Upload
nguyenduong
View
319
Download
9
Embed Size (px)
Citation preview
Implementing the TBS Information
Management Common Core (IMCC)Management Common Core (IMCC)
ARMA Workshop
Information Management Common Core (IMCC)
April 28, 2015
By: Joëlle Dagenais, Treasury Board Secretariat (TBS)
Workshop Overview
• What is the IM Common Core (IMCC)
• IMCC deliverables
• IMCC Tiger Team and IMCC Working Group
• Exercise 1 – Business requirement identification
• About the IMCC RM Classification File Plan for Common
2
• About the IMCC RM Classification File Plan for Common Internal Services – 2015 Edition
• Break (15 min.)
• How to apply the IMCC RM Classification File Plan methodology in your department
• Exercise 2 – Building a Function Based Classification File Plan
• Exercise 3 – Building a Document Management / Enterprise Folder Structure
Background
• GCDOCS became the GC-procured solution for EDRMS in 2011;
it is managed by the GCDOCS Enterprise Program Management
Office (EPMO) - PWGSC.
• As business owner, the Information Management and Open
Government Division (IMOG) at TBS is responsible for
establishing a common configuration for GCDOCS that aligns
3
establishing a common configuration for GCDOCS that aligns
with IM policy direction in the GC.
• IMOG working closely with the GCDOCS EPMO to ensure that IM
objectives are achieved through the implementation of
GCDOCS.
What is the Information Management
Common Core (IMCC)?
• A basic set of configuration rules for all GC EDRMS / GCDOCS
implementations.
• The default configuration of all instances of GCDocs
implemented through the GCDocs EPMO (PWGSC).
• Enables the Standard for Electronic Documents and Records
4
• Enables the Standard for Electronic Documents and Records
Management Solutions (EDRMS):
“Ensuring common, consistent, and cost effective departmental implementation of EDRM
solutions to meet recordkeeping requirements” (requirement 6.1.2)
• Aligned with the IM Policy Suite and other relevant policy
instruments, including:
• Operational Security Standard: Management of Information Technology Security
(MITS)
• Standard on Enterprise Resource Planning Systems
• Security Organization and Administration Standard
IM Common Core
System Rules
IM Common Core (IMCC) Deliverables
Part 1: System Rules
• Describe the operations, definitions
and constraints that apply to the
system.
Part 2: Metadata
• Points to the mandatory recordkeeping
5
IM Common Core
Metadata
File
Classification
Structure
• Points to the mandatory recordkeeping
metadata elements required in the
Standard on Metadata, Appendix B.
Part 3: IMCC – RM File Classification – Common Internal Services – 2015 Edition
• Provides a file classification structure
for implementing access rights,
retention schedules and disposition
activities.
Systems Rules - IM Common Core (IMCC)
Deliverables
SystemSystem
RulesRules
• 57 Rules grouped according to the information
management life-cycle:
•Collection, Creation Receipt and Capture
• Organization
• Use and Dissemination
6
• Maintenance, Protection and Preservation
• Disposition
•Evaluation
• References to relevant policy instruments.
Systems Rules - IM Common Core (IMCC)
Deliverables
SystemSystem
RulesRules
7
MetadataMetadata
Metadata - IM Common Core (IMCC)
Deliverables
• Mandatory recordkeeping metadata elements
as required by the Standard on Metadata,
Appendix B
• RK Metadata Suite of Tools:
• RK Metadata Element Set (RK MES)
8
• RK Metadata Element Set (RK MES)
• RK Metadata Application Profile (RK MAP)
• RK Metadata Implementation Guide (RK MIG)
• Document Type Scheme for RK (RK Type)
MetadataMetadata
Metadata - IM Common Core (IMCC)
Deliverables
9
File File
Classification Classification
StructureStructure
File Classification Structure - IM Common
Core (IMCC) Deliverables
• For GC Internal Services only.
• Based on PAA (April 2015) and LAC Generic
Valuation Tools (GVTs).
• 3 mandatory levels; other levels optional
10
• 3 mandatory levels; other levels optional
and customizable.
• Organizations will be responsible to develop
4th levels if needed.
File File
Classification Classification
StructureStructure
File Classification Structure - IM Common
Core (IMCC) Deliverables
11
Additional IMCC Components
• The IMCC could be expanded to
include other components that will
help departments meet
onboarding timelines.
• New components may include
• Default configuration lists: IM Common
System Rules
Metadata
DM Standardized
folder structure
12
• Default configuration lists:
• RK Document Types;
• Controlled vocabularies, such as
languages, countries, departments;
• Document Status;
• Business Roles;
• e-Disposition process;
• Document Management (DM)
standardized folder structure.
IM Common Core
File
Classification
Structure
RSIsBusiness Rules
E-Disposition Process
Sneak Peek – Records Series Identifiers (RSI)
1 Year after return or disposal of asset
13
IMCC Tiger Team - IMCC Working Group
• IMCC Tiger Team are only meeting as needed.
• IMCC Tiger Team is now used for consultation, gathering
feedback, validation on draft tools for GCDOCS.
• IMCC Working Group met on a weekly basis from • IMCC Working Group met on a weekly basis from
September to December 2014.
14
Next Steps
• EPMO new GCDOCS Project Manager– Confirm IMCC deliverable priorities and delivery dates.
– Confirm IMCC working group members, based on
deliverable to be addressed.
• Continue work on IMCC deliverables:• Continue work on IMCC deliverables:– Retention Series Identifiers (RSIs) for GCDOCS
– DM Standardized folder structure
– Business Rules
– E-Disposition process
15
IMCC and linkages to GC IM Initiatives
• Directive on Recordkeeping
Ensure effective recordkeeping practices that enable
departments to create, acquire, capture, manage and
protect the integrity of information resources of business
value in the delivery of Government of Canada programs and
services.services.
• Open Government
The objective of the directive is to maximize the release of
government information and data of business value to
support transparency, accountability, citizen engagement,
and socio-economic benefits through reuse, subject to
applicable restrictions associated with privacy,
confidentiality, and security.
16
• Work Place 2.0
IMCC and linkages to GC IM Initiatives
• E-mail Transformation Initiative (ETI)
The Email Transformation Initiative will move 43 Government
of Canada partner organizations from numerous email
services to [email protected]@[email protected]@canada.ca, a common, modern,
consolidated, secure, more reliable and more cost-effective
email system17
• Destination 2020
To adapt to the rapid rate of change taking place in
the world and society, Public Service leaders
developed a plan to meet the challenges of the
future – Blueprint 2020.
IMCC and linkages to GC IM Initiatives
future – Blueprint 2020.
• Blueprint 2020
The Blueprint 2020 vision foresees a capable and
high-performing Public Service that embraces
innovation, transformation and continuous
renewal.
18
Exercise 1
Business Requirement Identification
• Work as a team to develop requirements for the
purchase of a dishwasher for your office 2.0. (10
min.)
• On your flip chart write your team’s requirements.
• Group discussion• Group discussion
19
IMCC RM Classification File Plan for
Common Internal Services – 2015 Edition
• Target audience : IM/RM group.
• Not a tool for client users.
• Designed to be used in the RM module of
GCDOCS.
• Designed to be more simple and flexible.• Designed to be more simple and flexible.
• Must be linked to an Enterprise folder
structure/DM folder structure in GCDOCS.
• Function, sub-function and activity levels are
mandatory – Levels 1 to 3.
20
Development of the IMCC RM
Classification File Plan for Common
Internal Services• Developed by the IMCC Working Group
– Small group, no more than ten (10) participants.
• Timeline
– September 2014 to January 2015 (5 months)
• Resources • Resources
– one (1) full time resource + weekly working group
meetings + weekly meetings with LAC representative.
– Important to identify the right resources with required
knowledge, experience and time to commit to active
participation.
• Validation and Approval – January to mid-February 2015
• IMCC Tiger Team (approx. 40 departments)
• TBS-IMD Director General
21
Working Groups and Participants
• Modifications to the existing IMCC-GCDOCS Tiger
Team role.
• Creation of the IMCC-GCDOCS Working Group.
• Defining clear roles and responsibilities for all
involved.involved.
• Weekly in person meeting – IMCC-GCDOCS
Working Group – review of primary analysis.
• Weekly in person meeting – IMCC-GCDOCS Lead
Analyst and Library and Archives Canada (LAC)
Lead – Primary analysis.
22
Setting up the IMCC Working Group
• Identify lead analyst.
• Identify the pen holder – who will create, modify
and circulate the information.
• Establish frequency of the in person meetings
based on identified delivery date.based on identified delivery date.
• Decide if replacements are allowed or not.
23
Methodology
• Function and sub-function identification –
Program Alignment Architecture (PAA)
• Activity identification – IRBV Inventories ex: GVTs
• ISDAs, DAs
• Primary objective is to stream line activities that • Primary objective is to stream line activities that
have the same retention period and disposition
trigger. If these activities also relate to the same
business process then these activities can most
likely be merged.
24
Analysis
1. Identify functions and sub-functions.
2. Identify activities with same retention period.
3. Identify activities with same trigger.
4. Are the activities and IRBVs similar?
5. What is the source of the retention period and trigger:
a) Based on traditional retention practice applied to policy and procedure
IRBV of common administrative functions
b) Based on traditional retention practice applied to routine IRBV of b) Based on traditional retention practice applied to routine IRBV of
common administrative functions; assess business needs for
operational records.
c) Based on traditional retention practice applied to policy and procedure
IRBV for the Comptrollership function.;
d) Based on specific legislation
• (i.e.: Employment Equity Regulations, s. 12.1, Privacy
Regulations, s. 4, Canada Occupational Health and Safety
(COHS) Regulations, s. 14.49, etc.)
6. If activities were merged, would retention and disposition conditions be
respected?
7. If answer to question #6 is “Yes”, than merge and rename activities.25
Generic Valuation Tool (GVT)Generic Valuation Tool (GVT)Generic Valuation Tool (GVT)Generic Valuation Tool (GVT)
Management and Oversight ServicesManagement and Oversight ServicesManagement and Oversight ServicesManagement and Oversight Services
Common Business ProcessCommon Business ProcessCommon Business ProcessCommon Business Process
• Steps/actions that occur in the process• Steps/actions that occur in the process• Steps/actions that occur in the process• Steps/actions that occur in the processRecommendationsRecommendationsRecommendationsRecommendations
Information Resources of Business Value Retention
5. PROJECT MANAGEMENT 5. PROJECT MANAGEMENT 5. PROJECT MANAGEMENT 5. PROJECT MANAGEMENT
Assess organizational capacity Assess organizational capacity Assess organizational capacity Assess organizational capacity • Organization Project Management Capacity
Assessment (OPMCA) (submitted with Investment Plan
above)
10 years after Assessment (based on a 3-year planning
cycle, which would allow
Initiate project Initiate project Initiate project Initiate project
• Establish project objectives • Establish project objectives • Establish project objectives • Establish project objectives
• Business case/proposal
• Independent review
• Team roles and descriptions
• Briefing notes
• Meeting minutes
10 years after project completion
• Meeting minutes
• Record of consultation with TBS
• Approvals/documentation of governance decisions at
each stage
Plan Project Plan Project Plan Project Plan Project
• Establish level of complexity and risk • Establish level of complexity and risk • Establish level of complexity and risk • Establish level of complexity and risk
• Develop project plan • Develop project plan • Develop project plan • Develop project plan
• Perform risk assessments (see #7 below) • Perform risk assessments (see #7 below) • Perform risk assessments (see #7 below) • Perform risk assessments (see #7 below)
• Project Complexity and Risk Assessment (PCRA)
• Treasury Board Submission for approval (if required
after OPMCA and PCRA)
• Project Management Plan (PMP) including:
• Project brief (if required)
• Project charter
• Risk management plans
• Schedule
• Privacy Impact Assessment
• List of project team members, stakeholders, sponsors,
managers, etc.
• Work breakdown structure
• Risk response strategy
10 years after project completion
26
Control and Monitor Project Control and Monitor Project Control and Monitor Project Control and Monitor Project
• Liaise with TBS and stakeholders • Liaise with TBS and stakeholders • Liaise with TBS and stakeholders • Liaise with TBS and stakeholders • Progress reports, updates, GANNT charts
• Minutes from project meetings
• Steering committee reports
• Correspondence with TBS or stakeholders
• Change request log
• Report of any changes to OPMCA
• Report of any changes to PCRA
• Issue logs
• Project metrics
• Performance parameters
• Dashboards
• Results of any reviews, evaluations or audits of project
10 years after project completion
Generic Valuation Tool (GVT)Generic Valuation Tool (GVT)Generic Valuation Tool (GVT)Generic Valuation Tool (GVT)
Management and Oversight ServicesManagement and Oversight ServicesManagement and Oversight ServicesManagement and Oversight Services
Close Project Close Project Close Project Close Project • Project close-out plan
• Project close/completion report
• Outcome realization report
10 years after project completion
• “Lessons learned” reports
• Best practices reports
10 years after last administrative use
27
File Plan Result
Level 2Level 2Level 2Level 2
(Sub(Sub(Sub(Sub----Function)Function)Function)Function)
GCGCGCGC----1111----050050050050 Project ManagementProject ManagementProject ManagementProject Management
Level 3
(Activity)
GC-1-050-01 Assessing organizational capacity 10 years after Assessment (based on
a 3-year planning cycle, which would
allow reference to the IR for two
previous cycles)
GC-1-050-02 Project management
This classification merges five activities
10 years after project completion
This classification merges five activities
from the LAC document "Generic Valuation
Tool (GVT) MANAGEMENT AND OVERSIGHT
SERVICES". The five merged GVT activities
are “Initiate Project”, “Plan Project”,
“Control and monitor project”, "Close
project" and " Reporting risks". Please
consult the Management and Oversight
Services GVT for more detailed definitions
of these activities and their lists of
corresponding IRBVs.
Note: If the project involves
procurement, refer to the
Acquisitions Services section.
28
29
Implementing the IMCC RM File Plan
for Internal Services – 2015 Edition
• Alignment with the 2015 edition of the IMCC File
Plan.
• Mapping.
• Using the IMCC File Plan when sections apply to
your operational file plan.your operational file plan.
(i.e.: SSC – IT Services, PWGSC – Real Property,
Acquisition)
• Migration strategy – plan.
• GCDOCS gold build implementation.
• GCDOCS standalone implementation.
• Document Management (DM) or Enterprise folder
structure. 30
GCDOCS – DM Folder Structure link to
RM Classification Structure
Client / User
DM Folder Structure
RM Specialist
Function Information
TechnologyClassification # de
dossier Retention Disposition CISD
Sub-function Plan and Organize
Sub-function Monitor and Evaluate
31
Sub-function Monitor and Evaluate
Sub-function Service Level
Management
Sub-function Availability
ManagementInformation
Technology
GC-020-
040
2 years after last
administrative
Destroy DES-
LASTEDITDAT
E-2
Sub-function Capacity
Management
Sub-function IT Service Continuity
Management
How to apply the IMCC RM Classification File How to apply the IMCC RM Classification File How to apply the IMCC RM Classification File How to apply the IMCC RM Classification File
Plan methodology in you departmentPlan methodology in you departmentPlan methodology in you departmentPlan methodology in you department
• Must be based on the department’s functions
– Based on your department’s Program Alignment
Architecture (PAA).
– Leveraging from Library and Archives Canada’s
(LAC) Generic Valuation Tools (GVTs).(LAC) Generic Valuation Tools (GVTs).
– Leveraging from the Recordkeeping Initiative’s
outputs:• IRBV inventory;
• Identified business functions and activities;
• Departmental Records Disposition Authorities (RDAs) or
Disposition Authorities (DAs);
• IMCC RM Classification File Plan.
32
Exercise 2
Developing a Function Based Classification
File Plan
• Groups by table.
• Proceed to the analysis of the GVT documents.
• Produce a streamlined section for your file plan –• Produce a streamlined section for your file plan –
on flip charts.
• Group discussion.
33
Exercise 3
Developing a DM or Enterprise folder structure
• Based on the IT, Acquisition or Financial Management
sections for the IMCC RM Classification File Plan for Internal
Services.
• Develop the folder structured for activities.Client / User
DM Folder Structure
RM Specialist
34
RM Specialist
Function Information
TechnologyRM Classification File
Number Retention Disposition RSI
Sub-function Plan and Organize
Sub-function Monitor and Evaluate
Sub-function Service Level
Management
Sub-function Availability
ManagementInformation
Technology
GC-020-
040
2 years after last
administrative
Destroy DES-
LASTEDITDAT
E-2
Sub-function Capacity Management
Sub-function IT Service Continuity
Management
Contacts
• Further information on the IMCC is available on GCPEDIA:
http://www.gcpedia.gc.ca/wiki/Information_Management_Common_Core_(I
MCC)_to_Support_EDRMS_Implementation
• Questions can be sent to [email protected].
35