ILRS:Current Status and Future Plans

Carey NollMichael Pearlman

ILRS Central Bureau

21st International Workshop on Laser RangingNovember 05, 2018Canberra, Australia

Outline

• Introduction

• Current trends

• Network

• Mission support

• Infrastructure

• Conclusion

Page 2: ILRS: Outline - NASA · ILRS: Current Status and Future Plans 21st International Workshop on Laser Ranging | Canberra, Australia 7 0 10 20 30 40 50 60 70 80 0 5,000 10,000 15,000

The ILRS mission

• Laser ranging activities are organized under the International Laser Ranging Service (ILRS) which provides global satellite and lunar laser ranging data and their derived data products to support research in geodesy, geophysics, Lunar science, and fundamental physics. This includes data products that are fundamental to the International Terrestrial Reference Frame (ITRF), which is established and maintained by the International Earth Rotation and Reference Systems Service (IERS).

• The ILRS is one of the space geodetic services of the International Association of Geodesy (IAG) and is a member of the IAG’s Global Geodetic Observing System (GGOS). The Services, under the umbrella of GGOS, provide the geodetic infrastructure necessary for monitoring global change in the Earth system (Beutler and Rummel, 2012).

ILRS: Current Status and Future Plans 21st International Workshop on Laser Ranging | Canberra, Australia 1

Page 3: ILRS: Outline - NASA · ILRS: Current Status and Future Plans 21st International Workshop on Laser Ranging | Canberra, Australia 7 0 10 20 30 40 50 60 70 80 0 5,000 10,000 15,000

Governing board: 2019-2020

• Ex-officio/appointed positions:• Director of the Central Bureau – Mike Pearlman

• Secretary of the Central Bureau – Carey Noll

• Representative of IAG Commission 1 – Urs Hugentobler

• IERS Representative – Daniela Thaller

• Elected positions:• EUROLAS Network Representatives – Pippo Bianco, Georg Kirchner

• NASA Network Representatives – Jan McGarry, Stephen Merkowitz

• WPLTN Representatives – James Bennett, Zhang Zhongping

• Data Center Representative – Christian Schwatke

• LLR Representative – Jean-Marie Torre

• Analysis Representatives – Cinzia Luceri, Erricos Pavlis

• At-Large Representatives – Toshi Otsubo, Matt Wilkinson

• Two additional members to be appointed by the Governing Board

ILRS: Current Status and Future Plans 21st International Workshop on Laser Ranging | Canberra, Australia 2

• 18 members on ILRS Governing Board

• New Board to take office on January 01, 2019

Page 4: ILRS: Outline - NASA · ILRS: Current Status and Future Plans 21st International Workshop on Laser Ranging | Canberra, Australia 7 0 10 20 30 40 50 60 70 80 0 5,000 10,000 15,000

Journal of Geodesy: special issue

ILRS: Current Status and Future Plans 21st International Workshop on Laser Ranging | Canberra, Australia 3

Article Title

The SAO and the CNES contributions to the International Laser Ranging Network

Information Resources Supporting Scientific Research for the International Laser Ranging Service

Modernizing and Expanding the NASA Space Geodesy Network to Meet Future Geodetic Requirements

Assessment of the impact of one-way laser ranging on orbit determination of the Lunar Reconnaissance Orbiter

Rapid Response Quality Control Service for the Laser Ranging Tracking Network

The Next Generation of Satellite Laser Ranging Systems

NASA's Satellite Laser Ranging Systems for the 21st Century

Time and laser ranging: A window of opportunity for geodesy, navigation and metrology

Laser and Radio Tracking for Planetary Science Missions - A Comparison

The NASA Space Geodesy Network

Satellite Laser Ranging to Low Earth Orbiters - Orbit and Network Validation

*Note: 8 additional articles are currently under review and a small number are yet to be submitted

• Journal of Geodesy Special Issue on Laser Ranging • Publication currently in process

• 11 papers accepted thus far (some available online):

Page 5: ILRS: Outline - NASA · ILRS: Current Status and Future Plans 21st International Workshop on Laser Ranging | Canberra, Australia 7 0 10 20 30 40 50 60 70 80 0 5,000 10,000 15,000

Current trends

• SLR systems: lower energy, higher repetition rates (kHz)

• Single photon sensitive detectors (geodetic satellites)

• Shorter normal point intervals (take data more quickly) and faster slewing for increased pass interleaving

• Real-time data evaluation for real-time decision making

• Automated to autonomous operation with remote access

• Stations with two SLR systems to help address the workload (e.g., Hartebeestoek)

• Environmental monitoring and awareness for instrument integrity and safety

• Real-time network communication and information sharing among stations

• Denser arrays with smaller cubes helps reduce return signal rms

ILRS: Current Status and Future Plans 21st International Workshop on Laser Ranging | Canberra, Australia 4

Page 6: ILRS: Outline - NASA · ILRS: Current Status and Future Plans 21st International Workshop on Laser Ranging | Canberra, Australia 7 0 10 20 30 40 50 60 70 80 0 5,000 10,000 15,000

Highlights: network

• On track for increased data yield in 2018 (20 additional targets)

• New sites soon (see next slide)

• NASA systems transitioning to use of the event timer

• First co-location of Russian laser system with established station (Hartebeesthoek, South Africa)

• System comparison underway

• Such co-locations provide for expanded tracking capabilities at unique sites

• More co-locations under discussion

ILRS: Current Status and Future Plans 21st International Workshop on Laser Ranging | Canberra, Australia 5

Page 7: ILRS: Outline - NASA · ILRS: Current Status and Future Plans 21st International Workshop on Laser Ranging | Canberra, Australia 7 0 10 20 30 40 50 60 70 80 0 5,000 10,000 15,000

ILRS network

• BKG AGGO continuing setup at La Plata Observatory (Argentina)

• New stations underway:

• Russia: Ensenada (Mexico), Java (Indonesia), Canary Islands (Spain)

• NASA/NASA affiliated: McDonald, Halekala (USA), and Ny Ålesund (NMA, Norway)

• Others: Metsahovi (Finland), Mt. Abu and Ponmundi (India), and Yebes (Spain)

• Upgrades underway at some stations

ILRS: Current Status and Future Plans 21st International Workshop on Laser Ranging | Canberra, Australia 6

Gaps in geographic coverage remain

Page 8: ILRS: Outline - NASA · ILRS: Current Status and Future Plans 21st International Workshop on Laser Ranging | Canberra, Australia 7 0 10 20 30 40 50 60 70 80 0 5,000 10,000 15,000

Station performance: passes

ILRS: Current Status and Future Plans 21st International Workshop on Laser Ranging | Canberra, Australia 7

0

10

20

30

40

50

60

70

80

0

5,000

10,000

15,000

20,000

25,000Ya

rrag

adee

Ch

angc

hu

n

Mo

un

t St

rom

lo

Zim

me

rwal

d

Her

stm

on

ceu

x

Gre

enb

elt

Wet

tze

ll

Mat

era

Po

tsd

am

Shan

ghai

Gra

z

Mo

nu

me

nt

Pea

k

Ku

nm

ing

Wet

tze

ll

Har

teb

ees

tho

ek

Be

ijin

g

Are

qu

ipa

Sim

eiz

Alt

ay

Kat

zive

ly

Irku

tsk

Ko

mso

mo

lsk

Hal

eaka

la

Sim

osa

to

Bad

ary

Tah

iti

Zele

nch

uks

kaya

Bra

silia

Har

teb

ees

tho

ek

Rig

a

Bai

kon

ur

Bo

row

iec

Ark

hyz

Gra

sse

Svet

loe

Kie

v

Me

nd

ele

evo

Sejo

ng

McD

on

ald

Nu

mb

er o

f Sa

telli

tes

Nu

mb

er o

f P

asse

s

Station

Low

LAGEOS+LARES

High

Low

High

09/2017-08/2018

3500 pass minimum guideline

Page 9: ILRS: Outline - NASA · ILRS: Current Status and Future Plans 21st International Workshop on Laser Ranging | Canberra, Australia 7 0 10 20 30 40 50 60 70 80 0 5,000 10,000 15,000

Highlights: missions

• Network routinely tracked 100+ satellites in 2018

• In last year, new, approved missions included:

• S-NET (4 cubesats/testing inter-satellite communication)

• Sentinel-3B (altimeter mission/restricted tracking )

• GRACE-FO (2 satellites/gravity measurements)

• Tiangong-2 (Chinese spacecraft)

• Beidou-3M (4 GNSS satellites)

• PAZ (SAR mission)

• ICESat-2 (laser altimetry mission/restricted tracking)

• Astrocast Precursor (2 cubesats/engineering testing)

• GNSS (Galileo, GLONASS, IRNSS)

• Future missions:

• Additional GNSS: BeiDou/Compass, Galileo, etc.

• LightSail-2, COSMIC-2, HY-2C, SWOT, NISAR

ILRS: Current Status and Future Plans 21st International Workshop on Laser Ranging | Canberra, Australia 8

GalileoBeidou

NISAR

ICESat-2

COSMIC-2

PAZ

Astrocast

S-NET

GRACE-FO

Sentinel-3B

Page 10: ILRS: Outline - NASA · ILRS: Current Status and Future Plans 21st International Workshop on Laser Ranging | Canberra, Australia 7 0 10 20 30 40 50 60 70 80 0 5,000 10,000 15,000

Mission support

• Campaigns• 2018 LARGE campaigns:• First campaign: February 15 – May 15, 2018

• Second campaign: August 01 – October 31, 2018

• Proposed Etalon campaign:• February-April 2019

• Possible dedicated campaigns to improve tracking on new missions

• Restricted tracking:• Sentinel-3

• ICESat-2

• Others

ILRS: Current Status and Future Plans 21st International Workshop on Laser Ranging | Canberra, Australia 9

Designed to obtain improved temporal and spatial coverage by concentrating tracking on a subset of satellites from each of the GNSS constellations, GLONASS, Galileo, and Beidou/Compass.

Evaluate increase role of Etalon data in computation of ILRS products contributing to the ITRF.

Developing mission-specific procedures for restricting SLR tracking of vulnerable satellites takes considerable time, coordination, and interaction between CB, mission, and stations.

Page 11: ILRS: Outline - NASA · ILRS: Current Status and Future Plans 21st International Workshop on Laser Ranging | Canberra, Australia 7 0 10 20 30 40 50 60 70 80 0 5,000 10,000 15,000

Station performance: GNSS passes

ILRS: Current Status and Future Plans 21st International Workshop on Laser Ranging | Canberra, Australia 10

0

5

10

15

20

25

30

0

1,000

2,000

3,000

4,000

5,000

6,000

7,000Ya

rrag

adee

Ch

angc

hu

n

Her

stm

on

ceu

x

Mo

un

t St

rom

lo

Zim

me

rwal

d

Wet

tze

ll

Shan

ghai

Wet

tze

ll

Alt

ay

Gra

z

Ku

nm

ing

Ko

mso

mo

lsk

Mat

era

Be

ijin

g

Po

tsd

am

Bai

kon

ur

Bra

silia

Har

teb

ees

tho

ek

Irku

tsk

Gre

enb

elt

Mo

nu

me

nt…

Ark

hyz

Zele

nch

uks

kaya

Sim

eiz

Tah

iti

Har

teb

ees

tho

ek

Me

nd

ele

evo

Gra

sse

Bad

ary

Svet

loe

Rig

a

Bo

row

iec

Sim

osa

to

Kat

zive

ly

McD

on

ald

Sejo

ng

Are

qu

ipa

Hal

eaka

la

Kie

v

Nu

mb

er o

f Sa

telli

tes

Nu

mb

er o

f P

asse

s

Station

GLONASS

Galileo

Compass/Beidou

GLONASS

Galileo

09/2017-08/2018

1000 GNSS minimum pass

guideline

Page 12: ILRS: Outline - NASA · ILRS: Current Status and Future Plans 21st International Workshop on Laser Ranging | Canberra, Australia 7 0 10 20 30 40 50 60 70 80 0 5,000 10,000 15,000

Station performance: LARGE 2018

ILRS: Current Status and Future Plans 21st International Workshop on Laser Ranging | Canberra, Australia 11

GLONASS58%

Galileo28%

Compass14%

Station Tracking Totals by Constellation(Passes)

Chinese Network21%

European Network27%

NASA Network29%

Russian Network12%

All Others11%

Tracking Totals by Network(Passes)

Chinese network: 4 stationsEUROLAS network: 13 stationsNASA network: 8 stationsRussian network: 9 stationsOther stations: 2 stations

LARGE 2018 Campaign 1February-May 2018

Page 13: ILRS: Outline - NASA · ILRS: Current Status and Future Plans 21st International Workshop on Laser Ranging | Canberra, Australia 7 0 10 20 30 40 50 60 70 80 0 5,000 10,000 15,000

Tracking GNSS: possible approach

• Large number of GNSS satellites

• GNSS constellations have different requirements for ILRS tracking support

• More satellites coming with GPS-III

• Constellations may select 4 – 8 GNSS satellites for higher priority with 3 segments of tracking requested per pass

• Some number of additional GNSS satellites in each constellation remain on ILRS tracking list at lower priority

• Tracking of lower priority satellites on non-interference basis with other requirements

• Instruct stations to take more robust sampling of the selected satellites

• Discussions underway with the IGS and the ICG

ILRS: Current Status and Future Plans 21st International Workshop on Laser Ranging | Canberra, Australia 12

Beidou laser retroreflector array

(Chinese Academy of Sciences)

Page 14: ILRS: Outline - NASA · ILRS: Current Status and Future Plans 21st International Workshop on Laser Ranging | Canberra, Australia 7 0 10 20 30 40 50 60 70 80 0 5,000 10,000 15,000

Future mission support

• ILRS supports programs in geodesy, geodynamics, and space science with primary emphasis on tasks that support goals of GGOS

• Missions continue to submit support requests (10+ in 2018)

• ILRS set priorities and attempts to balance mission requests and maximize the utility of the network

• ILRS carefully reviews new mission support requests based on need and likelihood of success in meeting their tracking requirements

• To better ensure success for the mission AND the ILRS, missions must inform the ILRS well in advance of launch and in mission planning phases

• ILRS considering updated guidelines for acceptance of new missions for support

ILRS: Current Status and Future Plans 21st International Workshop on Laser Ranging | Canberra, Australia 13

Page 15: ILRS: Outline - NASA · ILRS: Current Status and Future Plans 21st International Workshop on Laser Ranging | Canberra, Australia 7 0 10 20 30 40 50 60 70 80 0 5,000 10,000 15,000

Highlights: operations/infrastructure (1/2)

• Quality Control Board (QCB) addressing laser ranging data quality issues via bi-monthly telecons

• Data systematics Pilot Project completed and operational version is being worked on now

• Examining consistency in NP computation

• Looking into new capabilities to assess station performance

• Provide online tools for stations and analysts

• Emphasize value of station performance to the users and science products

• Show areas of improvement to support goals of the ILRS

• Show network capabilities for altimetry, geodetic, and GNSS satellites/applications

ILRS: Current Status and Future Plans 21st International Workshop on Laser Ranging | Canberra, Australia 14

Page 16: ILRS: Outline - NASA · ILRS: Current Status and Future Plans 21st International Workshop on Laser Ranging | Canberra, Australia 7 0 10 20 30 40 50 60 70 80 0 5,000 10,000 15,000

Highlights: operations/infrastructure (2/2)

• Updates to site log format• Added more information about station configuration and operation

• Implemented improved procedures (web-based) for submitting/updating station site logs

• Helps stations keep their logs current

• CRD and CPF formats• Version 2 issued; testing underway

• Version updates facilitate support of future missions and applications (e.g., ELT, space debris)

• Data screening/QC at ops centers• More thorough QC procedures to improve ILRS data product for the user community

• Harmonized process between EDC and NASA OCs

ILRS: Current Status and Future Plans 21st International Workshop on Laser Ranging | Canberra, Australia 15

Page 17: ILRS: Outline - NASA · ILRS: Current Status and Future Plans 21st International Workshop on Laser Ranging | Canberra, Australia 7 0 10 20 30 40 50 60 70 80 0 5,000 10,000 15,000

Issues & challenges

• Many geographic gaps, primarily in Latin America, Africa, and Oceania

• Mix of new and old technologies and levels of financial support

• Lack of standardization in system hardware and operations

• Data quality issues (efforts underway to detect and reduce systematics)

• Number of target satellites continues to increase as new missions use SLR for orbit determination and other applications (100+ satellites)

• Need to implement more effective tracking strategies

• Need to be more selective on the targets

• Need to conduct periodic community surveys to understand user requirements