IMPACT OF MANGLA ISM PROJECT ON ENDEMICITY OF MALARIA Dr. Syed Mohammad Mujtaba Engr. Syed Iftikhar Ahmed Organized by WORLD HEALTH ORGANIZATION Regional Office for the Eastern Mediterranean

IMPACT OF MANGLA ISM PROJECT ON ENDEMICITY Dr. Syed … › docs › EM_Sem_VBC_11_3_P... · 2019-07-25 · 12. Mangla Dam is a multipurpose project on the river Jhelum south-east

  • Upload
    others

  • View
    0

  • Download
    0

Embed Size (px)

Citation preview

Page 1: IMPACT OF MANGLA ISM PROJECT ON ENDEMICITY Dr. Syed … › docs › EM_Sem_VBC_11_3_P... · 2019-07-25 · 12. Mangla Dam is a multipurpose project on the river Jhelum south-east

IMPACT OF MANGLA I S M PROJECT ON

ENDEMICITY OF MALARIA

Dr. Syed Mohammad Mujtaba

Engr. Syed Iftikhar Ahmed

Organized by

WORLD HEALTH ORGANIZATION Regional Office

for the Eastern Mediterranean

Page 2: IMPACT OF MANGLA ISM PROJECT ON ENDEMICITY Dr. Syed … › docs › EM_Sem_VBC_11_3_P... · 2019-07-25 · 12. Mangla Dam is a multipurpose project on the river Jhelum south-east

ENDEMICITY '6F W R I A

2 * D r . Syed Mohamaad Mujtaba Engr. Syed I f t i k h a r Ahmed ***

Introduction Of a l l the water-related diseases malaria presents the most ser ious publ ic hea l th problem i n Pakistan. It takes a heavy 5011 of hea l th and productivity, Since it leaves the victims weak and anaemic, and thus lowers t h e i r po ten t i a l for earning. I n an epidemic form it a f f e c t s advereely the i n d u s t r i a l and agr i cu l tu ra l production of the country. Since sporadic malaria epidemic a f f ec t s as many as 15 mil l ion people, Pakistan

occupies a prominent posi t ion on the malaria map of t h e world. (Fig. 1)

2. About 22 species of Anopheles mosquitoes have been iden t i f i ed i n Pakistan, which are l i s t e d i n Table I. Out of these species, Anopheles cu l i c i f ac i e s i s t h e moat important, eince it acts a s a vector of malaria. Its p re fe ren t i a l breeding places are : f resh r a i n water poola , w e l l s , waste i r r i g a t i o n water, c a t t l e ponds, sub-soil water swamps, rice f i e l d s , seepage f i l l e d borrow p i t s , i r r i g a t i o n channels with grassy banks, and surface drains.

3. Pakistan joined i n 1960 the world-wide malaria eradicat ion compaign sponsored by the World Health Organization, With the collaborat ion of WHO experts , a 14 years plan f o r malaria eradicat ion was prepared, Because of- some inherent defectis

* The views expressed i n t h i s paper are 'those of the authors and do not necessar i ly r e f l e c t t h e views of the Govt. of Pakistan.

** Director, Directorate of Malaria Control, Health Division, Govt, of Pakistan.

*** Chief, Water Resources, Planning 5 Development Division, Govt. of Pakistan.

Page 3: IMPACT OF MANGLA ISM PROJECT ON ENDEMICITY Dr. Syed … › docs › EM_Sem_VBC_11_3_P... · 2019-07-25 · 12. Mangla Dam is a multipurpose project on the river Jhelum south-east

i n the .plan as w e l l as i n t h e ope ra t ion approach, Slide

P o s i t i v i t y R a t e (SPR) after touching the lowest level of 0.2 i n 1966 inc reased t o as high as 15 i n 1972. (Fig. 2) With some effort it was brought down t o t h e l e v e l of 4.0

ove r a per iod of Ir years . I t has been observed that t h e SPR h a s a d i r e c t r e l a t i o n w i t h water a v a i l a b i l i t y for an m a . To i l l u s t r a t e t h i s p o i n t a comparison of the SPR and water a v a i l a b i l i t y dur ing 1975 f o r var ious provinces i s i n d i c a t e d below :

Water a v a i l a b i l i t y Province at f armgate SPR -

m l l l o n A c r e Feet ) Punjab Sind NWFP 1.9

Baluchis tan 0.5

86.0

4. Fu r the r t o i l l u s t r a t e t h e p o i n t , four d i s t r i c t s having maximum SPR each i n t h e i r r i g a t e d and t h e r a i n f e d areas of t h e Punjab are compared below:

Name of district SPR (a) 1rr ip;ated

i) Sahiwal 27.34 ii) Lahore 20.98

iii) Gujranwala 19.91

i v ) Guj ra t 18.12 ( b ) Rainfed

i) Campbellpur 4.35 ii) Jhelum 2.95

iii Rawalpindi 2.33

It can be i n f e r r e d t h a t t h e inc idence of malar ia is a func t ion of water resource a v a i l a b i l i t y .

Page 4: IMPACT OF MANGLA ISM PROJECT ON ENDEMICITY Dr. Syed … › docs › EM_Sem_VBC_11_3_P... · 2019-07-25 · 12. Mangla Dam is a multipurpose project on the river Jhelum south-east

5. An attempt has been made t o i den t i fy t he impact of water resources development p ro jec t s , i n general, and the

Mahgla Dam p ro jec t , i n p a r t i c u l a r , on t he pa t t e rn of endemicity of malaria. Other na tu ra l re levant f ac to r s such as topography, hydrology and c l imat ic conditions which are conducive t o breeding of mosquitoes have a l so been considered.

Topography E Climate of Pakistan 6. Pakistan is s i t u a t e d i n the t r o p i c a l b e l t of malaria, as it l i e s between 2Q0 and 37(' North Lati tude and 610 and 76O E a s t Longitude. It encompasses nearly 200 mil l ion acres of t o t a l surface area, of which 99 pe r cent is land and one per cent is water. The topography of the country var ies from snow covered mountains t o sandy deserts . (Fig. 3)

The mean annual r a i n f a l l var ies from 48 t o 2 inch. (Fig. 9)

The da i ly mean temperature i n the p la ins var ies from 40°c t o ~ O C . I n general the topography and the climatic conditions of Pakistan a re i d e a l f o r breeding of mosquitoes.

Water Resources Development 7. There are th ree hydrological un i t s i n the country; namely, t he Indus Basin, t he Kharan closed Basin and Mekran coas ta l aasin. (Fig. 5 ) About 70 per cent of t h e gross area of t h e country f a l l s under t h e Indus Basin, and Kharan and Mekran Basin each cover about 1 5 per cent of t he t o t a l geographical area. The Indus Basin can be c l a s s i f i e d as ho t bed of malaria. The basin is t raversed by 5 l a rge perennial r i v e r s and numerous seasonal streams. Nearly 3b.5 mill ion acres i n the basin are being i r r i g a t e d by 48 canal systems. The i r r i g a t i o n system consis ts of 5 large

and - d i m dams, 20 small d w , 1 8 r i v e r diversion works, 39,000 miles of canal , 3,700 miles of surface d ra ins , 161,000 number of tubewells. ( F i g . 6 )

8. The water resources development besides increas ing the production of food and f i b r e , br ings about changes i n t h e environment, readjustment of populaticm, calamities such as

Page 5: IMPACT OF MANGLA ISM PROJECT ON ENDEMICITY Dr. Syed … › docs › EM_Sem_VBC_11_3_P... · 2019-07-25 · 12. Mangla Dam is a multipurpose project on the river Jhelum south-east

waterlogging and s a l i n i t y , changes in climate ( increase i n humidity), and epidemics of water borne diseases. The water resources development p ro jec t s /programmes are being planned, designed, implemented and operated without paying due a t t en t i on t o t h e i r harmful e f f ec t s .

9 . There i s an ample evidence t h a t the areas which had low incidence of malaria, became hyperendemic regions after the construct ion of water development proj e c t s . The following aspects , r e l a t ed t o t h e water development p ro jec t s , are responsible f o r crea t ing conducive environment t o the breeding of mosquitoes :

a) A r t i f i c i a l fakes and rese rvo i r s created through construct ion of dams, barrages, diversion works across the r i ve r s : The r i v e r s and streams normally flow at high veloci ty and carry s u b s t a n t i a l amount of silt. '

This does not allow t h e breeding of mosquitoes. However, when the flow i s r e s t r i c t e d cr obstructed,on t he upstream of t h e obst ruct ion the water l e v e l increases , ve loci ty of flow decreases, and water becomes f r e e of silt. Reduction i n veloci ty and silt create ideal conditions f o r mosquito breeding. Rise i n water l e v e l fills t h e depressions along the r i v e r and when the l e v e l drops, t h e water s t ays i n such depressions. Such small ponds and lakes are responsible f o r breeding vectors of various diseases. b) I r r i g a t i o n channels: Nearly 25 per cent of water dei ivered a t the head of earthen i r r i g a t i o n channel i s l o s t due t o seepage and evaporation. Though the canal banks are desipned t o take care of hydraulic gradient', y e t the water seeps t o the borrow p i t s excavated f o r maintaining canal embankment. (Fig. 7) Such p i t s

are required t o be ploughed i n , bu t , i n p rac t i ce they are l e f t unattended and become permanent breeding places. The mean veloci ty i n the i r r i g a t i o n channels i n Pakistan varies f r o m 2.5 t o 4.0 f t /Sec . The veloci ty near the banks is, of course, much less than the mean velocity.

Page 6: IMPACT OF MANGLA ISM PROJECT ON ENDEMICITY Dr. Syed … › docs › EM_Sem_VBC_11_3_P... · 2019-07-25 · 12. Mangla Dam is a multipurpose project on the river Jhelum south-east

It has been observed t h a t on the channels with t h i ck vegetat ion growth along t h e banks, mosquitoes breed along the water l i n e . c) Drains: On account of non-avai labi l i ty of s t e e p natural grad ien t , d ra ins i n Pakistan have f la t slopes. Moreover, t h e d ra ins car ry s i l t free water, with t h e result that they get gut ted w i t h acquat ic plants . The d ra ins create pe r f ec t environment f o r t h e reproduction of mosquitoes. d ) I r r i g a t i o n Practices: Beyond t h e o u t l e t o r turn-out, as much as 50 pe r cent water is est imated t o be l o s t on account of s p i l l a g e , seepage, and evaporation. A part of t h e s p i l l e d water f inds i t s way t o low depressions and s tagnates i n small pools and becomes temporary abode of mosquitoes. Further , t h e rice f i e l d s usual ly flooded

with water are ideal breeding grounds f o r mosquitoes. Furthermore, i n t he Pancho System of i r r i g a t i o n , warm s tanding water i n t h e r i c e f i e l d s is replaced by f r e sh cool water from canals by l e t t i n g t h e warm f i e l d water flow t o low ly ing areas. Under t h i s l a rge a r t i f i c i a l lakes a r e created and areas around these lakes are swampped with mosquitoes,

* 10. A study was conducted i n Muzaffargarh District i n 1969

with a view t o establishing r e l a t i onsh ip between malariogenic

p o t e n t i a l s and i r r i g a t i o n channels. The population r e s id ing adjacent t o and away from t h e Muzaf fargarh canal was screened t o f i n d ou t t h e l eve l of human rese rvo i r . Whjle performing microscopic examination of blood through mass blood survey, it was observed t h a t t h e SPR was two times h igher among t h e population residing within one mile b e l t on e i t h e r s i d e of t h e canal than t he population r e s id ing f a r t h e r away. It was

* by D r . Bashirul Haq, Assis tant Chief, Health Sect ion, Planning E Development Division, Govt . of Pakistan.

Page 7: IMPACT OF MANGLA ISM PROJECT ON ENDEMICITY Dr. Syed … › docs › EM_Sem_VBC_11_3_P... · 2019-07-25 · 12. Mangla Dam is a multipurpose project on the river Jhelum south-east

a l s o observed t h a t t he dens i ty of vector mosquitoes

(&. c u l i c i f a c i e s ) was a l s o very high i n t h e human h a b i t a t s near t o the &anal. The observations were based on co l l e c t i on

of mosquitoes by space spray of l i v i n g rooms and cattle sheds,

Endemicfty of Malaria around Elangla Dam Projec t

11. It has been shown t h a t water resources s t r u c t u r e c lose ly

relate t o t h e pa t t e rn of endemicity of malaria, The impact of Hangla Dan; on endemicity of malar ia i s highl ighted ,

as an example.

1 2 . Mangla Dam i s a multipurpose p ro j ec t on t h e r i v e r Jhelum south-east of Islamabad. The p ro j ec t commenced i n 1962 and was completed i n 1967 a t a cos t of US $ 320 mil l ion. The

dam 1s designed t o conserve and cont ro l t h e f lood waters of

r i v e r Jhelum with a view t o supplementing i r r i g a t i o n shortages,

and generat ing power. The m a i r i e a r t h - f i l l dam which is 380 f t .

hlgh and 10,300 f t . long, s t o r e s 5.34 MAF i n t h e r e s e rvo i r

which extends 40 miles and has a surface area of 100 sq. miles.

(Fig . 8) For more t e chn i ca l data ,please see Table 11, It is est imated t h a t t h e n a t i o n a l benef i t t o t he a g r i c u l t u r a l

economy during t he normal r i v e r flow amounts t o US $ 34.7

mi l l ion (on t h e b a s i s of US $ 6.5 pe r acre foo t of s t o r ed

water) and ne t benef i t from power production is US $ 22.6

mi l l ion (on t h e b a s i s of US $ 0.005 pe r K.W.Hr. ) The maximum

r e s e r v o i r level a t t a i ned each year during t h e f i l l i n g

period is ind ica ted below:

Year - Date - Max. Reservoir Level

1967-68 Sept. 1 4 , 6 7 1202.32

1968-69 1t 5 $68 1202.10

1969-70 II 5 , 6 9 1202.09

1970-71 " 23,70 1193.57

1971-72 " 17,71 1183.76

1972-73 19 9,72 1202: 1 9

1973-74 " 13,73 1202.02

1 9 74- 75 r1 2,74 1173.65

Page 8: IMPACT OF MANGLA ISM PROJECT ON ENDEMICITY Dr. Syed … › docs › EM_Sem_VBC_11_3_P... · 2019-07-25 · 12. Mangla Dam is a multipurpose project on the river Jhelum south-east

It may be seen t h a t t h e r e s e rvo i r is f i l l e d during the swnmer monsoons, when t h e vector densi ty b u i l t s up progressively.

13. Owing t o t h e cons t ruc t ion of Mangla Dam, near ly 65,100 acres of land and 32,900 houses have been submerged, and 81,000 people have been af fec ted . About 20,000 fami l i e s had t o be r e se t t l ed . Due t o non-avai labi l i ty of s t a t e land

around Mangla some of t h e fami l ies had t o be s e t t l e d i n far away d i s t r i c t s having d i f f e r e n t environments. I n various d i s t r i c t s nea r ly 8300 ac res have been a l l o t t e d t o t h e new s e t t l e r s .

14. A s is apparent from Fig. 8, a huge a r t i f i c i a l l ake has been crea ted by impounding t h e waters of r i v e r Jhelum and i t s t r i b u t a r i e s . The dam has been i n operat ion s i nce 1967, thereby allowing t he examination of malariogenic po t en t i a l s over a 1 2 year period. Though no research study on t h e malariogenic e f f e c t s of Nangla Dam, as such, has been c a r r i e d ou t , ye t t h e rout ine work c a r r i e d out by t h e Malaria Control P ro jec t i n t he a r ea adjacent t o Mangla Dam provides morbidity

data. From t h i s da ta a glimpse of t h e epidemiological t r end of malaria can be s tudied.

15. The number of s l i d e s co l l ec ted through ac t i ve and passive case de tec t ion i n Mirpur District alongwith t h e r e s u l t s of microscopic examination are given i n Table 111.

A graphica l p resen ta t ion of the da ta has been made i n Fig. It is apparent t h a t i n 1969 (two years a f t e r t h e completion of t h e P r o j e c t ) , the SPR was as low as 0.32, and it has been r i s i n g s ince then and i n 1975 it was as high a6 2.236. Undoubtedly, the t r end i s i n l i n e with t h e s i t u a t i o n i n t h e o the r p a r t s of t h e country. It may be argued t h a t t he r i s i n e t r end i s not a consequence of t h e dam i t s e l f . However, it has been shown t h a t t h e epedemiological t r end of malaria has a d i r e c t r e l a t i o n

Page 9: IMPACT OF MANGLA ISM PROJECT ON ENDEMICITY Dr. Syed … › docs › EM_Sem_VBC_11_3_P... · 2019-07-25 · 12. Mangla Dam is a multipurpose project on the river Jhelum south-east

with t h e Water Resources Projects . The s to r ed water of l a rge dams is u t i l i z e d a l l over t he country and wherever t h i s water goes, it does leave a t r i a l of malaria.

16. Z t is unfortunate t h a t , while planning and designing t h e Water Resources Projects, no a t t en t i on hae so far been paid t o t h e remarks of S i r Malcohn Watson, who s a i d t h a t "Engineering which leaves a trial of malaria behind it, i s bad engineering".

17. Conclusion - tU compared t o nature , t h e man has produced b e t t e r environments and i d e a l h a b i t a t s for t h e vector of diseases which spread i n an epidemic proportion, - There is an ample evidence t h a t t h e water hrne vector diseases have a d i r e c t re lat ion with the development of water resources projects/programmas, spec i a l l y , i n the countr ies t h e topography, hydmlogy and climate of which i s appropriate f o r t h e surv iva l of these vectors . - Ins tead of waging only chemical w a r against: the vectors , a deeper th inking is needed i n con t ro l l i ne t h e vec to rbo rne diseases by other methods viz. environmental, b io log ica l , managerial, and self help. - A coordinated e f f o r t of planners, designers , engineers, l e p i s la t o rs , administrators , epidentologists , entomologists and the pub l ic at large is needed for cont ro l l ing and preventing t h e vector-borne d i s~asc~~.

Page 10: IMPACT OF MANGLA ISM PROJECT ON ENDEMICITY Dr. Syed … › docs › EM_Sem_VBC_11_3_P... · 2019-07-25 · 12. Mangla Dam is a multipurpose project on the river Jhelum south-east

Table I LIST OF ANOPHELES IN PAKISTAN

(1) Anopheles barbipostris van &r wulp, 1884

(2) II b6cianensis J-6, 19 XI- (3) t i &e var Similensis(J2mes) 1911 ($1 11 habibi - Mu?X.gan and Puri 19 36

ales v m der wulp

Giles , Pattan,

J-,

Theobald

a r i s t o p h e ~ ~

camboihu Ttaeobald

Theoba3.d

Theabald

Kaizunri Listcn, GMssi

GMssi Giles Giles

N.B. Out of the abcnre mticmed 22 Amqheline species A. d c i f a d e s and Stepbnsi are the mf irned vector species wh=rea6 A. fluviatifis S - ictus and maculatus (Hilly species)qpe the ~uqie,d sped-tan.

Page 11: IMPACT OF MANGLA ISM PROJECT ON ENDEMICITY Dr. Syed … › docs › EM_Sem_VBC_11_3_P... · 2019-07-25 · 12. Mangla Dam is a multipurpose project on the river Jhelum south-east

Table I1 (a) PERTINENT DATA ON MhNGLA 9AM

A. Hydrolo~ical

Cat- Area

ban h u a l Flw of River Jhelum at t4mgl.a Maxixum l3xbabI.a Flood t%l?dmm Mccarded FlOod

B. Other - Resermir

cmst kvel

12870 Sq. miles

Catastrcphic Flocd Level 1228 SPII

Yudmrm Ccnservaticn Level 1202 SPD MLnimnn Pool level Gross storage

Kve St-

1040 SPD

5.35 MAF

4.75 MAE' Length of he& Wl miles

Popdaticn Affected 81,000

Total to be aaph?ed 73,000 aaxs

C. DAMS - 1. Main Dam

Maxinum &i@t 380 ft. (crest level 3234 SPD)

-t Length 11,000 ft. 41 ft.

5.7 mcu. yd.

78.0 m.cu.yd.

purpose Storage and Ebm -- crest wgm

234 ft.

5700 ft.

Top Width 41 ft.

Page 12: IMPACT OF MANGLA ISM PROJECT ON ENDEMICITY Dr. Syed … › docs › EM_Sem_VBC_11_3_P... · 2019-07-25 · 12. Mangla Dam is a multipurpose project on the river Jhelum south-east

Table I1 (b)

3. sukirm Qvke

MPcinwm Height

Crest h g t h Excavaticn

Fill

D. Spillways 1. Main Spillway

Type No. of e g s

Size of Gates

lLpe

Capacity Excavatia

(h-lCrT?te

2. FfilesErlency Spillway

Type Exoavaticn Conete

Crest Elevation

-tY E. Hydro-Electric Works

1. Tunnels No. of Tunnels Size Length

Tunnel Excavation Concrete

2. P a e r Statim (lst Stage)

Tu&o.Alternatw Sets

Capacity (each set)

Cancrete

3. P w e r Station Tailrace

Excavflcm

Clnregulated apen cut.

16.3 m.m.yd.

0.014 m.cu.yd.

1206 Sm> 212,000 mew.

5

30 f t . d iamete r (Finishe.' 2000 f t . each

0.319 n. cu. yd.

0.131 m. cu. yd.

Page 13: IMPACT OF MANGLA ISM PROJECT ON ENDEMICITY Dr. Syed … › docs › EM_Sem_VBC_11_3_P... · 2019-07-25 · 12. Mangla Dam is a multipurpose project on the river Jhelum south-east

-12-

Table I1 ( c )

4. Bcay:CBlal Capacitu m?tfi Bed Width

Excavaticn F. Total Principal Estimated

Quant i ty Excavation

40,000 mecs 37 ft.

100 Et. 15000 ft.

10.5 mcu.yd.

55.0 m.cu.yd.

108.3 m. cu. yd.

Page 14: IMPACT OF MANGLA ISM PROJECT ON ENDEMICITY Dr. Syed … › docs › EM_Sem_VBC_11_3_P... · 2019-07-25 · 12. Mangla Dam is a multipurpose project on the river Jhelum south-east

T a b l e I11

SURVEILLANCE DATA OF MIRPUR DISTRICT 1969-76

Slides Slide Examined P.v. P.f. Tot a1 Positivity pats

Page 15: IMPACT OF MANGLA ISM PROJECT ON ENDEMICITY Dr. Syed … › docs › EM_Sem_VBC_11_3_P... · 2019-07-25 · 12. Mangla Dam is a multipurpose project on the river Jhelum south-east
Page 16: IMPACT OF MANGLA ISM PROJECT ON ENDEMICITY Dr. Syed … › docs › EM_Sem_VBC_11_3_P... · 2019-07-25 · 12. Mangla Dam is a multipurpose project on the river Jhelum south-east
Page 17: IMPACT OF MANGLA ISM PROJECT ON ENDEMICITY Dr. Syed … › docs › EM_Sem_VBC_11_3_P... · 2019-07-25 · 12. Mangla Dam is a multipurpose project on the river Jhelum south-east
Page 18: IMPACT OF MANGLA ISM PROJECT ON ENDEMICITY Dr. Syed … › docs › EM_Sem_VBC_11_3_P... · 2019-07-25 · 12. Mangla Dam is a multipurpose project on the river Jhelum south-east
Page 19: IMPACT OF MANGLA ISM PROJECT ON ENDEMICITY Dr. Syed … › docs › EM_Sem_VBC_11_3_P... · 2019-07-25 · 12. Mangla Dam is a multipurpose project on the river Jhelum south-east
Page 20: IMPACT OF MANGLA ISM PROJECT ON ENDEMICITY Dr. Syed … › docs › EM_Sem_VBC_11_3_P... · 2019-07-25 · 12. Mangla Dam is a multipurpose project on the river Jhelum south-east
Page 21: IMPACT OF MANGLA ISM PROJECT ON ENDEMICITY Dr. Syed … › docs › EM_Sem_VBC_11_3_P... · 2019-07-25 · 12. Mangla Dam is a multipurpose project on the river Jhelum south-east
Page 22: IMPACT OF MANGLA ISM PROJECT ON ENDEMICITY Dr. Syed … › docs › EM_Sem_VBC_11_3_P... · 2019-07-25 · 12. Mangla Dam is a multipurpose project on the river Jhelum south-east
Page 23: IMPACT OF MANGLA ISM PROJECT ON ENDEMICITY Dr. Syed … › docs › EM_Sem_VBC_11_3_P... · 2019-07-25 · 12. Mangla Dam is a multipurpose project on the river Jhelum south-east