Improving SMART Gas Meter output by 72%
in 9 months without CAPEX
A case study of delivering lasting step improvement
Adrian Howem: +44-7702-444744 e: [email protected]
November 2017
© Chartwell Consulting Limited 2013–2017. All rights reserved.
11
Chartwell is a specialist implementer of rapid operational improvementAbout us
• Founded in February 2013
• Offices in London, Berlin, Zurich
and Boston
• 33 employees and growing
• We work all over Europe and
worldwide
Chartwell Offices Project locations
© Chartwell Consulting Limited 2013–2017. All rights reserved.
22
Like Simon Sinek, I’ll start with “why”Why we do what we do – a personal story
This is Karl-Christian Hansen. I worked with Karl-Christian at the start ofwhat became the global change programme in the wind energy leader
Karl-Christian and his colleagues were living with major quality problems,such as “dry glass” that resulted in:
• 1 in 20 blades being scrapped
• 1 in 5 mould days being lost due to rework
• 28% resin waste
After 3 months of coaching, Karl and his colleagues had:
• Made 100 blades sequentially with no “dry glass”
• Eliminated the lost mould days, so output went up by 25%
• Reduced the resin loss by 71%
I asked him whether he thought that this achievement would have beenpossible and what he had learnt:
“I would never have believed you.
I can do a lot more than I think I can”
This is a fundamental principle upon which we founded Chartwell:
To replicate this belief in all organisations with whom we work
© Chartwell Consulting Limited 2013–2017. All rights reserved.
33
What do clients in diverse industries have in common?They all recognise huge hidden potential, that they want to recover
© Chartwell Consulting Limited 2013–2017. All rights reserved.
44
We are results-focussed, rather than activity-leadYou can deliver 20% - 50% improvement in a few months without CAPEX
30%
40%
50%
60%
70%
Jan
-13
Feb
-13
Ma
r-13
Ap
r-13
Ma
y-1
3
Ju
n-1
3
Ju
l-13
Au
g-1
3
w36
w37
w38
w39
w40
w41
w42
w43
w44
w45
w46
w47
PE
%
Production Efficiency % by Month/Week
20%
30%
40%
50%
60%
70%
80%
90%
100%
0 1 2 3 4 5 6 7 8
ZL
Eff
icie
ncy
%
Weeks
Zero-Loss Efficiency
5 month
mavg
10
15
20
25
30
1 2 3 4 5 6 7 8 9 10 11 12 13 14 16 17 18 19 20 21 22 23 24 25 26 27 28 29 33 34 35 36 37
No
of
Bla
des
Blade Production by Week
20%
30%
40%
50%
60%
70%
80%
Ma
r-12
Ap
r-12
Ma
y-1
2
Ju
n-1
2
Ju
l-12
Au
g-1
2
Sep
-12
Oc
t-12
No
v-1
2
De
c-1
2
Jan
-13
Feb
-13
Ma
r-13
Ap
r-13
Ma
y-1
3
Ju
n-1
3
Ju
l-13
Au
g-1
3
Sep
-13
Oc
t-13
No
v-1
3
De
c-1
3
Jan
-14
Feb
-14
Ma
r-14
PE
%
Production Efficiency % by Month
0
2,000
4,000
6,000
8,000
10,000
12,000
14,000
16,000
Tägliche Produktionsausbringung
0
5
10
15
20
25
30
35
40
45
50
kg/M
AStd
MAProduktivitätkg/MAStunde
0
10
20
30
40
50
60
70
80
90
kg/MAStd
MAProduktivitätkg/MAStunde
0%
5%
10%
15%
20%
25%
30%
May-14 Jun-14 Jul-14 Aug-14 Sep-14 Oct-14 Nov-14 Dec-14 Jan-15 Feb-15 Mar-15 Apr-15 May-15
Plant ZLE% Last 12 Months
70%
75%
80%
85%
90%
95%
100%
YieldbyMonth
0
5000
10000
15000
20000
25000
30000
35000
40000
45000
50000
12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 2 4 6 8
Ou
tpu
t p
er
We
ek
Build Output per Week
0%
50%
100%
150%
200%
250%
300%
02
04
06
08
10
12
14
16
18
20
22
24
26
28
30
32
34
36
38
40
42
44
46
48
50
Pro
du
cti
vit
y a
ga
ins
t B
as
eli
ne
Week
Weekly Productivity vs. Baseline
Performance vs Baseline before project start
Performance vs Baseline during Project
Performance vs Baseline after project end
Baseline
© Chartwell Consulting Limited 2013–2017. All rights reserved.
55
We put our skin in the gamePerformance guarantee
Our work should deliver superior value:
We don’t take on work if it won’t pay back at least 4 times our fees
Accountability is key in getting results. This applies to us, as well as our clients:
Our implementation projects are covered by our “no result, no fee” guarantee
Case study:Improving SMART Gas Meter output by
72% in 9 months without CAPEX
© Chartwell Consulting Limited 2013–2017. All rights reserved.
77
“What am I going to share with you?”About the case study
This case study shows some of the highlights of a recent project that I am very proud of:
• The client team achieved a 72% increase in output
• They reduced their scrap cost per product by more than 50%
• Most importantly, they have continued to improve since we left at the end of March
We will take a look at:
• The assessment
• Mobilisation and implementation
• Sustainability
I will try to highlight some of the important enablers, that you can maybe take home and hopefully help you to
drive your rate of improvement and implement change
© Chartwell Consulting Limited 2013–2016. All rights reserved.
88
We were asked to deliver step improvement and help drive long-term growthAbout the client
About the client:
• Industry SMART Gas Meters
• Revenue >£100m
• Employees > 600 on site
• Part of a larger group, parented by a Japanese
multinational
About the project:
The site had already improved significantly, but still
needed to quadruple output in 2 years
A capital plan was in place, however this would take
18 - 24 months to come on stream - It would not
address the order backlog or the 2017/18 plan
The assessment“If you want to go up Mount Everest, then have a very clear game plan”
© Chartwell Consulting Limited 2013–2017. All rights reserved.
1010
We assess the business in four “layers” Understanding more deeply why opportunity exists
Opportunity Value
Operational Performance
Improvement Cycle
Leadership and Culture
• Total value of all improvement from output, raw material
yield, inventory, quality/risk, capital avoidance
• Zero-based effectiveness and trends, top loss trend, detailed
study of failure modes and organisation’s response
• How effectively is operational loss measured, prioritised,
resourced and acted upon to permanent root cause solution
• The mindset, behaviour and actions of the leadership team
to create an environment in which improvement thrives
By viewing the situation in this way, we are more likely to be able
to deal with the underlying organisational conditions that allow
the opportunity to exist
© Chartwell Consulting Limited 2013–2017. All rights reserved.
1111
We have 35 assets and 500 people to look atPerformance assessment
Rod room
CNC Room
Transducer Build
Meter Build
Null Test
Full Flow Test
CAW Manometer
Customisation
Unit A
Unit B
Rods
Cups
Transducers
Tube Assembly
Transducer Test
White Mix
Polyurethane
Intermediate
Goods
Warehouse
Keep
The situation
• There are 35 different assets across 10 sub-
processes
• There is product mix dependency
• Several suppliers are also capacity constrained
The challenge
• At some point, every asset in every sub-process is
going to require de-bottlenecking
• There is a mixture of automatic and manual
processes and some technical constraints to solve
• This needs to be done in a very deliberate order to
make maximum improvement in the shortest time
• We can’t boil the ocean, so we want to ensure we
make the best use of resources and at the same
time, transfer skills to ensure sustainability
© Chartwell Consulting Limited 2013–2017. All rights reserved.
1212
“Zero Loss” concept gives a complete view of potentialZero Loss definition
What is Zero Loss?
* No loss from speed, downtime or quality
This principle can be applied to almost any process. We most often apply it to:
• Asset time / efficiency
• Raw Materials
• Energy
• Labour
• Manufacturing cost
Zero Loss Efficiency =
Time required under optimal conditions, without losses*
Amount of time actually used
© Chartwell Consulting Limited 2013–2017. All rights reserved.
1313
When we do this, we find far more potential than anyone thinks possibleZero based potential per process
• Hidden opportunity exists because people don’t see or believe the potential of their process
• We use a zero based approach to understanding losses and cycle time
• For example, build cells are running at 30 second cycle time – the team identified and delivered opportunity to run at
< 22 seconds
Internal View
An internal exercise
had been done, we
found a lot more
potential – think of it
as speed and hidden
lost time
Whilst this approach exposes more opportunity, it
means we have to solve “speed of sound” type
constraints
© Chartwell Consulting Limited 2013–2017. All rights reserved.
1414
There are multiple bottlenecks to overcome, one after anotherCapacity profile and line improvement strategy
We cannot work on all of these projects at once – and nor would we want to:
• We have a finite amount of time each day and finite resource to take action
• Not every action will get us improvement right now (come and try our de-bottlenecking exercise afterwards)
0
50,000
100,000
150,000
200,000
250,000
300,000
Rod Room CNC Trans Build Trans Test Tube Build Build Null Flow CAW Man Cust
Me
ters
pe
r M
on
th
Output Profile and Future Improvements
May-16 Jun-16 Jul-16 Aug-16 Sep-16
Oct-16 Nov-16 Target Baseline
* * *
* Tube build, CAW and Customisation currently have latent
capacity that is not required, hence the low baseline
*
* Hiring of 2nd operator for all shifts
to consistently hit 4-lift target
Any supplier can and
will limit effective line end output, unless we
work on them in
parallel
12 3 34
65
10
8
9
© Chartwell Consulting Limited 2013–2017. All rights reserved.
1515
We model what happens over time as we work on each constraint“Tube map” – output profile per process over time
100,000
120,000
140,000
160,000
180,000
200,000
220,000
240,000
260,000
280,000
May-16 Jun-16 Jul-16 Aug-16 Sep-16 Oct-16 Nov-16 Dec-16 Jan-17
Mete
rs p
er
Mo
nth
Monthly Improvement Projection - Excluding CAPEX
Difference UNIT B UNIT A Target
• If we work through the sequence of projects, we can predict what the overall nett throughput will be
• Each asset group has its own improvement line over time
• The best we can achieve is the lowest of these (the shaded area)
Each asset group
has its own
improvement line
The lowest at any
point in time
determines the
maximum nett
throughput
© Chartwell Consulting Limited 2013–2017. All rights reserved.
1616
And we work with the client to build up the game planProgramme plan – phase 1
Workstream June July Aug Sept Oct Nov
Beacon ProjectsUnit A and B
SCM
Quality
Capital Plan
Improvement processes
Governance
Tx Test
Improve & supplier engagement programme
Improvement cycle
Quality improvement programme
• Zero based FRS to give timely at a glance reports
• SIC, SHO, daily review
Rod Room
Tx Build
CAW validation
Stewardship and steering
Interim (Landis Resource)
Null and Flow
Build C1,C2,C3
CNC
Build A,B
OPEX Transition
• Visual management aids incl. Buffer management
• SMED, Line Control, Problem Solving
Customisation
CAW
Tube Build
Chartwell fully
supported workstream
Internally lead
workstream
Mobilisation and Implementation“A great plan is only as good as the execution”
© Chartwell Consulting Limited 2013–2016. All rights reserved.
1818
We use a proven approach to changeJohn Kotter – Leading and Accelerating Change
Source: John Kotter XLR8
• We apply the principles prescribed by John Kotter
• 1996 Leading Change
• 2014 XLR8 (Accelerate)
• These books offer a good structure for change that is
also results focussed
• In this project, our efforts centre on:
1. Describing the opportunity in a way that everybody
can understand to create urgency
2. Enlisting volunteers to start many pockets of
improvement
3. Creating quick wins, using them to motivate and
convince the rest of the organisation
4. Creating a sustainable vehicle for improvement
© Chartwell Consulting Limited 2013–2017. All rights reserved.
1919
Get the whole senior team deeply involved & enlist a network of volunteersMobilisation - critical success factors
For this programme, the critical steps are:
• Leadership alignment – a number of background sessions are run
until we have a “critical mass” of support. Discuss the potential
roadblocks ahead of time with your new guiding coalition. Know the
value of the opportunity when someone says “this is too difficult”
• Communication – we run 7 two-hour briefings for over 700 employees
– stopping the shifts so people knew if was important. Repeat the
message until it’s understood
• Asking for volunteers – we need a range of skills on the pilot project
teams and everyone who touches the product to have a say. Don’t
choose all your “favourites”
• Giving people the time, skills and support – if you expect your folks
to do improvement in there spare time, it will usually be the least urgent
task on their plate. If it’s worth doing, dedicate the resource and backfill
key roles
• Leadership presence – regular touch points and visibility to
demonstrate importance. Be there in good and tough times to show
you care and want to help
© Chartwell Consulting Limited 2013–2017. All rights reserved.
2020
The first results you get set out your stall for the rest of the programmeUnit A Team – “Beacon Project Team”
The first round of results are critical:
• It shows what really can be done – the potential is not just theoretical and should be celebrated
• This is not just another poster campaign, you are doing what you said you are going to do
• People can be empowered to fix things, if the conditions are right
• Getting results (and recognition) is fun
Doing what you say
you are going to do
builds credibility and
belief that step
improvement can
happen in your plant
© Chartwell Consulting Limited 2013–2017. All rights reserved.
2121
Create and bond a network of improvers from across the organisationThe PACE Room – a centre of excellence for improvement
• The whole programme is run from a
project office – a base for the teams
who spend most of their time on the
shop floor
• Each team has its own boards with
daily updated KPIs and simple visual
management of actions
• Leadership presence at weekly
reviews is “mandatory”
• “On feet” meeting
• Each team has a dedicated lead and some full and part time members
• Chartwell provides training and on the job coaching
• No time is spent on “window dressing” PPT slides => focus on results
• Shift management is embedded in the teams to help roll out
improvement and embed new processes through SOPs and training on
the shifts
Working this way demolishes inter-departmental
boundaries, creating One Team
© Chartwell Consulting Limited 2013–2017. All rights reserved.
2222
Fix the hard stuff, not just the low-hanging fruitAn example of technical constraint breaking
• It’s not all about doing the obvious “low hanging fruit” – of course there are easy wins
• If you have been improving already, it is the big gains that will come from breaking the more difficult constraints
• These problems require a very robust problem solving process
• New skills and coaching come in to solve issues that people don’t believe are possible
© Chartwell Consulting Limited 2013–2017. All rights reserved.
2323
3 months in, we are de-bottlenecking the “full flow” testing process Full flow cycle analysis
• People know how many meters they process and they guess that the average cycle time is “about 15 minutes”
• What they don’t know is what the “best observed” and “golden cycle” times are – so they don’t know how much
improvement potential there is:
• The average is 18 mins
• The best cycle we see is 12 mins
• What we find is that loading is a small part of the total cycle – asking people to work faster won’t gain much
• We need to dig down further into where in the cycle this variation is happening
Understanding cycle time variation is completely hidden
and its value is therefore not understood
FID413-UK/G470
0.00
5.00
10.00
15.00
20.00
25.00
FID413- AverageCT(mins)
AverageCT(mins) BestCT
0%
10%
20%
30%
40%
50%
60%
70%
80%
90%
100%
FID413- Efficiencyfrom21/08/16until04/09/16
GoodMeters3 Scrap/Rework2 CTVariation2
Reload(<10min)2 Aborted2 Downtime(>10min)2
238
0 0696
681
685
494
664
640
642 680
622
562
716
653 73
4310
0354
0 0 0 0 0 0 0488
729
699
708
729
684
684
711
719
722
684
635
259
511
0 0355
0509
0.00
200.00
400.00
600.00
800.00
1000.00
1200.00
FID413- GoodMeters
GoodMeters
0.00
0.50
1.00
1.50
2.00
2.50
3.00
3.50
4.00
4.50
5.00
21/08/16-E
21/08/16-L
21/08/16-N
22/08/16-E
22/08/16-L
22/08/16-N
23/08/16-E
23/08/16-L
23/08/16-N
24/08/16-E
24/08/16-L
24/08/16-N
25/08/16-E
25/08/16-L
25/08/16-N
26/08/16-E
26/08/16-L
26/08/16-N
27/08/16-E
27/08/16-L
27/08/16-N
28/08/16-E
28/08/16-L
28/08/16-N
29/08/16-E
29/08/16-L
29/08/16-N
30/08/16-E
30/08/16-L
30/08/16-N
31/08/16-E
31/08/16-L
31/08/16-N
01/09/16-E
01/09/16-L
01/09/16-N
02/09/16-E
02/09/16-L
02/09/16-N
03/09/16-E
03/09/16-L
03/09/16-N
04/09/16-E
04/09/16-L
04/09/16-N
FID413- AverageReload(mins)
AverageReload(mins) TargetReload
FID413-UK/G470
0.00
5.00
10.00
15.00
20.00
25.00
FID413- AverageCT(mins)
AverageCT(mins) BestCT
0%
10%
20%
30%
40%
50%
60%
70%
80%
90%
100%
FID413- Efficiencyfrom21/08/16until04/09/16
GoodMeters3 Scrap/Rework2 CTVariation2
Reload(<10min)2 Aborted2 Downtime(>10min)2
238
0 0696
681
685
494
664
640
642 68
0622
562
716
653 73
4310
0354
0 0 0 0 0 0 0488
729
699
708
729
684
684
711
719
722
684
635
259
511
0 0355
0509
0.00
200.00
400.00
600.00
800.00
1000.00
1200.00
FID413- GoodMeters
GoodMeters
0.00
0.50
1.00
1.50
2.00
2.50
3.00
3.50
4.00
4.50
5.00
21/08/16-E
21/08/16-L
21/08/16-N
22/08/16-E
22/08/16-L
22/08/16-N
23/08/16-E
23/08/16-L
23/08/16-N
24/08/16-E
24/08/16-L
24/08/16-N
25/08/16-E
25/08/16-L
25/08/16-N
26/08/16-E
26/08/16-L
26/08/16-N
27/08/16-E
27/08/16-L
27/08/16-N
28/08/16-E
28/08/16-L
28/08/16-N
29/08/16-E
29/08/16-L
29/08/16-N
30/08/16-E
30/08/16-L
30/08/16-N
31/08/16-E
31/08/16-L
31/08/16-N
01/09/16-E
01/09/16-L
01/09/16-N
02/09/16-E
02/09/16-L
02/09/16-N
03/09/16-E
03/09/16-L
03/09/16-N
04/09/16-E
04/09/16-L
04/09/16-N
FID413- AverageReload(mins)
AverageReload(mins) TargetReload
FID413-UK/G470
0.00
5.00
10.00
15.00
20.00
25.00
FID413- AverageCT(mins)
AverageCT(mins) BestCT
0%
10%
20%
30%
40%
50%
60%
70%
80%
90%
100%
FID413- Efficiencyfrom21/08/16until04/09/16
GoodMeters3 Scrap/Rework2 CTVariation2
Reload(<10min)2 Aborted2 Downtime(>10min)2
238
0 0696
681
685
494
664
640
642 680
622
562
716
653 73
4310
0354
0 0 0 0 0 0 0488
729
699
708
729
684
684
711
719
722
684
635
259
511
0 0355
0509
0.00
200.00
400.00
600.00
800.00
1000.00
1200.00
FID413- GoodMeters
GoodMeters
0.00
0.50
1.00
1.50
2.00
2.50
3.00
3.50
4.00
4.50
5.00
21/08/16-E
21/08/16-L
21/08/16-N
22/08/16-E
22/08/16-L
22/08/16-N
23/08/16-E
23/08/16-L
23/08/16-N
24/08/16-E
24/08/16-L
24/08/16-N
25/08/16-E
25/08/16-L
25/08/16-N
26/08/16-E
26/08/16-L
26/08/16-N
27/08/16-E
27/08/16-L
27/08/16-N
28/08/16-E
28/08/16-L
28/08/16-N
29/08/16-E
29/08/16-L
29/08/16-N
30/08/16-E
30/08/16-L
30/08/16-N
31/08/16-E
31/08/16-L
31/08/16-N
01/09/16-E
01/09/16-L
01/09/16-N
02/09/16-E
02/09/16-L
02/09/16-N
03/09/16-E
03/09/16-L
03/09/16-N
04/09/16-E
04/09/16-L
04/09/16-N
FID413- AverageReload(mins)
AverageReload(mins) TargetReload
RFT Meters/Shift Zero Loss Efficiency Average Cycle Time Mins
© Chartwell Consulting Limited 2013–2017. All rights reserved.
2424
Sign on
Valve Open Check
Leak Test (30s)
Null Calibration (15s)
Flow Calibration (6mins)
Read A23
Pressure Drop Check
Sign off
Register and Checks
Closing Valves (30s)
Start Keep
Flow Cal Initialisation (120s)
02468
1012141618
Ste
p T
ime
(m
ins)
36 Way Rig - Calibration Test Timing Variations
Avg Min Max
0
10
20
40 80 600 1200 1800 4800 5400 6000
Calibration: Nozzle Utilisation Times (6 Banks)
Total Requirement per bank Future Total requirement
Sign on
Valve Open Check
Leak Test (30s)
Null Calibration (15s)
Flow Calibration (6mins)
Read A23
Pressure Drop Check
Sign off
Register and Checks
Closing Valves (30s)
Start Keep
Flow Cal Initialisation (120s)
02468
1012141618
Ste
p T
ime
(m
ins)
36 Way Rig - Calibration Test Timing Variations
Avg Min Max
0
10
20
40 80 600 1200 1800 4800 5400 6000
Calibration: Nozzle Utilisation Times (6 Banks)
Total Requirement per bank Future Total requirement
We deep dive into the machine code to understand what is happeningPhase step cycle time analysis
Flush was being done with one of the smaller nozzles. We swapped these out and installed new filters
Sign on
Valve Open Check
Leak Test (30s)
Null Calibration (15s)
Flow Calibration (6mins)
Read A23
Pressure Drop Check
Sign off
Register and Checks
Closing Valves (30s)
Start Keep
Flow Cal Initialisation (120s)
02468
1012141618
Ste
p T
ime
(m
ins)
36 Way Rig - Calibration Test Timing Variations
Avg Min Max
0
10
20
40 80 600 1200 1800 4800 5400 6000
Calibration: Nozzle Utilisation Times (6 Banks)
Total Requirement per bank Future Total requirement
© Chartwell Consulting Limited 2013–2017. All rights reserved.
2525
This constraint is completely removedImmediate impact seen from the 600L nozzle change
• This process had become the factory bottleneck. It was completely hidden in the past
• Nothing else we did would increase output until this was resolved
• After months of record weeks, people were questioning whether we really needed to do this modification
• They were only convinced once the results came in on the first modified machine
1. Beware improvement fatigue
2. If you smash enough constraints, you will make huge gains
If you don’t heed these 2 points, improvement will stop
We see and
immediate step
change after the
modification
RFT Meters/Shift Average Cycle Time Mins
© Chartwell Consulting Limited 2013–2017. All rights reserved.
2626
The client team improved output by 72%Results
• Over the course of 9 months, the client team was able make a massive step in performance and productivity
‘The critical improvements that our work with Chartwell delivered brought our company’s planned
deliveries back on track and ensured that we were prepared for the unprecedented ramp in demand
that our customers have requested over the next five years.’
– Steve Cunningham, Senior Vice President Infrastructure Programmes, EMEA
Improvement Project
0
5000
10000
15000
20000
25000
30000
35000
40000
45000
50000
12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 2 4 6 8
Ou
tpu
t p
er
We
ek
Build Output per Week
Sustainability“Make sure you nail down every detail of the new behaviours and habits”
© Chartwell Consulting Limited 2013–2016. All rights reserved.
2828
Step results are one thing, what about sustainability?Working out key levers for long term improvement and change
To understand the reasons why opportunity
exists, we do an in depth study during the
implementation
• We reflected on 20+ years of experience to
develop the HPO framework to look at the
right drivers for results
• The model has 8 main headings and > 80
sub-objectives, each with individual criteria
This enables us to work with clients to build a
tailored solution, with the right conditions for
improvement to thrive
The High Performance Operations Model
A High Performance Operation will deliver
sustained best in class rate of improvement
year after year
© Chartwell Consulting Limited 2013–2017. All rights reserved.
2929
Some highlights: building habit takes time and repetitive effortProduction Office: The operations manual
• We work with shifts and departments to codify and implement the “Landis Way” of doing the day job and improvement in
shift management, supervision, maintenance and supply chain
• A new RFC (Request for Change) process is established to fast track improvements
• These are trained, auditable processes
• On a six month follow up visit, the routines are running better then when we left
© Chartwell Consulting Limited 2013–2017. All rights reserved.
3030
Since we left in March, productivity has continued to improveFinancial impact statement from CFO
• When we left, scrap cost per meter was down more than 50%, saving £1.4m
• Labour cost per meter was reduced by 29.9%, valued at £3.4m p.a.*
• On a follow up visit at the end of September, further productivity gains had been made, taking total labour
cost savings to £5.2m p.a.
Total financial impact > £6.4m p.a.
2016-0
3
2016-0
4
2016-0
5
2016-0
6
2016-0
7
2016-0
8
2016-0
9
2016-1
0
2016
-11
2016-1
2
2017-0
1
2017-0
2
Q1
Q3
Labour Cost per Meter
* Based on 3 month rolling average
Key learning points
© Chartwell Consulting Limited 2013–2016. All rights reserved.
3232
If you want to win matches, get the right coachWhy does this approach get results?
We see the role of the Chartwell staff as akin to a coach or personal trainer:
• The coach is there with you on and off the field until you achieve your objectives
• Minor changes to technique, thinking ahead, creating passion and belief to win
• Direct access to the top for resources normally not available to the individual
• Our aim is for your team to get winning results. Faster and better than the competition
Anyone
know who
this is?
Choose a coach who focuses on results
© Chartwell Consulting Limited 2013–2017. All rights reserved.
3333
Take Aways & Questions
Alignment
• Know and refer to the value of the opportunity
• Create a guiding coalition that won’t give up at the first hurdle or keep changing priorities
Communicate
• “The problem with communication is the illusion that it has happened”
• Do x10 more than you are today
Create an army of results focussed volunteers
• Give them time, skills and the right coaching support
• Work on the constraints, not just “low hanging fruit”
• Activity does not equal results
Be a visible servant leader
• “Be the change you want to see in the world”
• Beware improvement fatigue
• Keep it fun - spread the word and grow your network of improvers
www.chartwell-consulting.com │ [email protected]
United Kingdom
Chartwell Consulting Limited
Richmond Bridge House
419 Richmond Road
Twickenham, TW1 2EX
Tel: +44 (0)208 296 1854
Switzerland
Chartwell Consulting GmbH
Sihleggstrasse 23
8832 Wollerau
Tel: +41 (0)43 888 0710
Germany
Chartwell Consulting
Deutschland GmbH
Unter den Linden 10
10117 Berlin
Tel: +49 (0)30 60984 90211
United States
Chartwell Consulting, Inc.
The Schraffts Center Power House
529 Main Street
Charlestown, MA 02129
Tel: +1 857 203 8740