DADRI
NTPC LIMITED-DADRI
P.O. VIDYUTNAGAR, DISTT- G. B. NAGAR, (U.P.) 201008
INTEGRATED MANAGEMENT SYSTEMDEPARTMENT MANUAL DADRI
Deptt: O&M/OPN -GP Revision : 00ISSUE No. 03
Page : 2/86 Doc Ref:ND-IM-OPG Issue Date: 29 Nov. 11
TITLE: INTRODUCTION CONTENTS
Sl No Doc Title Page No. 1. INTRODUCTION
Contents 2
Integrated Policy 3
Issue Records 4
Revision History 5
List of abbreviations 6-7
Terms & Definitions 82. Department MOU and EHS Objectives and Targets for the current year 93. Management Program for Department MOU and EHS Objectives and Targets 10-21
4. Deptt Organization Chart 22
5. Responsibilities and Authorities 23-24
6. Process Map 25
7. Flow Chart for the process 26-29
8. Process Models for each Process 30-43
9. Competence Norms 44
10. List of Infrastructure 46
11. IMS Documents
List of legal / statutory requirements 47
List of documents of external origin 47
List of reference manuals 48
List of quality plans / applicable I.S.codes 49
List of reports despatched 50
List of drawings 51
List of equipment used/ calibrated 52
List of work instructions 5312. IMS Records
List of formats 54
List of records 5513. Communication Matrix 56
14. Initial Environment Review (IER) 57-60
15. Group Risk Assessment (GRA) 61-63
16. OCP 64-85
17. Improvement Projects 8618. EMP19. OHS MP
Prepared by: YashPalSr. Supdt..(OPN)
Issued by: A.N GoyalMR
Approved by: V.K.SinghHOD(OPN)
INTEGRATED MANAGEMENT SYSTEMDEPARTMENT MANUAL DADRI
Deptt: O&M/OPN -GP Revision : 00ISSUE No. 03
Page : 3/86 Doc Ref:ND-IM-OPG Issue Date: 29 Nov. 11
TITLE: INTRODUCTION
IMS POLICY (Quality, Environment, Safety and Occupational Health)
NTPC Limited -Dadri is committed to generate reliable power cost effectively through continual improvement of performance in the areas of quality, workplace management, environment, occupational health and safety in a socially responsible mannerThis shall be ensured by actualizing the following strategic objectives:
- Generating reliable power as per customer requirement and schedule
- Optimization of Cost- Use of innovation and latest economically viable
technologies. - Compliance of all applicable legal, contractual and
corporate requirements - Prevention and Control of pollution, occupational
hazards, incidents, accidents & ill health.- Developing skills and competencies of all employees
and ensuring their involvement.- Collecting information on best practices to improve
performance.- Enhancing satisfaction of all stakeholders- Waste minimization, utilization of waste and
conservation of Natural Resources.- Contributing to society.
This policy is communicated to all persons working for the organization or on its behalf and is made available to interested parties on demand.Date:15 March 2011 General ManagerPlace : Vidyut Nagar
Prepared by: Yash PalSr. Supdt..(OPN)
Issued by: A.N GoyalMR
Approved by: V.K.SinghHOD(OPN)
INTEGRATED MANAGEMENT SYSTEMDEPARTMENT MANUAL DADRI
Deptt: O&M/OPN -GP Revision : 00ISSUE No. 03
Page : 4/86 Doc Ref:ND-IM-OPG Issue Date: 29 Nov. 11
TITLE: INTRODUCTION
ISSUE RECORD
S No COPY HOLDER MODE
1. DGM (O) Hard Copy
2. SS(O) Soft copy in Webdadri
3. MR Soft copy in Webdadri
4. SCE/ASCE/ MODULE ENGR/ CONTROL ROOM Soft copy in Webdadri
Prepared by: Yash PalSr. Supdt..(OPN)
Issued by: A.N GoyalMR
Approved by: V.K.SinghHOD(OPN)
Prepared by: Devinder singhSr. Supdt..(OPN)
Issued by: MR
Approved by: P.K.JindalHOD(OPN)
INTEGRATED MANAGEMENT SYSTEMDEPARTMENT MANUAL DADRI
Deptt: O&M/OPN -GP Revision : 00ISSUE No. 03
Page : 5/86 Doc Ref:ND-IM-OPG Issue Date: 29 Nov. 11
TITLE: INTRODUCTIONREVISION HISTORY
S No
Page No AMENDMENT DESCRIPTION Rev No
DATE REASON FOR AMMENDMENT (#)
1 9 Objectives and Targets 01 01/04/2007 Revision of Target2 9 Objectives and Targets 02 07/01/2009 Revision of Target3 79 Control of energy consumption 01 07/01/2009 Inadequacy4 57-59 Aspect register 01 04/04/09 Review of aspects5 48 List of reference manual 01 10/01/10 IMP6 50 List of reports dispatched 01 10/01/10 IMP7 55 List of Records 01 10/01/10 ADT8 61 Group Risk Assessment 01 10/01/10 ADT9 71 Waste generated 01 10.01.10 ADT10 86 Improvement project 01 10/01/10 ADT11 9 Objectives and Targets 01 15/05/2010 Revision of Target12 9 Objectives and Targets 02 06.01.11 ADT13 57 IER 01 06.01.11 ADT14 78 OCP 01 06.01.11 ADT15 3 IMS POLICY 02 08/01/10 Revision of Policy16 9 DEPTT MOU 02 01/04/11 Revision of Target17 86 IMPROVEMENT PROJECT 02 01/04/11 New Activity
Prepared by: Yash PalSr. Supdt..(OPN)
Issued by: A.N GoyalMR
Approved by: V.K.SinghHOD(OPN)
CODE DETAILS CODEE
DETAILS
ADT AUDIT OBSERVATION RPO REVIEW OF DEPARTMENTAL OBJECTIVES
ECH EDIT CHANGES IMP SYSTEM IMPROVEMENT
INTEGRATED MANAGEMENT SYSTEMDEPARTMENT MANUAL DADRI
Deptt: O&M/OPN -GP Revision : 00ISSUE No. 03
Page : 6/86 Doc Ref:ND-IM-OPG Issue Date: 29 Nov’11
TITLE: INTRODUCTION LIST OF ABBREVIATIONS
Abbrvn Description Abbrvn Description
AHP Ash Handling Plant ISO International Standard Organization
APC Auxiliary Power Consumption IT Information TechnologyASCE Assistant Shift Charge Engineer LDO Light Diesel OilAUD Ash Utilization Department LWC Limited Work CertificateAUTP Ash Utilization Technology Park MR Management RepresentativeAux. Auxiliary MAINT MaintenanceBHEL Bharat Heavy Electrical Ltd. MW Mega WattBIS Bureau of Indian Standards NC Non-Conformity BMD Boiler Maintenance Department NCR National Capital RegionC&I Control & Instrumentation NRLDC Northern Region Load Despatch CenterC&M Contracts & Materials OLMMS Online Maintenance Management System CC Corporate Center O&M Operation & MaintenanceCCD Civil Construction Department OPD Out Door PatientCEA Central Electricity Authority OPN OperationChem. Chemistry OS Off SitesCISF Central Industrial Security Force P&S Planning & SystemCMO Chief Medical Officer PGCIL Power Grid Corporation Of India LimitedCT Cooling Tower PM Preventive MaintenanceCW Cooling Water PTW Permit To WorkDC Declared Capability QSP Quality System ProcedureDept Department QMS Quality Management SystemDG Diesel Generator RCC Regional Control CenterDGM(O) Deputy General Manager (Operation) R&D Research & DevelopmentDMP Disaster Management Plan R&M Renovation & Modernization EDC Employee Development Center R&R Rehabilitation & ResettlementEED Equipment Erection Department SCE Shift Charge EngineerEEMG Energy Efficiency Monitoring Group SG Steam Generator(Boiler)EMD Electrical maintenance Department STP Sewage Teratment PlantEMG Environment Management Group SS(O) Senior Superintendent (Operation)FM Fuel Management Supdt SuperintendentFQA Field Quality Assurance TA Township AdministrationGM General Manager Th ThermalGT Generator Transformer TQM Total Quality ManagementHOD Head Of Department TS Technical ServicesHR Heat Rate TG Turbo-GeneratorHRD Human Resource Department UCE Unit Control EngineerUSS Unit Service Swichgear UI Unscheduled InterchangeWI Work instruction
Prepared by: Yash PalSr. Supdt..(OPN)
Issued by: A.N GoyalMR
Approved by: V.K.SinghHOD(OPN)
Prepared by: Yash PalSr. Supdt..(OPN)
Issued by: A.N GoyalMR
Approved by: V.K.SinghHOD(OPN)
INTEGRATED MANAGEMENT SYSTEMDEPARTMENT MANUAL DADRI
Deptt: O&M/OPN -GP Revision : 00ISSUE No. 03
Page : 7/86 Doc Ref:ND-IM-OPG Issue Date: 29 Nov’11
TITLE: INTRODUCTION (LIST OF ABBREVIATIONS)
Abbrvnn
Description Abbrvnn
Description
ADT AUDIT OBSERVATION RPO REVIEW OF DEPARTMENTAL OBJECTIVES
ECH EDIT CHANGES IMP SYSTEM IMPROVEMENT
INTEGRATED MANAGEMENT SYSTEMDEPARTMENT MANUAL DADRI
Deptt: O&M/OPN -GP Revision : 00ISSUE No. 03
Page : 8/86 Doc Ref:ND-IM-OPG Issue Date: 29 Nov’11
TITLE: INTRODUCTION
TERMS AND DEFINITIONS
S No
TERM DEFINITION
1. HR= HEAT RATE ENERGY REQD.(KCAL) TO GENERATE POWER (KW HOUR)2. APC=AUX.POWER
CONSUMPTIONPOWER CONSUMED BY PLANT EQUIPMENTS TO GENERATE RATED OUTPUT
3. DC=DECLARED CAPABILITY
AVAILABLE GENERATING CAPACITY ON ANY GIVEN POINT IN TIME OF 15 MINUTES’ BLOCK IN THE DAY.
4. UI=UNSCHEDULED INTERCHANGE
GENERATION ABOVE OR BELOW SCHEDULED GENERATION BUT WITHIN DECLARED CAPABILITY
5. DM CONSUMPTION DAILY DEMINARELISED WATER CONSUMPTION TO RUN THE PLANT FOR COMPENSATING LOSSED WATER IN THE SYSTEM.
6. GCV=GROSS CALORIFIC VALUE
HEAT VALUE IN GAS/ HSD FUEL WITH MOISTURE AVAILABLE FOR BURNING.
7. NCV= NET CALORIFIC VALUE
NET HEAT VALUE IN GAS/HSD FUEL AVAILABLE FOR BURNING WITHOUT ANY IMPURITY
8. Process Set of interrelated or interacting activities which transforms inputs into outputs.
9. Product Result of a process (Hardware / Software / Services / Processed Material)
10. Quality Degree to which a set of inherent characteristics fulfils requirements.11. Quality Objective Something sought, or aimed for, related to quality.12. Quality Policy Overall intentions and direction of an organization related to quality
as formally expressed by top management.13. Supplier Organization or person that provides a product.14. Work environment Set of conditions under which work is performed.
Prepared by: Yash Pal Issued by: A N Goyal Approved by: V.K.Singh
Sr. Supdt..(OPN) MR HOD(OPN)
INTEGRATED MANAGEMENT SYSTEMDEPARTMENT MANUAL DADRI
Deptt: O&M/OPN -GP Revision : 00ISSUE No. 03
Page : 9/86 Doc Ref:ND-IM-OPG Issue Date: 29 Nov’11
TITLE: DEPTT. MOU
OPERATION DEPARTMENT OBJECTIVES AND TARGETS FOR THE YEAR 2010-2011
Sl. No.
Parameter Unit of Measurement
Target/ Bench Mark
001 GROSS GENERATION MU 5400
002 ADHERENCE TO SCHEDULE % UI = 0 or +VE
003 AVAILABILITY FACTOR % 93.55
004 HEAT RATE KCAL/KWH 1975
005 AUX. POWER CONSUMPTION % 2.45
006 UNIT TRIPPING DUE TO HUMAN ERROR
NUMBER OF OCCASION
0
007 STACK EMMISSION LESS THAN NORMS (150 mg per ncum)
VIOLATION NUMBER OF OCCASION
0
008 TRAINING ACHIEVEMENTS 7 MANDAYS 100% of the employees in
operation department
009 Improvement projects No. 01
010 QC presentation. No. 01
011 To maintain occupational health of the employees
% Regular Medical Checkup of Employees (100%)
Prepared by: Yash PalSr. Supdt..(OPN)
Issued by: A.N GoyalMR
Approved by: V.K.SinghHOD(OPN)
INTEGRATED MANAGEMENT SYSTEMDEPARTMENT MANUAL DADRI
Deptt: O&M/OPN -GP Revision : 00ISSUE No. 03
Page : 10/86 Doc Ref:ND-IM-OPG Issue Date: 29 Nov’11
TITLE: MANAGEMENT PROGRAM
MANAGEMENT PROGRAM-1
1. Objective: To achieve MOU targets for Generation , Declared Capability. avail factor
2. Target: As per MOU target.3. Team Members: DGM(O), SCE, SR.SUPDT(O), MODULE ENGINEER,
OPERATORS 4. Action Plan:
Sl Activity Responsibility
Target Date Records
01 Unit wise capacity demonstration and identifying action areas for improvement.
DGM(O) DAILY DAILY MTP MEETING/ ORT
02 Identifying reasons for partial loading of units for corrective actions
DGM ( O) DAILY DAILY MTP MEETING / ORT
03 Availability and healthiness of all critical equipment like HP/LP BFPs ,HP/LP CC P/Ps, CW PUMPS, CEPs etc apart from boiler ,turbine and generator for corrective action , if required, in time.
SCEs DAILY LOG BOOK / MTP MEETING
04 Reduction of unit down time for attending boiler tube leakage by controlled cooling of WHRB by Compressor washing.
SCEs DURING SHUTDOWN DUE TO BTL
ORT REPORT
05 Reduction of Forced outage due to human Error
SCEs DAILY ORT report
06 Reduction of start up and shutdown time to benchmarking level .
DGM ( O ) /SCEs
Every start up & shutdown
ORT REPORT / Daily MTP Meeting
07 Identifying areas for improving of Heat rate, reduction in Aux. Power consumptions and actions for improvement .
SCEs DAILY DAILY MTP MEETING/ORT
Prepared by: Yash PalSr. Supdt..(OPN)
Issued by: A.N GoyalMR
Approved by: V.K.SinghHOD(OPN)
INTEGRATED MANAGEMENT SYSTEMDEPARTMENT MANUAL DADRI
Deptt: O&M/OPN -GP Revision : 00ISSUE No. 03
Page : 11/86 Doc Ref:ND-IM-OPG Issue Date: 29 Nov’11
TITLE: MANAGEMENT PROGRAM
MANAGEMENT PROGRAMME - 2
1. Objective: To reduce Heat Rate to achieve MOU target. 2. Target: As per MOU target.3 Team Members: DGM(O),SCE,SR.SUPDT(O), MODULE ENGINEER ,OPERATORS 4. Action Plan
Sl. No.
Activity Responsibility Target Date Records
01 Monitoring and optimization of process parameters to achieve target heat rate.
SCE DAILY LOG BOOK/ ORT
02 Analysis of HR deviations on real time basis and corrective actions for improvement.
SCE REAL TIME BASIS
MTP MEETING / ORT
03 Merit order Operation of units. To run GTs in base load as far as possible.
DGM(O)/SCE REAL TIME BASIS
MTP MEETING / ORT
04 Monitoring steam / water leakage for corrective actions to reduce consequent heat loss.
SCE DAILY LOG BOOK/ MTP MEETING
05 Need / Opportunity based condenser pass cleaning to improve vacuum
DGM(O)/SCE NEED/ OPPORTUNITY
LOG BOOK
06 ST coupling time reduction.
SCE REAL TIME BASIS
MTP MEETING / ORT
Prepared by: Yash PalSr. Supdt..(OPN)
Issued by: A.N GoyalMR
Approved by: V.K.SinghHOD(OPN)
TITLE: MANAGEMENT PROGRAM
MANAGEMENT PROGRAM - 3 1. Objective: To reduce Auxiliary Power Consumption to achieve MOU target. 2. Target: As per MOU target.3. Team Members: DGM(O) , SCE, SR.SUPDT(O), MODULE ENGINEERS, OPERATORS 4. Action Plan:
Sl. No.
Activity Responsibility Target Date Records
01 Current Monitoring and optimizing all HT drives and efficiency checking .
DGM(O)/SCE DAILY LOG BOOK / ECE Report
02 Identifying flue gas / Air / Water/ Steam leakages for corrective actions.
SCE Daily & Opportunity
LOG BOOK/MTP MEETING
03 Shut down of auxiliaries during GT/WHRB shut down.
DGM(O)/SCE During shut down
Log book
04 Reducing Idle running of equipment
SCE -do- LOG BOOK
05 Optimize circulating water pump / Aux Raw cooling water pump /CT Fans operation in winter by stopping of pump
SCE DURING WINTER
LOG BOOK
06 Identifying reasons for partial loading of units for corrective actions
DGM(O)/SCE Daily Daily MTP Meeting / ORT
07 Reduction in Lighting loads SCE Dailly
INTEGRATED MANAGEMENT SYSTEMDEPARTMENT MANUAL DADRI
Deptt: O&M/OPN -GP Revision : 00ISSUE No. 03
Page : 12/86 Doc Ref:ND-IM-OPG Issue Date: 29 Nov’11
Prepared by: Yash PalSr. Supdt..(OPN)
Issued by: A.N GoyalMR
Approved by: V.K.SinghHOD(OPN)
INTEGRATED MANAGEMENT SYSTEMDEPARTMENT MANUAL DADRI
Deptt: O&M/OPN -GP Revision : 00ISSUE No. 03
Page : 13/86 Doc Ref:ND-IM-OPG Issue Date: 29 Nov’11
TITLE: MANAGEMENT PROGRAM
MANAGEMENT PROGRAM - 4 1. Objective: Reduction of Unit tripping due to Human error . 2. Target: Zero 3. Team Members: DGM(O) , SCE, SR.SUPDT(O), MODULE ENGINEERS, OPERATORS 4. Action Plan:
Sl. No.
Activity Responsibility Target Date
Records
01 Critical operational procedures are standardized and standard checklist/Formats to be online / followed.
DGM(O)/SCE In Practice
DGM(O)/CCR
02 Discussion/ Training on emergency handling of Operational staff.
DGM(O)/SCE As per Schedule
Communication Meeting / Department site
03 Awareness development and discussion on near miss incidents on regular basis.
DGM(O)/SCE As per Schedule
Communication meeting
05 Need based In house and Simulator training.
DGM(O)/SCE Need Based
In Net
Prepared by: Yash PalSr. Supdt..(OPN)
Issued by: A.N GoyalMR
Approved by: V.K.SinghHOD(OPN)
INTEGRATED MANAGEMENT SYSTEMDEPARTMENT MANUAL DADRI
Deptt: O&M/OPN -GP Revision : 00ISSUE No. 03
Page : 14/86 Doc Ref:ND-IM-OPG Issue Date: 29 Nov’11
TITLE: MANAGEMENT PROGRAM
MANAGEMENT PROGRAM - 5 1. Objective: To maintain Stack Emission within Norms 2. Target: Number of violation – Nil 3. Team Members: DGM(O) , SCE, SR.SUPDT(O), MODULE ENGINEERS, OPERATORS 4. Action Plan:
Sl. No.
Activity Responsibility Target Date
Records
01 Monitoring of NOX once in a month of all GTs .
DGM(O)/SCE MONTHLY LOG Book / MTP Meeting / ORT
02 Monitoring of Field parameters reading and corrective actions for improvement.
DGM(O)/SCE Daily Log Book
03 GTs to be run on premix mode .
DGM(O)/SCE Daily LOG Book / MTP Meeting / ORT
Prepared by: Yash PalSr. Supdt..(OPN)
Issued by: A.N GoyalMR
Approved by: V.K.SinghHOD(OPN)
INTEGRATED MANAGEMENT SYSTEMDEPARTMENT MANUAL DADRI
Deptt: O&M/OPN -GP Revision : 00ISSUE No. 03
Page : 15/86 Doc Ref:ND-IM-OPG Issue Date: 29 Nov’11
TITLE: MANAGEMENT PROGRAM
MANAGEMENT PROGRAM - 6 1. Objective: Dm Water Consumption2. Target: As per MOU target.3. Team Members: DGM(O) , SCE, SR.SUPDT(O), MODULE ENGINEERS,
OPERATORS4. Action Plan:
Sl. No. Activity Responsibility Target Date 1 Monitoring and checking of all
open points for leakage of steam.
SCE Daily.
2 Monitoring and checking of all open points for leakage of water.
SCE Daily.
3 Optimising start up time / Boiler coupling time to reduce water consumption.
SCE During start up.
Prepared by: Yash PalSr. Supdt..(OPN)
Issued by: A.N GoyalMR
Approved by: V.K.SinghHOD(OPN)
INTEGRATED MANAGEMENT SYSTEMDEPARTMENT MANUAL DADRI
Deptt: O&M/OPN -GP Revision : 00ISSUE No. 03
Page : 16/86 Doc Ref:ND-IM-OPG Issue Date: 29 Nov’11
TITLE: MANAGEMENT PROGRAM
MANAGEMENT PROGRAM - 7 1. Objective: UI (Adherence to Schedule )2. Target: 0 or +VE3. Team Members: DGM(O) , SCE, SR.SUPDT(O), MODULE ENGINEERS,
OPERATORS 4. Action Plan:
Sl. No.
Activity Responsibility Target Date
1 Maximizing efforts to extract +ui on real time basis.
DGM(O)/SCE Daily. MTP meeting review. ORT
Prepared by: Yash PalSr. Supdt..(OPN)
Issued by: A.N GoyalMR
Approved by: V.K.SinghHOD(OPN)
INTEGRATED MANAGEMENT SYSTEMDEPARTMENT MANUAL DADRI
Deptt: O&M/OPN -GP Revision : 00ISSUE No. 03
Page : 17/86 Doc Ref:ND-IM-OPG Issue Date: 29 Nov’11
TITLE: MANAGEMENT PROGRAM
MANAGEMENT PROGRAM - 8
1. Objective: Training Achievements(Trg. order Compliance)2. Target: 85% of all staff.3. Team Members: DGM(O) , SCE, SR.SUPDT(O), MODULE ENGINEERS,
OPERATORS 4. Action Plan:
Sl. No.
Activity Responsibility Target Date
1 To impart training to all staff on Power Station Management. 7 days per year.
DGM(O)/SS(O) Every Year
Prepared by: Yash PalSr. Supdt..(OPN)
Issued by: A.N GoyalMR
Approved by: V.K.SinghHOD(OPN)
INTEGRATED MANAGEMENT SYSTEMDEPARTMENT MANUAL DADRI
Deptt: O&M/OPN -GP Revision : 00ISSUE No. 03
Page : 18/86 Doc Ref:ND-IM-OPG Issue Date: 29 Nov’11
TITLE: MANAGEMENT PROGRAM
MANAGEMENT PROGRAM - 9
1. Objective: To maintain Occupational health of the employees2. Target: Regular Medical Checkup Of Employees. 3. Team Members: DGM(O) , SCE, SR.SUPDT(O), MODULE ENGINEERS,
OPERATORS 4. Present status / Performance criteria: Medical check-up is carried out in an
irregular basis. 5. Action Plan:
Sl. No.
Activity Responsibility Target Date
1 Identification of employees working in hazardous area
Safety in charge Every Year
2 Handing over list of identified employees to CMO in 03 categories ( below 40 years, above 40 years, above 45 years)
HOD(HR) Every Year
3 Medical checkup in phased manner as per schedule.
CMO/ HOD (CNI) Every Year
4 Reffering to specialist for specialised treatment if any alinment is detected
CMO Every Year
5 Job rotation of employees or any other action for minimisation of affect
CMO/ HOD (CNI)/ HOD(HR)
Prepared by: Yash PalSr. Supdt..(OPN)
Issued by: A.N GoyalMR
Approved by: V.K.SinghHOD(OPN)
INTEGRATED MANAGEMENT SYSTEMDEPARTMENT MANUAL DADRI
Deptt: O&M/OPN -GP Revision : 00ISSUE No. 03
Page : 19/86 Doc Ref:ND-IM-OPG Issue Date: 29 Nov’11
TITLE: MANAGEMENT PROGRAM
MANAGEMENT PROGRAM - 10
1. Objective: Customer Satisfaction Rating2. Target: AV 3, ON 0-4 SCALE.3. Team Members: DGM(O) , SCE, SR.SUPDT(O), MODULE ENGINEERS,
OPERATORS 4. Action Plan:
Sl. No.
Activity Responsibility Target Date
1 Internal customer Audit on biannual basis.
DGM(O) Twice Every year.
2 Implementation of audit enquiry points on regular basis.
DGM(O) Twice Every year.
Prepared by: Yash PalSr. Supdt..(OPN)
Issued by: A.N GoyalMR
Approved by: V.K.SinghHOD(OPN)
INTEGRATED MANAGEMENT SYSTEMDEPARTMENT MANUAL DADRI
Deptt: O&M/OPN -GP Revision : 00ISSUE No. 03
Page : 20/86 Doc Ref:ND-IM-OPG Issue Date: 29 Nov’11
TITLE: MANAGEMENT PROGRAM
MANAGEMENT PROGRAM - 11
1. Objective: Performance Improvement Initiatives2. Target: four areas:: forced outage, parameter improvement, generation
improvement .3. Team Members: DGM(O) , SCE, SR.SUPDT(O), MODULE ENGINEERS,
OPERATORS 4. Action Plan:
Sl. No. Activity Responsibility Target Date 1 To achieve Zero forced
outageDGM(O) Year end
2 To better operating parameters than past year.
DGM(O)/DGM(M) Every year
3 Improvement in Availability and PLF.
DGM(O)/DGM(M) Every year
Prepared by: Yash PalSr. Supdt..(OPN)
Issued by: A.N GoyalMR
Approved by: V.K.SinghHOD(OPN)
INTEGRATED MANAGEMENT SYSTEMDEPARTMENT MANUAL DADRI
Deptt: O&M/OPN -GP Revision : 00ISSUE No. 03
Page : 21/86 Doc Ref:ND-IM-OPG Issue Date: 29 Nov’11
TITLE: MANAGEMENT PROGRAM
MANAGEMENT PROGRAM - 12
1. Objective: Employee Involvement Quality Initiatives: 5S, QC, PC & Suggestion Scheme.
2. Target: 3. Team Members: DGM(O) , SCE, SR.SUPDT(O), MODULE ENGINEERS,
OPERATORS 4. Action Plan:
Sl. No.
Activity Responsibility Target Date
1 To involve staff on improvement activities and suggesting ways of reducing wasteful expenditure.
DGM(O) Regular
2 Regular internal 5S audit and implementation .
DGM(O) Regular
3 Participation in QC and PC activities. All Staff Regular
4 Participation in suggestion scheme through out the year.
All Staff Regular
Prepared by: Yash PalSr. Supdt..(OPN)
Issued by: A.N GoyalMR
Approved by: V.K.SinghHOD(OPN)
INTEGRATED MANAGEMENT SYSTEMDEPARTMENT MANUAL DADRI
Deptt: O&M/OPN -GP Revision : 00ISSUE No. 03
Page : 22/86 Doc Ref:ND-IM-OPG Issue Date: 29 Nov’11
TITLE: DEPTT. ORG. CHART
ORGANISATION CHART Prepared by: Yash PalSr. Supdt..(OPN)
Issued by: A.N GoyalMR
Approved by: V.K.SinghHOD(OPN)
DGM (OPN) I/C
SS (OPN)
SCE
MOD-I ENGR MOD-II ENGR OFFSITE ENGR
INTEGRATED MANAGEMENT SYSTEMDEPARTMENT MANUAL DADRI
Deptt: O&M/OPN -GP Revision : 00ISSUE No. 03
Page : 23/86 Doc Ref:ND-IM-OPG Issue Date: 29 Nov’11
TITLE: RESPONSIBILITY & AUTHORITIES
RESPONSIBILITIES AND AUTHORITIES
The main power plant is operated round the clock, throughout the year. To ensure uninterrupted operation, the operation staff is divided in to four groups. Each day is divided in to three shifts viz. Morning shift, Evening shift & Night shift.
Shift Charge Engineer (SCE):In each shift main plant operation is headed by SCE, who is responsible for all activities of process control system during his shift. SCE takes instructions from HOD(Opn) and takes decision to meet the requirements of process control system. He is given generation schedule from NRLDC / NCRHQ through switchyard or directly to the SCE and instructs all the MODULE ENGINEERS about the schedule and Unit load to be maintained, depending upon the Unit constraints and grid requirements. In the morning shift SCE reports all the major problems and pending problems in the Daily planning meeting. SCE acts as a nodal point in case of any emergency. SCE is assisted by MODULE Engineers who co-ordinates the operational activities of the whole plant with special attention to Common utilities like Switch Yard , Fuel Oil Pump House , Compressor House, CW Pump house & Raw Water Pump House. SCE maintains a record of activities during the shift & availability of equipment and their defects. MODULE Engineer : The MODULE ENGINEER is the in-charge of the concerned unit and is responsible for all the processes & activities of that Unit. MODULE ENGINEER takes Instruction from the SCE about unit load, startups & shutdown of the unit. MODULE ENGINEER monitors health of all equipment and plants and raises equipment defects, issues PTW, cancels PTW and checks the availability of stand by equipment. To assist the Unit operation, supervisors & local operators are posted in each unit and they work according to the instructions given by the control engineer.
OFFSITE Engineer : OFFSITE ENGINEER is responsible for carrying out safe & efficient operation of switchyard AND OTHER OFF SITE AREAS.
Prepared by: Yash PalSr. Supdt..(OPN)
Issued by: A.N GoyalMR
Approved by: V.K.SinghHOD(OPN)
INTEGRATED MANAGEMENT SYSTEMDEPARTMENT MANUAL DADRI
Deptt: O&M/OPN -GP Revision : 00ISSUE No. 03
Page : 24/86 Doc Ref:ND-IM-OPG Issue Date: 29 Nov’11
TITLE: RESPONSIBILITY & AUTHORITIES
RESPONSIBILITY / AUTHORITY CHART
S No
KEY PERSONNEL
RESPONSIBILITY AUTHORITY
1. DGM (O) RESPONSIBLE FOR IMS IMPLEMENTATION IN OPERATION DEPARTMENT
ACTIVITIES COMMENSURATE WITH RESPONSIBILITIES IN CONSULTATION AND APPROVAL OF HOD/DOP.
2. SS(O) OPERATION COORDINATION FOR IMS ACTIVITIES
ACTIVITIES COMMENSURATE WITH RESPONSIBILITIES IN CONSULTATION AND APPROVAL OF HOD/DOP
3. SCE IN CHARGE OF TOTAL OPERATIONAL ACTIVITIES IN SHIFT
ACTIVITIES COMMENSURATE WITH RESPONSIBILITIES IN CONSULTATION AND APPROVAL OF HOD/DOP
4. MODULE ENGR.
IN CHARGE OF TOTAL OPERATIONAL ACTIVITIES IN ONE MODULE.
ACTIVITIES COMMENSURATE WITH RESPONSIBILITIES IN CONSULTATION AND APPROVAL OF HOD/DOP
Prepared by: Yash PalSr. Supdt..(OPN)
Issued by: A.N GoyalMR
Approved by: V.K.SinghHOD(OPN)
INTEGRATED MANAGEMENT SYSTEMDEPARTMENT MANUAL DADRI
Deptt: O&M/OPN -GP Revision : 00ISSUE No. 03
Page : 25/86 Doc Ref:ND-IM-OPG Issue Date: 29 Nov’11
TITLE: PROCESS MAP
PROCESS MAP
Prepared by: Yash PalSr. Supdt..(OPN)
Issued by: A.N GoyalMR
Approved by: V.K.SinghHOD(OPN)
Gas from GAIL
C C RSupply of Soft Water
Availability of M/Cs
Availability/Supply of DM Water
Gas Allocation from NCR
Availability of HSD
DC
NRLDC
Revised Schedule
Gen., Schedule
Feedback from NRLDC
Revised DC
TO Northern Grid
INTEGRATED MANAGEMENT SYSTEMDEPARTMENT MANUAL DADRI
Deptt: O&M/OPN -GP Revision : 00ISSUE No. 03
Page : 26/86 Doc Ref:ND-IM-OPG Issue Date: 29 Nov’11
TITLE: FLOW CHART FOR THE PROCESS
OBJECTUI =0 or +VE
Prepared by: Yash PalSr. Supdt..(OPN)
Issued by: A.N GoyalMR
Approved by: V.K.SinghHOD(OPN)
START
RECEIVE UI SHEET FROM O&E
Net UI0/+VE
Analyse the Daily UI Report
Reason Established
Reason Controllable
Take Corrective/PreventiveActions
Record reason
Maintain Records of UI CA / PA Deviation
STOP
YES
NO
NO
YES
INTEGRATED MANAGEMENT SYSTEMDEPARTMENT MANUAL DADRI
Deptt: O&M/OPN -GP Revision : 00ISSUE No. 03
Page : 27/86 Doc Ref:ND-IM-OPG Issue Date: 29 Nov’11
TITLE: FLOW CHART FOR THE PROCESS
FLOW CHART OF THE PROCESS LEADING TO OBJECTIVES' REALIZATION
Prepared by: Yash PalSr. Supdt..(OPN)
Issued by: A.N GoyalMR
Approved by: V.K.SinghHOD(OPN)
Record DM Water Consumption from
Balance log at 24:00 hrs
DMCONS.Mod.#1
DMCONS.Mod.#2
TOTALDM
CONS.
DEVIATION FROM DAILY AVG. OF YEARLY TARGETJUSTIFIED?
NO
YES
LOG
START
STOP
Corrective Action
OBJECTDM WATER CONSUMPTION
100% OF MOU TARGET
INTEGRATED MANAGEMENT SYSTEMDEPARTMENT MANUAL DADRI
Deptt: O&M/OPN -GP Revision : 00ISSUE No. 03
Page : 28/86 Doc Ref:ND-IM-OPG Issue Date: 29 Nov’11
TITLE: FLOW CHART FOR THE PROCESSFLOW CHART OF THE PROCESS LEADING TO OBJECTIVES' REALIZATION
Heat rate (CC) - HR
(CC) + Heat rate (OC) - HR
(OC)
NHR – Nominal Heat Rate
NO
Yes
Yes NO
OBJECTHEAT RATE100% OF MOU
ISHR (CC) NHRHR (OC)HR(OC)
Analysis causes of Higher HR
Remedial Measures to betaken to reduce HR
ISHR (CC) NHRHR (OC)HR(OC)
START
STOP
Heat rate is now <_ NHR
Prepared by: Yash PalSr. Supdt..(OPN)
Issued by: A.N GoyalMR
Approved by: V.K.SinghHOD(OPN)
INTEGRATED MANAGEMENT SYSTEMDEPARTMENT MANUAL DADRI
Deptt: O&M/OPN -GP Revision : 00ISSUE No. 03
Page : 29/86 Doc Ref:ND-IM-OPG Issue Date: 29 Nov’11
TITLE: FLOW CHART FOR AUXILIARY POWER CONSUMPTIONFLOW CHART OF THE PROCESS LEADING TO OBJECTIVES' REALIZATION
Actual value of APC (%)
Target Value (TV)
No
Yes
Yes
No
Check APC > Set value
Analysis the cause of higher APC
Remedial measures to be taken to reduce APC
Check APC > Target APC
START
STOP
APC is now < target APC
OBJECTAUXILIARY POWER CONSUMPTION100% OF MOU
Prepared by: Yash PalSr. Supdt..(OPN)
Issued by: A.N GoyalMR
Approved by: V.K.SinghHOD(OPN)
INTEGRATED MANAGEMENT SYSTEM
DEPARTMENT MANUAL DADRIDeptt: O&M/OPN -GP Revision : 00
ISSUE No. 03Page : 30/86 Doc Ref:ND-IM-OPG Issue Date: 29 Nov’11
TITLE: PROCESS MODEL
PROCESS MODEL Whole process divided into Five steps:
A. RECEIPT OF NATURAL GAS/ RLNG/HSD AT DGPS TERMINAL. B. Process of burning of fuel to generate power in gas turbines. C. Process of steam generation in WHRB by GT exhaust gas.D. Supply of steam to turbine and generation of electricity in generator .E. the process of supply of generated electricity to the grid .
PROCESS: A. RECEIPT OF NATURAL GAS/ RLNG/HSD AT DGPS TERMINAL1.0PURPOSE: The purpose of this document is to describe the process of
receipt of fuel in DGPS terminal.2.0SCOPE: To plan ,monitor and take necessary corrective action for receiving
fuels for firing in gas turbines.3.0DEFINITIONS: Nil4.0PRPCESS OWNER : DGM (O) PROCESS FLOW:
Sl.No. Activity Responsibility Ref. Doc.
Clean Natural gas/ RLNG is supplied by M/S GAIL through pipeline at a pressure of 20(+/-5) bar. Rombach filters are provided for further cleaning of the gas and subjected to next stage of filtration at Filtan filters before being fired at the gas turbine combustion chambers. The fuel gas is supplied to 16 burners of each gas turbine ( each having 2 combustion chambers). The following parameters are measured continuously : • pressure of gas : 20( +-/-) 5 bar:. Temperature of gas 15+ ^0 centigrade.: gas CV is measured by Chemistry and by M/S GAILApart from the above mentioned process parameters monitoring following also is monitored : :- HSD receipt:: HSD is supplied by PSU OIL companies. IOCL, BPCL, HPCL. DIESEL is stored in 1 mother tank and 2 day tanks.During receipt density and viscosity of the product is measured by chemistry . other metallic and non metallic contaminants are measured by chemistry from time to time.
DGM(O)Sr. Mgr (Chemistry)
Siemens documents.Technical specification.MTP meeting ORT meeting.
Prepared by: Yash PalSr. Supdt..(OPN)
Issued by: A.N GoyalMR
Approved by: V.K.SinghHOD(OPN)
INTEGRATED MANAGEMENT SYSTEMDEPARTMENT MANUAL DADRI
Deptt: O&M/OPN -GP Revision : 00ISSUE No. 03
Page : 31/86 Doc Ref:ND-IM-OPG Issue Date: 29 Nov’11
TITLE: PROCESS MODEL
Correction and preventive action for Rombach/ Filtan filter/HSD FILTERS. :. • When DP across Rombach filter reaches 40 % filter change over is initiated. Chocked filter cartridges are cleaned and put back into the system for future use.
• Filtan filters are cleaned from time to time . . HSD filters are cleaned in every shift so as to keep them as clean as possible from solid contaminants.
DGM(MM) DGM(o)SCE
SCE LOG BOOK
MTP meeting fineness report
PROCESS OUTPUT Output To Ref. Doc. CLEAN GAS GT SIEMENS
MANUAL,TECHNICAL SPECIFICATIONLMI. IS 1460 FOR HSD.
CLEAN HSD
Prepared by: Yash PalSr. Supdt..(OPN)
Issued by: A.N GoyalMR
Approved by: V.K.SinghHOD(OPN)
INTEGRATED MANAGEMENT SYSTEMDEPARTMENT MANUAL DADRI
Deptt: O&M/OPN -GP Revision : 00ISSUE No. 03
Page : 32/86 Doc Ref:ND-IM-OPG Issue Date: 29 Nov’11
TITLE: PROCESS MODELPROCESS MONITORING(FOR EFFECTIVENESS AND EFFICIENCY)
Monitoring Brief Acceptance Criteria Responsibility Review Frequency
Ref. Doc.
GAS FLOW 40-45 SM^3/HR. AT FULL LOAD
MODULE ENGR..
continuous SIEMENS MANUAL, TECH. SPEC, DFR, OPPMS, Report in MTP meeting. Daily O&E report/ORT report
AIR INTAKE FILTERDP
< 15 m BAR. ALARM AT >30 mbar. To replace filters
MODULE ENGR
continuous SIEMENS MANUAL, TECH. SPEC, DFR, OPPMS, Report in MTP meeting. Daily O&E report/ORT report
Compressor outlet pressure(cpd)
> 9 bar. MODULE ENGR
continuous SIEMENS MANUAL, TECH. SPEC, DFR, OPPMS, Report in MTP meeting. Daily O&E report/ORT report
Load : 130 MW IN EACH GT ON TEMP. CONTROL.
> 130 MW ON TEMP. CONTROL AT 3000RPM, 27^ CENT.
MODULE ENGR
continuous SIEMENS MANUAL, TECH. SPEC, DFR, OPPMS, Report in MTP meeting. Daily O&E report/ORT report
GT EXHAUST TEMPERATURES AND OUTLET TEMP.
< FLOATING ALARM/TRIP VALUE.
MODULE ENGR
continuous SIEMENS MANUAL, TECH. SPEC, DFR, OPPMS, Report in MTP meeting. Daily O&E report/ORT report
Electricity generation
As per generation schedule
DGM(O/MM) Daily/ monthly
SIEMENS MANUAL, TECH. SPEC,
6.0 RECORDS :SCE/ MOD. ENGR. LOG BOOK.
Prepared by: Yash PalSr. Supdt..(OPN)
Issued by: A.N GoyalMR
Approved by: V.K.SinghHOD(OPN)
INTEGRATED MANAGEMENT SYSTEMDEPARTMENT MANUAL DADRI
Deptt: O&M/OPN -GP Revision : 00ISSUE No. 03
Page : 33/86 Doc Ref:ND-IM-OPG Issue Date: 29 Nov’11
TITLE: PROCESS MODEL
PROCESS – B Process of burning of fuel to generate power in gas turbines1.0PURPOSE: The purpose of this document is to describe the process of
combustion of GAS IN COMBUSTION CHAMBERS FOR GENERATION OF POWER.
2.0SCOPE: To plan, monitor and take corrective action for power generation in GT by combustion of gas/ hsd fuel
3.0DEFINITIONS: Nil4.0PRPCESS OWNER : DGM (O)5.0PROCESS INPUTS:Inputs Source Ref Doc. GAS M/S GAIL SIEMENS MANUAL,
TECH. SPEC,HSD Oil FOPH SIEMENS MANUAL,
TECH. SPEC,DM water Water treatment plant SIEMENS MANUAL,
TECH. SPEC,Air AIR INTAKE FILTERS SIEMENS MANUAL,
TECH. SPEC,
PROCESS FLOW: Sl.No. Activity Responsibility Ref. Doc.
POWER GENERATION : IN GAS TURBINE::
THE CLEAN FUEL IS FIRED IN COMBUSTION CHAMBERS OF EACH GT AND EXHAUST GAS AT HIGH TEMP. IS RELEASED. AIR IS TAKEN INTO THE COMPRESSOR OF THE GT THROUGH AIR INTAKE FILTERS. GAS IS SUPPLIED TO COMBUSTION CHAMBERS THROUGH BURNERS FOR FIRING AND 1050 ^ CENT. IS ACHIEVED. THIS IS REFLECTED THROUGH COT . THE HOT GAS MIXTURE IS PASSED THRIUGH TURBINE TO PRODUCE ELECTRICAL POWER AND HIGH HEAT EXHAUST GAS IS RELEASED.
SCEMODULE ENGR.
SIEMENS MANUAL, TECH. SPEC,LMI
Prepared by: Yash PalSr. Supdt..(OPN)
Issued by: A.N GoyalMR
Approved by: V.K.SinghHOD(OPN)
INTEGRATED MANAGEMENT SYSTEMDEPARTMENT MANUAL DADRI
Deptt: O&M/OPN -GP Revision : 00ISSUE No. 03
Page : 34/86 Doc Ref:ND-IM-OPG Issue Date: 29 Nov’11
TITLE: PROCESS MODEL
Sl.No. Activity
Monitoring of cpd, ambient temp. , hot air/ cold air bearing temp., vibration, cot, outlet / exhaust temp.
Under this system, following parameters are monitored / maintained by the
Responsibility Ref. Doc. SCEMODULE ENGR.
SIEMENS MANUAL, TECH. SPEC,LMI
Prepared by: Yash PalSr. Supdt..(OPN)
Issued by: A.N GoyalMR
Approved by: V.K.SinghHOD(OPN)
INTEGRATED MANAGEMENT SYSTEMDEPARTMENT MANUAL DADRI
Deptt: O&M/OPN -GP Revision : 00ISSUE No. 03
Page : 35/86 Doc Ref:ND-IM-OPG Issue Date: 29 Nov’11
TITLE: PROCESS MODEL
PROCESS MONITORING(FOR EFFECTIVENESS AND EFFICIENCY) Monitoring Brief
Acceptance Criteria
Responsibility Review Frequency
Ref. Doc.
SIEMENS MANUAL, TECH. SPEC,LMI Daily Mtp meeting report Daily O&E report/ORT report
Total Gas flow As per Gas turbine load 10 - 45sm3/hr
-do- -do-
HSD flow As per Gas turbine load 10 to 45sm3/hr
-do- -do-
Compressor discharge pressure
Up to 10.3 bar
-do- -do-
Air intake DP <30 m bar -do- -do- Bearing Temp. < 100 °C -do- -do- Bearing vibration
< 7 mm/ sec.
DGM(O) Daily/ monthly
Aux power consumption
2.4 % -do-- -do-
Heat Rate 1970 kcal / kwhr
-do- -do-
6.0 RECORDS- Boiler desk log book, UCE Log Book, Daily MTP Report, ORT Report,
Prepared by: Yash PalSr. Supdt..(OPN)
Issued by: A.N GoyalMR
Approved by: V.K.SinghHOD(OPN)
INTEGRATED MANAGEMENT SYSTEMDEPARTMENT MANUAL DADRI
Deptt: O&M/OPN -GP Revision : 00ISSUE No. 03
Page : 36/86 Doc Ref:ND-IM-OPG Issue Date: 29 Nov’11
TITLE: PROCESS MODEL
PROCESS C: Process of steam generation in WHRB by GT exhaust gas.
1.0PURPOSE: Process of steam generation in WHRB by GT exhaust gas 2.0SCOPE: To plan monitor and take necessary corrective action in the process
of steam generation in WHRB by GT exhaust gas3.0 DEFINITIONS: Nil4.0PRPCESS OWNER : DGM (O) 5.0PROCESS INPUTS:6.0Inputs Source Hot Gas to WHRB Gas Turbine
exhaustDM water to Boiler
Dm water p/p house
PROCESS FLOW: Sl.No.
Activity Responsibility
Ref. Doc.
WHRB SYSTEMThe exhaust gas from gas turbine at 560 deg(at gas turbine base load) passed to WHRB. WHRB is dual pressure boiler in which steam is generated in two parts that is HP and LP steams. HP superheated steam generated in HP circuit which consists of HP drum eco 1/ 2 , evaporator and super heater, feed water is passed from eco through FRS into HP drum and in HP evopourator saturated steam is generated by for circulation, HP super heater generate super heater steam. LP superheated steam generated in LP circuit which consists of LP drum eco, evaporator and super heater, feed water is passed from eco through FRS into LP drum and in LP evaporator saturated steam is generated by for circulation, LP super heater generate super heater steam.
SCEMODULE ENGR.
LMI/OD/OPS/SYST/006
Prepared by: Yash PalSr. Supdt..(OPN)
Issued by: A.N GoyalMR
Approved by: V.K.SinghHOD(OPN)
INTEGRATED MANAGEMENT SYSTEMDEPARTMENT MANUAL DADRI
Deptt: O&M/OPN -GP Revision : 00ISSUE No. 03
Page : 37/86 Doc Ref:ND-IM-OPG Issue Date: 29 Nov’11
TITLE: PROCESS MODELPROCESS D: SUPPLY OF STEAM TO TURBINE AND GENERATION OF ELECTRICITY IN GENERATOR.1.0 PURPOSE: Supply of steam to turbine and generation of electricity in generator.2.0 SCOPE: To plan monitor and take necessary corrective action in the process of Supply of
steam to turbine and generation of electricity in generator.3.0 DEFINITIONS: Nil4.0 PRPCESS OWNER : DGM (O) 5.0 PROCESS INPUTS:Inputs Source Ref Doc.
HP STEAM WHRB HP CKT. BHEL MANUALSIEMENS MANUALCHEMISTRY
LP STEAM WHRB LP CKT. DM WATER Dm water p/p houseCW WATER Dm water p/p house CHEMISTRYSl.No Activity Resp. Ref. Doc.
The Condensate, Feed Water & Boiler Water system The condensate from the Hotwell is extracted by CEP & is pumped, via, Gland steam cooler ,CONDENSATE PRE-Heaters (where it gets heated up) to the De-aerator for removing dissolved oxygen . The condensate now becomes Feed water & gets stored in the Feed Water Storage Tank just below Deaerator. The HP/LP BFPs take Suction from this Feed Storage tank & pumps this feedwater through economizerAND feed control station (FRS) to the Boiler Drum, where it becomes Boiler Water. This boiler water goes to the boiler water tubes where it absorbs heat, transforms in to steam & return back to the Boiler drum through HP /LP CIRCULATING PUMPS.Monitoring of the Condensate & feed water system Under this system, following inspection & testing are conducted by the module engr. on regular basis for smooth running of the unit . a. Boiler drum level. b. Feed water and main steam flow etc . c. Hotwell level. d. Condenser back pressure. e. CEP discharge header pressure f. Deaerator level/Pressure. g. Cycle make up water flow. h. BFPs flow. Corrective and Preventive actions for .The Condensate & feed water system Being part of a closed cycle, the deviations in the level of all three storage vessels Hotwell, Deaerator and Boiler drum are constantly watched and corrected in order to maintain them at normal level with the help of respective control system.
SCEMODULE ENGR.
BHEL manualLMI
Prepared by: Yash PalSr. Supdt..(OPN)
Issued by: A.N GoyalMR
Approved by: V.K.SinghHOD(OPN)
INTEGRATED MANAGEMENT SYSTEMDEPARTMENT MANUAL DADRI
Deptt: O&M/OPN -GP Revision : 00ISSUE No. 03
Page : 38/86 Doc Ref:ND-IM-OPG Issue Date: 29 Nov’11
TITLE: PROCESS MODEL
Sl.No. Activity Responsibility Ref. Doc. The abnormal variation of any of the above storage vessel level will lead to the failure of the pump, which is taking suction from it. This calls for maintaining correct level in these vessels to prevent the failures. The Boiler drum level control is of utmost importance as low drum level may cause the starvation of boiler tube and its failure & high drum level may cause priming and water carry over to the turbine. To prevent this the Boiler drum level is maintained with in limits by FRS control valves. DP is maintained across the FRS control valve to ensure required feed water flow to Boiler drum by varying BFP speed with the scoop control mechanism. The Boiler feed pump draws water from the Deaerator, whose pressure is maintained by supplying steam to it, in order to provide positive NPSH to BFP. Deaerator level is maintained by supplying condensate water through CEP, which draws water from Hotwell. The Hotwell receives the condensate from the condensation of steam in condenser. The Hotwell level is controlled by adjusting the condensate flow to Deaerator through a control valve. Low Deaerator level is corrected by supplying cycle make up water to the Hotwell and high Deaerator level is corrected through an overflow valve.
SCEMODULE ENGR.
BHEL manualLMI
Prepared by: Yash PalSr. Supdt..(OPN)
Issued by: A.N GoyalMR
Approved by: V.K.SinghHOD(OPN)
INTEGRATED MANAGEMENT SYSTEMDEPARTMENT MANUAL DADRI
Deptt: O&M/OPN -GP Revision : 00ISSUE No. 03
Page : 39/86 Doc Ref:ND-IM-OPG Issue Date: 29 Nov’11
TITLE: PROCESS MODEL
Sl.No. Activity Responsibility Ref. Doc. Condenser back pressure is maintained by creating vacuum in condenser by drawing out the non condensable gases as well as by condensing the LPT exhaust steam with the proper cooling water flow. Deviations in the condenser back pressure are corrected by giving proper CW flow in condenser to effectively condense the LPT exhaust steam & preventing air ingress to the condenser.Deviation in condenser back pressure from its design value causes cycle inefficiency and large deviations in it may lead to LP blade overheating & its failure. To prevent this the condenser back pressure is maintained with in limitsTG lube oil & Governing System The TG lube oil system lubricates the bearings of the Main TG & also carries away the heat produced in the TG bearings. The lube oil systems basically consist of Main oil tank which stores the governing/lube oil. It consists MOP (mounted on Main TG shaft), AC LOP, DC LOP & lube oil coolers. The Governing system controls the output & speed of the Turbo Generator (TG) through stop valves and control valves at the steam entrance of HP & LP Turbine.
Monitoring of TG lube oil & Governing System Under this system, following inspection & testing are conducted by the MODULE ENGR. on regular basis for smooth running of the unit . a. MOT level b. TG lube oil temperature.
SCEMODULE ENGR.
BHEL manualLMI
c. TG bearing temperature/vibration. d. Availability of AC LOP, DC LOP Main oil tank is reservoir of lubrication oil for TG bearing and Seal oil system of generator. Lube oil is provided by the shaft mounted MOP which is in running along with main turbine, however, if the lube oil pressure falls due to any reason, Standby lube oil pumps are taken in service to prevent the TG bearing from failure. These standby lube oil pumps (AC LOP and DC LOP) are checked regularly, to ensure their availability. Most of these parameters are available on DAS system for regular monitoring.
Prepared by: Yash PalSr. Supdt..(OPN)
Issued by: A.N GoyalMR
Approved by: V.K.SinghHOD(OPN)
INTEGRATED MANAGEMENT SYSTEMDEPARTMENT MANUAL DADRI
Deptt: O&M/OPN -GP Revision : 00ISSUE No. 03
Page : 40/86 Doc Ref:ND-IM-OPG Issue Date: 29 Nov’11
Generator System: The mechanical energy is converted to the electrical energy ( Product ) in the generator and is supplied to the switchyard via GT at 400 KV.. Rotor and other elements of the generator are cooled by the hydrogen gas, which circulates in the generator by the shaft-mounted fans and is in turn cooled by the cooling water in the gas coolers. To have effective cooling, hydrogen gas is filled at high pressure. This hydrogen gas is sealed by generator seal oil system at both the ends. Sealing at both ends of generator is done by providing the seal oil at higher pressure than generator hydrogen pressure. In order to prevent escapement of hydrogen as well as the formation of explosive mixture of hydrogen & air, Seal oil to hydrogen differential pressure is maintained with the available control system. The availability of DC SOP are checked regularly. The deviation in seal oil temp is corrected byregulating cooling water flow to seal oil coolers. The generator voltage is maintained by AVR, it is kept under constant watch & corrective actions are initiated in case of its deviation or generator instability by changing excitation. Stand by exciter is readily available to meet the main exciter problem of any unit.
Output To Ref. Doc. Electricity Switchyard MAN/002/ST-1/GEN-
001 MAN/002/ST-2/GEN-001
Prepared by: Yash PalSr. Supdt..(OPN)
Issued by: A.N GoyalMR
Approved by: V.K.SinghHOD(OPN)
INTEGRATED MANAGEMENT SYSTEMDEPARTMENT MANUAL DADRI
Deptt: O&M/OPN -GP Revision : 00ISSUE No. 03
Page : 41/86 Doc Ref:ND-IM-OPG Issue Date: 29 Nov’11
TITLE: PROCESS MODEL
PROCESS OUTPUT PROCESS MONITORING(FOR EFFECTIVENESS AND EFFICIENCY) Monitoring Brief
Acceptance Criteria
Responsibility Review Frequency
Ref. Doc.
Steam temps 530-540 C MODULE ENGR.
continuous SIEMENS, BHEL, TECH. SPEC.
Condenser Back Pressure
40-100 mmHg MODULE ENGR.
-do-
MOT level > -20 mm MODULE ENGR.
Daily
EOP availability
Daily trial to check healthiness
MODULE ENGR.
daily
TG lub oil temp
40-47 C MODULE ENGR.
continuous
TG brg temp and vibration
As per load MODULE ENGR.
CONTINUOUS
MW and MVAR
As per grid condition
MODULE ENGR.
-do-
Generator H2 gas pressure
2.7-3.0 Kg/cm2
MODULE ENGR.
-do-
Seal oil DP 1.2- 1.5 Kg/Cm2
MODULE ENGR.
-do-
Electricity As per MODULE Daily/ monthly
generation Schedule ENGR.
PROCESS E: The process of supply of generated electricity to the grid .1.0PURPOSE: The purpose of this document is to describe the process of
supply of generated electricity to the grid2.0SCOPE: To plan monitor and take necessary corrective action for supplying
generated electricity to the grid.3.0DEFINITIONS: Nil4.0PRPCESS OWNER : DGM (O) 5.0PROCESS INPUTSPrepared by: Yash PalSr. Supdt..(OPN)
Issued by: A.N GoyalMR
Approved by: V.K.SinghHOD(OPN)
INTEGRATED MANAGEMENT SYSTEMDEPARTMENT MANUAL DADRI
Deptt: O&M/OPN -GP Revision : 00ISSUE No. 03
Page : 42/86 Doc Ref:ND-IM-OPG Issue Date: 29 Nov’11
TITLE: PROCESS MODEL
Inputs Source Ref Doc. Electricity after voltage step up From Generator MAN/002/ST-1/GEN-001
MAN/002/ST-2/GEN-001 PROCESS FLOW: Sl.No. Activity Responsibility Ref.
Doc. Corrective and preventive Actions for Switchyard Engineer Electric power generation in all units is maintained by SCE/ MODULE ENGINEER as per generation schedule, this as the final output flows to the 400 kV Switchyard. From switchyard this power instantaneously goes to the grid through 400 KV and 220 KV lines. The switch yard Incharge keeps a close watch on the out put of all units & the line loading of all the 400 KV and 220 KV lines. He also remains in touch with grid controllers about the availability & loading of other important transmission lines. In case of significant deviations in unit / line loading or any trip out in DGPS switch yard or other important generating station & transmission lines of Eastern grid, he takes corrective & preventive action by informing the SCE/MOD. ENGR. & coordinates with grid controller. The grid frequency and the bus voltage at DGPS end are also kept under close watch & in case of deviations in them, appropriate corrective actions are initiated by the switchyard Incharge by consulting SCE and grid
SCEMODULE ENGR.
LMI
controlling authorities. All 400 KV & 220 KV equipments such as breakers, isolators, transformers, reactors, CTs & CVTs, are checked regularly for healthy functioning in order to prevent them from failure. SF6 pressure is watched and its deviations are corrected by getting defects attended by maintenance department in order to ensure healthiness of circuit breakers. For SF6
gas filled breakers, their gas pressure is watched & corrective actions are initiated in case of deviation (such as getting gas filled by maintenance department).
Prepared by: Yash PalSr. Supdt..(OPN)
Issued by: A.N GoyalMR
Approved by: V.K.SinghHOD(OPN)
INTEGRATED MANAGEMENT SYSTEMDEPARTMENT MANUAL DADRI
Deptt: O&M/OPN -GP Revision : 00ISSUE No. 03
Page : 43/86 Doc Ref:ND-IM-OPG Issue Date: 29 Nov’11
PROCESS MONITORING(FOR EFFECTIVENESS AND EFFICIENCY) Monitoring Brief Acceptance
Criteria Responsibility Review
Frequency Ref. Doc.
220 KV bus voltage
210-230 KV Switchyard Engr/UCEs
Continuous
MVAR As per grid condition
-do- -do-
Electricity generation As per
Schedule
DGM(O/MM) Daily/ monthly
6.0RECORDS :Switcyard log book, SCE logbook, ORT Report7.0REFERENCE(include ref. Docs like Work Inst etc)
1. Switchyard 2. Blackout Instructions
Prepared by: Yash PalSr. Supdt..(OPN)
Issued by: A.N GoyalMR
Approved by: V.K.SinghHOD(OPN)
INTEGRATED MANAGEMENT SYSTEMDEPARTMENT MANUAL DADRI
Deptt: O&M/OPN -GP Revision : 00ISSUE No. 03
Page : 44/86 Doc Ref:ND-IM-OPG Issue Date: 29 Nov’11
TITLE: COMPETENCE NORMS
COMPETENCE NORMS
SL. NO.
DESIGNATION SKILLS REQUIRED (FOR CRITICAL ACTIVITIES)
TRAINING REQUIRED REMARKS
01 DGM (O) I/C Monitoring of MOU targets, managing manpower
Management Trgs
02 SCE Monitoring of shift activities, managing people
Advance Trg on simulator,Tech. Trgs, Management Trgs
03 MODULE ENGINEER
-DO- -DO-
04 DGM(O) Monitoring , management of people
Advance Trg on simulator,Tech. Trgs, Management Trgs
05 OFFSITE ENGR.
Operation OF GT/ ST.
Simulator trg
06 OPERATORS Local equipment operation
-DO-
Prepared by: Yash PalSr. Supdt..(OPN)
Issued by: A.N GoyalMR
Approved by: V.K.SinghHOD(OPN)
INTEGRATED MANAGEMENT SYSTEMDEPARTMENT MANUAL DADRI
Deptt: O&M/OPN -GP Revision : 00ISSUE No. 03
Page : 45/86 Doc Ref:ND-IM-OPG Issue Date: 29 Nov’11
TITLE: LIST OF INFRASTRUCTURE
LIST OF INFRASTRUCTURE
S. No.
Details Quantity/Capacity
01 CCR FOR OPERATION OF gt /st UNITS 01 NOS 02 220 KV SWITCHYARD O1 NO
03 OFFSITE AREAS LIKE CW PUMP HOUSE, COMPRESSOR HOUSE ,DG SETS,
01 EACH
04 OFFSITE AREAS LIKE CW PUMP HOUSE,,COMPRESSOR HOUSE , NEW DG SETS,
01 EACH
06 WORKSPACE ,BUILDING FOR PLANT AND OFFICES
07 SUBMERSIBLE PUMPS 18 NOS Prepared by: Yash PalSr. Supdt..(OPN)
Issued by: A.N GoyalMR
Approved by: V.K.SinghHOD(OPN)
INTEGRATED MANAGEMENT SYSTEMDEPARTMENT MANUAL DADRI
Deptt: O&M/OPN -GP Revision : 00ISSUE No. 03
Page : 46/86 Doc Ref:ND-IM-OPG Issue Date: 29 Nov’11
Title: IMS DOCUMENTS
LIST OF LEGAL / STATUTORY REQUIREMENTS
S No APPLICABLE LEGISLATION RESPONSIBILITY RECORDS A/V WITH
1. The Water (Prevention And Control Of Pollution ) Act, 1974, Rules1975
DGM(O), DGM (CHE ) EMG/CHEMISTRY
2. The Air (Prevention And Control Of Pollution ) Act, 1981 Rules1982 / 1983
DGM(O), DGM (CHE ) EMG/CHEMISTRY
3. The Factories Act (As amended till 1987) 1948 / 1952
DGM (O) SAFETY
4. The Indian Boilers Act, 1923 DGM(O),DGM(MM), DGM(EEMG)
MTP
5. The Noise Pollution (Regulation & Control) Rules, 2000
DGM (O),DGM(MTP) MTP
Prepared by: Yash PalSr. Supdt..(OPN)
Issued by: A.N GoyalMR
Approved by: V.K.SinghHOD(OPN)
INTEGRATED MANAGEMENT SYSTEMDEPARTMENT MANUAL DADRI
Deptt: O&M/OPN -GP Revision : 00ISSUE No. 03
Page : 47/86 Doc Ref:ND-IM-OPG Issue Date: 29 Nov’11
Title: IMS DOCUMENTS
LIST OF REFERENCE MANUALS
S No
REFERENCE MANUAL IDENTIFICATION CODE
A/V WITH
01 Technical Diary QM-OPG-01 SOFT COPY IN CCR PC / WEB DADRI
02 Siemens Gas Turbine Manual QM-OPG-02 LIBRARY/CONTROL ROOM / SOFT COPY IN WEB DADRI
03 ST MANUAL QM-OPG-03 LIBRARY/CONTROL ROOM / SOFT COPY IN WEB DADRI
04 GT fault alarm with description QM-OPG-04 CONTROL ROOM05 ST fault alarm with description QM-OPG-05 CONTROL ROOM
LIST OF DOCUMENTS OF EXTERNAL ORIGIN
S No
TITLE OF DOCUMENT IDENTIFICATION CODE
A/V WITH
01 NRLDC GENERATION SCHEDULE NRLDC-01 CONTROL ROOM
Prepared by: Yash PalSr. Supdt..(OPN)
Issued by: A.N GoyalMR
Approved by: V.K.SinghHOD(OPN)
INTEGRATED MANAGEMENT SYSTEMDEPARTMENT MANUAL DADRI
Deptt: O&M/OPN -GP Revision : 00ISSUE No. 03
Page : 48/86 Doc Ref:ND-IM-OPG Issue Date: 29 Nov’11
Title: IMS DOCUMENTS (List of Quality Plans/ Applicable I.S.Codes)
LIST OF QUALITY PLANS / APPLICABLE I.S. CODE
S No
EQUIPMENT / COMPONENT QUALITY PLAN No. A/V WITH
01 Nil
Prepared by: Yash PalSr. Supdt..(OPN)
Issued by: A.N GoyalMR
Approved by: V.K.SinghHOD(OPN)
INTEGRATED MANAGEMENT SYSTEMDEPARTMENT MANUAL DADRI
Deptt: O&M/OPN -GP Revision : 00ISSUE No. 03
Page : 49/86 Doc Ref:ND-IM-OPG Issue Date: 29 Nov’11
Title: IMS DOCUMENTS
LIST OF REPORTS DESPATCHED
S No
TITLE OF REPORT DESPATCHED TO FREQUENCY
01 Format- A (DC) RCC Daily02 Details of Generation & Line Flow Data NRLDC Daily03 Generation Data (SAP) OS Daily04 ORT Data EEMG Monthly
Prepared by: Yash PalSr. Supdt..(OPN)
Issued by: A.N GoyalMR
Approved by: V.K.SinghHOD(OPN)
INTEGRATED MANAGEMENT SYSTEMDEPARTMENT MANUAL DADRI
Deptt: O&M/OPN -GP Revision : 00ISSUE No. 03
Page : 50/86 Doc Ref:ND-IM-OPG Issue Date: 29 Nov’11
Title: IMS DOCUMENTS
LIST OF DRAWINGS
S No
TITLE OF THE DRAWING DRAWING CODE / NO.
A/V WITH
01 NIL0203040506
Prepared by: Yash PalSr. Supdt..(OPN)
Issued by: A.N GoyalMR
Approved by: V.K.SinghHOD(OPN)
INTEGRATED MANAGEMENT SYSTEMDEPARTMENT MANUAL DADRI
Deptt: O&M/OPN -GP Revision : 00ISSUE No. 03
Page : 51/86 Doc Ref:ND-IM-OPG Issue Date: 29 Nov’11
Title: IMS DOCUMENTS
LIST OF EQUIPMENTS USED / CALIBRATED
S No
EQUIPMENTS (CRITICAL / REQUIRING CALIBRATION)
EQUIPMENT CODE CALIBRATION RECORD A/V WITH
01 Nil0203040506
Prepared by: Yash PalSr. Supdt..(OPN)
Issued by: A.N GoyalMR
Approved by: V.K.SinghHOD(OPN)
INTEGRATED MANAGEMENT SYSTEMDEPARTMENT MANUAL DADRI
Deptt: O&M/OPN -GP Revision : 00ISSUE No. 03
Page : 52/86 Doc Ref:ND-IM-OPG Issue Date: 29 Nov’11
Title: IMS DOCUMENTS
LIST OF WORK INSTRUCTIONS
S No TITLE OF THE WORK INSTRUCTION(s) W.I. No.
01 PREPARATION AND NORMALISATION OF PTW. OPG-WI-1
02 ST START UP PROCEDURE. OPG-WI-2
03 ST SHUTDOWN PROCEDURE. OPG-WI-3
04 SHUTDOWN PROCEDURE FOR ONE WHRB. OPG-WI-4
05 HYDROGEN FILLING PROCEDURE IN ST GENERATOR. OPG-WI-5
06 HYDROGEN PURGING OF ST GENERATOR. OPG-WI-6
07 STATION BLACK OUT PROCEDURE. OPG-WI-7
08 GT START UP PROCEDURE WITH BLACK START DG SET. OPG-WI-8
09 HSD RACK UNLOADING PROCEDURE. OPG-WI-9
10 OPERATION DURING ST TRIPPING. OPG-WI-10
11 PROCEDURE FOR TAKING SECOND WHRB IN SERVICE OPG-WI-11
12 CRITICAL PARAMETERS OPG-WI-12
13 BLACK START DG SET START UP PROCEDURE OPG-WI-13
14 CT SYSTEM OPERATION OPG-WI-14
15 GAS TURBINE COMPRESSOR WASHING PROCEDURE OPG-WI-15
16 EHC-HC GOVERNOR CHANGEOVER PROCEDURE OPG-WI-16
Prepared by: Yash PalSr. Supdt..(OPN)
Issued by: A.N GoyalMR
Approved by: V.K.SinghHOD(OPN)
INTEGRATED MANAGEMENT SYSTEMDEPARTMENT MANUAL DADRI
Deptt: O&M/OPN -GP Revision : 00ISSUE No. 03
Page : 53/86 Doc Ref:ND-IM-OPG Issue Date: 29 Nov’11
Title: IMS RECORDS
LIST OF APPLICABLE FORMATS
S No FORMAT DESCRIPTION FORMAT No.01 Department Distribution Register F-IM-02
02 Record matrix F-IM-0603 Non conformity register F-IM-3304 Format A For DC TO RCC F-08(GPS-P-01)05 Revised DC Format F-08(GPS-P-02)
Prepared by: Yash PalSr. Supdt..(OPN)
Issued by: A.N GoyalMR
Approved by: V.K.SinghHOD(OPN)
INTEGRATED MANAGEMENT SYSTEMDEPARTMENT MANUAL DADRI
Deptt: O&M/OPN -GP Revision : 00ISSUE No. 03
Page : 54/86 Doc Ref:ND-IM-OPG Issue Date: 29 Nov’11
Title: IMS RECORDS (List of Records)
LIST OF DEPARTMENTAL RECORDS
S No
RECORD DESCRIPTION RECORD No. RETENTION PERIOD
RETENTION AT
01 SCE LOG BOOK LS-GP-01-00 TWO YEARS EEMG
02 MODULE-1 ENGINEER LOG BOOK LE-GP-02-01 TWO YEARS EEMG
03 MODULE-2 ENGINEER LOG BOOK LE-GP-02-02 TWO YEARS EEMG
04 MOD – 1 OPERATOR LOG BOOK LO-GP-03-01 TWO YEARS EEMG
05 MOD – 2 OPERATOR LOG BOOK LO-GP-03-02 TWO YEARS EEMG
06 FOPH OPERATOR LOG BOOK LO-GP-04-00 TWO YEARS EEMG
07 S-YARD / SW-GR OPERATOR LOG BOOK LO-GP-06-00 TWO YEARS EEMG
08 OFFSITE OPERATOR LOG BOOK LO-GP-07-00 TWO YEARS EEMG
09 STEAM TURBINE OPERATOR LOG BOOK LO-GP-08-00 TWO YEARS EEMG
10 CLEARANCE REGISTER F-01(GPS-P-01) FIVE YEARS EEMG
11 ABT SCHEDULE REGISTER F-02(GPS-P-01) ONE YEARS EEMG
12 DAILY CHEMISTRY REPORT F-03(GPS-P-01) TWO YEARS EEMG
13 OIL TEST RESULT F-04(GPS-P-01) TWO YEARS EEMG
14 PTW REGISTER F-05(GPS-P-01) ONE YEARS EEMG
15 WEEKLY EQUIPMENT CHANGEOVER
SCHEDULE
F-06(GPS-P-01) TWO YEARS EEMG
16 EMERGENCY EQUIPMENT CHECKING
SCHEDULE
F-07(GPS-P-01) TWO YEARS EEMG
17 PROPOSED ABT D.C. FOR NEXT DAY F-08(GPS-P-01) ONE YEARS EEMG
18 MESSAGE BOOK F-11(GPS-P-01) FIVE YEARS EEMG
19 DFR REGISTER F-12(GPS-P-01) ONE YEARS EEMG
20 GAIL/ENERGY METER REGISTER F-13(GPS-P-01) FIVE YEARS EEMG
Prepared by: Yash PalSr. Supdt..(OPN)
Issued by: A.N GoyalMR
Approved by: V.K.SinghHOD(OPN)
INTEGRATED MANAGEMENT SYSTEMDEPARTMENT MANUAL DADRI
Deptt: O&M/OPN -GP Revision : 00ISSUE No. 03
Page : 55/86 Doc Ref:ND-IM-OPG Issue Date: 29 Nov’11
Title: Communication MatrixCOMMUNICATION MATRIX
SL NO
COMMUNICATION DETAIL
MODE RESPONSIBI
LITY
FREQUENCY
COMMUNICATION TO Within Deptt
MR / TQM Cell
Other
Deptt
Customer
1. Integrated Policy
Display in Dept
Dept Head
Once in 3 Months
All Employees
√ - -
2. MoU Display in UCB /Deptt
Meeting
Dept Head
All time/ Once a Month
All Employees
√ - -
3. Progress on MoU
Deptt Meeting / LAN
Dept Head
Once a Month/All
Time
All Employees
√ - -
4. Corrective &
Preventive Actions
Daily MTP meeting/
ORT/ Deptt Meeting
Dept Head
Daily/ Monthly
All Employees
√ √ -
5. External / Internal
Customer Complaints
Daily MTP meeting/ Dept
meeting
Dept Head
Daily/ Monthly
All Employees
- √ √
6 Statutory & Regulatory Requireme
nts
Displays in LAN
-do- All time All Employees
All Employees
- -
7 All Tech. / General Communication
LAN / Display in UCB/ Communication register
Dept Head
All Time/ As and when
reqd.
All Employees
- - -
Prepared by: Yash PalSr. Supdt..(OPN)
Issued by: A.N GoyalMR
Approved by: V.K.SinghHOD(OPN)
INTEGRATED MANAGEMENT SYSTEMDEPARTMENT MANUAL DADRI
Deptt: O&M/OPN -GP Revision : 00ISSUE No. 03
Page : 56/86 Doc Ref:ND-IM-OPG Issue Date: 29 Nov’11
Title: IER SCORE G = ABCDEF
QUA
NTIT
Y (A)
OCC
URR
ENCE (B)
IMPA
CT(C
)
LEG
AL
REQ
(D)
DETE
CTI
ON (E)
CONT
ROL (F
)
Negligible 1
Rare 1
No visual effect No1
Immediate1
Control effective & reliable 1
Low
2
Once in week2
Nuisance / discomfort
2
Yes10
With in 1 hour2
Secondary control2
Moderate
3
With in 24 hours
3
Depletion of natural
resources3
With in 8 hrs
3
Human interference needed
3
High
4
Several times a day
4
Global concern4
With in 24 hrs4
Control exists, not checked
4Excessive
5Continuous
5Human health
effect 5After 1 day
5Control not reliable
5Fatal
6Absence of control
6If score is > 30 or impact is >4 or D=10 aspect is significantND-ROA-OPG
S No ACTIVITY D / I ENV ASPECT N/ A/ E
ENV IMP
QTYA
OCCRB
IMPC
LEGD
DETE
CONF
SCOREG
ACTION/REMARK
S1 HSD Unloading from
RakeD Leakage
from Hose Pipe
A W / S 1 2 3 1 2 3 36 OCP-26
2 HSD Unloading Pump Operation
D Leakage from Unloading P/p
A W / S 1 1 2 1 1 3 6
3 HSD Storage Tank Area
D Leakage A W / S 1 1 2 10 4 2 160 OCP-26, DMP
4 HSD Tank Fire D Fire / Explosion
E A 4 1 6 10 1 1 240 OCP-24,DMP
5 Movement of Tankers & Rakes
I Vehicular Emissions
N A 2 2 1 1 1 3 12
I Leakage of Lube Oil
A W / S 1 1 2 1 1 3 6
6 Air Filter Cleaning System
D Dust Emission
N A / W 2 1 2 1 1 2 8
Prepared by: Yash PalSr. Supdt..(OPN)
Issued by: A.N GoyalMR
Approved by: V.K.SinghHOD(OPN)
INTEGRATED MANAGEMENT SYSTEMDEPARTMENT MANUAL DADRI
Deptt: O&M/OPN -GP Revision : 00ISSUE No. 03
Page : 57/86 Doc Ref:ND-IM-OPG Issue Date: 29 Nov’11
Title: IERS No
ACTIVITY D / I
ENV ASPECT N/ A/ E
ENV IMP
QTYA
OCCRB
IMPC
LEGD
DETE
CONF
SCOREG
ACTION/REMARKS
7 HSD Firing in Gas Turbines D
Gas EMISSION N A
3 2 4 1 1 3 72 OCP-47
8 Operation of Fuel Transfer Pump D Leakage A W
1 2 3 1 2 3 36 OCP-26
9 Operation of Fuel Injection Pump D Leakage A W
1 2 4 1 1 3 24
10 Blow Down of CW System D
Waterblow down N W
2 3 3 1 1 3 54 OCP-39
D
Water Drainage N DNR
2 3 3 1 1 3 54 OCP-4
11 Chlorination Plant Operation D
Leakage of Chlorine A A
1 1 2 1 1 3 6
D
Leakage of Chlorine E A
4 1 5 10 1 2 400OCP-44
DMP12
Air Filter Changing DDust Emission N A / W
2 1 2 1 1 3 12
13 Compressed Air Plant Operation(Gas & Thermal) D Noise N A
3 5 2 10 1 2 600OCP-15
14 Compressed Air Plant Operation D
Energy Consumption A DNR
2 5 3 1 1 2 60 OCP-43
15 Air Conditioning System D
Gas Leakage A
O3 DEPL
1 1 4 10 3 3 360 OCP-38
DEnergy Consumption A DNR
2 5 3 1 1 2 60 OCP-43
16 Operation of Gas Turbine on Fuel Gas (Bursting of Pipeline)
D Explosion E A4 1 6 10 1 2 480 OCP-47
D
CO2
emission N A3 5 4 1 1 2 120
OCP/OPN-GP/01
D Leakage A A 2 1 2 1 1 2 8
D NOISE N A3 5 2 10 1 2 600
OCP-15
17 QUENCHING OF CBD D
WATER USE N DNR
2 1 1 1 1 1 2
18STEAM LEAKS
WATER LOSS A DNR
2 2 3 1 1 3 36 OCP-4
19 EFFLUENT DICHARGE D W.POL N W
2 4 2 10 1 2 320 OCP-21
20 Fire Fighting Line Leakage D Leakage A DNR
3 1 3 1 1 3 27
21 OIL SYSTEM D SPILLS A W 1 2 2 1 1 3 1222 CW Pump Operation
(GAS & Thermal) D NOISE N A2 5 2 1 1 2 40 OCP-15
D
Energy Consumption N DNR
2 5 3 1 1 3 90 OCP-43
Prepared by: Yash PalSr. Supdt..(OPN)
Issued by: A.N GoyalMR
Approved by: V.K.SinghHOD(OPN)
INTEGRATED MANAGEMENT SYSTEMDEPARTMENT MANUAL DADRI
Deptt: O&M/OPN -GP Revision : 00ISSUE No. 03
Page : 58/86 Doc Ref:ND-IM-OPG Issue Date: 29 Nov’11
Title: IERS
No ACTIVITYD / I
ENV ASPECT
N/ A/ E
ENV IMP
QTYA
OCCRB
IMPC
LEGD
DETE
CONF
SCOREG
ACTION/REMARKS
23 Seal Oil System D Oil Leakage A W 2 1 2 1 3 3 36 OCP-324 Hydrogen in
Generator D Leakage A A2 1 1 1 2 3 12
d Fire E A / W 5 1 6 10 1 2 600 DMP25 Hydrogen in Rack D Leakage A A 2 1 1 1 2 3 12 D Fire E A 3 1 6 1 1 2 36 DMP
26 Carbon Dioxide Gas D Leakage A A 2 1 2 1 2 3 2427 Main Oil Tank D Oil Leakage A W / S 2 2 2 1 2 2 32 OCP-3 D Fire A A 4 1 2 1 1 1 8 DMP
28Boiler Feed Pumps D
energy consum N DNR
2 5 3 1 1 3 90
D NOISE N A 3 5 2 1 1 2 60 OCP-15
DFeed water leakage A DNR
2 1 3 1 2 3 36 OCP-4
29Condensate Extraction Pumps D
Condensate water leakege A DNR
2 1 3 1 2 3 36 OCP-4
30 Central Oil Purification system D
Sludge Disposal N W.Gen.
1 1 2 1 1 3 6
31 Hydrazine Dozing System D Leakage A A / W
1 1 4 1 3 3 36 OCP- 41
32 Phosphate Dozing System D Leakage A A / W
1 1 2 1 3 3 18
33 Battery Room D Acid leakage A A / W 2 1 1 1 3 3 18 D Fumes N A 1 5 1 1 5 1 25
34 Storage & Issue of Lube Oil D Leakage A W
2 1 2 1 2 3 24
D SPILLS A W 1 2 2 1 1 3 1235
DG Set Operation
D NOISE N A 3 3 2 10 1 2 360 OCP-15 D Oil leakage A W / S 2 1 2 1 1 2 8 Smoke N A 3 2 2 1 1 2 24
LEAK OF DISEL A DNR
1 1 3 1 1 3 9
A W 1 1 4 1 1 2 8 FIRE E A 3 1 4 1 1 3 36 DMP
36Cooling Tower ( GAS ) D
Oil leakage from Gear Boxes. A W
1 1 2 1 3 3 18
D plume drift N DNR 1 5 3 1 1 1 15
D
Water leakage (Splashing) A DNR
1 3 1 1 2 3 18
37 CT FAN OPERATION D
ENERGY CONS DNR
1 5 3 1 1 2 30 OCP-43
Prepared by: Yash PalSr. Supdt..(OPN)
Issued by: A.N GoyalMR
Approved by: V.K.SinghHOD(OPN)
INTEGRATED MANAGEMENT SYSTEMDEPARTMENT MANUAL DADRI
Deptt: O&M/OPN -GP Revision : 00ISSUE No. 03
Page : 59/86 Doc Ref:ND-IM-OPG Issue Date: 29 Nov’11
Title: IER
38 TRANSPORTATION OF NATURAL GAS BY 1.4 KM GAS PIPE LINE FROM GAIL TERMINAL TO GAS PLANT
I LEAKAGE A DNR
1 1 2 1 5 3 30 OCP-49
I FIRE A AIR 4 1 5 10 2 2 800 DMP39 GAIL TERMINAL I LEAKAGE A DNR 1 1 3 1 3 3 27 I FIRE A AIR 5 1 6 10 1 3 900 DMP
Prepared by: Yash PalSr. Supdt..(OPN)
Issued by: A.N GoyalMR
Approved by: V.K.SinghHOD(OPN)
INTEGRATED MANAGEMENT SYSTEMDEPARTMENT MANUAL DADRI
Deptt: O&M/OPN -GP Revision : 00ISSUE No. 03
Page : 60/86 Doc Ref:ND-IM-OPG Issue Date: 29 Nov’11
Title: Group Risk Assessment (GRA)ND-ROH-OPG
Activity Hazard LikelihoodL
Scale S
Level of Consequence C
Detectability D
Risk Classification (TotalS+L*C+D)
Over Riding Factor
D-Direct, N-Normal HUL(1)
1-Spot 1-Slightly Harmful
1-Instantaneous
3 Trivial LC-Legal concern
I -Indirect AN-Abnormal UL
(2)
2-Within Dept
2-harmful 2-High 4-8 Moderate
DC-Domino concern
R - Routine
E-Emergency Likely
(3)
3-Within Factory
3-Very Harmful
3-Low 9-15 Substantial
CE-Chronic effect
NR-Non-Routine
Very Likely
(4)
Outside Factory-4
4-extremely harmful
Nil-4 16-24 Intolerable
*If total score is >12 or overriding factor LC/DC/CE the risk is significant
F-IM-19Risk Identification Risk Assessment
Ov
er r
idin
g f
acto
r (L
C/ D
C/ C
E)
Risk Control MeasureActivity Hazard Condition Adequacy of
MeasureRisk
Sca
le [
SC
]
Lik
elih
oo
d [
L]
Lev
el o
f C
on
s-
equ
en
ce [
C]
Sev
erit
y
De
tec
tib
ility
[D
]
To
tal [
SC
+S
E+
D]
Ris
k C
lass
ific
atio
n
Activity
Hazard
D/I
R/N
R
N/A
N/E
Exi
stin
g
Ga
ps,
if
any
Lik
elih
oo
d
Co
nse
qu
ence
Inspection of GT
area
Exposure to
noise (~ 80 dB)
D R N Use of ear plug
--- unlikely
hearing
discomfort
1 2 2 4 1 6 Sig
LC Existing measures
to continue, OCP-15
Prepared by: Yash PalSr. Supdt..(OPN)
Issued by: A.N GoyalMR
Approved by: V.K.SinghHOD(OPN)
INTEGRATED MANAGEMENT SYSTEMDEPARTMENT MANUAL DADRI
Deptt: O&M/OPN -GP Revision : 00ISSUE No. 03
Page : 61/86 Doc Ref:ND-IM-OPG Issue Date: 29 Nov’11
Risk Identification Risk Assessment
Ov
er r
idin
g f
acto
r (L
C/ D
C/ C
E)
Risk Control MeasureActivity Hazard Condition Adequacy of
MeasureRisk
Sca
le [
SC
]
Lik
elih
oo
d [
L]
Lev
el o
f C
on
s-
equ
en
ce [
C]
Sev
erit
y
De
tec
tib
ility
[D
]
To
tal [
SC
+S
E+
D]
Ris
k C
lass
ific
atio
n
Activity
Hazard
D/I
R/N
R
N/A
N/E
Exi
stin
g
Ga
ps,
if
any
Lik
elih
oo
d
Co
nse
qu
ence
HSD handlin
g in FOPH area
a) Fire due to
oil spillage
D R AN Fire protection
equipments placed
---
unlikely
may cause damage to
man & mach
2 2 4 8 1 11
Sig
LC Fire control
equipments, proper maintenance.OHSMS OCP-
24,26b)
Slippage
D R AN No leakages,
Proper housekeepi
ng
---
unlikely
may lead to
physical
injury
1 2 4 8 1 10
Sub
Proper maintena
nce & good
house-keeping
WHRB / BFP house
inspection &
monitoring
Exposure to
physical heat / High
pressure
I R AN Proper insulation, sealing of equipment
--- unlikely
may cause burnin
g
1 2 2 4 2 7 Moderate
Proper sealing, gland
packing, insulation
have been
provided Combiti
on chamb
er inspecti
on
Exposure to heat
D R AN Fire sensors,
immediate actions to
attend leakages
---
unlikely
may cause
fire
1 2 4 8 2 11
Sig
LC Fire sensors, proper railing
etc.OHMS OCP6,
Prepared by: Yash PalSr. Supdt..(OPN)
Issued by: A.N GoyalMR
Approved by: V.K.SinghHOD(OPN)
INTEGRATED MANAGEMENT SYSTEMDEPARTMENT MANUAL DADRI
Deptt: O&M/OPN -GP Revision : 00ISSUE No. 03
Page : 62/86 Doc Ref:ND-IM-OPG Issue Date: 29 Nov’11
Title: Group Risk Assessment (GRA)Risk Identification Risk Assessment
Ov
er r
idin
g f
acto
r (L
C/ D
C/ C
E)
Risk Control MeasureActivity Hazard Condition Adequacy of
MeasureRisk
Sca
le [
SC
]
Lik
elih
oo
d [
L]
Lev
el o
f C
on
s-
equ
en
ce [
C]
Sev
erit
y [S
E =
L x
C]
De
tec
tib
ility
[D
]
To
tal [
SC
+S
E+
D]
Ris
k C
lass
ific
atio
n
Activity Hazard
D/I
R/N
R
N/A
N/E
Exi
stin
g
Ga
ps,
if
any
Lik
elih
oo
d
Co
nse
qu
ence
Switch gear/ EHV
switch yard
Expo-sure to flash over,
Electric shock
D R AN Insulation, proper
Earthing, precautio
ns
--- unlikely
Damage to
man & materia
l
2 2 4 8 1 11
Sig
LC Ensuring additional earthing &
proper isolation OHSMS OCP5,12
Steam turbine MOT area
inspection
Oil spillage &
fire
D R AN Proper maintenance and house
keeping
--- Highly
unlikely
Accident,
damage to
equipment
2 1 4 4 2 8 Sig
DC Good house
keeping, maintenan
ce, Fire protection
system installed
Hydrogen
filling station
Explosion due to
leakage of
hydrogen
D R AN Leakage detection & pursing
FF Equipme
nt available,
LMI available
--- Highly
unlikely
Explosion
2 1 4 4 3 9 Sig
DC existing measure
to continuedOCP-16
Prepared by: Yash PalSr. Supdt..(OPN)
Issued by: A.N GoyalMR
Approved by: V.K.SinghHOD(OPN)
INTEGRATED MANAGEMENT SYSTEMDEPARTMENT MANUAL DADRI
Deptt: O&M/OPN -GP Revision : 00ISSUE No. 03
Page : 63/86 Doc Ref:ND-IM-OPG Issue Date: 29 Nov’11
Title: OCP-3, CARRY OVER OF OIL (SEAL AND LUBE) TO DISCHARGE
1. PURPOSE : To establish a system for controlling the Water contamination resulting from oil carry over to drains from the leaks in oil system(Seal oil, Lube Oil)
2. SCOPE : All equipment Lub. Oil system, T/G seal oil system of Coal & Gas stations, All other related areas of NTPC Dadri
3. DEFINITION : UCE : Unit Control Engineer4. RESPONSIBILITY : HoD(Opn_Th), HoD(Opn_Gas), Hod (Mntc_Th),
Hod(Mntc_Gas), HoD(MTP_Th), HoD(MTP_Gas)5. PROCEDURE: As described below
DESCRIPTION RESPONSIBILITY REF. DOC.
5.1 Inspect the oil lines thoroughly during the shift and ensure the tank oil levels are normal
5.2 In case of any leaks noticed, inform the unit control engineer and record in the log book. Keep a watch on the leak till it is attended
5.3 In case of leaks, inform the maintenance engineer for
attending the same
5.4 Attend to the leaks and record corrective action taken
5.5 Wherever sub drains are provided, ensure that the oil leak is not entering the sub drains. Wherever sub drains are not provided ensure oil from settling pit does not enter the main drain. In case it is entering the main drain from the sub drain/settling pit, isolate the sub drain/settling pit temporarily from the main drain to avoid carry over
5.6 Arrange to pump out the oil from the sub drain/settling pit and ensure that no oil is getting carried over to the drain.
5.7 Wipe out the oil spills/ leaks with cotton waste and put the soiled waste into the bin provided for it.
OPERATOR
OPERATOR
UCE
Mntc Engineer
OPERATOR
TECHNICIAN
TECHNICIAN
LO-MP-O8-XXLO-GP-08
Job card/Work order card
Job card/Work order card
Prepared by: Yash PalSr. Supdt..(OPN)
Issued by: A.N GoyalMR
Approved by: V.K.SinghHOD(OPN)
INTEGRATED MANAGEMENT SYSTEMDEPARTMENT MANUAL DADRI
Deptt: O&M/OPN -GP Revision : 00ISSUE No. 03
Page : 64/86 Doc Ref:ND-IM-OPG Issue Date: 29 Nov’11
Title: OCP-4, Control Of Water Leaks From Feed / Steam And Fire Water Systems
1. PURPOSE: To establish a system for controlling the Depletion of Natural Resources resulting form the leakage from feed water / steam / fire water system and to ensure least impact of the same.
2. SCOPE : Feed / condensate lines of Boiler / Turbine in Thermal & Gas Stations / Fire Fighting System of NTPC Dadri. 3. DEFINITION : UCE : Unit Control Engineer
4. RESPONSIBILITY: HoD(Opn_Th), HoD (Mntc_Th) HoD(Opn_Gas), HoD (Mntc_Gas) HoD(FM), HoD(AHP) & all concerned HODs.
5. PROCEDURE: as described belowDESCRIPTION RESPONSIBILITY REF. DOC.
5.1 Check once in a shift for leakage in feed / condensate line. If any leaks are observed, inform UCE and record in log book the zone & type leak
5.2 Verify the leak and decide its cause of action i.e. whether the leak can be arrested on line or to plan for a shut down. In case the leak can be arrested on line, inform maintenance & get it attended.
5.3 If it can not be attended on line and needs an isolation, plan it accordingly
5.4 If the leak is to be attended by isolating the line, which is possible only during a shut down, record the same and inform the concerned area operator to keep a watch on it. Inform Maintenance to put a tag for identification for attending it.
5.5 If possible, put a shield to control its dispersion range
5.6 Get the leak attended as per priority basis
5.7 Record the corrective action taken
Concerned area Operator
UCE
Maintenance Engineer
UCE
Maintenance Engineer
Maintenance Engineer Maintenance Engineer
LO-MP-O7-XXLO-MP-08-XXLC-OS-05LO-GP-03-XX
Job card/Work order card
Job card/Work order card
Job card/Work
order card
Job card/Work order card
Prepared by: Yash PalSr. Supdt..(OPN)
Issued by: A.N GoyalMR
Approved by: V.K.SinghHOD(OPN)
INTEGRATED MANAGEMENT SYSTEMDEPARTMENT MANUAL DADRI
Deptt: O&M/OPN -GP Revision : 00ISSUE No. 03
Page : 65/86 Doc Ref:ND-IM-OPG Issue Date: 29 Nov’11
Title: OHSMS OCP-5 Prevention and Control of Electrocution of personnel
1. Purpose : To eliminate/control Electrocution of personnel 2. Scope : All human beings during operation & maintenance of Electrical
installation in Plant.3. Responsibility : Engineer in-charge4. Performance criteria
: Incident /Accident register/ record
5. Cross references
: Indian Electricity Rules, 1956 IS 18001 clause 4.4.3 operational control
6. Activities:Activity Responsibility
1. To ensure display of safety instruction and shock Treatment Chart (CPR)
Technician
2. To ensure deputation of trained personnel, in First Aid and shock treatment.
-do-
3. Availability of safety appliances and first aid box. -do-4. To ensure display of telephone nos. of hospital. Supervisor/
Technician on duty.
5. Switch off affected installation from live circuit Remove the affected persons from incident place Provide shock treatment as per chart If required, provide artificial respiration by recuperate Call ambulance to shift the affected persons to Hospital Inform duty officer, executive -in-charge.
-do-
8.0 CHECKING, CORRECTIVE AND PREVENTIVE ACTION :
Engineer I/c shall ensure effective implementation of above procedure. In case of any deviation he shall undertake necessary connective preventive action.
Prepared by: Yash PalSr. Supdt..(OPN)
Issued by: A.N GoyalMR
Approved by: V.K.SinghHOD(OPN)
INTEGRATED MANAGEMENT SYSTEMDEPARTMENT MANUAL DADRI
Deptt: O&M/OPN -GP Revision : 00ISSUE No. 03
Page : 66/86 Doc Ref:ND-IM-OPG Issue Date: 29 Nov’11
Title: OHSMS OCP -6 CONTROL LOSSES DUE TO FIRE/ EXPLOSION
1.0 Purpose : To eliminate/control losses due to Fire/Explosion.
2.0 Scope : Electrical equipment/ installation and over head lines of Plant.
3.0 Responsibility : Engineer in-charge.
04. Performance Criteria: Incident/ Accident register/ record.
5.0 Cross Reference : IS 18001 clause 4.4.3 operational control
6.0 Activities :
S. No.
Activity Responsibility
1. To ensure display of telephone nos. of Executive in-charge, other Sr. executives of department, fire station, CISF control room, Night duty officer and Ambulance.
Executive In-charge.
2. Availability of Fire extinguishers for electrical/ oil fire. CISF Fire/ Executive In-charge.
3. To ensure deputation of trained personnel, in Fire fighting and First Aid, for operation & maintenance of Electrical installations.
Executive In-charge.
4. To check and ensure proper functioning of protection controls.
Technician on duty
6.1 Response Plan :1. Disconnect the affected area from live line.
Use appropriate Fire Extinguisher Contact CISF fire control room for calling fire
tender. Inform duty officer, Executive –in-charge.
Technician on duty
2. Place “Do Not Switch ON” notice board on affected installation.
Technician on duty
7.0 Checking, Corrective and Preventive Action:
Concerned HOD shall ensure effective implementation of above procedure.
Prepared by: Yash PalSr. Supdt..(OPN)
Issued by: A.N GoyalMR
Approved by: V.K.SinghHOD(OPN)
INTEGRATED MANAGEMENT SYSTEMDEPARTMENT MANUAL DADRI
Deptt: O&M/OPN -GP Revision : 00ISSUE No. 03
Page : 67/86 Doc Ref:ND-IM-OPG Issue Date: 29 Nov’11
Title: OHSMS OCP-12 LOCKOUT, TAGOUT DURING ELECTRICAL MAINTENANCE
1.0 Purpose : Safe working for Electrical maintenance, lockout, tagout.
2.0 Scope : Electrical equipment/ installation and over head lines.
3.0 Responsibility : HOD (Operation ) & HOD (Elect.)
4. 0 Performance Criteria : Incident/ Accident register/ record.
5.0 Cross Reference : Indian Electricity Rules, 1956 : Indian Electricity Act, 1910.
: IS 18001 clause 4.4.3 operational control
6.0 Activities S.No. Activity Responsibility
1. PTW (Authorization for maintenance work) Engineer in-charge
2. Provision of safety devices like insulated hand gloves, electrical shoes, safety belt, ladder, earth connection devices, helmets and line tester.
-do-
3. Taking electrical shutdown of equipment/ installation and over headlines for maintenance.
-do-
4. De-energising & isolation of installation/ equipment from live line ensuring lockout and tagout.
-do-
5. Discharging and Earth connection of installation, after ensuring visual isolation of installation from both ends of live line, as per Indian Electricity Rule 36.
-do-
6. Repair/ maintenance of equipment as per instructions of supplier/ manufacturer and job card.
-do-
7. Return of shutdown after repair, removal of earth connection, testing for insulation resistance before re-energizing.
-do-
7.0 Checking, Corrective and Preventive Action:HOD (Elect.Maint.) shall ensured effective implementation of above programme. In case of any deviation he shall take appropriate Corrective & Preventive action. He shall conduct monthly meeting for ensuring effective progress.
Prepared by: Yash PalSr. Supdt..(OPN)
Issued by: A.N GoyalMR
Approved by: V.K.SinghHOD(OPN)
INTEGRATED MANAGEMENT SYSTEMDEPARTMENT MANUAL DADRI
Deptt: O&M/OPN -GP Revision : 00ISSUE No. 03
Page : 68/86 Doc Ref:ND-IM-OPG Issue Date: 29 Nov’11
Title: OCP-15, CONTROL OF NOISE
1. OBJECTIVE : To establish a system for minimising the effect of the noise at different locations to ensure a least impact.
2. SCOPE : TG hall & Boilers of Unit 1,2,3,4 , AHP Compressors of Units 1,2,3,4, Vacuum Pumps, DG Set, Mill Areas, Compressors Of Thermal And Gas Stations, Pump Houses, Crusher House, Conveyors, Work Shops.
3. DEFINITION : AHP : Ash Handling Plant DG : Diesel Generator PPE : Personal Protective Equipment4. RESPONSIBILITY : HoD(Opn_Th), HoD(Mntc_Th, HOD(Opn_Gas) &
HOD(Mntc_Gas) HOD(FM), HoD(AHP), HoD(Safety)5.PROCEDURE : As described below
DESCRIPTION RESPONSIBILITY REF. DOC.
5.1 Ensure the availability of PPE like ear muffs and insist to use the same
5.2 Ensure the display of awareness Boards to insist on usage of PPE at work locations that are noise prone zones
5.3 Check the condition of doors of all the enclosures, gaskets, sealings under normal conditions ensure the doors to be closed. Under abnormal conditions of noise, check the equipment for leaks of steam, vacuum conditions etc.
5.4 Inform maintenance for attending abnormalities
5.5 Inform MTP for Noise level monitoring/ recording
5.6 Records of abnormalities and actions taken in log book
5.7 Ensure the periodic checking of PPE for their effectiveness/healthiness
5.8 If a PPE is found defective, replace the same.
SCE
SCE, SrMgr(Safety)
Operator
UCE
UCE
UCE
Sr.Mgr( Safety)
Concerned HOD
Job card/work order card
Job card/work order card
LE-GP-02-XXLE-CHP-01LE-AHP-01-00LE-AHP-05-00
Prepared by: Yash PalSr. Supdt..(OPN)
Issued by: A.N GoyalMR
Approved by: V.K.SinghHOD(OPN)
INTEGRATED MANAGEMENT SYSTEMDEPARTMENT MANUAL DADRI
Deptt: O&M/OPN -GP Revision : 00ISSUE No. 03
Page : 69/86 Doc Ref:ND-IM-OPG Issue Date: 29 Nov’11
Title: OCP-16, CONTROL OF FIRE FROM H2 AND OTHER GAS SYSTEM2. PURPOSE : To establish a system for the control of fire from flammable gas
Cylinders Storage location3. SCOPE : H2 cylinders rack at all Units, H2 gas filled system at all Units,
Store Open Yard, Acetylene gas, storage areas, LPG at Canteen ,all other storages in Coal and Gas Stations
4. DEFINITION : LPG : Liquified petroleum Gas H2 : Hydrogen CMC : Canteen Management Committee 5. RESPONSIBILITY : HoD(Opn_Th), HoD(Opn_Gas), HoD(C&M), Head(CMC) are responsible
for the operation of this procedure.DESCRIPTION RESPONSIBILITY REF. DOC.
5.1 Check for leakages of valves, union joint and headers once in a shift to ensure that there is no leakage in the filling rack and H2 filled gas system.
5.2 In case of any leakage, isolate if possible and inform the Unit controller/incharge concerned
5.3 Identify the point of the leakage .5.4 Instruct operator to keep a vigil & stop the filling
process(in case it is on).5.5 Inform maintenance to attending the leak5.6 Ensure the availability & use of sparkless tools to
attend the leak
5.7 Ensure the display of safety boards in the respective locations
5.8 Ensure the availability and healthiness of Fire fighting system and record the same at least once in a day
5.9 Check the point after the leak is attended to ensure that there is no leak
5.10Keep records of leak, actions taken
5.11At the storage areas check for leaks once daily and keep records.
5.12Report abnormalities to Stores In charge 5.13Expedite immediate action to arrest leakage5.14Incase of fire, use suitable fire extinguisher and
inform Emergency Control room and concerned HOD
5.15Ensure employees do not carry inflammable materials and display No Smoking zone boards
Operator
Operator
UCEUCE
UCEI/C (Mtce -TG),Coal and Gas
DGM(O-Coal& Gas)Sr.Mgr(Safety)
Operator
Operator
Concerned Area Mntc EngineerSupervisor(Stores)
Supervisor(Stores)Incharge(Stores)OperatorSupervisor(Store)
Concerned HODSr,MGR(Safety)
LO-MP-08-XXLO-GP-08-00LC-STORE-02
Job card/WOC
LO-MP-08-XXLO-GP-08-00LC-STORE-02
Job card/WOC
Prepared by: Yash PalSr. Supdt..(OPN)
Issued by: A.N GoyalMR
Approved by: V.K.SinghHOD(OPN)
INTEGRATED MANAGEMENT SYSTEMDEPARTMENT MANUAL DADRI
Deptt: O&M/OPN -GP Revision : 00ISSUE No. 03
Page : 70/86 Doc Ref:ND-IM-OPG Issue Date: 29 Nov’11
Title: OCP-19, WASTE DISPOSAL FROM WORK LOCATIONS
1. PURPOSE : To establish a system for safe disposal of solid waste to identified locations.Applicable to all kinds of wastes such as hazardous / non-hazardous, ferrous / non-ferrous including asbestos, that is generated from work place during various operations such as maintenance, house-keeping, storage, handling activities.
2. SCOPE : All the working locations (of temporary and / or permanent nature)3. DEFINITION : During the power generation operation/maintenance operations
different kinds of wastes are generated as described in point No 1. At NTPC - Dadri, all such wastes are categorized into three categories viz 1. Ferrous, 2. NonFerrous, 3. Hazardous such as chemical sludge from lagoon, oil sludge from centrifuge.4. RESPONSIBILITY : The responsibility of implementing this procedure lies with
the concerned HODs.5. DESCRIPTION:
DESCRIPTION RESPONSIBILITY REF. DOC.
5.1 Ensuring the availability of containers of sufficient capacity at various permanent locations (Separate containers for scrap & waste materials)5.2 Ensuring the availability of similar containers, if required, at/near temporary working sites.5.3 Display of hoardings about the nature and kind of solid wastes as described in point 3 5.4 Display of hoardings/instruction for the safe handling/disposal of the solid wastes as described in point 3 5.5 Ensuring the usage of PPE for the handling/disposal of waste into the identified containers and from the containers/bins to the disposal sites, depending upon the type of waste on regular basis5.6 Ensure the Deployment of sufficient number of tractor trolleys/for unloading of waste from containers and transport it to store’s Scrap Yard/any other specified destination depending upon the nature of the waste.
ALL HODs
ALL HODs
ALL HODs
ALL HODs
HOD (Safety)
ALL HODs
Prepared by: Yash PalSr. Supdt..(OPN)
Issued by: A.N GoyalMR
Approved by: V.K.SinghHOD(OPN)
INTEGRATED MANAGEMENT SYSTEMDEPARTMENT MANUAL DADRI
Deptt: O&M/OPN -GP Revision : 00ISSUE No. 03
Page : 71/86 Doc Ref:ND-IM-OPG Issue Date: 29 Nov’11
Title: OCP-21, DISCHARGE OF EFFLUENT1. PURPOSE: To establish a system for controlling the quality of effluents of Main
Plant, CHP & AHP for ensuring least impact on the environment.2. SCOPE: Effluent discharge points of Main Plant, CHP, AHP, Ash Mound and BHEL
pump house.3. DEFINITION : TSS :Total Suspended solids O&G : Oil & Grease
BOD: Biological oxygen demand COD: Chemical oxygen demand CHP: Coal handling plant TDS: Total dissolved solidsAHP: Ash handling plant
4. RESPONSIBILITY : HoD(Opn_Th), HoD(Opn_Gas), HoD(FM), HoD(AHP), HoD(EED)
5. PROCEDURE: As described belowS.No.
ACTIVITY RESPON-SIBILITY
REF. DOC.
5.1 List the instrumentation required for monitoring the various effluent parameters and include the same by informing the Head (MTP) for covering under the calibration schedule.
I/c Chemistry F-01 (OCP-21)
5.2 Ensure that the calibration of the same is traceable to the national standards.
I/c Chemistry
5.3 Establish a Schedule for monitoring of the effluents from various discharge points for the required physical and chemical parameters. Various parameters like TSS, TDS, Temperature, pH are to be measured as per format F-DM-08 (E). Keep records of measurements.
Mgr Chemistry
Lab Asstt
LO-DM-08
5.4 Monitor and record the parameters specified and verify the compliance of the same to the limits specified. In case of any deviations, inform the same to the I/c Chemistry.
Lab Asstt LO-DM-O8
5.5 Review the deviations and Inform the concerned HOD for affecting required corrective and preventive actions
I/c Chemistry F-DM-08(E)
5.6 Check the reasons for the deviations and take the necessary corrective action. Inform I/c Chemistry to re-monitor the same so as to ensure the compliance to the limits.
Concerned HOD
5.7 Ensure the regulatory compliance for all the parameters as applicable before letting the discharge to the final drain.
I/c Chemistry
5.8 Record the corrective & preventive actions. Concerned HOD
Prepared by: Yash PalSr. Supdt..(OPN)
Issued by: A.N GoyalMR
Approved by: V.K.SinghHOD(OPN)
INTEGRATED MANAGEMENT SYSTEMDEPARTMENT MANUAL DADRI
Deptt: O&M/OPN -GP Revision : 00ISSUE No. 03
Page : 72/86 Doc Ref:ND-IM-OPG Issue Date: 29 Nov’11
Title: OHSMS OCP-24 CONTROL OF FIRE WHILE HANDLING OF DIESEL, PETROL
1. PURPOSE : To establish a system for the control of fire while handling diesel/petrol/HFO in the stores and ensure the least impact of the same
2. SCOPE : Stores, Diesel, Petrol, MTO Storage areas of all NTPC Dadri handling locations
3. RESPONSIBILITY: HOD(C&M), HOD(FM), HOD(Maint.Gas),HOD(Opn_Gas), HOD(Safety)
4. PERFORMANCE CRITERIA : Accident / Incident records5. CROSS REFERENCE: The petroleum Act’1934 including amendment of 1997
IS 18001 clause 4.4.3 operational control6. ACTIVITIES:
S.NO DESCRIPTION RESPONSIBILITY1. Display No smoking Zone boards wherever necessary.
Ensure that the personnel working in the area does not use flammable materials like lighters, cigarretes Bidis etc.
Incharges of all individual sections as per point No.4
2. Ensure the availability of ventilation system/exhaust to dispel emissions if any and fire fighting system of the storage area. If its not so, ensure its working condition by getting it attended immediately.
Incharges of all individual sections as per point No.4
3. Ensure the availability of correct sized equipment like funnel, cans etc in good condition, for facilitating the issue in required quantities at the issue locations. If it is not so, ensure to make the same available.
Store Keeper
4. Ensure the issue and transfer of the Diesel/Petrol so that there are no spills on the ground and record the issue in the issue register.
Store Keeper
5. Ensure PCC flooring at the storage areas with adequate containment and drainage facilities.
Incharges of all individual sections as per point No.4
6. In case of any spills, leaks, ensure to contain and recover the same. Ensure that the cotton waste/ Jute used for cleaning the spills/floor is put the identified dust bin.
Store Keeper
7. Record the leaks/spills and actions taken in the log book. Store Keeper / operator of the concerned location
8. Weekly once ensure the healthiness of fire fighting equipment and if it is not so, inform concerned I/c for affecting the corrective actions and record the availability.
-Do-
Prepared by: Yash PalSr. Supdt..(OPN)
Issued by: A.N GoyalMR
Approved by: V.K.SinghHOD(OPN)
INTEGRATED MANAGEMENT SYSTEMDEPARTMENT MANUAL DADRI
Deptt: O&M/OPN -GP Revision : 00ISSUE No. 03
Page : 73/86 Doc Ref:ND-IM-OPG Issue Date: 29 Nov’11
Title: OCP-25 ACCIDENT DUE TO HYDROGEN GAS CYLINDERS1. PURPOSE : To establish a system for the control of fire from flammable gas
Cylinders Storage location2. SCOPE : H2 cylinders rack at all Units, H2 gas filled system at all Units, 3. DEFINITION : LPG : Liquified petroleum Gas H2 : Hydrogen4. RESPONSIBILITY : HoD(Opn_Gas), is responsible for the operation of this
procedure.5. PROCEDURE :
DESCRIPTION RESPONSIBILITY REF. DOC.
5.1 Check for leakages of valves, union joint and headers once in a shift to ensure that there is no leakage in the filling rack and H2 filled gas system.
5.2 In case of any leakage, isolate if possible and inform the Unit controller/incharge concerned
5.3 Identify the point of the leakage .5.4 Instruct operator to keep a vigil & stop the filling
process(in case it is on).5.5 Inform maintenance to attending the leak5.6 Ensure the availability & use of sparkless tools to
attend the leak5.7 Ensure the display of safety boards in the
respective locations5.8 Ensure the availability and healthiness of Fire
fighting system and record the same at least once in a day
5.9 Check the point after the leak is attended to ensure that there is no leak
5.10Keep records of leak, actions taken
5.11Incase of fire, use suitable fire extinguisher and inform Emergency Control room and concerned HOD
5.12Ensure employees do not carry inflammable materials and display No Smoking zone boards
Operator
Operator
SCE
SCEI/C (Mtce) Gas
DGM(O),Sr.Mgr(Safety)
Operator
Operator
Concerned Area Mntc EngineerOperator
DGM(O)Sr,MGR(Safety)
LO-GP-08-00
Job card/WOC
LO-GP-08-00
Job card/WOC
Prepared by: Yash PalSr. Supdt..(OPN)
Issued by: A.N GoyalMR
Approved by: V.K.SinghHOD(OPN)
INTEGRATED MANAGEMENT SYSTEMDEPARTMENT MANUAL DADRI
Deptt: O&M/OPN -GP Revision : 00ISSUE No. 03
Page : 74/86 Doc Ref:ND-IM-OPG Issue Date: 29 Nov’11
Title: OCP-26, CONTROL OF OIL SPILLS
1. PURPOSE : To avoid the spillage of the oil, HFO, LDO during the oil unloading activity and carry over to the drain.
2. SCOPE : Fuel oil unloading area.3. DEFINITION : HFO : Heavy furnace oil LDO : Light diesel oil,HSD: High Speed Diesel4. RESPONSIBILITY : HoD(FM), HoD(Opn_Th), HoD(Opn_Gas)5. PROCEDURE: As described below
DESCRIPTION RESPONSIBILITY REF. DOC.
5.1 Ensure that all the drains leading to the separation pit are clear and ensure the out let gate of the separation pit is in closed condition.
5.2 Check for the healthiness of the unloading hoses and ensure all the bolts and nuts are secured properly.
5.3 Ensure the header valves are in the closed condition and open the unloading port valves.
5.4 Start the unloading and inspect the hose and header for any leakage. In case of any leakage, stop unloading, inform the same to the engineer incharge to get it attended.
5.5 Ensure the complete evacuation of the oil from the rake.
5.6 Disconnect the hoses and ensure the placement of the same in the hose stand.
5.7 In case of any spills on the ground,ensure the cleaning of the same with cotton waste and put the soiled waste into the dust bin provided for it.
5.8 Check the drains leading to the separation pit and ensure that there is no oil carry over.
5.9 In case of any carry over, ensure the separating pit is effectively containing the oil carry over.
5.10If, it is not so, inform the area incharge to take the corrective action.
5.11If necessary do the reclamation of the oil from the separating pit.
Operator
Technician
Technician
Technician
Area Engineer
Technician
Technician
Operator
Technician
Technician
Technician
F-FM-01
LO-FO-01
Prepared by: Yash PalSr. Supdt..(OPN)
Issued by: A.N GoyalMR
Approved by: V.K.SinghHOD(OPN)
INTEGRATED MANAGEMENT SYSTEMDEPARTMENT MANUAL DADRI
Deptt: O&M/OPN -GP Revision : 00ISSUE No. 03
Page : 75/86 Doc Ref:ND-IM-OPG Issue Date: 29 Nov’11
Title: OCP-33, To Minimize Possibility Of Fire At Different Locations And Mitigate Its Impact
1. PURPOSE: To minimize the possibility of fire at different locations and mitigate the impact of the same.
2. SCOPE: Applicable to all areas of Fuel storage and handling, material storage and handling.
3. DEFINITION:
4. RESPONSIBILITY: Concerned HODs
5. PROCEDURE: As described below
ACTIVITY RESPONSIBILITY REF DOC5.1 Ensure the availability of the adequate fire fighting
system as indicated in the locations by filling the check list of the fire fighting system
5.2 review the fire fighting check lists and ensure the refilling,inspection by the CISF personnel as pert he schedule indicated on the tags attached to the fire fighting system
5.3 in the coal handling area ,ensure the regular inspection of coal conveyors for any abnormality in conveyor idlers
5.4 ensure adequate house keeping in conveyor galleries and the transfer points
5.5 ensure the person carrying any Hot work under maintenance at the above mentioned areas is possessing Hot work permit for carrying the same
Area incharge
Area incharge
Area incharge
Area incharge
Area incharge
Checklist for fire fighting
Prepared by: Yash PalSr. Supdt..(OPN)
Issued by: A.N GoyalMR
Approved by: V.K.SinghHOD(OPN)
INTEGRATED MANAGEMENT SYSTEMDEPARTMENT MANUAL DADRI
Deptt: O&M/OPN -GP Revision : 00ISSUE No. 03
Page : 76/86 Doc Ref:ND-IM-OPG Issue Date: 29 Nov’11
Title: OCP-38, Reduction In Consumption Of Mafron In Dadri
1. PURPOSE: To establish a system for reduction in consumption of the refrigerant gas cylinders in NTPC Dadri-Gas.
2. SCOPE: Concerned Maintenance dept and Operation dept.3. DEFINITION: Nil4. RESPONSIBILITY: HoD(Mntc_Gas), HoD(Opn_Gas), HoD(MTP_Gas) 5. DESCRIPTION:
S. No.
ACTIVITY RESPONSI-BILITY
REF. DOC.
5.1 Ensure complete isolation of refrigerant gas system when issuing PTW on A/C system.
HoD (Opn_Gas)
5.2 Condition of the running A/C equipments to be monitored (Vibration).
HoD (MTP_Gas)
5.3 During weekly PM of A/C system, check for leaks using soap solutions, record and attend the problems if any.
HoD (Mntc_Gas)
Maint. log book
5.4 Record filling of gas when required during PM or B/D maintenance work.
HoD (Mntc_Gas)
Maint. log book
5.5 Record annual consumption of refrigerant gas cylinders. HoD (MTP_Gas)
Prepared by: Yash PalSr. Supdt..(OPN)
Issued by: A.N GoyalMR
Approved by: V.K.SinghHOD(OPN)
INTEGRATED MANAGEMENT SYSTEMDEPARTMENT MANUAL DADRI
Deptt: O&M/OPN -GP Revision : 00ISSUE No. 03
Page : 77/86 Doc Ref:ND-IM-OPG Issue Date: 29 Nov’11
Title: OCP-39, To Minimize Scaling Tendency Of Circulatng Water During Borewell Feeding.
1. PURPOSE: To minimize the scaling tendency of circulating water in condenser during bore-well feeding.
2. SCOPE: All the condensers of Thermal-Coal and Gas project.3. DEFINITION: ppm – Parts Per Million4. RESPONSIBILITY: HoD(Opn_Th), HoD(Opn_Gas).5. DESCRIPTION:
S. No.
ACTIVITY RESPONSI-BILITY
REF. DOC.
5.1 During borewell feeding, ensure premature exhaustion of Softening plant vessels. Hardness in fore bay not to exceed 25 ppm.
Mgr (Chem) LO-DM-07
5.2 In case of any technical constraint, e.g.(a) Lack of sufficient borewell water(b) Reduced availability of Softening plant due to
overloading of resin etcWhich in turn may affect generation, I/c Chemistry in consultation with DGM (Opn_Coal) shall take the appropriate action. Record of the above to be maintained.
I/c (Chem) LO-DM-12
5.3 Simulation study to be carried out in one of the Thermal-Coal units using a trial heat exchanger for preparing baseline data for further analysis.
I/c (Chem),HoD (Opn_Th),I/c (TMD)
LO-DM-12
5.4 Carry out inspection of each condenser during annual overhauling of each unit and record its scaling status before and after mechanical cleaning.Carry out its inspection for next three years and study the impact of chemical cleaning. Loss in condenser vacuum due to scaling to be evaluated for the above period.
I/c (Chem),HoD (Opn_Th),
I/c (TMD),HoD(O&E_Th)
LO-DM-12
5.5 Based on the conclusions drawn from the activities mentioned in 5.3 and 5.4, determine the optimum period for carrying out acid cleaning.
I/c (Chem),HoD (Opn_Th),
I/c (TMD)
Prepared by: Yash PalSr. Supdt..(OPN)
Issued by: A.N GoyalMR
Approved by: V.K.SinghHOD(OPN)
INTEGRATED MANAGEMENT SYSTEMDEPARTMENT MANUAL DADRI
Deptt: O&M/OPN -GP Revision : 00ISSUE No. 03
Page : 78/86 Doc Ref:ND-IM-OPG Issue Date: 29 Nov’11
Title: OCP-41, To Establish A System For Dozing Ammonia In WHRB System1. PURPOSE: To establish a system for dozing ammonia in WHRB system. 2. SCOPE: All the four waste heat recovery boilers of the Gas project.3. DEFINITION(s): WHRB: Waste Heat Recovery Boiler
ppm : Parts Per Millionppb : Parts Per BillionSCE : Shift Charge EngineerLP : Low Pressure
4. RESPONSIBILITY: Sr Supdt (Chem), Sr Supdt (Opn_Gas)5. DESCRIPTION: S. No.
ACTIVITY RESPONSI-BILITY
REF. DOC.
5.1 Analyze the ammonia levels once per shift Lab Asstt (SWAS-GP)
5.2 Maintain the parameter in Feed, Steam and Condensate cycles as:pH : 8.8-9.2Ammonia : < 1.0 ppm
Lab Asstt (SWAS-GP)
5.3 LP dozing should be continuous and normally 500 ml of ammonia to be added in the LP dozing tank in the morning shift daily. In case of any deviation, dilute the dozing tank or add additional ammonia in lot of 500 ml only. Any extra addition should be carried after checking the effect of previous addition.
Lab Asstt (SWAS-GP)
5.4 In case pH of the system is 8.9, add 500 ml of ammonia in the LP dozing tank.
Lab Asstt (SWAS-GP)
5.5 Send the analysis report as per format F-03 GPS-P-01 along with recommendation in every shift to SCE and Sr Supdt (Opn_Gas). Keep record of the same.
Lab Asstt (SWAS-GP)
F-03GPS-P-01
5.6 Carryout LP dozing as per the recommendations of Chemistry.
SCE (Gas)
5.7 Keep the ammonia cans inside an enclosure and in case of leakage or spillage, neutralize with sodium hypo-chlorite inside the enclosure itself. Test for residual ammonia before disposing off the same and inform Mgr (Chem). Keep record of any spillage / leakage. Use rubber gloves while handling ammonia.
Lab Asstt (SWAS-GP)
Prepared by: Yash PalSr. Supdt..(OPN)
Issued by: A.N GoyalMR
Approved by: V.K.SinghHOD(OPN)
INTEGRATED MANAGEMENT SYSTEMDEPARTMENT MANUAL DADRI
Deptt: O&M/OPN -GP Revision : 00ISSUE No. 03
Page : 79/86 Doc Ref:ND-IM-OPG Issue Date: 29 Nov’11
Title: OCP-42, To Establish A System For Phosphate Dozing In WHRB System
1. PURPOSE: To establish a system for phosphate dozing in WHRB system (both HP and LP).
2. SCOPE: All the four waste heat recovery boilers of the Gas project.3. DEFINITION(s): WHRB: Waste Heat Recovery Boiler
ppm : Parts Per Millionppb : Parts Per BillionSCE : Shift Charge EngineerLP : Low PressureHP : High PressureTSP : Tri Sodium PhosphateMs/cm : Micro Siemens per cm
4. RESPONSIBILITY: Sr Supdt (Chem), Sr Supdt (Opn_Gas)5. DESCRIPTION: S. No.
ACTIVITY RESPONSI-BILITY
REF. DOC.
5.1 Analyze the phosphate levels in all the running LP and HP boilers once per shift
Lab Asstt (SWAS-GP)
5.2 Maintain the parameter in boiler drum as :pH : 9.5-10.5Phosphate : 2000-6000 ppbConductivity: 50 ms/cm
Lab Asstt (SWAS-GP)
5.3 Recommend dozing of phosphate if pH of boiler drum reaches 9.6 or phosphate level 2.5 ppm. Normally recommend dozing for max 30 minutes.
Lab Asstt (SWAS-GP)
5.4 For preparing a full tank of TSP solution, normally add 8-10 kg of TSP.
Lab Asstt (SWAS-GP)
5.5 In case of any deviation, consult Manager (Chem) for further action. Recommendation for further dozing should be after checking the effect of previous dozing.
Lab Asstt (SWAS-GP)
5.6 Send the analysis report as per format F-03 GPS-P-01 along with recommendation in every shift to SCE and Sr Supdt (Opn_Gas). Keep record of the same.
Lab Asstt (SWAS-GP)
5.7 Carryout phosphate dozing as per the recommendations of Chemistry.
SCE (Gas)
Prepared by: Yash PalSr. Supdt..(OPN)
Issued by: A.N GoyalMR
Approved by: V.K.SinghHOD(OPN)
INTEGRATED MANAGEMENT SYSTEMDEPARTMENT MANUAL DADRI
Deptt: O&M/OPN -GP Revision : 00ISSUE No. 03
Page : 80/86 Doc Ref:ND-IM-OPG Issue Date: 29 Nov’11
Title: OCP-43, Monitoring Of Auxiliary Power Consumption
1. PURPOSE: To establish a system for operational control to monitor the auxiliary power consumption in CW system/BFP/Compressor/Airconditioning system and CT fans
2. SCOPE: Applicable to the area of operation of Dadri (Gas) power station.3. DEFINITION(s): EEMG : Energy efficiency management group
Opn : OperationSCE : Shift Charge EngineerCW : Circulating Water
4. RESPONSIBILITY: HoD(O&E_GP), HoD(Opn_GP)5. DESCRIPTION: S. No.
ACTIVITY RESPONSI-BILITY
REF. DOC.
5.1 Monitor CW flow, CW inlet temp, CW outlet temp and Condenser vacuum on regular basis.
HoD(EEMG_GP)
5.2 If CW inlet temp is 20C and inlet/outlet differential temp is < 10.8C, stop one CW temp.
SCE
5.3 Keep on monitoring CW inlet temperature and inlet/outlet differential temp in one CW pump stopped condition.
SCE
5.4 (a) If differential temperature rises above 10.8C (design value), start CW pump again.
(b) With one CW pump in stopped condition, if CW inlet temp is 20C and inlet/outlet differential temp is < 10.8C, stop one more CW temp.
SCE
5.5 Continue to monitor Condenser performance for any deterioration as per 5.1 and recommend corrective action in case of deterioration in performance.
DGM(OPN-GP)
report available with EEMG
5.6 Reporting Higher power consumption in /BFP/Compressor/ Air-conditioning system and Raw water pumps in maintenance planning meeting
DGM(OPN-GP)
5.7 Ensuring that corrective and preventive actions are carried out on
DGM(OPN-GP)
5.8 Carrying out periodic energy audit once in two year HOD(EEMG-GP)
Energy audit report available with EEMG
5.9 Ensuring that corrective and preventive actions are carried out on energy audit findings
DGM(OPN-GP)
Prepared by: Yash PalSr. Supdt..(OPN)
Issued by: A.N GoyalMR
Approved by: V.K.SinghHOD(OPN)
INTEGRATED MANAGEMENT SYSTEMDEPARTMENT MANUAL DADRI
Deptt: O&M/OPN -GP Revision : 00ISSUE No. 03
Page : 81/86 Doc Ref:ND-IM-OPG Issue Date: 29 Nov’11
Title: OCP-44, Monitoring Of Safety Related Aspect Wrt Chlorine1. PURPOSE: To establish a system for monitoring the healthiness of safety related
aspect w.r.t. Chlorine.2. SCOPE: Chlorination Plant - Thermal (PTS AND CW)
- Gas (CW)3. DEFINITION(s): PTS: Pretreatment Softening
CW: Circulating water4. RESPONSIBILITY: Sr Mgr (Chem), HoD(Opn_Th), HoD(Opn_Gas)5. DESCRIPTION: S. No.
ACTIVITY RESPONSI-BILITY
REF. DOC.
5.1 All filled Chlorine cylinders should be on rollers & all cylinders inside the building should have a visible tag of Empty / Full / Service.
Optr. (Chlorination Plant)
5.2 Keep a record of Chlorine tonners status at each location and note the cylinder number which are full.
Optr. (Chlorination Plant)
LO-DM-12LO-DM-13LO-DM-14
5.3 Keep at least one Breathing Apparatus set at each location and one at D. M. Plant Control Room also in proper condition.
Manager (Chem.)
5.4 Check the following fortnightly:(a) Eyewash(b) Shower at CW Chlorination (Thermal) & DM Plant(c) Strength of neutralization pit. It should have specific gravity
>= 1.2(d) Pressure of B. A. Set cylinder > 50 kg/cm2
In case of any deviation, inform Manager (Chem.). Keep record of above.
Sr Chemist LO-DM-12LO-DM-13LO-DM-14
5.5 Carry out the following on monthly basis:(a) Mock drill using BA Set and Emergency Kit.(b) Emergency kit item checking.(c) Availability of Chlorine leak detectors and alarm system(d) Availability of hoist and exhaust fans of chlorination roomKeep Record.
Sr Chemist LO-DM-12LO-DM-13LO-DM-14
5.6 In Gas Plant, check the automatic Chlorine absorption system for auto start and caustic strength on monthly basis. Caustic solution should have specific gravity of 1.1 0.02.Keep record.
Sr Chemist LO-DM-14
5.7 Ensure availability of duplicate keys of Emergency kit and chlorination room at D M Plant Control room for Thermal & at SWAS Lab for Gas Plant.
Manager (Chem.)
Prepared by: Yash PalSr. Supdt..(OPN)
Issued by: A.N GoyalMR
Approved by: V.K.SinghHOD(OPN)
INTEGRATED MANAGEMENT SYSTEMDEPARTMENT MANUAL DADRI
Deptt: O&M/OPN -GP Revision : 00ISSUE No. 03
Page : 82/86 Doc Ref:ND-IM-OPG Issue Date: 29 Nov’11
Title: OCP-47,Methodology Of NOx Monitoring On Weight/Volume Basis
1. PURPOSE: To establish a system for NOx monitoring on weight/volume basis.2. SCOPE: Applicable to all the four gas turbines of NTPC Dadri-Gas.3. DEFINITION(s): 4. RESPONSIBILITY: HoD(Opn_Gas)5. DESCRIPTION:
S. No.
ACTIVITY RESPONSI-BILITY
REF. DOC.
5.1 Measure the offline NOx values of al the gas turbines once every fortnight.
I/c (Chem) LO-DM-08
5.2 Obtain the GT operating hours on fortnightly basis from O&E dept.
I/c (O&E_Gas) F-13-GPS-P-01 [GAIL / Energymeter register
5.3 Compute the total NOx release from gas plant based on the data as per 5.1 and 5.2.
HoD (Opn_Gas)I/c (O&E_Gas)
5.6 Plot the trend of NOx release from Gas plant. HoD (Opn_Gas)
5.7 Analyze and discuss the NOx generation and trend of NOx in MTP/ORT meeting every month.
HoD (Opn_Gas)
OCP/ OPN-GP/01 Control of CO2 emission1. PURPOSE: To establish a procedure for control of CO2 emission in Gas station.2. SCOPE: Applicable to all the four gas turbines of NTPC Dadri-Gas.3. DEFINITION(s): EOH – Equivalent operating hours calculated based on running
hours of GT and GT tripping.4. RESPONSIBILITY: HOD (Opn – Gas), HOD (MM – GP)5. DESCRIPTION:
S. No.
ACTIVITY RESPONSI-BILITY
5.1 Obtain the GT operating hours on fortnightly basis from O&E dept. I/c (O&E – Gas)
5.2 Ensure that compressor washing done during forced outage whenever there is opportunity.
HOD(Opn–Gas), HOD (MM – GP)
5.3 Ensure that compressor washing done during planned outage at 2000 EOH. 4000 EOH, 8000 EOH, 16000 EOH.
HOD(Opn–Gas), HOD (MM – GP)
5.4 Ensure that burner inspection is done during planned outage at 2000 EOH. 4000 EOH, 8000 EOH, 16000 EOH and corrective action is taken.
HOD(Opn–Gas), HOD (MM – GP)
5.5 Ensure that refurbishment is done during outage at 25000 EOH. HOD(Opn–Gas), HOD (MM – GP)
Prepared by: Yash PalSr. Supdt..(OPN)
Issued by: A.N GoyalMR
Approved by: V.K.SinghHOD(OPN)
INTEGRATED MANAGEMENT SYSTEMDEPARTMENT MANUAL DADRI
Deptt: O&M/OPN -GP Revision : 00ISSUE No. 03
Page : 83/86 Doc Ref:ND-IM-OPG Issue Date: 29 Nov’11
Title: OCP-49, Checking Of Natural Gas Pipeline In Gas Plant
1. PURPOSE: To establish a system for checking the healthiness of Natural Gas pipeline system in Gas plant.
2. SCOPE: 1.4-km long gas pipeline from GAIL Dadri terminal to Dadri Gas Power Plant.
3. DEFINITION(s): 4. RESPONSIBILITY: HoD(Opn_Gas), HoD(Mntc_Gas)5. DESCRIPTION: S. No.
ACTIVITY RESPONSI-BILITY
REF. DOC.
5.1 Surveillance checks of Gas pipeline across the line once in a month.
HOD (Mntc_Gas) Maint Record
5.2 Checking of pedestals of Gas pipeline, Drains and Vents along the length once in a month.
HOD (Mntc_Gas)HOD (Opn)
Maint Record
5.3 Thickness measurement of bends of Gas pipeline once in a year.
HOD (Mntc_Gas)Sr Mgr (FQA)
Maint Record
5.4 Painting of Gas pipe line once in two years. HOD (Mntc_Gas)
Prepared by: Yash PalSr. Supdt..(OPN)
Issued by: A.N GoyalMR
Approved by: V.K.SinghHOD(OPN)
INTEGRATED MANAGEMENT SYSTEMDEPARTMENT MANUAL DADRI
Deptt: O&M/OPN -GP Revision : 00ISSUE No. 03
Page : 84/86 Doc Ref:ND-IM-OPG Issue Date: 29 Nov’11
Title: OCP-53, Monitoring Of Natural Gas Quality And Quantity At Gas Plant1. PURPOSE: To establish a system of monitoring Natural Gas quality and quantity at
Dadri Gas Power Station.
2. SCOPE: Dadri Gas Power Station and GAIL terminal.
3. DEFINITION : GAIL: Gas Authority India Limited NCV: Net Calorific Value
4. RESPONSIBILITY : HoD (Opn_Gas), HOD (EEMG_Gas)
5. PROCEDURE : As described below-
S No
ACTIVITY RESPON-SIBILITY
REF. DOC.
5.1 GAIL- Gas flow meter readings will be jointly checked by O&E Gas and GAIL representatives daily.
HOD (EEMG_Gas)
5.2 Calibration of GAIL Gas chromatograph computer printouts will be checked by O&E_Gas representative daily. The printouts will be under the custody of GAIL.Computation of average NCV of Natural Gas supplied to Dadri_Gas will be carried out by O&E section of Gas plant based on Gas chromatograph readings of GAIL.
HOD (O&E_Gas)
5.3 Checking and signing of daily Joint Ticket of Gas NCV and Gas quantity supplied to Dadri_Gas shall be done.
HOD (O&E_Gas)
2 KF 8.2
5.4 Monitoring of Gas pressure and temperature at CCR as per WI-12.
HOD (Opn_Gas)
Prepared by: Yash PalSr. Supdt..(OPN)
Issued by: A.N GoyalMR
Approved by: V.K.SinghHOD(OPN)
INTEGRATED MANAGEMENT SYSTEMDEPARTMENT MANUAL DADRI
Deptt: O&M/OPN -GP Revision : 00ISSUE No. 03
Page : 85/86 Doc Ref:ND-IM-OPG Issue Date: 29 Nov’11
Title: OCP-OPN-GP/01, Control of CO2 Emission1. Purpose: To establish a procedure for control of CO2 emission in gas station.2. Scope: Applicable to all the four gas turbines of NTPC Dadri- Gas.
Prepared by: Yash PalSr. Supdt..(OPN)
Issued by: A.N GoyalMR
Approved by: V.K.SinghHOD(OPN)
3. Definition: EOH- Equivalent operating hour calculated based on running hour of GT and GT tripping4. Responsibility: HOD ( Opn- gas), HOD ( MM- GP)5. Description:
S No
ACTIVITY RESPON-SIBILITY
REF. DOC.
5.1 Obtain the GT operating hours on fortnightly basis from EEMG deptt
HOD (EEMG_Gas)
5.2 Ensure that compressor washing is done during forced outage whenever there is opportunity.
HOD(Opn_Gas)HOD(MM_Gas)
5.3 Ensure that compressor washing is done during planned outages at 2000EOH, 4000EOH and 8000EOH.
HOD(Opn_Gas)HOD(MM_Gas)
5.4 Ensure that burner inspection is done during outages at 2000EOH, 4000EOH and 8000EOH and corrective action is taken.
HOD(Opn_Gas)HOD(MM_Gas)
5.5 Ensure that refurbishment is done during outage at 25000 EOH inspection.
HOD(Opn_Gas)HOD(MM_Gas)
INTEGRATED MANAGEMENT SYSTEMDEPARTMENT MANUAL DADRI
Deptt: O&M/OPN -GP Revision : 00ISSUE No. 03
Page : 86/86 Doc Ref:ND-IM-OPG Issue Date: 29 Nov’11
Title: Improvement projects
S No
Improvement project RESPON-SIBILITY
REF. DOC.
1 Optimising Compressor efficiency of gas turbine through regular off line & on line compressor washing.
DGM(O) OEM tech Manual
Prepared by: Yash PalSr. Supdt..(OPN)
Issued by: A.N GoyalMR
Approved by: V.K.SinghHOD(OPN)