analysis

Page 10: In Key Number Order FY 2020 - 2026 STIP Updated: 9/21/2020 …€¦ · In Key Number Order FY 2020 - 2026 STIP SUMMARY OF ALL FHWA and FTA STIP AMENDMENTS and ADMINISTRATIVE MODIFICATIONS

In Key Number Order FY 2020 - 2026 STIPSUMMARY OF ALL FHWA and FTA

STIP AMENDMENTS and ADMINISTRATIVE MODIFICATIONS

Updated: 1/4/2021 6:46 AM

Federal

Approval Document

Key

Number District

Program

Year Route, Project Name Program Action MPO Area

12/3/2020 AdMod 20-40 20794 1 2019 US 95, JCT SH 53 IC, UPRR BR, KOOTENAI CO GARVEE Decrease $1M KMPO

1/16/2020 FHWA H02 20795 1 2020 US 95, GARWOOD RD GS & FRONTAGE RDS, KOOTENAI CO GARVEE/Bridge Restoration Decrease $1.9M KMPO

12/3/2020 AdMod 20-40 20795 1 2020 US 95, GARWOOD RD GS & FRONTAGE RDS, KOOTENAI CO Bridge Restoration Increase $2.4M KMPO

12/3/2020 AdMod 20-40 20795 1 2020 US 95, GARWOOD RD GS & FRONTAGE RDS, KOOTENAI CO GARVEE Decrease $2.1M KMPO

11/18/2020 AdMod 20-36 20839 6 2018 STC-6869, PENCE BRIDGE WETLAND MONITORING, LOST RIVER HD STP - Local Rural Increase CL $1k n/a

3/30/2020 AdMod 20-09 20841 3 2023 SH 55, BIKE/PED BR OVER BOISE RV, EAGLE STP - TMA Decrease RW $63k COMPASS

3/30/2020 AdMod 20-09 20841 3 2023 SH 55, BIKE/PED BR OVER BOISE RV, EAGLE TAP - TMA Decrease RW $10k COMPASS

3/30/2020 AdMod 20-09 20841 3 2023 SH 55, BIKE/PED BR OVER BOISE RV, EAGLE Local Participation Increase RW $73k COMPASS

3/30/2020 AdMod 20-09 20841 3 2023 SH 55, BIKE/PED BR OVER BOISE RV, EAGLE Local Participation Decrease PC $138k COMPASS

6/9/2020 AdMod 20-18 20841 3 2023 SH 55, BIKE/PED BR OVER BOISE RV, EAGLE STP - TMA Increase RW $63k COMPASS

6/9/2020 AdMod 20-18 20841 3 2023 SH 55, BIKE/PED BR OVER BOISE RV, EAGLE Local Participation Decrease RW $63k COMPASS

7/10/2020 AdMod 20-23 20841 3 2023 SH 55, BIKE/PED BR OVER BOISE RV, EAGLE STP - TMA Decrease RW $63k COMPASS

7/10/2020 AdMod 20-23 20841 3 2023 SH 55, BIKE/PED BR OVER BOISE RV, EAGLE STP - TMA Increase PC $63k COMPASS

9/10/2020 AdMod 20-29 20841 3 2023 SH 55, BIKE/PED BR OVER BOISE RV, EAGLE STP - TMA Convert LP to STP-TMA COMPASS

9/10/2020 AdMod 20-29 20841 3 2023 SH 55, BIKE/PED BR OVER BOISE RV, EAGLE TAP - TMA Increase PL/PC $21k COMPASS

3/30/2020 AdMod 20-09 20847 6 2020 CAPITAL CONSTRUCTION AND VEHICLE REPLACEMENT FTA 5339 - Rural Delay prog. year from FY19 to FY20 n/a

6/26/2020 AdMod 20-20 21805 5 2021 STATE, FY21 D4 REST AREA SEAL COATS Pave. Preservation (Com.) Increase CN $375k n/a

3/11/2020 AdMod 20-07 21858 3 2021 US 20, SH 16 TO LINDER RD, ADA COUNTY Private Funds Increase RW 135k COMPASS

1/24/2020 AdMod 20-02 21872 5 2025 I 15, W INKOM IC NBL & SBL, BANNOCK CO Bridge Restoration Decrease PC $450k n/a

12/18/2020 FHWA #19 21890 3 2021 SH 78, INT SH-167 IMPROVEMENTS Capacity Add to program n/a

1/22/2020 FHWA H03 21894 4 2020 STATE, FY24 D4 HI PRIORITY BRIDGE REPAIR Bridge Preservation Advance from FY24 to FY20 n/a

1/24/2020 AdMod 20-02 21895 5 2025 US 30, NOUNAN RD TO BENNINGTON, BEAR LAKE CO Restoration Decrease PE $200k n/a

11/18/2020 AdMod 20-36 21913 3 2019 LOCAL, BSU COVERED BIKE FACILITY STBG - TMA Increase PL $.5k/CC $3k COMPASS

5/14/2020 AdMod 20-15 21923 6 2025 US 26, JCT HITT ROAD (25TH E), BONNEVILLE CO Capacity Increase PC $500k BMPO

7/16/2020 AdMod 20-24 21937 1 2026 SH 41, DIAGONAL RD TURNBAYS, RATHDRUM Safety - State Increase PE $10k KMPO

5/12/2020 AdMod 20-14 21982 1 2500 STC-5908, SCHOOL HOUSE RD IMPR, BOUNDARY CO STP - Local Rural Delay PE/PC/PL $200k to FY21 n/a

6/19/2020 AdMod 20-19 21983 6 2500 STC-6809, N 500 W RECONSTRUCTION, TETON CO STP - Local Rural Increase PC $90k n/a

7/10/2020 AdMod 20-23 21983 6 2500 STC-6809, N 500 W RECONSTRUCTION, TETON CO STP - Local Rural Increase PC $2k n/a

9/10/2020 AdMod 20-29 21984 6 PREL STC-6774, MOODY RD BR, MADISON CO Bridge - Local Increase PC $80k n/a

5/12/2020 AdMod 20-14 21986 2 2500 OFFSYS, SAND RD BR NR MOSCOW, N LATAH HD Bridge - Off System Delay PE/PC/PL $405k to FY21 n/a

5/21/2020 FHWA H06 21988 1 2020 STC-5727, RAMSEY RD BNSF GS, LAKES HD Safety - Local Remove from program KMPO

9/10/2020 AdMod 20-29 21990 1 2021 OFFSYS, RRX NR SANDPOINT, BONNER CO Safety - Local Increase PC $54k n/a

1/4/2021 AdMod 20-47 21991 1 2021 SMA-7045, INT PRAIRIE AVE & IDAHO RD, POST FALLS HD Safety - Local Increase PL $5k KMPO

1/4/2021 AdMod 20-47 21993 1 2021 I 90S, SHERMAN AVE & LAKESIDE AVE, COEUR D'ALENE Safety - Local Increase PL $4k KMPO

8/20/2020 AdMod 20-27 21994 1 2021 OFFSYS, GUARDRAIL UPGRADE, NR BONNERS FERRY Safety - Local Increase PC $21k n/a

*GF-BR, General Funds, Bridge Replacement and Rehabilitation Program Funds

Idaho Transportation Department

10 of 16Financial Planning and Analysis

Page 11: In Key Number Order FY 2020 - 2026 STIP Updated: 9/21/2020 …€¦ · In Key Number Order FY 2020 - 2026 STIP SUMMARY OF ALL FHWA and FTA STIP AMENDMENTS and ADMINISTRATIVE MODIFICATIONS

In Key Number Order FY 2020 - 2026 STIPSUMMARY OF ALL FHWA and FTA

STIP AMENDMENTS and ADMINISTRATIVE MODIFICATIONS

Updated: 1/4/2021 6:46 AM

Federal

Approval Document

Key

Number District

Program

Year Route, Project Name Program Action MPO Area

8/20/2020 AdMod 20-27 21996 2 2021 OFFSYS, OLD AHSAHKA GRADE, CLEARWATER CO Safety - Local Increase PC $26k n/a

6/26/2020 AdMod 20-20 21998 2 2021 SMA-7834, INT 21ST ST & 19TH AVE, LEWISTON Safety - Local Increase PC $27k LCVMPO

8/31/2020 AdMod 20-28 22001 4 2020 OFFSYS, RIVER RD SAFETY IMPRV, BUHL HD Safety - Local Advance from FY21 to FY20 n/a

5/11/2020 AdMod 20-13 22003 4 2022 STC-2777, SHOE STRING RD SAFETY, GOODING HD Safety - Local Increase PC $10k n/a

7/16/2020 AdMod 20-24 22005 6 2021 SMA-7406, INT 17TH ST & ROLLANDET, IDAHO FALLS Safety - Local Increase PC $35k BMPO

7/16/2020 AdMod 20-24 22005 6 2021 SMA-7406, INT 17TH ST & ROLLANDET, IDAHO FALLS Safety - Local Increase PL $5k BMPO

7/10/2020 AdMod 20-23 22016 3 2500 STC-7973, MIDWAY RD; KARCHER TO CALDWELL BLVD, CANYON HD STP - Local Urban Increase PC $100k COMPASS

11/18/2020 AdMod 20-36 22016 3 2500 STV-7973, MIDWAY RD; KARCHER TO CALDWELL BLVD, CANYON RD STP - Local Urban Increase PL $25k COMPASS

9/10/2020 AdMod 20-29 22017 3 PREL NHS-8523, CHERRY LN; FRANKLIN BLVD TO 11TH AVE N, NAMPA STP - Local Urban Advance (design) from FY22 to FY20 COMPASS

11/18/2020 AdMod 20-36 22017 3 2500 NHS-2523, CHERRY LN; FRANKLIN BLVD TO 11TH AVE N., NAMPA STP - Local Urban Increase PL $30k COMPASS

7/10/2020 AdMod 20-23 22018 3 2500 SMA-7813, MONTANA AVE; PED IMPRV & WIDENING, CALDWELL STP - Local Urban Increase PE/PL/PC $89k COMPASS

9/10/2020 AdMod 20-29 22025 HQ 2020 LOCAL, FY22 LHTAC PLANNING STP - Local Urban Advance from FY22 to FY20 n/a

9/10/2020 AdMod 20-29 22026 HQ 2020 LOCAL, FY21 LHTAC PLANNING STP - Local Urban Advance from FY21 to FY20 n/a

1/8/2020 FHWA H01 22034 3 2020 STC-8233, MIDLAND BLVD UPRR RRX, NAMPA Federal Rail Add to program COMPASS

3/18/2020 AdMod 20-08 22070 3 2020 LOCAL, STODDARD PATH EXT PH 2, NAMPA TAP - Urban Advance from FY21 to FY20 COMPASS

4/22/2020 FHWA H05 22072 3 2021 SH 55, BOSMA TO LABOR CAMP SIDEWALK, MARSING TAP - Rural Remove from program n/a

1/16/2020 AdMod 20-01 22073 1 2021 SMA-7775, PINE ST SIDEWALK, SANDPOINT TAP - Urban Increase PL $10k, PC $36k n/a

4/30/2020 AdMod 20-12 22076 3 2020 OFFSYS, GRIMES CITY PATHWAY, NAMPA TAP - Urban Increase PE/PL $4k COMPASS

4/30/2020 AdMod 20-12 22076 3 2020 OFFSYS, GRIMES CITY PATHWAY, NAMPA TAP - Urban Decrease CN $4k COMPASS

11/18/2020 AdMod 20-36 22076 3 2020 OFFSYS, GRIMES CITY PATHWAY, NAMPA TAP - Urban Increase CN $32k COMPASS

5/27/2020 AdMod 20-16 22087 3 2021 STATE, FY20 CASCADE 7 ADA RAMPS System Support Delay to FY21 n/a

5/21/2020 FHWA H06 22089 4 2020 STATE, FY20 HAILEY 6 ADA RAMPS System Support Remove from program n/a

5/21/2020 FHWA H06 22096 3 2020 STATE, FY20 RIGGINS 19 ADA RAMPS System Support Remove from program n/a

5/21/2020 FHWA H06 22099 3 2020 STATE, FY20 WEISER 17 ADA RAMPS System Support Add to program n/a

6/19/2020 AdMod 20-19 22101 3 2022 LOCAL, PECKHAM RD INTERSECTIONS, GOLDEN GATE HD Freight Increase PC $28k COMPASS

11/5/2020 AdMod 20-34 22102 3 2022 STC-8223, FRANKLIN BLVD & KARCHER RD INT, NAMPA Freight Increase PC $281k COMPASS

11/5/2020 AdMod 20-34 22103 3 2022 OFFSYS, FRANKLIN BLVD & 3RD N FREIGHT IMPRV, NAMPA Freight Decrease PC $281k COMPASS

7/10/2020 AdMod 20-23 22132 3 2500 LOCAL, INT HOLLY ST & NW NAZARENE U RDWAY, NAMPA STP - Local Urban Increase PE/PL/PC $88k COMPASS

9/10/2020 AdMod 20-29 22132 3 2500 LOCAL, INT HOLLY ST & NW NAZARENE U RDWAY, NAMPA STP - Local Urban Convert LP to STP-Urban COMPASS

11/18/2020 AdMod 20-36 22132 3 2500 LOCAL, INT HOLLY ST & NW NAZARENE U RDWAY, NAMPA STP - Local Urban Increase PL $20k COMPASS

1/16/2020 FHWA H02 22154 3 2020 I 84, USTICK RD & MIDDLETON RD OVERPASSES, CANYON CO GARVEE/Capacity Increase PE $100k, PC $200k COMPASS

3/11/2020 AdMod 20-07 22154 3 2020 I 84, USTICK RD & MIDDLETON RD OVERPASSES, CANYON CO INFRA Increase PC $291k COMPASS

3/11/2020 AdMod 20-07 22154 3 2020 I 84, USTICK RD & MIDDLETON RD OVERPASSES, CANYON CO Restoration Increase PC $468k COMPASS

3/11/2020 AdMod 20-07 22154 3 2020 I 84, USTICK RD & MIDDLETON RD OVERPASSES, CANYON CO Mobility Increase PC $194k COMPASS

3/11/2020 AdMod 20-07 22154 3 2020 I 84, USTICK RD & MIDDLETON RD OVERPASSES, CANYON CO Restoration Decr. RW $1.5M, Incr. PE/PC $1.6M COMPASS

*GF-BR, General Funds, Bridge Replacement and Rehabilitation Program Funds

Idaho Transportation Department

11 of 16Financial Planning and Analysis

Page 12: In Key Number Order FY 2020 - 2026 STIP Updated: 9/21/2020 …€¦ · In Key Number Order FY 2020 - 2026 STIP SUMMARY OF ALL FHWA and FTA STIP AMENDMENTS and ADMINISTRATIVE MODIFICATIONS

In Key Number Order FY 2020 - 2026 STIPSUMMARY OF ALL FHWA and FTA

STIP AMENDMENTS and ADMINISTRATIVE MODIFICATIONS

Updated: 1/4/2021 6:46 AM

Federal

Approval Document

Key

Number District

Program

Year Route, Project Name Program Action MPO Area

6/16/2020 FHWA H07 22154 3 2020 I 84, USTICK RD & MIDDLETON RD OVERPASSES, CANYON CO Local Participation Increase PC $631k COMPASS

8/20/2020 AdMod 20-27 22154 3 2020 I 84, USTICK RD & MIDDLETON RD OVERPASSES, CANYON CO INFRA Increase PE/UT $129k COMPASS

8/20/2020 AdMod 20-27 22154 3 2020 I 84, USTICK RD & MIDDLETON RD OVERPASSES, CANYON CO Capacity Increase PE/UT $86k COMPASS

1/4/2021 AdMod 20-47 22160 2 2020 SMA-7564, A STREET, MOSCOW, STG 2 (CN Only) STP - Local Urban Increase CN $28k n/a

3/18/2020 AdMod 20-08 22196 3 2021 I 84, FRANKLIN IC TO KARCHER IC, CANYON CO GARVEE Decrease CN $553k COMPASS

4/22/2020 FHWA H05 22196 3 2021 I 84, FRANKLIN IC TO KARCHER IC, CANYON CO GARVEE Increase CN $14M COMPASS

8/19/2020 FHWA H11 22196 3 2021 I 84, FRANKLIN IC TO KARCHER IC, CANYON CO GARVEE Broke out to KN 23079, 23080, 23081 COMPASS

5/27/2020 AdMod 20-16 22213 2 2020 US 95, CULDESAC CANYON PASS. LN PH 3 EARLY R/W Safety - State Remove from prog. budget to KN 20032 n/a

5/27/2020 AdMod 20-16 22214 2 2020 US 95, CULDESAC CANYON PASS. LN PH 4 EARLY R/W Safety - State Remove from prog. budget to KN 20032 n/a

10/15/2020 AdMod 20-32 22221 2 2022 SH 162, ZENNER RD TO NEZPERCE, LEWIS CO Pave. Preservation (Com.) Advance from FY23 to FY22 n/a

3/11/2020 AdMod 20-07 22237 3 2021 I 84, EAST BOISE POE, ADA CO Supporting Infra. Assets Delay from FY20 to FY21 COMPASS

3/11/2020 AdMod 20-07 22239 3 2020 I 84, FY20 D3 INTERSTATE FENCING Supporting Infra. Assets Increase CC/CN $751k n/a

3/11/2020 AdMod 20-07 22243 3 2021 SH 71, SNAKE RV BR TO JCT US-95 GUARDRAIL, WASHINGTON CO Supporting Infra. Assets Delay from FY20 to FY21 n/a

3/11/2020 AdMod 20-07 22244 3 2020 STATE, FY20 D3 SIGNAL CABINETS Supporting Infra. Assets Increase CC/CN $445k n/a

2/10/2020 AdMod 20-04 22246 3 2020 I 84, FY20 D3 INTERCHANGE RAMPS, ADA/CANYON CO Pave. Preservation (Com.) Change to STATE funded COMPASS

6/16/2020 FHWA H07 22246 3 2020 I 84, FY20 D3 INTERCHANGE RAMPS, ADA/CANYON CO Pave. Preservation (Com.) Remove from program COMPASS

2/13/2020 AdMod 20-05 22262 1 2020 SH 54, FY20 D1 MILL AND INLAY, KOOTENAI CO Pave. Preservation (Com.) Increase PC $26k, PE 10k KMPO

1/16/2020 FHWA H02 22273 1 2021 US 95, D1 CULVERT REPLACEMENT, BONNER CO Supporting Infra. Assets Change name and milepost n/a

2/13/2020 AdMod 20-05 22301 1 2021 I 90, FY21 D1 SPECIAL PAVEMENT MARKINGS Supporting Infra. Assets Change name, scope, and milepost KMPO

7/16/2020 AdMod 20-24 22302 1 2020 SMA-7235, NW BLVD SIGNAL UPGRADE, COEUR D'ALENE Supporting Infra. Assets Increase CN $65k KMPO

7/23/2020 AdMod 20-25 22404 2 2022 LOCAL, LAKE RD SAFETY IMPROVEMENTS, GRANGEVILLE HD Safety - Local Increase PC $75k n/a

5/27/2020 AdMod 20-16 22411 5 2022 SMA-7231, S 5TH AVE SAFETY IMPROV, POCATELLO Safety - Local Decrease PE/PL $8k BTPO

5/27/2020 AdMod 20-16 22411 5 2022 SMA-7231, S 5TH AVE SAFETY IMPROV, POCATELLO Local Participation Increase PE/PL $8k BTPO

7/6/2020 AdMod 20-22 22411 5 2022 SMA-7231, S 5TH AVE SAFETY IMPROV, POCATELLO Advanced Construction (Local) Add AC | Convert in FY21 BTPO

1/16/2020 FHWA H02 22431 6 2021 S HIGBEE DR, BUTTE ARM CANAL BR, IDAHO FALLS Bridge Discretionary Add to program BMPO

3/11/2020 AdMod 20-07 22431 6 2021 OFFSYS, HIGBEE BR, IDAHO FALLS Bridge Discretionary Decrease PC $20k BMPO

12/2/2020 AdMod 20-38 22431 6 2021 LOCAL, S HIGBEE DR, BUTTE ARM CANAL BR, IDAHO FALLS Bridge - Off System Increase $267k (CN $91k, PC $176k) BMPO

5/27/2020 AdMod 20-16 22450 5 2020 STATE, FY21 POCATELLO 11 ADA RAMPS System Support Advance from FY21 to FY20 BTPO

5/11/2020 AdMod 20-13 22459 2 2020 US 95, MP189.5 TO 190 GUARDRAIL, IDAHO CO System Support Increase CN $4k n/a

8/20/2020 AdMod 20-27 22460 3 2020 SH 19, BVRR RRX, GREENLEAF Rail Crossing Advance from FY22 to FY20 COMPASS

2/13/2020 AdMod 20-05 22468 1 2022 I 90, FY22 D1 SPECIAL PAVEMENT MARKINGS Supporting Infra. Assets Change name, scope, and milepost KMPO

2/13/2020 AdMod 20-05 22469 1 2023 I 90, FY23 D1 SPECIAL PAVEMENT MARKINGS Supporting Infra. Assets Change name, scope, and milepost KMPO

11/5/2020 AdMod 20-34 22509 3 2020 STOCK AND INFRASTRURE, BOISE AREA, VRT 2020 FTA 5339 - LU FTA requested changes to COMPASS

1/24/2020 AdMod 20-02 22544 5 2022 I 86, UPRR BRIDGE, POCATELLO Bridge Restoration Delay from FY21 to FY22 BTPO

3/11/2020 AdMod 20-07 22544 5 2022 I 86, UPRR BRIDGE, POCATELLO Bridge Restoration Change to STATE funded BTPO

*GF-BR, General Funds, Bridge Replacement and Rehabilitation Program Funds

Idaho Transportation Department

12 of 16Financial Planning and Analysis

Page 13: In Key Number Order FY 2020 - 2026 STIP Updated: 9/21/2020 …€¦ · In Key Number Order FY 2020 - 2026 STIP SUMMARY OF ALL FHWA and FTA STIP AMENDMENTS and ADMINISTRATIVE MODIFICATIONS

In Key Number Order FY 2020 - 2026 STIPSUMMARY OF ALL FHWA and FTA

STIP AMENDMENTS and ADMINISTRATIVE MODIFICATIONS

Updated: 1/4/2021 6:46 AM

Federal

Approval Document

Key

Number District

Program

Year Route, Project Name Program Action MPO Area

3/30/2020 AdMod 20-09 22544 5 2022 I 86, UPRR BRIDGE, POCATELLO Bridge Restoration Increase UT $50k BTPO

2/24/2020 FHWA H04 22562 3 2020 I 84, SNAKE RIVER REST AREA REPAIR Board Unallocated Add to program n/a

1/16/2020 FHWA H02 22593 3 2021 S. 4TH AVENUE, INDIAN CREEK BR, CALDWELL Bridge Discretionary Add to program COMPASS

3/11/2020 AdMod 20-07 22593 3 2021 OFFSYS, S 4TH AVE, INDIAN CREEK BR, CALDWELL Bridge Discretionary Decrease PC $120k COMPASS

12/3/2020 AdMod 20-40 22593 3 2021 LOCAL, S. 4TH AVENUE, INDIAN CREEK BR, CALDWELL Bridge - Off System Increase $307k (CN $141k, PC $166k) COMPASS

3/11/2020 AdMod 20-07 22594 3 2021 OFFSYS, NORTH FORK BOULDER CREEK BR, OWYHEE CO Bridge Discretionary Increase PC $97k n/a

11/24/2020 AdMod 20-37 22594 3 2021 LOCAL, NORTH FORK BOULDER CREEK BR, OWYHEE CO Bridge - Off System Increase $231k (CN $28k, PC $191, PL $12k) n/a

3/11/2020 AdMod 20-07 22595 4 2021 OFFSYS, LITTLE WOOD RIVER BR, SHOSHONE HD Bridge Discretionary Increase PC $10k n/a

11/24/2020 AdMod 20-37 22595 4 2021 LOCAL, LITTLE WOOD RIVER BR, SHOSHONE HD Bridge - Off System Increase $242k (CN $50k, PC $193k) n/a

3/11/2020 AdMod 20-07 22596 4 2021 OFFSYS, 4200 N RD, DEEP CREEK BR, BUHL HD Bridge Discretionary Increase PC $36k n/a

11/24/2020 AdMod 20-37 22596 4 2021 LOCAL, 4200 NORTH ROAD, DEEP CREEK BR, BUHL HD Bridge - Off System Increase $234k (CN $55k, PC $175k, PL $5k) n/a

3/11/2020 AdMod 20-07 22597 5 2021 STC-7221, W CARSON ST, PORTNEUF RIVER DR, POCATELLO Bridge Discretionary Decrease PC $118k BTPO

11/25/2020 AdMod 20-38 22597 5 2021 STC 7221, W CARSON ST, PORTNEUF RIVER BR, POCATELLO Bridge - Local Increase $477k BTPO

3/11/2020 AdMod 20-07 22598 5 2021 OFFSYS, ST CHARLES CREEK BR, BEAR LAKE CO Bridge Discretionary Increase PC $96k n/a

11/24/2020 AdMod 20-37 22598 5 2021 LOCAL, ST CHARLES CREEK BR, BEAR LAKE CO Bridge - Off System Increase $207k (CN $26k, PC $181k, PC $10k) n/a

1/16/2020 FHWA H02 22599 6 2021 OFFSYS, E 121TH S, IDAHO CANAL BR, BONNEVILLE CO Bridge Discretionary Add to program BMPO

3/11/2020 AdMod 20-07 22599 6 2021 OFFSYS, E 121ST S, IDAHO CANAL BR, BONNEVILLE CO Bridge Discretionary Increase PC $19k BMPO

12/2/2020 AdMod 20-38 22599 6 2021 LOCAL, E 121TH S, IDAHO CANAL BR, BONNEVILLE CO Bridge - Off System Increase $206k (CN $32k, PC $171, PL $3k) BMPO

1/16/2020 FHWA H02 22600 3 2024 STC-3787, WESTERN HERITAGE BYWAY (SWAN FALLS RD), ADA CO FLAP Add to program COMPASS

1/16/2020 FHWA H02 22602 3 2024 SMA-7923, INDIANA & ORCHARD SHARED RDWY, CANYON HD #4 FLAP Add to program COMPASS

1/8/2020 FHWA H01 22607 1 2023 OFFSYS, YELLOWSTONE TRAIL RD IMP SEG 1 PT 2, EASTSIDE HD FLAP Add to program KMPO

1/22/2020 FHWA H03 22616 HQ 2020 LOCAL, BRIDGE REPAIR AND BUNDLING WORKSHOPS Other Federal Non-Formula Add to program n/a

1/16/2020 FHWA H02 22618 3 2020 I 84, MIDDLETON RD OVERPASS, CANYON CO INFRA/Capacity Add to program COMPASS

2/28/2020 AdMod 20-06 22618 3 2020 I 84, MIDDLETON RD OVERPASS, CANYON CO Capacity Increase CN $250k COMPASS

5/11/2020 AdMod 20-13 22618 3 2021 I 84, MIDDLETON RD OVERPASS, CANYON CO Capacity Increase CN $373k COMPASS

5/11/2020 AdMod 20-13 22618 3 2021 I 84, MIDDLETON RD OVERPASS, CANYON CO INFRA Increase CN $588k COMPASS

1/16/2020 FHWA H02 22619 3 2020 I 84, USTICK RD OVERPASS, CANYON CO INFRA/Capacity Add to program COMPASS

5/11/2020 AdMod 20-13 22619 3 2020 I 84, USTICK RD OVERPASS, CANYON CO Capacity Decrease CN $363k COMPASS

5/11/2020 AdMod 20-13 22619 3 2020 I 84, USTICK RD OVERPASS, CANYON CO INFRA Decrease CN $545k COMPASS

6/16/2020 FHWA H07 22619 3 2020 I 84, USTICK RD OVERPASS, CANYON CO Local Participation Increase CN $4M COMPASS

6/19/2020 AdMod 20-19 22619 3 2020 I 84, USTICK RD OVERPASS, CANYON CO Capacity Decrease CN $265k COMPASS

2/24/2020 FHWA H04 22638 2 2020 OFFSYS, CHERRYLANE BR, NEZ PERCE CO (CONSTRUCTION) TIGER, Bridge - Off System Split out from KN 9070 n/a

5/12/2020 AdMod 20-14 22638 2 2020 OFFSYS, CHERRYLANE BR, NEZ PERCE CO (CONSTRUCTION) Bridge - Off System Advance CN offsets in AdMod 20-14 n/a

12/28/2020 AdMod 20-45 22638 2 2020 OFFSYS, CHERRYLANE BR, NEZ PERCE CO (CONSTRUCTION) Bridge - Off System Decrease $197k n/a

10/14/2020 FHWA H14 22654 5 2023 STATE, D5 MATERIALS RECONNAISSANCE Planning & Scoping Add to program n/a

*GF-BR, General Funds, Bridge Replacement and Rehabilitation Program Funds

Idaho Transportation Department

13 of 16Financial Planning and Analysis

Page 14: In Key Number Order FY 2020 - 2026 STIP Updated: 9/21/2020 …€¦ · In Key Number Order FY 2020 - 2026 STIP SUMMARY OF ALL FHWA and FTA STIP AMENDMENTS and ADMINISTRATIVE MODIFICATIONS

In Key Number Order FY 2020 - 2026 STIPSUMMARY OF ALL FHWA and FTA

STIP AMENDMENTS and ADMINISTRATIVE MODIFICATIONS

Updated: 1/4/2021 6:46 AM

Federal

Approval Document

Key

Number District

Program

Year Route, Project Name Program Action MPO Area

10/14/2020 FHWA H14 22661 6 2023 STATE, FY23 D6 MILL AND OVERLAY Supporting Infra. Assets Add to program n/a

10/14/2020 FHWA H14 22662 6 2023 STATE, FY23 D6 ROCKFALL MITIGATION Supporting Infra. Assets Add to program n/a

10/14/2020 FHWA H14 22663 6 2023 STATE, FY23 D6 DELINEATORS Supporting Infra. Assets Add to program n/a

10/14/2020 FHWA H14 22664 6 2023 STATE, FY23 D6 MOWING Supporting Infra. Assets Add to program n/a

11/6/2020 FHWA H16 22687 5 2027 US 30, YELLOWSTONE TO GARRETT CORRIDOR, POCATELLO Safety - State Add to program BTPO

10/14/2020 FHWA H14 22696 4 2027 I 84, FY27 D4 INTERSTATE STRIPING Supporting Infra. Assets Add to program n/a

10/14/2020 FHWA H14 22704 4 2027 SH 24, MINIDOKA CO LN TO KIMAMA, LINCOLN CO Safety - State Add to program n/a

10/14/2020 FHWA H14 22709 4 2023 STATE, D4 LUMINAIRE REPAIR Supporting Infra. Assets Add to program n/a

11/6/2020 FHWA H16 22715 3 2027 SH 55, KARCHER RD; INDIANA TO LAKE, CALDWELL Capacity Add to program COMPASS

11/6/2020 FHWA H16 22716 3 2027 SH 55, KARCHER RD; LAKE TO MIDWAY, CALDWELL Capacity Add to program COMPASS

11/6/2020 FHWA H16 22717 3 2027 SH 45, LOCUST LANE INTERSECTION, NAMPA Capacity Add to program COMPASS

11/6/2020 FHWA H16 22718 3 2027 SH 44, PALMER LN INTERSECTION IMPROVEMENTS Local Partnerships Add to program COMPASS

10/14/2020 FHWA H14 22723 4 2023 SH 25, WEST RD TO W FRONTAGE RD N, JEROME CO Supporting Infra. Assets Add to program n/a

10/14/2020 FHWA H14 22735 1 2023 I 90, FY23 D1 BROOMING Supporting Infra. Assets Add to program n/a

10/14/2020 FHWA H14 22736 2 2027 US 95, SPALDING BR TO THORN CR RD CABLE BARRIER Safety - State Add to program n/a

10/14/2020 FHWA H14 22744 3 2022 STATE, FY22 D3 SIGNING Supporting Infra. Assets Add to program n/a

10/14/2020 FHWA H14 22745 3 2022 STATE, FY22 D3 CULVERT CLEANING Supporting Infra. Assets Add to program n/a

10/14/2020 FHWA H14 22759 5 2021 STATE, FY21 D5 INTERSECTION IMPROVEMENTS Safety - State Add to program n/a

10/14/2020 FHWA H14 22766 1 2023 US 95, D1 BYWAY BRIDGE APPROACHES Supporting Infra. Assets Add to program n/a

10/14/2020 FHWA H14 22776 2 2021 SH 64, NEZPERCE TO DRAKE RD, LEWIS CO Supporting Infra. Assets Add to program n/a

10/14/2020 FHWA H14 22780 2 2021 US 12, FY21 D2 HIGH PRI CULVERT REPLACEMENT, IDAHO CO Supporting Infra. Assets Add to program n/a

10/14/2020 FHWA H14 22783 2 2023 STATE, FY23 D2 SOFT SPOT REPAIRS Supporting Infra. Assets Add to program n/a

10/14/2020 FHWA H14 22785 2 2022 STATE, FY22 D2 HIGH PRIORITY CULVERT REPLACEMENTS Supporting Infra. Assets Add to program n/a

10/14/2020 FHWA H14 22787 2 2022 STATE, FY22 D2 HIGHWAY LUMINAIRES LED UPDATE Supporting Infra. Assets Add to program n/a

10/14/2020 FHWA H14 22788 2 2023 US 95B, WINCHESTER BUSINESS LOOP Supporting Infra. Assets Add to program n/a

4/29/2020 FTA T01 22869 1 2020 CDA UZA RIVERSTONE TRANSIT CENTER, PH 2 FTA 5339 - Rural Add to program KMPO

4/29/2020 FTA T01 22870 1 2020 CDA UZA PARATRANSIT SERVICES FTA 5310 >200k Add to program KMPO

11/6/2020 FHWA H16 22878 3 2024 SMA-3724, HOMEDALE RD CURVE IMPV, CANYON HD Safety - Local Add to program COMPASS

5/21/2020 FHWA H06 22888 1 2021 SH 3, GOOSEHAVEN RD TO ROUND LAKE RD, BENAWAH CO Board Unallocated Add to program n/a

10/14/2020 FHWA H14 22897 2 2021 LOCAL, FY21 CLEARWATER SRTS, CLEARWATER CO Local - TAP Add to program n/a

10/14/2020 FHWA H14 22903 9 2021 STATE, FY21 STWD SRTS COORDINATOR STIPEND Local - TAP Add to program n/a

10/14/2020 FHWA H14 22910 4 2021 LOCAL, FY21 MRTA SRTS COORDINATOR & ACTIVITIES Local - TAP Add to program n/a

11/6/2020 FHWA H16 22914 5 2021 LOCAL, FY21 SICOG SRTS COORDINATOR & ACTIVITIES Local - TAP Add to program BTPO

10/14/2020 FHWA H14 22917 2 2021 LOCAL, FY21 UNIV OF IDAHO SRTS COORDINATOR & ACTIVITIES Local - TAP Add to program n/a

11/6/2020 FHWA H16 22944 3 2022 LOCAL, FY22 STODDARD PATHWAY, NAMPA Local - TAP Add to program COMPASS

*GF-BR, General Funds, Bridge Replacement and Rehabilitation Program Funds

Idaho Transportation Department

14 of 16Financial Planning and Analysis

Page 15: In Key Number Order FY 2020 - 2026 STIP Updated: 9/21/2020 …€¦ · In Key Number Order FY 2020 - 2026 STIP SUMMARY OF ALL FHWA and FTA STIP AMENDMENTS and ADMINISTRATIVE MODIFICATIONS

In Key Number Order FY 2020 - 2026 STIPSUMMARY OF ALL FHWA and FTA

STIP AMENDMENTS and ADMINISTRATIVE MODIFICATIONS

Updated: 1/4/2021 6:46 AM

Federal

Approval Document

Key

Number District

Program

Year Route, Project Name Program Action MPO Area

10/14/2020 FHWA H14 22947 4 2022 LOCAL, CROY TO QUIGLEY PATH, HAILEY Local - TAP Add to program n/a

10/14/2020 FHWA H14 22948 3 2021 LOCAL, SOUTH JOHNS AVE, EMMETT Local - TAP Add to program n/a

10/14/2020 FHWA H14 22949 2 2022 LOCAL, MAIN ST SIDEWALK & ADA, LAPWAI Local - TAP Add to program n/a

10/14/2020 FHWA H14 22955 4 2022 LOCAL, EAST MAIN ST SIDEWALK, JEROME Local - TAP Add to program n/a

10/14/2020 FHWA H14 22956 4 2022 LOCAL, BUHL SCHOOL SIDEWALK, BUHL Local - TAP Add to program n/a

10/14/2020 FHWA H14 22958 1 2022 LOCAL, PATHWAY CONNECTION, DOVER Local - TAP Add to program n/a

10/14/2020 FHWA H14 22966 4 2021 LOCAL, FY22 JEROME 7 ADA RAMPS PH 1 State - System Support Add to program n/a

10/14/2020 FHWA H14 22968 4 2021 LOCAL, FY22 JEROME ADA RAMPS PH 2 State - System Support Add to program n/a

5/21/2020 FHWA H06 22980 1 2020 LOCAL, FY20 TECHNOLOGY TRANSFER Federal-Aid Other Local Add to program n/a

11/6/2020 FHWA H16 22995 3 2021 LOCAL, BIKE IMPROVEMENTS, SIGNS & PVMT MARKINGS, ADA TAP - TMA Add to program COMPASS

1/4/2021 AdMod 20-47 22995 3 2021 LOCAL, BIKE IMPROVEMENTS, SIGNS & PVMT MARKINGS, ADA Local Non-Participation Increase PC/CN $118k COMPASS

10/14/2020 FHWA H14 23007 9 2021 LOCAL, FY21 TECHNOLOGY TRANSFER Hwy - Misc. Federal Add to program n/a

10/14/2020 FHWA H14 23032 6 2021 LOCAL, TRANSPORTATION PLAN, MADISON CO STP - Local Urban Add to program n/a

10/14/2020 FHWA H14 23033 1 2021 LOCAL, TRANSPORTATION PLAN, SANDPOINT AREA STP - Local Urban Add to program n/a

11/6/2020 FHWA H16 23041 1 2023 US 95, SPOKANE RV BRIDGE REPAIRS, KOOTENAI CO Bridge Preservation Add to program KMPO

5/21/2020 FHWA H06 23053 6 2021 SH 33, SHS ADJUSTMENT PAYMENT, MADISON CO System Support Add to program n/a

10/14/2020 FHWA H14 23053 6 2021 US 20, SHS ADJUSTMENT PAYMENT, MADISON CO State - System Support Add to program n/a

10/14/2020 FHWA H14 23064 9 2021 STATE, RECESSED PAVEMENT MARKING PILOT State - System Support Add to program n/a

10/30/2020 AdMod 20-33 23064 9 2021 STATE, RECESSED PAVEMENT MARKING PILOT Supporting Infra. Assets Change program n/a

6/16/2020 FHWA H07 23071 3 2021 STUDY, SH 45 REALIGNMENT ALTERNATIVES ANAL, NEPA, NAMPA Local Participation Add to program COMPASS

7/21/2020 FHWA H10 23073 3 2021 LOCAL, FY21 MCCALL 3 ADA RAMPS System Support Add to program n/a

7/21/2020 FHWA H10 23075 6 2021 LOCAL, VICTOR ELEMENTARY BIKE/PED PATH TAP - Rural Add to program n/a

7/21/2020 FHWA H10 23076 5 2021 US 30, LAVA HOT SPRINGS ROCK FALL MITIGATION Supporting Infra. Assets Add to program n/a

7/21/2020 FHWA H10 23078 2 2021 US 95, MP 188 ROCK SLIDE MITIGATION, NEAR RIGGINS Supporting Infra. Assets Add to program n/a

8/19/2020 FHWA H11 23079 3 2021 I 84, TEMP WIDENING, FRANKLIN IC TO KARCHER IC GARVEE Add to program $16.8M COMPASS

8/19/2020 FHWA H11 23080 3 2021 I 84, FRANKLIN RD IC TO KARCHER IC - WEST GARVEE Add to program $68.5M COMPASS

8/19/2020 FHWA H11 23081 3 2021 I 84, FRANKLIN RD IC TO KARCHER IC - EAST GARVEE Add to program $55M COMPASS

8/11/2020 FTA T04 23082 2 2020 LEWISTON COMMUNITY TRANSIT CENTER FTA 5339 - SU Add to program LCVMPO

8/11/2020 FTA T04 23083 4 2021 MRTA ELECTRIC BUS AND CHARGING INFRASTRUCTURE FTA 5339 - Rural Add to program n/a

9/17/2020 FHWA H13 23084 6 2023 LOCAL, SH 33 & LEGRAND PIERRE PATHWAY EXTENSION DRIGGS TAP - Rural Add to program n/a

10/14/2020 FHWA H14 23086 5 2022 I 86B, INT POCATELLO AVE FILTRATION SYSTEM, POWER CO Safety - State Add to program n/a

9/10/2020 AdMod 20-29 23087 9 2020 FY20 DISADVANTAGED BUSINESS ENTERPRISES Other Federal Non-Formula Add to program, split from KN 19253 n/a

10/19/2020 FHWA H15 23089 HQ 2021 LOCAL, COMPLETE ADVANCED WETLAND MITIGATION Other Federal Non-Formula Add to program n/a

10/19/2020 FHWA H15 23090 2 2021 US 95, AHT'WY INTERCHANGE AND PLAZA, NEZ PERCE CO BUIILD Grant Add to program n/a

11/23/2020 FTA T05 23091 3 2021 TRANSIT, FUELING STATION AND PARKING LOT, BOISE FTA 5339 - LU Add to program COMPASS

*GF-BR, General Funds, Bridge Replacement and Rehabilitation Program Funds

Idaho Transportation Department

15 of 16Financial Planning and Analysis

Page 16: In Key Number Order FY 2020 - 2026 STIP Updated: 9/21/2020 …€¦ · In Key Number Order FY 2020 - 2026 STIP SUMMARY OF ALL FHWA and FTA STIP AMENDMENTS and ADMINISTRATIVE MODIFICATIONS

In Key Number Order FY 2020 - 2026 STIPSUMMARY OF ALL FHWA and FTA

STIP AMENDMENTS and ADMINISTRATIVE MODIFICATIONS

Updated: 1/4/2021 6:46 AM

Federal

Approval Document

Key

Number District

Program

Year Route, Project Name Program Action MPO Area

10/19/2020 FHWA H15 23092 1 2021 LOCAL, CANYON ROAD BRIDGE FEASIBILITY STUDY Bridge - Local Add to program KMPO

11/23/2020 FHWA H17 23093 6 2021 SH 28, LITTLE SAWMILL CREEK CULVERT, LEMHI COUNTY Supporting Infra. Assets Add to program n/a

12/8/2020 FHWA H18 23096 1 2021 LOCAL, LAKESHORE CONNECTION PLANNING Discretionary Add to program n/a

12/18/2020 FHWA #19 23098 4 2021 SH 24, EIRR MAGIC VALLEY RAIL SAFETY EXPANSION, RUPERT Other Federal Non-Formula Add to program n/a

9/1/2020 FHWA H12 n/a n/a 2021 BRIDGE RESTORATION GROUPED TOTAL Grouped Total Increase from $17M to $20M n/a

*GF-BR, General Funds, Bridge Replacement and Rehabilitation Program Funds

Idaho Transportation Department

16 of 16Financial Planning and Analysis