REVISIONS TO THE 2020-2029 STIP
ITEM N
HIGHWAY PROGRAM
STIP ADDITIONS
DIVISION 3DIVISION 3JACKSONVILLE TRANSIT, CONSTRUCT AN URBAN FIXED-ROUTE SATELLITE TRANSFER FACILITY FOR JACKSONVILLE TRANSIT TO INCLUDE PUBLIC PARKING, SHELTERS, RESTROOMS AND PESSENGER TERMINAL.ADD PROJECT TL-0001 TO STIP FOR FY 20. NEW PROJECT DEVELOPED FOR FEDERAL FUNDING AWARD. PROJECT ADDED AT THE REQUEST OF JACKSONVILLE URBAN AREA MPO.
CONSTRUCTION FY 2020 - (5307)$1,000,000$1,000,000
* TL-0001ONSLOWPROJ.CATEGORY
JACKSONVILLE TRANSIT, CONSTRUCT PEDESTRIAN ACCESS AND SAFETY IMPROVEMENTS FOR JACKSONVILLE TRANSIT WITHIN 1/2 MILE OF HIGH VOLUME URBAN FIXED ROUTE BUS STOPS. IMPROVEMENTS WILL INCLUDE NEW SIDE WALK CONNECTIONS, ADA RETROFIT OF EXISTING SIDE WALKS AND CONSTRUCTION OF HIGH VISIBILITY CROSSWALKS AT KEY ROADWAY INTERSECTIONS.ADD PROJECT TL-0002 TO STIP FOR FY 20. NEW PROJECT DEVELOPED FOR FEDERAL FUNDING AWARD. PROJECT ADDED AT THE REQUEST OF THE JACKSONVILLE URBAN AREA MPO.
CONSTRUCTION FY 2020 - (5307)$900,000$900,000
* TL-0002ONSLOWPROJ.CATEGORY
DIVISION 9DIVISION 9VARIOUS, CITY OF SALISBURY SIGNAL SYSTEM UPGRADE.PROJECT ADDED AT REQUEST OF MPO.
CONSTRUCTION FY 2021 - (BGDA)$343,000FY 2021 - (L)$86,000
$429,000
* HL-0005ROWAN
DIVISIONPROJ.CATEGORY
DIVISION 10DIVISION 10SR 1394 (POPLAR TENT ROAD), SR 1449 (HARRIS ROAD) INTERSECTION. CONSTRUCT INTERSECTION IMPROVEMENTS AND WIDEN SR 1394 (POPLAR TENT ROAD) FROM SR 2880 (MOSS DRIVE) TO FULLERTON PLACE DRIVE.PROJECT ADDED AT REQUEST OF MPO.
ENGINEERING FY 2021 - (BGDA)$1,368,000FY 2021 - (L)$342,000
RIGHT-OF-WAY FY 2022 - (BGDA)$4,416,000FY 2022 - (L)$1,104,000
CONSTRUCTION FY 2024 - (BGDA)$3,140,000FY 2024 - (L)$785,000FY 2025 - (BGDA)$3,140,000FY 2025 - (L)$785,000
$15,080,000
* HL-0001CABARRUS
DIVISIONPROJ.CATEGORY
1Thursday, September 3, 2020
* INDICATES FEDERAL AMENDMENT
REVISIONS TO THE 2020-2029 STIP
ITEM N
HIGHWAY PROGRAM
STIP ADDITIONS
DIVISION 11DIVISION 11US 321A (MAIN STREET), CONSTRUCT PEDESTRIAN CROSSING IMPROVEMENTS FROM SR 1952 (CEDAR VALLEY ROAD) TO SR 1156 (LEGION ROAD).PROJECT ADDED AT REQUEST OF MPO.
ENGINEERING FY 2022 - (BGDA)$64,000FY 2022 - (L)$16,000
RIGHT-OF-WAY FY 2022 - (BGDA)$19,000FY 2022 - (L)$5,000
CONSTRUCTION FY 2023 - (BGDA)$352,000FY 2023 - (L)$88,000
$544,000
* BL-0002CALDWELL
DIVISIONPROJ.CATEGORY
DIVISION 12DIVISION 12US 70, SR 1358 (4TH STREET DRIVE SW) INTERSECTION IN HICKORY. CONSTRUCT INTERSECTION IMPROVEMENTS.PROJECT ADDED AT REQUEST OF MPO.
RIGHT-OF-WAY FY 2021 - (BGDA)$80,000FY 2021 - (L)$20,000
CONSTRUCTION FY 2021 - (BGDA)$320,000FY 2021 - (L)$80,000
$500,000
* HL-0002CATAWBA
EXEMPTPROJ.CATEGORY
17TH STREET NW, CONSTRUCT ROADWAY EXTENSION FROM 9TH AVENUE NW TO SR 1371 (CLEMENT BOULEVARD NW).PROJECT ADDED AT REQUEST OF MPO.
ENGINEERING FY 2021 - (BGDA)$384,000FY 2021 - (L)$96,000
RIGHT-OF-WAY FY 2022 - (BGDA)$576,000FY 2022 - (L)$144,000
CONSTRUCTION FY 2023 - (BGDA)$3,840,000FY 2023 - (L)$960,000
$6,000,000
* HL-0004CATAWBA
DIVISIONPROJ.CATEGORY
US 74, SR 1168 (LATTIMORE ROAD) INTERSECTION. UPGRADE AT-GRADE INTERSECTION TO INTERCHANGE.ADD NEW INFRASTRUCTURE FOR REBUILDING AMERICA (INFRA) GRANT PROJECT.
RIGHT-OF-WAY FY 2022 - (T)$1,500,000FY 2023 - (T)$1,500,000
UTILITIES FY 2022 - (T)$500,000CONSTRUCTION FY 2022 - (DP)$3,600,000
FY 2022 - (T)$430,000FY 2023 - (T)$2,723,000FY 2024 - (T)$2,723,000FY 2025 - (T)$2,724,000
$15,700,000
* R-4045CLEVELAND
REGIONALPROJ.CATEGORY
GASTONIA TRANSIT, ADA PARATRANSIT SERVICEFUNDING ADDED TO FY 20 AT THE REQUEST OF GASTON-CLEVELAND-LINCOLN MPO.
OPERATIONS FY 2020 - (L)$68,000FY 2020 - (5307)$270,000
$338,000
* TG-6183AGASTONPROJ.CATEGORY
2Thursday, September 3, 2020
* INDICATES FEDERAL AMENDMENT
REVISIONS TO THE 2020-2029 STIP
ITEM N
HIGHWAY PROGRAM
STIP ADDITIONS
DIVISION 12DIVISION 12GASTONIA TRANSIT, PREVENTATIVE MAINTENANCEFUNDING ADDED TO FY 20 AT THE REQUEST OF GASTON-CLEVELAND-LINCOLN MPO.
OPERATIONS FY 2020 - (L)$125,000FY 2020 - (5307)$500,000
$625,000
* TG-6184BGASTONPROJ.CATEGORY
GASTON TRANSIT, TRANSIT ENHANCEMENTS - PEDESTRIAN WALKWAYSFUNDING ADDED TO FY 20 AT THE REQUEST OF GASTON-CLEVELAND-LINCOLN MPO.
CONSTRUCTION FY 2020 - (L)$83,000FY 2020 - (5307)$330,000
$413,000
* TG-6792GASTONPROJ.CATEGORY
GASTONIA TRANSIT, TRANSIT ENHANCEMENTS SHELTERSFUNDING ADDED TO FY 20 AT THE REQUEST OF GASTON-CLEVELAND-LINCOLN MPO.
CONSTRUCTION FY 2020 - (L)$50,000FY 2020 - (5307)$200,000
$250,000
* TG-6793GASTONPROJ.CATEGORY
GASTONIA TRANSIT, TRANSIT APPFUNDING ADDED TO FY 20 AT THE REQUEST OF GASTON-CLEVELAND-LINCOLN MPO.
OPERATIONS FY 2020 - (L)$13,000FY 2020 - (5307)$50,000
$63,000
* TG-6804GASTONPROJ.CATEGORY
GASTON TRNSIT, TRANSIT ENHANCEMENTS - BENCHES AT BRADLY STATIONADD PROJECT TL-0004 TO STIP FOR FY 20. NEW PROJECT DEVELOPED FOR FEDERAL FUNDING AWARD. PROJECT ADDED AT THE REQUEST OF GASTON-CLEVELAND-LINCOLN MPO.
CONSTRUCTION FY 2020 - (L)$25,000FY 2020 - (5307)$100,000
$125,000
* TL-0004GASTONPROJ.CATEGORY
GASTONIA TRANSIT, OPERATING EXPENSESFUNDING ADDED TO FY 20 AT THE REQUEST OF GASTON-CLEVELAND-LINCOLN MPO.
OPERATIONS FY 2020 - (L)$846,000FY 2020 - (5307)$846,000
$1,692,000
* TO-6061GASTONPROJ.CATEGORY
3Thursday, September 3, 2020
* INDICATES FEDERAL AMENDMENT
REVISIONS TO THE 2020-2029 STIP
ITEM N
HIGHWAY PROGRAM
STIP ADDITIONS
DIVISION 13DIVISION 13MAIN AVENUE EAST, CONSTRUCT PEDESTRIAN IMPROVEMENTS FROM 2ND STREET SE TO US 70.PROJECT ADDED AT REQUEST OF MPO.
ENGINEERING FY 2022 - (BGDA)$64,000FY 2022 - (L)$16,000
RIGHT-OF-WAY FY 2022 - (BGDA)$80,000FY 2022 - (L)$20,000
CONSTRUCTION FY 2023 - (BGDA)$272,000FY 2023 - (L)$68,000
$520,000
* BL-0001BURKE
DIVISIONPROJ.CATEGORY
STATEWIDESTATEWIDESTATEWIDE, 5339(b) DISCRETIONARY GRANT FOR FACILITY CONSTRUCTIONADD PROJECT TC-0005 TO STIP FOR FY 21. NEW PROJECT DEVELOPED FOR FEDERAL FUNDING AWARD. PROJECT ADDED AT THE REQUEST OF NCDOT
CONSTRUCTION FY 2021 - (5339)$1,668,000$1,668,000
* TC-0005STATEWIDEPROJ.CATEGORY
STATEWIDE, 5339(b) DISCRETIONARY GRANT FOR FOR FACILITY CONSTRUCTIONADD PROJECT TC-0006 TO STIP FOR FY 21. NEW PROJECT DEVELOPED FOR FEDERAL FUNDING AWARD. PROJECT ADDED AT THE REQUEST OF NCDOT
CONSTRUCTION FY 2021 - (5339)$335,000$335,000
* TC-0006STATEWIDEPROJ.CATEGORY
STATEWIDE, 5339(b) DISCRETIONARY GRANT FOR CONSTRUCTION PROJECTADD PROJECT TC-0007 TO STIP FOR FY 21. NEW PROJECT DEVELOPED FOR FEDERAL FUNDING AWARD. PROJECT ADDED AT THE REQUEST OF NCDOT
CAPITAL FY 2021 - (5339)$1,189,000$1,189,000
* TC-0007STATEWIDEPROJ.CATEGORY
STATEWIDE, 5339(b) DISCRETIONARY GRANT FOR FACILITY CONSTRUCTIONADD PROJECT TC-0008 TO STIP FOR FY 21. NEW PROJECT DEVELOPED FOR FEDERAL FUNDING AWARD. PROJECT ADDED AT THE REQUEST OF NCDOT
CAPITAL FY 2021 - (5339)$4,000,000$4,000,000
* TC-0008STATEWIDEPROJ.CATEGORY
STATEWIDE, 5339(b) DISCRETIONARY GRANT FOR FOR FACILITY CONSTRUCTIONADD PROJECT TC-0010 TO STIP F0R FY 21. NEW PROJECT DEVELOPED FOR FEDERAL FUNDING AWARD. PROJECT ADDED AT THE REQUEST OF NCDOT
CONSTRUCTION FY 2021 - (5339)$1,135,000$1,135,000
* TC-0010STATEWIDEPROJ.CATEGORY
4Thursday, September 3, 2020
* INDICATES FEDERAL AMENDMENT
REVISIONS TO THE 2020-2029 STIP
ITEM N
HIGHWAY PROGRAM
STIP ADDITIONS
STATEWIDESTATEWIDESTATEWIDE, 5339(b) DISCRETIONARY GRANT FOR FACILITY CONSTRUCTIONADD PROJECT TC-0011 TO STIP FOR FY 21. NEW PROJECT DEVELOPED FOR FEDERAL FUNDING AWARD. PROJECT ADDED AT THE REQUEST OF NCDOT
CAPITAL FY 2021 - (5339)$2,391,000$2,391,000
* TC-0011STATEWIDEPROJ.CATEGORY
STATEWIDE, 5339(b) DISCRETIONARY GRANT TO PURCHASE ELECTRIC BUSES AND CHARGING STATIONS.ADD PROJECT TC-0012 TO STIP FOR FY 21. NEW PROJECT DEVELOPED FOR FEDERAL FUNDING AWARD. PROJECT ADDED AT THE REQUEST OF NCDOT
ACQUISITION FY 2021 - (5339)$894,000$894,000
* TC-0012STATEWIDEPROJ.CATEGORY
STATEWIDE, FY21 5307 SBUS CAPITALADD PROJECT TG-0002 TO STIP FOR FY 21. NEW PROJECT DEVELOPED FOR FEDERAL FUNDING AWARD. PROJECT ADDED AT THE REQUEST OF NCDOT
CAPITAL FY 2021 - (5307)$21,000$21,000
* TG-0002STATEWIDEPROJ.CATEGORY
STATEWIDE, FY21 5307 SBUS CAPITALADD PROJECT TG-0004 TO STIP FOR FY 21. NEW PROJECT DEVELOPED FOR FEDERAL FUNDING AWARD. PROJECT ADDED AT THE REQUEST OF NCDOT
CAPITAL FY 2021 - (5307)$168,000$168,000
* TG-0004STATEWIDEPROJ.CATEGORY
STATEWIDE, FY21 5307 SBUS CAPITALADD PROJECT TG-0005 TO STIP FOR FY 21. NEW PROJECT DEVELOPED FOR FEDERAL FUNDING AWARD. PROJECT ADDED AT THE REQUEST OF NCDOT
CAPITAL FY 2021 - (5307)$168,000$168,000
* TG-0005STATEWIDEPROJ.CATEGORY
STATEWIDE, FY21 5307 SBUS CAPITALADD PROJECT TG-0006 TO STIP FOR FY 21. NEW PROJECT DEVELOPED FOR FEDERAL FUNDING AWARD. PROJECT ADDED AT THE REQUEST OF NCDOT
CAPITAL FY 2021 - (5307)$122,000$122,000
* TG-0006STATEWIDEPROJ.CATEGORY
5Thursday, September 3, 2020
* INDICATES FEDERAL AMENDMENT
REVISIONS TO THE 2020-2029 STIP
ITEM N
HIGHWAY PROGRAM
STIP ADDITIONS
STATEWIDESTATEWIDESTATEWIDE, 5307 OPERATING FUNDSADD PROJECT TM-0010 TO STIP FOR FY 21. NEW PROJECT DEVELOPED FOR FEDERAL FUNDING AWARD. PROJECT ADDED AT THE REQUEST OF NCDOT
OPERATIONS FY 2021 - (5307)$142,000$142,000
* TM-0010STATEWIDEPROJ.CATEGORY
STATEWIDE, 5307 OPERATING FUNDSADD PROJECT TM-0012 TO STIP FOR FY 21. NEW PROJECT DEVELOPED FOR FEDERAL FUNDING AWARD. PROJECT ADDED AT THE REQUEST OF NCDOT
OPERATIONS FY 2021 - (5307)$129,000$129,000
* TM-0012STATEWIDEPROJ.CATEGORY
STATEWIDE, 5307 OPERATING FUNDSADD PROJECT TM-0014 TO STIP FOR FY 21. NEW PROJECT DEVELOPED FOR FEDERAL FUNDING AWARD. PROJECT ADDED AT THE REQUEST OF NCDOT
OPERATIONS FY 2021 - (5307)$75,000$75,000
* TM-0014STATEWIDEPROJ.CATEGORY
STATEWIDE, 5307 OPERATING FUNDSADD PROJECT TM-0015 TO STIP FOR FY 21. NEW PROJECT DEVELOPED FOR FEDERAL FUNDING AWARD. PROJECT ADDED AT THE REQUEST OF NCDOT
ADMINISTRATIVE FY 2021 - (5307)$145,000$145,000
* TM-0015STATEWIDEPROJ.CATEGORY
STATEWIDE, 5307 OPERATING FUNDSADD PROJECT TM-0020 TO STIP F0R FY 21. NEW PROJECT DEVELOPED FOR FEDERAL FUNDING AWARD. PROJECT ADDED AT THE REQUEST OF NCDOT
ADMINISTRATIVE FY 2021 - (5307)$45,000$45,000
* TM-0020STATEWIDEPROJ.CATEGORY
STATEWIDE, 5307 OPERATING FUNDSADD PROJECT TM-0022 TO STIP FOR FY 21. NEW PROJECT DEVELOPED FOR FEDERAL FUNDING AWARD. PROJECT ADDED AT THE REQUEST OF NCDOT
ADMINISTRATIVE FY 2021 - (5307)$18,000$18,000
* TM-0022STATEWIDEPROJ.CATEGORY
6Thursday, September 3, 2020
* INDICATES FEDERAL AMENDMENT
REVISIONS TO THE 2020-2029 STIP
ITEM N
HIGHWAY PROGRAM
STIP MODIFICATIONS
DIVISION 1DIVISION 1TRI-COUNTY AIRPORT (ASJ), RUNWAY EXTENSION.AT REQUEST OF DIVISION OF AVIATION, DELAY CONSTRUCTION FROM FY 23 TO FY 29.
CONSTRUCTION FY 2029 - (T)$679,000$679,000
* AV-5778HERTFORD
DIVISIONPROJ.CATEGORY
NC 46, NC 48 IN GASTON TO THE VIRGINIA STATE LINE. UPGRADE AND WIDEN EXISTING FACILITY.TO ASSIST IN BALANCING FUNDS, DELAY RIGHT-OF-WAY FROM FY 20 TO FY 23 AND CONSTRUCTION FROM FY 22 TO FY 25.
RIGHT-OF-WAY FY 2023 - (T)$100,000CONSTRUCTION FY 2025 - (T)$4,294,000
FY 2026 - (T)$4,294,000$8,688,000
* R-5739NORTHAMPTON
DIVISIONPROJ.CATEGORY
DIVISION 2DIVISION 2US 70, TABERNA WAY. CONVERT AT-GRADE INTERSECTION TO INTERCHANGE.COST INCREASE EXCEEDING $2 MILLION AND 25% THRESHOLDS.
RIGHT-OF-WAY FY 2020 - (T)$23,719,000FY 2021 - (T)$23,719,000
UTILITIES FY 2020 - (T)$300,000CONSTRUCTION FY 2020 - (T)$2,501,000
FY 2021 - (T)$15,833,000FY 2022 - (T)$15,833,000FY 2023 - (T)$15,833,000
$97,738,000
* R-5777ACRAVEN
STATEWIDEPROJ.CATEGORY
7Thursday, September 3, 2020
* INDICATES FEDERAL AMENDMENT
REVISIONS TO THE 2020-2029 STIP
ITEM N
HIGHWAY PROGRAM
STIP MODIFICATIONS
DIVISION 2DIVISION 2US 70, WEST THURMAN ROAD/EAST THURMAN ROAD. CONVERT AT-GRADE INTERSECTION TO INTERCHANGE.COST INCREASE EXCEEDING $2 MILLION AND 25% THRESHOLDS.
ENGINEERING FY 2020 - (T)$7,000FY 2021 - (T)$7,000FY 2022 - (T)$7,000FY 2023 - (T)$7,000FY 2024 - (T)$7,000FY 2025 - (T)$7,000FY 2026 - (T)$7,000FY 2027 - (T)$7,000FY 2028 - (T)$7,000FY 2029 - (T)$7,000FY 2030 - (T)$7,000FY 2031 - (T)$7,000FY 2032 - (T)$7,000POST YR- (T)$14,000
BUILD NC ROW FY 2020 - (T)$1,000FY 2021 - (T)$1,000FY 2022 - (T)$1,000FY 2023 - (T)$1,000FY 2024 - (T)$1,000FY 2025 - (T)$1,000FY 2026 - (T)$1,000FY 2027 - (T)$1,000FY 2028 - (T)$1,000FY 2029 - (T)$1,000FY 2030 - (T)$1,000FY 2031 - (T)$1,000FY 2032 - (T)$1,000POST YR- (T)$2,000
RIGHT-OF-WAY FY 2020 - (T)$23,716,000FY 2021 - (T)$23,716,000
UTILITIES FY 2020 - (T)$300,000CONSTRUCTION FY 2020 - (T)$2,501,000
FY 2021 - (T)$15,833,000FY 2022 - (T)$15,833,000FY 2023 - (T)$15,833,000
$97,852,000
* R-5777BCRAVEN
REGIONALPROJ.CATEGORY
US 70, SR 1124 (GRANTHAM ROAD) TO NEUSE RIVER BRIDGE. UPGRADE ROADWAY TO FREEWAY.COST INCREASE EXCEEDING $2 MILLION AND 25% THRESHOLDS.
RIGHT-OF-WAY FY 2020 - (T)$47,438,000FY 2021 - (T)$47,438,000
UTILITIES FY 2020 - (T)$1,000,000CONSTRUCTION FY 2020 - (T)$8,176,000
FY 2021 - (T)$38,831,000FY 2022 - (T)$38,831,000FY 2023 - (T)$38,831,000FY 2024 - (T)$38,831,000
$259,376,000
* U-5713CRAVEN
STATEWIDEPROJ.CATEGORY
8Thursday, September 3, 2020
* INDICATES FEDERAL AMENDMENT
REVISIONS TO THE 2020-2029 STIP
ITEM N
HIGHWAY PROGRAM
STIP MODIFICATIONS
DIVISION 2DIVISION 2VARIOUS, 128 SECONDARY ROADSAND ONE PRIMARY ROUTE (NC 11) IN EIGHT COUNTIES OF DIVISION TWO. INSTALL THERMOPLASTIC PAVEMENT MARKINGS.PROJECT BREAK ADDED AT REQUEST OF TRANSPORTATION MOBILITY AND SAFETY.
CONSTRUCTION FY 2021 - (T)$2,994,153$2,994,153
* W-5702PCRAVENBEAUFORTGREENELENOIRJONESPITTCARTERETPAMLICO
DIVISIONPROJ.CATEGORY
DIVISION 3DIVISION 3NC 24, REPLACE BRIDGE 810056 OVER SIX RUNS CREEK.AT REQUEST OF STRUCTURES MANAGEMENT UNIT, DELAY CONSTRUCTION FROM FY 21 TO FY 26.
RIGHT-OF-WAY FY 2020 - (T)$390,000CONSTRUCTION FY 2026 - (NHPB)$2,950,000
FY 2027 - (NHPB)$2,950,000$6,290,000
* B-4636SAMPSON
STATEWIDEPROJ.CATEGORY
SR 1817 (BRADSHAW ROAD), REPLACE BRIDGE 810188 OVER WARD SWAMP.AT REQUEST OF STRUCTURES MANAGEMENT UNIT, DELAY RIGHT-OF-WAY FROM FY 22 TO FY 23 AND CONSTRUCTION FROM FY 23 TO FY 24.
RIGHT-OF-WAY FY 2023 - (BGOFF)$150,000CONSTRUCTION FY 2024 - (BGOFF)$1,500,000
$1,650,000
B-5310SAMPSON
DIVISIONPROJ.CATEGORY
CSX SE LINE, TIE AND RAIL REHABILITATION, CURVE REALIGNMENT, AND UPGRADE RAIL BRIDGES.PROJECT BREAK ADDED AT REQUEST OF RAIL DIVISION.
CONSTRUCTION FY 2022 - (DP)$15,522,000FY 2022 - (T)$5,514,000FY 2023 - (T)$5,514,000
$26,550,000
P-5740ABRUNSWICKNEW HANOVER
STATEWIDEPROJ.CATEGORY
9Thursday, September 3, 2020
* INDICATES FEDERAL AMENDMENT
REVISIONS TO THE 2020-2029 STIP
ITEM N
HIGHWAY PROGRAM
STIP MODIFICATIONS
DIVISION 3DIVISION 3CSX SE LINE, IMPROVEMENTS TO HIGHWAY GRADE CROSSINGS, CLOSE AND IMPROVE VARIOUS EXISTING AT-GRADE CROSSINGS.PROJECT BREAK ADDED AT REQUEST OF RAIL DIVISION.
RIGHT-OF-WAY FY 2021 - (T)$600,000CONSTRUCTION FY 2022 - (DP)$2,545,000
FY 2022 - (T)$902,000FY 2023 - (T)$903,000
$4,950,000
P-5740BNEW HANOVER
STATEWIDEPROJ.CATEGORY
CSX SE LINE, INSTALLATION OF RAILROAD GRADE CROSSING SIGNALS AND GATES AT VARIOUS AT-GRADE CROSSINGS.PROJECT BREAK ADDED AT REQUEST OF RAIL DIVISION.
CONSTRUCTION FY 2022 - (DP)$5,792,000FY 2022 - (T)$2,054,000FY 2023 - (T)$2,054,000
$9,900,000
P-5740CNEW HANOVERBRUNSWICK
STATEWIDEPROJ.CATEGORY
DIVISION 4DIVISION 4NC 33, REPLACE BRIDGE 320080 OVER TAR RIVER. REPLACE BRIDGE 320049 OVER TAR RIVER OVERFLOW.AT REQUEST OF STRUCTURES MANAGEMENT UNIT, DELAY RIGHT-OF-WAY FROM FY 23 TO 25 AND CONSTRUCTION FROM FY 24 TO FY 27.
RIGHT-OF-WAY FY 2025 - (T)$60,000FY 2026 - (T)$800,000
CONSTRUCTION FY 2027 - (NHPB)$4,600,000FY 2028 - (NHPB)$4,600,000
$10,060,000
* B-4933EDGECOMBE
REGIONALPROJ.CATEGORY
NC 581, REPLACE BRIDGE 630091 OVER TAR RIVER.AT REQUEST OF STRUCTURES MANAGEMENT UNIT, DELAY RIGHT-OF-WAY FROM FY 20 TO FY 23 AND CONSTRUCTION FROM FY 21 TO FY 24.
RIGHT-OF-WAY FY 2023 - (NHPB)$400,000UTILITIES FY 2023 - (NHPB)$35,000CONSTRUCTION FY 2024 - (NHPB)$2,133,000
FY 2025 - (NHPB)$2,133,000FY 2026 - (NHPB)$2,134,000
$6,835,000
B-5947NASH
REGIONALPROJ.CATEGORY
SR 1522 (HALIFAX ROAD), REPLACE BRIDGE 630203 OVER I-95.TO ASSIST IN BALANCING FUNDS, DELAY CONSTRUCTION FROM FY 20 TO FY 21.
RIGHT-OF-WAY FY 2020 - (NHPB)$2,000,000CONSTRUCTION FY 2021 - (NHPB)$15,600,000
$17,600,000
B-5980NASH
STATEWIDEPROJ.CATEGORY
10Thursday, September 3, 2020
* INDICATES FEDERAL AMENDMENT
REVISIONS TO THE 2020-2029 STIP
ITEM N
HIGHWAY PROGRAM
STIP MODIFICATIONS
DIVISION 4DIVISION 4I-95, REPLACE BRIDGES 500082 AND 500085 OVER BLACK CREEK AND BRIDGES 500100 AND 500101 OVER THE NEUSE RIVER.AT REQUEST OF STRUCTURES MANAGEMENT UNIT, DELAY RIGHT-OF-WAY FROM FY 22 TO FY 23 AND CONSTRUCTION FROM FY 24 TO FY 25.
RIGHT-OF-WAY FY 2023 - (NHPB)$1,220,000FY 2023 - (O)$3,660,000
CONSTRUCTION FY 2025 - (NHPB)$3,600,000FY 2025 - (O)$10,800,000FY 2026 - (NHPB)$3,600,000FY 2026 - (O)$10,800,000
$33,680,000
* B-6044JOHNSTON
STATEWIDEPROJ.CATEGORY
SR 2137 (PITTMAN ROAD) SR 2130 (E MAIN STREET) SR 2339 (BAGLEY ROAD), REPLACE BRIDGE 500109 ON SR 2137 (PITTMAN ROAD) OVER I-95, BRIDGE 500110 ON SR 2130 (EAST MAIN STREET) OVER I-95, AND BRIDGE 500112 ON SR 2339 (BAGLEY ROAD) OVER I-95.AT REQUEST OF STRUCTURES MANAGEMENT UNIT, DELAY RIGHT-OF-WAY FROM FY 21 TO FY 24 AND CONSTRUCTION FROM FY 23 TO FY 26.
RIGHT-OF-WAY FY 2024 - (NHPB)$1,500,000CONSTRUCTION FY 2026 - (NHPB)$5,000,000
FY 2027 - (NHPB)$5,000,000FY 2028 - (NHPB)$5,000,000
$16,500,000
* B-6050JOHNSTON
DIVISIONPROJ.CATEGORY
US 13 (BERKELEY BOULEVARD), REALIGNMENT OF HOOD SWAMP ROAD.TO ASSIST IN BALANCING FUNDS, DELAY CONSTRUCTION FROM FY 22 TO FY 23.
CONSTRUCTION FY 2023 - (T)$1,500,000$1,500,000
U-3609BAWAYNE
REGIONALPROJ.CATEGORY
DIVISION 5DIVISION 5SR 1321 (AVENT FERRY ROAD), REPLACE BRIDGE 910318 OVER LAKE JOHNSON IN RALEIGH.PROJECT TO NO LONGER UTILIZE GARVEE BONDS. TO ASSIST IN BALANCING FUNDS, DELAY CONSTRUCTION FROM FY 22 TO FY 26.
CONSTRUCTION FY 2026 - (NHPB)$3,650,000$3,650,000
* B-5130WAKE
DIVISIONPROJ.CATEGORY
US 15 / US 501 NORTHBOUND, REPLACE BRIDGE 310080 OVER SR 1308 (CORNWALLIS ROAD) IN DURHAM.TO ASSIST IN BALANCING FUNDS, DELAY RIGHT-OF-WAY FROM FY 20 TO 22 AND CONSTRUCTION FROM FY 22 TO FY 24.
RIGHT-OF-WAY FY 2022 - (NHPB)$110,000CONSTRUCTION FY 2024 - (NHPB)$2,209,000
$2,319,000
B-5674DURHAM
REGIONALPROJ.CATEGORY
11Thursday, September 3, 2020
* INDICATES FEDERAL AMENDMENT
REVISIONS TO THE 2020-2029 STIP
ITEM N
HIGHWAY PROGRAM
STIP MODIFICATIONS
DIVISION 5DIVISION 5NC 231, REPLACE BRIDGE 910034 OVER NORFOLK SOUTHERN RAILROAD IN WENDELL.TO ASSIST IN BALANCING FUNDS, DELAY RIGHT-OF-WAY FROM FY 21 TO 22 AND CONSTRUCTION FROM FY 22 TO FY 23.
RIGHT-OF-WAY FY 2022 - (NHPB)$164,000UTILITIES FY 2022 - (NHPB)$163,000CONSTRUCTION FY 2023 - (NHPB)$2,948,000
$3,275,000
B-5986WAKE
REGIONALPROJ.CATEGORY
US 401, REPLACE BRIDGES 910115 AND 910117 OVER NORFOLK SOUTHERN RAILROAD AND AN UNNAMED CREEK.TO ASSIST IN BALANCING FUNDS, DELAY RIGHT-OF-WAY FROM FY 21 TO 23 AND CONSTRUCTION FROM FY 22 TO FY 24.
RIGHT-OF-WAY FY 2023 - (NHPB)$640,000UTILITIES FY 2023 - (NHPB)$640,000CONSTRUCTION FY 2024 - (NHPB)$8,450,000
FY 2025 - (NHPB)$8,450,000$18,180,000
B-5987WAKE
REGIONALPROJ.CATEGORY
SR 1609 (BAPTIST CHURCH ROAD), REPLACE BRIDGE 340078 OVER TAR RIVERTO ASSIST IN BALANCING FUNDS, DELAY RIGHT-OF-WAY FROM FY 21 TO 25 AND CONSTRUCTION FROM FY 23 TO FY 26.
RIGHT-OF-WAY FY 2025 - (BGOFF)$405,000CONSTRUCTION FY 2026 - (BGOFF)$4,050,000
$4,455,000
B-6003FRANKLIN
DIVISIONPROJ.CATEGORY
SR 1501 (JUNNY ROAD); NORTH WILLOW STREET; WEST LILLINGTON STREET, NORTH WILLOW STREET, EAST JULIA STREET TO JUNNY ROAD; JUNNY ROAD, EAST JULIA STREET TO GLEN MEADOW DRIVE; AND WEST LILLINGTON STREET, SOUTH PARK STREET TO NC 210, IN ANGIER. CONSTRUCT SIDEWALK EXTENSIONS.TO ASSIST IN BALANCING FUNDS, DELAY RIGHT-OF-WAY FROM FY 21 TO FY 22 AND CONSTRUCTION FROM FY 21 TO FY 22.
ENGINEERING FY 2021 - (BGDA)$140,000FY 2021 - (L)$35,000
RIGHT-OF-WAY FY 2022 - (BGDA)$120,000FY 2022 - (L)$30,000
CONSTRUCTION FY 2022 - (BGDA)$1,166,000FY 2022 - (L)$291,000
$1,782,000
EB-6020HARNETT
DIVISIONPROJ.CATEGORY
I-40, EAST OF NC 147 TO SR 3015 (AIRPORT BOULEVARD). PAVEMENT REHABILITATION.PROJECT TO NO LONGER UTILIZE GARVEE BOND FUNDING.
CONSTRUCTION FY 2022 - (NHPIM)$5,272,000$5,272,000
* I-5995DURHAMWAKE
STATEWIDEPROJ.CATEGORY
12Thursday, September 3, 2020
* INDICATES FEDERAL AMENDMENT
REVISIONS TO THE 2020-2029 STIP
ITEM N
HIGHWAY PROGRAM
STIP MODIFICATIONS
DIVISION 5DIVISION 5CSX S LINE, CONSTRUCT GRADE SEPARATION AT SR 2052 (ROGERS ROAD EXTENSION) CROSSING (633905Y) IN WAKE FOREST.TO ASSIST IN BALANCING FUNDS, DELAY CONSTRUCTION FROM FY 21 TO FY 22.
CONSTRUCTION FY 2022 - (T)$7,834,000FY 2023 - (T)$7,833,000FY 2024 - (T)$7,833,000
$23,500,000
P-5707WAKE
REGIONALPROJ.CATEGORY
CSX, CROSSING 630607N AT NEW HOPE CHURCH ROAD IN RALEIGH. CONSTRUCT GRADE SEPARATION.TO ASSIST IN BALANCING FUNDS, DELAY CONSTRUCTION FROM FY 21 TO FY 22.
CONSTRUCTION FY 2022 - (T)$618,000FY 2022 - (O)$535,000FY 2023 - (T)$3,916,000FY 2024 - (T)$3,915,000FY 2025 - (T)$3,915,000
$12,899,000
P-5715WAKE
REGIONALPROJ.CATEGORY
CSX, CROSSING 630601X AT SR 2006 (DURANT ROAD) IN RALEIGH. CONSTRUCT GRADE SEPARATION.COST INCREASE EXCEEDING $2 MILLION AND 25% THRESHOLDS. TO ASSIST IN BALANCING FUNDS, DELAY CONSTRUCTION FROM FY 21 TO FY 22.
CONSTRUCTION FY 2022 - (T)$7,310,000FY 2022 - (O)$480,000FY 2023 - (T)$7,310,000
$15,100,000
* P-5720WAKE
REGIONALPROJ.CATEGORY
US 401 / NC 39 (BICKETT BOULEVARD), BURKE BOULEVARD TO NC 56 / NC 581 (NASH STREET) IN LOUISBURG. CONVERT 5-LANE SECTION TO 4-LANE DIVIDED FACILITY WITH BICYCLE / PEDESTRIAN ACCOMMODATIONS.COST INCREASE EXCEEDING $2 MILLION AND 25% THRESHOLDS.
RIGHT-OF-WAY FY 2021 - (T)$800,000FY 2022 - (T)$2,400,000
UTILITIES FY 2021 - (T)$125,000FY 2022 - (T)$375,000
CONSTRUCTION FY 2023 - (T)$16,100,000$19,800,000
* U-6024FRANKLIN
DIVISIONPROJ.CATEGORY
SR 2051 (BURLINGTON MILLS ROAD), EAST OF ROLESVILLE MIDDLE SCHOOL TO US 401 BUSINESS (SOUTH MAIN STREET) IN ROLESVILLE. REALIGN ROADWAY AND CONSTRUCT NEW INTERSECTION WITH SOUTH MAIN STREET. US 401 BUSINESS (SOUTH MAIN STREET), SR 2051 (BURLINGTON MILLS ROAD) TO NORTH OF SR 1003 (EAST YOUNG STREET) / SR 1945 (WEST YOUNG STREET). CONSTRUCT SIDEWALK EXTENSIONS AND COMPLETE STREET IMRPOVEMENTS.DESCRIPTION REVISED AT REQUEST OF MPO TO INCLUDE SCOPE OF EB-6047.
CONSTRUCTION FY 2021 - (BGDA)$4,838,000FY 2021 - (L)$1,210,000
$6,048,000
* U-6241WAKE
DIVISIONPROJ.CATEGORY
13Thursday, September 3, 2020
* INDICATES FEDERAL AMENDMENT
REVISIONS TO THE 2020-2029 STIP
ITEM N
HIGHWAY PROGRAM
STIP MODIFICATIONS
DIVISION 6DIVISION 6NC 24, REPLACE BRIDGE 250144 OVER SOUTH RIVER.AT REQUEST OF STRUCTURES MANAGEMENT UNIT, DELAY RIGHT-OF-WAY FROM FY 24 TO FY 26 AND CONSTRUCTION FROM FY 25 TO FY 27.
RIGHT-OF-WAY FY 2026 - (T)$204,000UTILITIES FY 2026 - (T)$56,000CONSTRUCTION FY 2027 - (T)$2,040,000
FY 2028 - (T)$2,040,000$4,340,000
* B-5708CUMBERLAND
STATEWIDEPROJ.CATEGORY
LITTLE CROSS CREEK GREENWAY EXTENSION, FILTER PLANT DRIVE TO ROWAN STREET BRIDGE IN FAYETTEVILLE. CONSTRUCT MULTI-USE PATH.TO ASSIST IN BALANCING FUNDS, DELAY RIGHT-OF-WAY FROM FY 21 TO FY 22 AND CONSTRUCTION FROM FY 22 TO FY 23.
RIGHT-OF-WAY FY 2022 - (L)$20,000CONSTRUCTION FY 2023 - (TAANY)$384,000
FY 2023 - (L)$96,000$500,000
EB-5540CUMBERLAND
DIVISIONPROJ.CATEGORY
CAMPBELL UNIVERSITY SIDEWALK, WADE STEWART CIRCLE TO PEARSON ROAD IN BUIES CREEK. CONSTRUCT SIDEWALK.ADD RIGHT-OF-WAY IN FY 21 NOT PREVIOUSLY PROGRAMMED.
RIGHT-OF-WAY FY 2021 - (TALT5)$80,000FY 2021 - (L)$20,000
CONSTRUCTION FY 2021 - (TALT5)$480,000FY 2021 - (L)$120,000
$700,000
* EB-6014HARNETT
DIVISIONPROJ.CATEGORY
US 401 BYPASS (SKIBO ROAD), CONSTRUCT SIDEWALK FROM RICHWOOD COURT TO NC 24 (BRAGG BOULEVARD).TO ASSIST IN BALANCING FUNDS, DELAY RIGHT-OF-WAY FROM FY 20 TO FY 21 AND CONSTRUCTION FROM FY 21 TO FY 22.
RIGHT-OF-WAY FY 2021 - (TADA)$60,000FY 2021 - (L)$15,000
CONSTRUCTION FY 2022 - (TADA)$360,000FY 2022 - (L)$90,000
$525,000
EB-6030CUMBERLAND
DIVISIONPROJ.CATEGORY
US 401 (RAMSEY STREET), CONSTRUCT SIDEWALK FROM SUMMERCHASE DRIVE TO SR 1611 (ANDREWS ROAD).TO ASSIST IN BALANCING FUNDS, DELAY CONSTRUCTION FROM FY 20 TO FY 21.
CONSTRUCTION FY 2021 - (TADA)$68,000FY 2021 - (L)$17,000
$85,000
EB-6031CUMBERLAND
DIVISIONPROJ.CATEGORY
NC 59 (HOPE MILLS ROAD), CONSTRUCT SIDEWALK FROM FAYETTEVILLE CITY LIMITS TO SUMAC CIRCLE.TO ASSIST IN BALANCING FUNDS, DELAY CONSTRUCTION FROM FY 20 TO FY 21.
CONSTRUCTION FY 2021 - (TADA)$282,000FY 2021 - (L)$70,000
$352,000
EB-6032CUMBERLAND
DIVISIONPROJ.CATEGORY
14Thursday, September 3, 2020
* INDICATES FEDERAL AMENDMENT
REVISIONS TO THE 2020-2029 STIP
ITEM N
HIGHWAY PROGRAM
STIP MODIFICATIONS
DIVISION 6DIVISION 6US 74, NC 72/NC 130. UPGRADE AT-GRADE INTERSECTION TO INTERCHANGE.TO ASSIST IN BALANCING FUNDS, DELAY RIGHT-OF-WAY FROM FY 20 TO FY 21.
RIGHT-OF-WAY FY 2021 - (T)$100,000CONSTRUCTION FY 2023 - (T)$6,766,000
FY 2024 - (T)$6,767,000FY 2025 - (T)$6,767,000
$20,400,000
R-5751ROBESON
REGIONALPROJ.CATEGORY
DIVISION 7DIVISION 7WILLOW ROAD, REPLACE BRIDGE 400352 OVER I-40 / BUSINESS 85 IN GREENSBORO.TO ASSIST IN BALANCING FUNDS, DELAY RIGHT-OF-WAY FROM FY 22 TO 25 AND CONSTRUCTION FROM FY 23 TO FY 26.
RIGHT-OF-WAY FY 2025 - (NHPB)$166,000CONSTRUCTION FY 2026 - (NHPB)$3,318,000
$3,484,000
* B-5713GUILFORD
DIVISIONPROJ.CATEGORY
SR 2177 (DAN VALLEY ROAD), REPLACE BRIDGE 780124 OVER MAYO RIVER IN MADISON.TO ASSIST IN BALANCING FUNDS, DELAY RIGHT-OF-WAY FROM FY 20 TO 21 AND CONSTRUCTION FROM FY 20 TO FY 22.
RIGHT-OF-WAY FY 2021 - (BGLT5)$188,000UTILITIES FY 2021 - (BGLT5)$269,000CONSTRUCTION FY 2022 - (BGLT5)$3,500,000
$3,957,000
B-5721ROCKINGHAM
DIVISIONPROJ.CATEGORY
SR 1710 (GRIERS CHURCH ROAD), REPLACE BRIDGE 160007 OVER HYCO CREEK.TO ASSIST IN BALANCING FUNDS, DELAY RIGHT-OF-WAY FROM FY 22 TO 24 AND CONSTRUCTION FROM FY 23 TO FY 26.
RIGHT-OF-WAY FY 2024 - (BGOFF)$290,000CONSTRUCTION FY 2026 - (BGOFF)$2,900,000
$3,190,000
* B-5725CASWELL
DIVISIONPROJ.CATEGORY
NC 86, REPLACE BRIDGE 670049 OVER NORTH CAROLINA RAILROAD / NORFOLK SOUTHERN RAILROAD.TO ASSIST IN BALANCING FUNDS, DELAY RIGHT-OF-WAY FROM FY 21 TO 24 AND CONSTRUCTION FROM FY 23 TO FY 25.
RIGHT-OF-WAY FY 2024 - (NHPB)$250,000CONSTRUCTION FY 2025 - (NHPB)$2,500,000
$2,750,000
* B-6037ORANGE
REGIONALPROJ.CATEGORY
US 220 (WENDOVER AVENUE), GRECADE STREET TO SR 1001 (NORTH CHURCH STREET) AND SR 2526 (SUMMIT AVENUE) TO US 29 (NORTH O'HENRY BOULEVARD) IN GREENSBORO. CONSTRUCT SIDEWALKS.TO ALLOW ADDITIONAL TIME FOR PLANNING AND DESIGN DELAY RIGHT-OF-WAY FROM FY 20 TO FY 21 AND CONSTRUCTION FROM FY 20 TO FY 22 TO REFLECT CURRENT CITY DELIVERY SCHEDULE.
RIGHT-OF-WAY FY 2021 - (TAP)$357,000FY 2021 - (L)$89,000
CONSTRUCTION FY 2022 - (TAP)$2,139,000FY 2022 - (L)$535,000
$3,120,000
EB-5883GUILFORD
DIVISIONPROJ.CATEGORY
15Thursday, September 3, 2020
* INDICATES FEDERAL AMENDMENT
REVISIONS TO THE 2020-2029 STIP
ITEM N
HIGHWAY PROGRAM
STIP MODIFICATIONS
DIVISION 7DIVISION 7I-40 / I-85, SR 1007 (MEBANE-OAKS ROAD) IN MEBANE. INTERCHANGE IMPROVEMENTS.TO ASSIST IN BALANCING FUNDS, DELAY CONSTRUCTION FROM FY 20 TO FY 21.
GARVEE CON FY 2021 - (NHP)$186,000FY 2022 - (NHP)$186,000FY 2023 - (NHP)$186,000FY 2024 - (NHP)$186,000FY 2025 - (NHP)$186,000FY 2026 - (NHP)$186,000FY 2027 - (NHP)$186,000FY 2028 - (NHP)$186,000FY 2029 - (NHP)$186,000POST YR- (NHP)$1,116,000
CONSTRUCTION FY 2021 - (NHP)$3,644,000FY 2021 - (S(M))$241,000FY 2022 - (NHP)$3,643,000FY 2022 - (S(M))$241,000FY 2023 - (NHP)$3,643,000FY 2023 - (S(M))$241,000
$14,443,000
I-5711ALAMANCE
STATEWIDEPROJ.CATEGORY
NC 65 / NC 87, WEST OF SR 2371 (OLD COUNTY HOME ROAD) IN WENTWORTH TO SR 1001 (SANDY CROSS ROAD) / SR 1998 (WENTWORTH STREET)TO ASSIST IN BALANCING FUNDS, DELAY RIGHT-OF-WAY FROM FY 20 TO FY 21.
RIGHT-OF-WAY FY 2021 - (T)$100,000UTILITIES FY 2021 - (T)$1,197,000CONSTRUCTION FY 2022 - (T)$1,850,000
$3,147,000
R-5766AROCKINGHAM
DIVISIONPROJ.CATEGORY
NC 65 / NC 87, SR 1001 (SANDY CROSS ROAD) / SR 1998 (WENTWORTH STREET) TO SR 2413 (VANCE STREET EXTENSION)TO ASSIST IN BALANCING FUNDS, DELAY RIGHT-OF-WAY FROM FY 20 TO FY 21.
RIGHT-OF-WAY FY 2021 - (T)$330,000UTILITIES FY 2021 - (T)$237,000CONSTRUCTION FY 2022 - (T)$1,673,000
$2,240,000
R-5766BROCKINGHAM
DIVISIONPROJ.CATEGORY
NC 65 / NC 87, SR 2413 (VANCE STREET EXTENSION) TO US 158 / US 29 BUSINESS IN REIDSVILLETO ASSIST IN BALANCING FUNDS, DELAY RIGHT-OF-WAY FROM FY 20 TO FY 21.
RIGHT-OF-WAY FY 2021 - (T)$600,000UTILITIES FY 2021 - (T)$100,000CONSTRUCTION FY 2024 - (T)$3,300,000
$4,000,000
R-5766CROCKINGHAM
DIVISIONPROJ.CATEGORY
16Thursday, September 3, 2020
* INDICATES FEDERAL AMENDMENT
REVISIONS TO THE 2020-2029 STIP
ITEM N
HIGHWAY PROGRAM
STIP MODIFICATIONS
DIVISION 7DIVISION 7NC 54, SR 1006 (ORANGE GROVE ROAD) TO SR 1107 / SR 1937 (OLD FAYETTEVILLE ROAD). CONSTRUCT OPERATIONAL IMPROVEMENTS, INCLUDING BICYCLE/PEDESTRIAN ACCOMMODATIONSCOST INCREASE EXCEEDING $2 MILLION AND 25% THRESHOLDS. TO ASSIST IN BALANCING FUNDS, DELAY RIGHT-OF-WAY FROM FY 20 TO FY 21.
RIGHT-OF-WAY FY 2021 - (T)$630,000UTILITIES FY 2021 - (T)$100,000CONSTRUCTION FY 2022 - (T)$12,675,000
FY 2023 - (T)$12,675,000FY 2024 - (T)$12,675,000FY 2025 - (T)$12,675,000
$51,430,000
* R-5821AORANGE
REGIONALPROJ.CATEGORY
SR 1007 (RANDLEMAN ROAD), ELMSLEY DRIVE TO GLENDALE DRIVE IN GREENSBORO. WIDEN TO MULTLANES.TO ASSIST IN BALANCING FUNDS, DELAY RIGHT-OF-WAY FROM FY 21 TO FY 22.
RIGHT-OF-WAY FY 2022 - (T)$467,000UTILITIES FY 2022 - (T)$56,000CONSTRUCTION FY 2024 - (T)$2,400,000
$2,923,000
U-5850GUILFORD
DIVISIONPROJ.CATEGORY
NC 119, SR 1981 (TROLLINGWOOD-HAWFIELDS ROAD) / SR 2126 (OLD HILLSBOROUGH ROAD TO LOWES BOULEVARD IN MEBANE. WIDEN TO MULTILANES.TO ASSIST IN BALANCING FUNDS, DELAY RIGHT-OF-WAY FROM FY 21 TO FY 22.
RIGHT-OF-WAY FY 2022 - (T)$3,000,000UTILITIES FY 2022 - (T)$500,000CONSTRUCTION FY 2023 - (T)$2,600,000
FY 2024 - (T)$2,600,000$8,700,000
U-6013ALAMANCE
DIVISIONPROJ.CATEGORY
NC 62, SR 1154 (KERSEY VALLEY ROAD) TO SR 1162 (WEANT ROAD) IN ARCHDALE. IMPROVE INTERCHANGE AREA AND REALIGN SR 1154 AND SR 1162 INTERSECTIONS.TO ASSIST IN BALANCING FUNDS, DELAY CONSTRUCTION FROM FY 22 TO FY 23.
RIGHT-OF-WAY FY 2021 - (T)$3,200,000UTILITIES FY 2021 - (T)$200,000CONSTRUCTION FY 2023 - (T)$10,300,000
$13,700,000
U-6018GUILFORD
DIVISIONPROJ.CATEGORY
DIVISION 8DIVISION 8SR 1400 (CUMNOCK ROAD), REPLACE BRIDGE 520069 AND BRIDGE 520070 OVER NORFOLK SOUTHERN RAILROAD.ACCELERATE RIGHT OF WAY FROM FY 25 TO FY 24 AND CONSTRUCTION FROM FY 27 TO 25 DUE TO RE-PRIORITIZATION OF BRIDGE PROGRAM.
RIGHT-OF-WAY FY 2024 - (BGOFF)$196,000CONSTRUCTION FY 2025 - (BGOFF)$3,934,000
$4,130,000
B-5976LEE
DIVISIONPROJ.CATEGORY
17Thursday, September 3, 2020
* INDICATES FEDERAL AMENDMENT
REVISIONS TO THE 2020-2029 STIP
ITEM N
HIGHWAY PROGRAM
STIP MODIFICATIONS
DIVISION 8DIVISION 8SR 1950 (WEST ACADEMY STREET), SR 1952 (HIGH POINT STREET) TO HILLARY STREET IN RANDLEMAN. CONSTRUCT SIDEWALK ON NORTH SIDE.TO ASSIST IN BALANCING FUNDS, DELAY CONSTRUCTION FROM FY 21 TO FY 22.
CONSTRUCTION FY 2022 - (TA5200)$329,000FY 2022 - (L)$82,000
$411,000
EB-5744RANDOLPH
DIVISIONPROJ.CATEGORY
NC 731 (EAST ALLENTON STREET), EXISTING SIDEWALK ON NC 731 TO STANBECK PARK IN MT. GILEAD. CONSTRUCT SIDEWALK.TO ASSIST IN BALANCING FUNDS, DELAY CONSTRUCTION FROM FY 21 TO FY 22.
CONSTRUCTION FY 2022 - (TALT5)$96,000FY 2022 - (L)$24,000
$120,000
EB-5899MONTGOMERY
DIVISIONPROJ.CATEGORY
NEW ROUTE, COUNTRY ROUTT BROWN ROAD TO US 15 / US 501. CONSTRUCT 2-LANE ROADWAY ON NEW LOCATION.TO ASSIST IN BALANCING FUNDS, DELAY RIGHT-OF-WAY FROM FY 21 TO 22 AND CONSTRUCTION FROM FY 22 TO FY 23.
RIGHT-OF-WAY FY 2022 - (T)$2,071,000UTILITIES FY 2022 - (T)$100,000CONSTRUCTION FY 2023 - (T)$6,874,000
FY 2023 - (O)$9,000,000$18,045,000
R-5930CHATHAM
DIVISIONPROJ.CATEGORY
SR 1420 (GILLIS HILL ROAD), GILLIS HILL ROAD EXTENSION, SR 1406 (ROCKFISH ROAD) TO SR 1418 (LINDSAY ROAD) NEAR FAYETTEVILLE. CONSTRUCT MULTILANE FACILITY ON NEW LOCATION TO TIE IN AT THE INTERSECTION OF SR 1406 ROCKFISH ROAD AND WESTFIELD DRIVE.TO ASSIST IN BALANCING FUNDS, DELAY CONSTRUCTION FROM FY 22 TO FY 23.
RIGHT-OF-WAY FY 2021 - (T)$8,904,000UTILITIES FY 2021 - (T)$9,598,000CONSTRUCTION FY 2023 - (T)$6,175,000
FY 2024 - (T)$6,175,000FY 2025 - (T)$6,175,000FY 2026 - (T)$6,175,000
$43,202,000
U-5707HOKE
DIVISIONPROJ.CATEGORY
NC 42, SR 2237 (EAST SALISBURY STREET) TO NORTH OF US 64 / NC 49 (DIXIE DRIVE) IN ASHEBORO. WIDEN TO THREE LANES.TO ASSIST IN BALANCING FUNDS, DELAY RIGHT-OF-WAY FROM FY 20 TO FY 21.
RIGHT-OF-WAY FY 2021 - (T)$1,083,000UTILITIES FY 2021 - (T)$698,000CONSTRUCTION FY 2022 - (T)$3,750,000
FY 2023 - (T)$3,750,000$9,281,000
U-5743RANDOLPH
REGIONALPROJ.CATEGORY
18Thursday, September 3, 2020
* INDICATES FEDERAL AMENDMENT
REVISIONS TO THE 2020-2029 STIP
ITEM N
HIGHWAY PROGRAM
STIP MODIFICATIONS
DIVISION 8DIVISION 8SR 1406 (ROCKFISH ROAD), SR 1418 (LINDSAY ROAD) TO SR 1003 (CAMDEN ROAD) NEAR FAYETTEVILLE. WIDEN TO MULTILANES.TO ASSIST IN BALANCING FUNDS, DELAY CONSTRUCTION FROM FY 22 TO FY 23.
RIGHT-OF-WAY FY 2021 - (T)$5,185,000FY 2022 - (T)$5,185,000
UTILITIES FY 2021 - (T)$1,146,000CONSTRUCTION FY 2023 - (T)$5,200,000
FY 2024 - (T)$5,200,000FY 2025 - (T)$5,200,000
$27,116,000
U-5857HOKE
DIVISIONPROJ.CATEGORY
DIVISION 9DIVISION 9WEST FIRST STREET, REPLACE BRIDGE 330296 OVER NORFOLK SOUTHERN RAILWAY IN WINSTON-SALEM.TO ALLOW ADDITIONAL TIME FOR PLANNING AND DESIGN. DELAY RIGHT-OF-WAY FROM FY 20 TO FY 21
RIGHT-OF-WAY FY 2021 - (BGOFF)$56,000FY 2021 - (L)$14,000
CONSTRUCTION FY 2022 - (BGOFF)$560,000FY 2022 - (L)$140,000
$770,000
B-5007
FORSYTH
SR 1674 (SHEPPARD MILL ROAD), REPLACE BRIDGE 840082 OVER DAN RIVER IN DANBURY.TO ASSIST IN BALANCING FUNDS, DELAY RIGHT-OF-WAY FROM FY 22 TO 23.
RIGHT-OF-WAY FY 2023 - (BGOFF)$218,000CONSTRUCTION FY 2024 - (BGOFF)$2,175,000
FY 2025 - (BGOFF)$2,175,000$4,568,000
B-5766STOKES
DIVISIONPROJ.CATEGORY
US 29 / US 70 / BUSINESS 85, REPLACE BRIDGE 280164 AND BRIDGE 280168 OVER NORFOLK SOUTHERN RAILROAD.TO ASSIST IN BALANCING FUNDS, DELAY RIGHT-OF-WAY FROM FY 21 TO 22 AND CONSTRUCTION FROM FY 22 TO FY 23.
RIGHT-OF-WAY FY 2022 - (NHPB)$288,000CONSTRUCTION FY 2023 - (NHPB)$5,778,000
$6,066,000
B-5783DAVIDSON
REGIONALPROJ.CATEGORY
GRANTS CREEK GREENWAY, CATAWBA COLLEGE AND MEADOWBROOK NEIGHBORHOOD TO WILTSHIRE VILLAGE. CONSTRUCT MULTIUSE PATH.TO ALLOW CITY ADDITIONAL TIME FOR PLANNING AND DESIGN. DELAY CONSTRUCTION FROM FY 20 TO FY 23.
CONSTRUCTION FY 2023 - (BGDA)$1,151,000FY 2023 - (L)$288,000
$1,439,000
EB-5619BROWAN
DIVISIONPROJ.CATEGORY
19Thursday, September 3, 2020
* INDICATES FEDERAL AMENDMENT
REVISIONS TO THE 2020-2029 STIP
ITEM N
HIGHWAY PROGRAM
STIP MODIFICATIONS
DIVISION 9DIVISION 9GRANTS CREEK GREENWAY, WILTSHIRE VILLAGE TO KELSEY SCOTT PARK. CONSTRUCT MULTIUSE PATH.ADD SEGMENT "C" NOT PREVIOUSLY PROGRAMMED PER MPO.
ENGINEERING FY 2021 - (BGDA)$294,000FY 2021 - (L)$74,000
CONSTRUCTION FY 2023 - (BGDA)$1,882,000FY 2023 - (L)$470,000
$2,720,000
* EB-5619CROWAN
DIVISIONPROJ.CATEGORY
THIRD STREET GREENWAY, 3RD STREET TO YADKIN RIVER IN SPENCER. CONSTRUCT ALTERNATE ROUTE, INCLUDING SPUR FROM GRANTS CREEK.TO ALLOW TOWN ADDITIONAL TIME FOR PLANNING AND DESIGN, DELAY CONSTRUCTION FROM FY 20 TO FY 21.
CONSTRUCTION FY 2021 - (TAANY)$3,578,000FY 2021 - (L)$894,000
$4,472,000
EB-5861ROWAN
DIVISIONPROJ.CATEGORY
US 158, MULTI-LANES NORTH OF US 421 / I-40 BUSINESS TO SR 1965 (BELEWS CREEK ROAD)TO ASSIST IN BALANCING FUNDS, DELAY CONSTRUCTION FROM FY 23 TO FY 24.
RIGHT-OF-WAY FY 2021 - (T)$12,100,000FY 2022 - (T)$12,100,000FY 2023 - (T)$12,100,000
UTILITIES FY 2021 - (T)$469,000BUILD NC CON FY 2024 - (T)$858,000
FY 2025 - (T)$858,000FY 2026 - (T)$858,000FY 2027 - (T)$858,000FY 2028 - (T)$858,000FY 2029 - (T)$858,000POST YR- (T)$7,722,000
CONSTRUCTION FY 2024 - (T)$11,800,000FY 2025 - (T)$11,800,000FY 2026 - (T)$11,800,000
$85,039,000
* R-2577A FORSYTH
REGIONALPROJ.CATEGORY
NEW ROUTE, SR 4001 (REYNOLDS BOULEVARD) TO SR 2264 (AKRON DRIVE) AT INTERSECTION OF SR 1763 (INDIANA AVENUE) IN WINSTON-SALEM. CONSTRUCT ACCESS ROAD.DELAY CONSTRUCTION FROM FY 20 TO FY 21 PENDING REIMBURSEMENT.
CONSTRUCTION FY 2021 - (T)$1,300,000FY 2021 - (L)$2,700,000
$4,000,000
U-6231FORSYTH
DIVISIONPROJ.CATEGORY
SR 2120 (LONG FERRY ROAD), SR 2182 (I-85 SERVICE ROAD) NEAR SPENCER. CONSTRUCT RIGHT-TURN LANE ON SR 2120, AND CONSTRUCT CUL-DE-SAC, REMOVE RESIDUAL PAVEMENT AND STRENGTHEN REMAINING PAVEMENT ON SR 2182.DELAY CONSTRUCTION FROM FY 20 TO FY 21 PENDING RIGHT-OF-WAY CERTIFICATION.
UTILITIES FY 2021 - (T)$50,000CONSTRUCTION FY 2021 - (T)$315,000
$365,000
U-6237ROWAN
DIVISIONPROJ.CATEGORY
20Thursday, September 3, 2020
* INDICATES FEDERAL AMENDMENT
REVISIONS TO THE 2020-2029 STIP
ITEM N
HIGHWAY PROGRAM
STIP MODIFICATIONS
DIVISION 10DIVISION 10SR 1681 (OLD CAMDEN ROAD), REPLACE BRIDGE 890021 OVER STEWART'S CREEK.TO ASSIST IN BALANCING FUNDS, DELAY RIGHT-OF-WAY FROM FY 22 TO FY 23 AND CONSTRUCTION FROM FY 23 TO FY 25.
RIGHT-OF-WAY FY 2023 - (BGOFF)$210,000CONSTRUCTION FY 2025 - (BGOFF)$2,100,000
$2,310,000
* B-5376UNION
DIVISIONPROJ.CATEGORY
NC 200, REPLACE BRIDGE 890053 OVER STEWARTS CREEK.ACCELERATE RIGHT-OF-WAY FROM FY 25 TO FY 24 AND CONSTRUCTION FROM FY 26 TO FY 25 AT THE REQUEST OF STRUCTURES MANAGEMENT UNIT.
RIGHT-OF-WAY FY 2024 - (T)$120,000CONSTRUCTION FY 2025 - (T)$1,250,000
FY 2026 - (T)$1,250,000$2,620,000
B-5949UNION
REGIONALPROJ.CATEGORY
NC 160, REPLACE BRIDGE 590054 OVER SOUTHERN RAILROAD.TO ASSIST IN BALANCING FUNDS, DELAY RIGHT-OF-WAY FROM FY 21 TO FY 23 AND CONSTRUCTION FROM FY 22 TO FY 24.
RIGHT-OF-WAY FY 2023 - (NHPB)$336,000UTILITIES FY 2023 - (NHPB)$336,000CONSTRUCTION FY 2024 - (NHPB)$5,600,000
$6,272,000
* B-5983MECKLENBURG
REGIONALPROJ.CATEGORY
NC 49, REPLACE BRIDGE 590088 OVER SOUTHERN RAILROAD.TO ASSIST IN BALANCING FUNDS, DELAY RIGHT-OF-WAY FROM FY 21 TO FY 23 AND CONSTRUCTION FROM FY 22 TO FY 24.
RIGHT-OF-WAY FY 2023 - (NHPB)$354,000UTILITIES FY 2023 - (NHPB)$354,000CONSTRUCTION FY 2024 - (NHPB)$6,367,000
$7,075,000
* B-5984MECKLENBURG
REGIONALPROJ.CATEGORY
SR 1138 WESTBOUND, REPLACE BRIDGE 590001 OVER SUGAR CREEK.TO ASSIST IN BALANCING FUNDS, DELAY RIGHT-OF-WAY FROM FY 21 TO FY 23 AND CONSTRUCTION FROM FY 22 TO FY 25.
RIGHT-OF-WAY FY 2023 - (T)$174,000UTILITIES FY 2023 - (T)$174,000CONSTRUCTION FY 2025 - (T)$3,127,000
$3,475,000
* B-5990MECKLENBURG
DIVISIONPROJ.CATEGORY
I-277 (BROOKSHIRE FRWY), INTERIM STRUCTURE IMPROVEMENTS AT GRAHAM STREET AND BREVARD STREET.ADD SEGMENT CA NOT PREVIOUSLY PROGRAMMED AT REQUEST OF DIVISION.
CONSTRUCTION FY 2021 - (NHPIM)$500,000$500,000
* I-5746CAMECKLENBURG
STATEWIDEPROJ.CATEGORY
21Thursday, September 3, 2020
* INDICATES FEDERAL AMENDMENT
REVISIONS TO THE 2020-2029 STIP
ITEM N
HIGHWAY PROGRAM
STIP MODIFICATIONS
DIVISION 11DIVISION 11US 52 (NORTHBOUND LANE), REPLACE BRIDGE 850122 OVER TOMS CREEK AND REPLACE BRIDGE 850342 OVER OLD US 52 SOUTHBOUND EXIT RAMP.TO ASSIST IN BALANCING FUNDS, DELAY RIGHT-OF-WAY FROM FY 22 TO FY 23 AND CONSTRUCTION FROM FY 23 TO FY 24.
RIGHT-OF-WAY FY 2023 - (BGLT5)$400,000CONSTRUCTION FY 2024 - (BGLT5)$2,000,000
FY 2025 - (BGLT5)$2,000,000$4,400,000
* B-5527SURRY
STATEWIDEPROJ.CATEGORY
NC 67, REPLACE BRIDGE 980035 OVER YADKIN RIVER.REMOVE BUILD NC BONDS.
CONSTRUCTION FY 2023 - (T)$4,133,000FY 2024 - (T)$4,134,000FY 2025 - (T)$4,133,000
$12,400,000
B-5825YADKIN
REGIONALPROJ.CATEGORY
SR 2080 (QUAKER CHURCH ROAD), REPLACE BRIDGE 850152 OVER ARARAT RIVER.TO ASSIST IN BALANCING FUNDS, DELAY RIGHT-OF-WAY FROM FY 22 TO FY 24 AND CONSTRUCTION FROM FY 23 TO FY 25.
RIGHT-OF-WAY FY 2024 - (BGOFF)$200,000CONSTRUCTION FY 2025 - (BGOFF)$1,800,000
FY 2026 - (BGOFF)$1,800,000$3,800,000
* B-5832SURRY
DIVISIONPROJ.CATEGORY
SR 1306 (HICKS HOLLOW ROAD), REPLACE BRIDGE 050125 OVER ELK RIVER.TO ASSIST IN BALANCING FUNDS, DELAY RIGHT-OF-WAY FROM FY 21 TO FY 25 AND CONSTRUCTION FROM FY 22 TO FY 26.
RIGHT-OF-WAY FY 2025 - (BGOFF)$92,000CONSTRUCTION FY 2026 - (BGOFF)$1,450,000
$1,542,000
* B-5835AVERY
DIVISIONPROJ.CATEGORY
DIVISION 12DIVISION 12SR 1709 (ROCK BARN ROAD), REPLACE BRIDGE 170173 OVER I-40.TO ASSIST IN BALANCING FUNDS, DELAY RIGHT-OF-WAY FROM FY 21 TO FY 23 AND CONSTRUCTION FROM FY 22 TO FY 24.
RIGHT-OF-WAY FY 2023 - (NHPB)$200,000CONSTRUCTION FY 2024 - (NHPB)$2,250,000
FY 2025 - (NHPB)$2,250,000$4,700,000
* B-5847CATAWBA
DIVISIONPROJ.CATEGORY
22Thursday, September 3, 2020
* INDICATES FEDERAL AMENDMENT
REVISIONS TO THE 2020-2029 STIP
ITEM N
HIGHWAY PROGRAM
STIP MODIFICATIONS
DIVISION 12DIVISION 12I-40, REPLACE BRIDGE 170177 AND 170178 OVER LYLE CREEK.TO ASSIST IN BALANCING FUNDS, DELAY RIGHT-OF-WAY FROM FY 22 TO FY 25 AND CONSTRUCTION FROM FY 23 TO FY 26.
RIGHT-OF-WAY FY 2025 - (NHPB)$860,000CONSTRUCTION FY 2026 - (NHPB)$4,300,000
FY 2027 - (NHPB)$4,300,000$9,460,000
* B-6041CATAWBA
STATEWIDEPROJ.CATEGORY
NC 150, REPLACE BRIDGE 540026 OVER S.A.L. RAILROAD.TO ASSIST IN BALANCING FUNDS, DELAY RIGHT-OF-WAY FROM FY 21 TO FY 25 AND CONSTRUCTION FROM FY 23 TO FY 26.
RIGHT-OF-WAY FY 2025 - (NHPB)$290,000CONSTRUCTION FY 2026 - (NHPB)$2,900,000
$3,190,000
* B-6042LINCOLN
REGIONALPROJ.CATEGORY
US 29 / US 74, REPLACE BRIDGE 350091 OVER CATAWBA RIVERTO ASSIST IN BALANCING FUNDS, DELAY CONSTRUCTION FROM FY 22 TO FY 23.
RIGHT-OF-WAY FY 2022 - (HFB)$4,000,000CONSTRUCTION FY 2023 - (HFB)$40,900,000
$44,900,000
B-6051GASTON
STATEWIDEPROJ.CATEGORY
NC 273 (SOUTHMAIN STREET), SR 2044 (TUCKASEEGE ROAD) TO ROSE STREET. CONSTRUCT SIDEWALKS ON BOTH SIDES OF ROAD.TO ASSIST IN BALANCING FUNDS, DELAY CONSTRUCTION FROM FY 20 TO FY 21.
CONSTRUCTION FY 2021 - (TA5200)$488,000FY 2021 - (L)$122,000
$610,000
EB-5746GASTON
DIVISIONPROJ.CATEGORY
DIVISION 13DIVISION 13US 19/US 23/US 25/ US 70, REPLACE BRIDGE 100345, AND BRIDGE 100346 OVER SR 1839.TO ASSIST IN BALANCING FUNDS, DELAY RIGHT-OF-WAY FROM FY 21 TO FY 25 AND CONSTRUCTION FROM FY 22 TO FY 26.
RIGHT-OF-WAY FY 2025 - (NHPB)$720,000CONSTRUCTION FY 2026 - (NHPB)$3,600,000
FY 2027 - (NHPB)$3,600,000$7,920,000
* B-4443BUNCOMBE
STATEWIDEPROJ.CATEGORY
US 64 US 70, REPLACE BRIDGE 110099 OVER SOUTHERN RAILROAD.TO ASSIST IN BALANCING FUNDS, DELAY RIGHT-OF-WAY FROM FY 20 TO FY 24 AND CONSTRUCTION FROM FY 21 TO FY 25.
RIGHT-OF-WAY FY 2024 - (NHPB)$3,167,000CONSTRUCTION FY 2025 - (NHPB)$3,350,000
FY 2026 - (NHPB)$3,350,000$9,867,000
* B-5869BURKE
REGIONALPROJ.CATEGORY
23Thursday, September 3, 2020
* INDICATES FEDERAL AMENDMENT
REVISIONS TO THE 2020-2029 STIP
ITEM N
HIGHWAY PROGRAM
STIP MODIFICATIONS
DIVISION 13DIVISION 13SR 1306 (BILLS CREEK ROAD), REPLACE BRIDGE 800628 OVER LAKE LURE DAM AND BROAD RIVER.TO ASSIST IN BALANCING FUNDS, DELAY RIGHT-OF-WAY FROM FY 21 TO FY 22 AND CONSTRUCTION FROM FY 22 TO FY 24.
RIGHT-OF-WAY FY 2022 - (BGOFF)$250,000CONSTRUCTION FY 2024 - (BGOFF)$1,667,000
FY 2025 - (BGOFF)$1,667,000FY 2026 - (BGOFF)$1,666,000
$5,250,000
* B-5871RUTHERFORD
DIVISIONPROJ.CATEGORY
US 74, REPLACE BRIDGE 800083 AND BRIDGE 800084 OVER SECOND BROAD RIVER.TO ASSIST IN BALANCING FUNDS, DELAY CONSTRUCTION FROM FY 24 TO FY 27.
CONSTRUCTION FY 2027 - (BGLT5)$4,900,000FY 2028 - (BGLT5)$4,900,000
$9,800,000
B-5876RUTHERFORD
STATEWIDEPROJ.CATEGORY
SR 1002 (OLD LEICESTER HWY), REPLACE BRIDGE 100649 OVER FRENCH BROAD RIVER AND SOUTHERN RAILROAD.ACCELERATE RIGHT-OF-WAY FROM FY 25 TO FY 23 AND CONSTRUCTION FROM FY 26 TO FY 24 AT THE REQUEST OF STRUCTURES MANAGEMENT UNIT.
RIGHT-OF-WAY FY 2023 - (T)$1,000,000CONSTRUCTION FY 2024 - (T)$6,667,000
FY 2025 - (T)$6,667,000FY 2026 - (T)$6,666,000
$21,000,000
* B-5953BUNCOMBE
DIVISIONPROJ.CATEGORY
SR 1395, REPLACE BRIDGE 560071 OVER BIG LAUREL CREEK.TO ASSIST IN BALANCING FUNDS, DELAY RIGHT-OF-WAY FROM FY 21 TO FY 23 AND CONSTRUCTION FROM FY 22 TO FY 24.
RIGHT-OF-WAY FY 2023 - (BGOFF)$13,000UTILITIES FY 2023 - (BGOFF)$130,000CONSTRUCTION FY 2024 - (BGOFF)$2,600,000
$2,743,000
* B-5989MADISON
DIVISIONPROJ.CATEGORY
SR 1620 (FLETCHER MARTIN ROAD), REPLACE BRIDGE 100007 OVER FRENCH BROAD RIVER AND SOUTHERN RAILROAD.TO ASSIST IN BALANCING FUNDS, DELAY RIGHT-OF-WAY FROM FY 20 TO FY 22 AND CONSTRUCTION FROM FY 22 TO FY 24.
RIGHT-OF-WAY FY 2022 - (BGOFF)$67,000UTILITIES FY 2022 - (BGOFF)$543,000CONSTRUCTION FY 2024 - (BGOFF)$2,500,000
FY 2025 - (BGOFF)$2,500,000FY 2026 - (BGOFF)$2,500,000
$8,110,000
* B-5992BUNCOMBE
DIVISIONPROJ.CATEGORY
US 70, REPLACE BRIDGE 580127 OVER SOUTHERN RAILROAD.TO ASSIST IN BALANCING FUNDS, DELAY RIGHT-OF-WAY FROM FY 21 TO FY 23 AND CONSTRUCTION FROM FY 23 TO FY 24.
RIGHT-OF-WAY FY 2023 - (NHPB)$420,000CONSTRUCTION FY 2024 - (NHPB)$4,200,000
$4,620,000
* B-6040McDOWELL
REGIONALPROJ.CATEGORY
24Thursday, September 3, 2020
* INDICATES FEDERAL AMENDMENT
REVISIONS TO THE 2020-2029 STIP
ITEM N
HIGHWAY PROGRAM
STIP MODIFICATIONS
DIVISION 13DIVISION 13BLACK MOUNTAIN RIVERWALK GREENWAY, CONSTRUCT MULTI-USE PATH FROM EXISTING FLAT CREEK GREENWAY TRAILHEAD NORTH OF US 70 TO THE INTO THE OAKS TRAIL.TO ASSIST IN BALANCING FUNDS, DELAY RIGHT-OF-WAY FROM FY 20 TO 21 AND CONSTRUCTION FROM FY 21 TO FY 22.
RIGHT-OF-WAY FY 2021 - (BGDA)$80,000FY 2021 - (L)$20,000
CONSTRUCTION FY 2022 - (BGANY)$2,300,000FY 2022 - (BGDA)$934,000FY 2022 - (L)$809,000
$4,143,000
EB-5547BUNCOMBE
DIVISIONPROJ.CATEGORY
NC 251 (RIVERSIDE DRIVE) MULTI-USE PATH, US 19/23/70 (EXIT 25) TO US 25. CONSTRUCT MULTI-USE PATH VIA BEAVERDAM CREEK.TO ASSIST IN BALANCING FUNDS, DELAY RIGHT-OF-WAY FROM FY 20 TO FY 21.
ENGINEERING FY 2020 - (BGDA)$600,000FY 2020 - (L)$150,000
RIGHT-OF-WAY FY 2021 - (BGDA)$176,000FY 2021 - (L)$44,000
CONSTRUCTION FY 2021 - (BGANY)$2,000,000FY 2021 - (BGDA)$1,824,000FY 2021 - (L)$1,156,000
$5,950,000
EB-5774BUNCOMBE
DIVISIONPROJ.CATEGORY
SR 1687 (GOAT FARM ROAD), IMPROVE EXISTING SR 1687 (GOAT FARM ROAD) ACCESS ROAD INTO THE PROPOSED INDUSTRIAL PARK.TO ALLOW ADDITIONAL TIME FOR PLANNING AND DESIGN, DELAY CONSTRUCTION FROM FY 20 TO FY 21.
CONSTRUCTION FY 2021 - (APD)$1,246,000FY 2021 - (L)$1,611,000
$2,857,000
R-5967BURKE
EXEMPTPROJ.CATEGORY
DIVISION 14DIVISION 14SR 1326, REPLACE BRIDGE 159 OVER HANGING DOG CREEK.TO ASSIST IN BALANCING FUNDS, DELAY RIGHT-OF-WAY FROM FY 22 TO FY 27 AND CONSTRUCTION FROM FY 22 TO FY 27.
RIGHT-OF-WAY FY 2027 - (BGOFF)$295,000CONSTRUCTION FY 2027 - (BGOFF)$1,800,000
$2,095,000
* B-4069CHEROKEE
DIVISIONPROJ.CATEGORY
US 23 US 74, REPLACE BRIDGE 430168 OVER US 19 AND US 23.TO ASSIST IN BALANCING FUNDS, DELAY RIGHT-OF-WAY FROM FY 21 TO FY 23 AND CONSTRUCTION FROM FY 22 TO FY 24.
RIGHT-OF-WAY FY 2023 - (NHPB)$150,000CONSTRUCTION FY 2024 - (NHPB)$1,550,000
FY 2025 - (NHPB)$1,550,000$3,250,000
* B-5898HAYWOOD
STATEWIDEPROJ.CATEGORY
SR 1216 (STEEL BRIDGE ROAD), REPLACE BRIDGE 430246 OVER WEST FORK PIGEON CREEK.TO ASSIST IN BALANCING FUNDS, DELAY RIGHT-OF-WAY FROM FY 22 TO FY 23 AND CONSTRUCTION FROM FY 23 TO FY 24.
RIGHT-OF-WAY FY 2023 - (BGOFF)$30,000CONSTRUCTION FY 2024 - (BGOFF)$610,000
$640,000
* B-5920HAYWOOD
DIVISIONPROJ.CATEGORY
25Thursday, September 3, 2020
* INDICATES FEDERAL AMENDMENT
REVISIONS TO THE 2020-2029 STIP
ITEM N
HIGHWAY PROGRAM
STIP MODIFICATIONS
DIVISION 14DIVISION 14SR 1120 (CEDAR CREEK ROAD), REPLACE BRIDGE 490008 CEDAR CREEK.ACCELERATE RIGHT-OF-WAY FROM FY 24 TO FY 23 AND CONSTRUCTION FROM FY 25 TO FY 24 AT THE REQUEST OF STRUCTURES MANAGEMENT UNIT.
RIGHT-OF-WAY FY 2023 - (BGOFF)$20,000CONSTRUCTION FY 2024 - (BGOFF)$400,000
$420,000
* B-5921JACKSON
DIVISIONPROJ.CATEGORY
SR 1548 (OLD HIGHWAY 64), REPLACE BRIDGE 223 OVER HIWASSEE RIVER.TO ASSIST IN BALANCING FUNDS, DELAY RIGHT-OF-WAY FROM FY 21 TO FY 23 AND CONSTRUCTION FROM FY 22 TO FY 24.
RIGHT-OF-WAY FY 2023 - (BGLT5)$260,000CONSTRUCTION FY 2024 - (BGLT5)$2,600,000
$2,860,000
* B-5925CHEROKEE
DIVISIONPROJ.CATEGORY
US 74, REPLACE BRIDGE 430095 OVER SOUTHERN RAILROAD.TO ASSIST IN BALANCING FUNDS, DELAY CONSTRUCTION FROM FY 23 TO FY 24.
RIGHT-OF-WAY FY 2022 - (HFB)$392,000UTILITIES FY 2022 - (HFB)$140,000CONSTRUCTION FY 2024 - (HFB)$5,400,000
$5,932,000
* B-5982HAYWOOD
STATEWIDEPROJ.CATEGORY
SR 1351 (MATLOCK CREEK ROAD), REPLACE BRIDGE 550220 OVER MATLOCK CREEK.TO ASSIST IN BALANCING FUNDS, DELAY CONSTRUCTION FROM FY 23 TO FY 26.
CONSTRUCTION FY 2026 - (BGOFF)$625,000$625,000
* B-6030MACON
DIVISIONPROJ.CATEGORY
SR 1445 (LEE BUMGARNER ROAD), REPLACE BRIDGE 490129 OVER SCOTT CREEK.TO ASSIST IN BALANCING FUNDS, DELAY CONSTRUCTION FROM FY 23 TO FY 26.
CONSTRUCTION FY 2026 - (BGOFF)$1,200,000$1,200,000
* B-6033JACKSON
DIVISIONPROJ.CATEGORY
SR 1737 (CANEY FORK ROAD), REPLACE BRIDGE 490081 OVER JOHNS CREEK.TO ASSIST IN BALANCING FUNDS, DELAY RIGHT-OF-WAY FROM FY 22 TO FY 23 AND CONSTRUCTION FROM FY 23 TO FY 25.
RIGHT-OF-WAY FY 2023 - (BGOFF)$70,000CONSTRUCTION FY 2025 - (BGOFF)$700,000
$770,000
* B-6036JACKSON
DIVISIONPROJ.CATEGORY
26Thursday, September 3, 2020
* INDICATES FEDERAL AMENDMENT
REVISIONS TO THE 2020-2029 STIP
ITEM N
HIGHWAY PROGRAM
STIP MODIFICATIONS
DIVISION 14DIVISION 14I-40, REPLACE BRIDGE 430057 OVER US FOREST SERVICE ROAD/COLD SPRINGS CREEK AT HARMON'S DEN.TO ALLOW ADDITIONAL TIME FOR PLANNING AND DESIGN, DELAY RIGHT-OF-WAY FROM FY 20 TO FY 21 AND CONSTRUCTION FROM FY 20 TO FY 21.
ENGINEERING FY 2020 - (T)$500,000RIGHT-OF-WAY FY 2021 - (NHPB)$5,000UTILITIES FY 2021 - (NHPB)$5,000CONSTRUCTION FY 2021 - (NHPB)$5,000,000
$5,510,000
B-6054AHAYWOOD
STATEWIDEPROJ.CATEGORY
I-40, REPLACE BRIDGE 430159 OVER SR 1338 (WHITE OAK ROAD).TO ALLOW ADDITIONAL TIME FOR PLANNING AND DESIGN, DELAY RIGHT-OF-WAY FROM FY 20 TO FY 21 AND CONSTRUCTION FROM FY 21 TO FY 22.
ENGINEERING FY 2020 - (T)$500,000RIGHT-OF-WAY FY 2021 - (NHPB)$5,000UTILITIES FY 2021 - (NHPB)$5,000CONSTRUCTION FY 2022 - (NHPB)$5,000,000
$5,510,000
B-6054BHAYWOOD
STATEWIDEPROJ.CATEGORY
I-40, REPLACE BRIDGE 430171 OVER SR 1338 (WHITE OAK ROAD) AND JONATHAN CREEK.TO ALLOW ADDITIONAL TIME FOR PLANNING AND DESIGN, DELAY RIGHT-OF-WAY FROM FY 20 TO FY 21 AND CONSTRUCTION FROM FY 21 TO FY 23.
ENGINEERING FY 2020 - (T)$2,500,000RIGHT-OF-WAY FY 2021 - (NHPB)$5,000UTILITIES FY 2021 - (NHPB)$5,000CONSTRUCTION FY 2023 - (NHPB)$25,000,000
$27,510,000
B-6054CHAYWOOD
STATEWIDEPROJ.CATEGORY
I-40, REPLACE BRIDGE 430124 OVER SR 1338 (WHITE OAK ROAD) AND FINES CREEK.TO ALLOW ADDITIONAL TIME FOR PLANNING AND DESIGN, DELAY CONSTRUCTION FROM FY 22 TO FY 23.
ENGINEERING FY 2021 - (T)$500,000RIGHT-OF-WAY FY 2021 - (HFB)$5,000UTILITIES FY 2021 - (HFB)$5,000CONSTRUCTION FY 2023 - (HFB)$5,000,000
$5,510,000
B-6054DHAYWOOD
STATEWIDEPROJ.CATEGORY
STIP DELETIONS
DIVISION 5DIVISION 5US 401 BUSINESS (SOUTH MAIN STREET), SR 2051 (BURLINGTON MILLS ROAD) TO NORTH OF SR 1003 (EAST YOUNG STREET) / SR 1945 (WEST YOUNG STREET) IN ROLESVILLE. CONSTRUCT SIDEWALK EXTENSIONS AND COMPLETE STREET IMRPOVEMENTS.DELETE AT THE REQUEST OF MPO; SCOPE IS BEING ADDED TO U-6241 AT REQUEST OF TOWN.
CONSTRUCTION FY 2021 - (BGDA)$2,950,000FY 2021 - (L)$738,000
$3,688,000
* EB-6047WAKE
DIVISIONPROJ.CATEGORY
27Thursday, September 3, 2020
* INDICATES FEDERAL AMENDMENT
REVISIONS TO THE 2020-2029 STIP
ITEM N
HIGHWAY PROGRAM
STIP DELETIONS
DIVISION 7DIVISION 7US 220 (WENDOVER AVENUE), GRECADE STREET TO SR 1001 (NORTH CHURCH STREET) IN GREENSBORO. CONSTRUCT SIDEWALKS.DELETE AT THE REQUEST OF MPO. WORK TO BE ACCOMPLISHED UNDER EB-5883.
CONSTRUCTION FY 2020 - (TAANY)$507,000FY 2020 - (L)$127,000
$634,000
* EB-5883AGUILFORD
DIVISIONPROJ.CATEGORY
US 220 (WENDOVER AVENUE), SR 2526 (SUMMIT AVENUE) TO US 29 (NORTH O'HENRY BOULEVARD) IN GREENSBORO. CONSTRUCT SIDEWALKS.DELETE AT THE REQUEST OF MPO. WORK TO BE ACCOMPLISHED UNDER EB-5883.
CONSTRUCTION FY 2020 - (TAANY)$249,000FY 2020 - (L)$62,000
$311,000
* EB-5883BGUILFORD
DIVISIONPROJ.CATEGORY
DIVISION 12DIVISION 12SHELBY-CLEVELAND COUNTY REGIONAL AIRPORT (EHO), EXTEND RUNWAY AND TAXIWAY.DELETE PROJECT - PROJECT DID NOT SCORE HIGH ENOUGH IN P5.0 FOR FUNDING. IN STIP BY ERROR.
RIGHT-OF-WAY FY 2023 - (T)$900,000CONSTRUCTION FY 2023 - (T)$2,755,000
FY 2024 - (T)$2,755,000$6,410,000
* AV-5849CLEVELAND
DIVISIONPROJ.CATEGORY
CONSTRUCT WEST A STREET BIKE AND PEDESTRIAN IMPROVEMENTS.DELETE AT THE REQUEST OF MPO.
CONSTRUCTION 2020 (BGANY)$1,000,0002020 (BGDA)$1,651,0002020 (O)$250,0002020 (L)$413,000
$3,314,000
* EB-5825CATAWBA
DIVISIONPROJ.CATEGORY
5 POINTS PEDESTRIAN/TRAFFIC SIGNAL UPGRADE IN DOWNTOWN CONOVERDELETE AT THE REQUEST OF MPO.
CONSTRUCTION 2020 (BGDA)$792,0002020 (L)$798,000
$1,590,000
* EB-5936CATAWBA
DIVISIONPROJ.CATEGORY
28Thursday, September 3, 2020
* INDICATES FEDERAL AMENDMENT
REVISIONS TO THE 2020-2029 STIP
ITEM N
HIGHWAY PROGRAM
STIP DELETIONS
DIVISION 12DIVISION 12I-77, NC 150 INTERCHANGE. CONSTRUCT INTERCHANGE IMPROVEMENTS.DELETE, WORK TO BE ACCOMPLISHED UNDER PROJECT R-2307B.
GARVEE CON 2021 (BGANY)$515,0002022 (BGANY)$515,0002023 (BGANY)$515,0002024 (BGANY)$515,0002025 (BGANY)$515,0002026 (BGANY)$515,0002027 (BGANY)$515,0002028 (BGANY)$515,0002029 (BGANY)$515,000POST YR- (BGANY)$3,090,000
CONSTRUCTION FY 2021 - (S(M))$5,300,000$13,025,000
* I-5717IREDELL
STATEWIDEPROJ.CATEGORY
ITEM N SUMMARY
ADDITION 33 $56,824,000PROJECTS
MODIFICATION 104 PROJECTS
DELETION 7 $28,972,000PROJECTS
144 $27,852,000PROJECTS
29Thursday, September 3, 2020
* INDICATES FEDERAL AMENDMENT