IHI’s Activities for coal-fired generation
in Southeast Asia
3rd.September, 2014
IHI Corporation
2
Contents
1. Company Profile
2. Recent Activities for Coal Fired Power Plant Business in Asia
3. Introduction of TIGAR ( Twin IHI GAsifieR)
Copyright © 2013 IHI Corporation All Rights Reserved. 3
Net Sales : JPY 1,236,049 mil (USD
13,355 mil)
Founded : 1853
Works : 10 Branch Offices : 19(Japan) , 14(Overseas) Subsidiaries : 182
Overseas Office
Global Subsidiary Company
Global Network
The First Steamship Built by Japanese Private Company – “Tsu-un maru”.
1. IHI Company Profile
Information is on consolidated basis and is corrected as of March 2013
Re-sources, En-ergy and Envi-ron-ment26%
Aero En-
gines27%
Indus-trial Sys-tems30%
Social Infra-struc-ture9%
Others8%
Total Sales Volume / as of March, 2014
Industrial Systems(Steel Manufacturing Furnaces, Heat/Surface Treatment
Equipment, Logistics Systems, Material Handling Equipment, etc.)
Social Infrastructure and Offshore Facilities
(Bridge, Transportation System, Security, etc.)
4
General-Purpose Machinery(Compressor, Separator, Turbo charger, etc.)
Resources, Energy and and Environment(Boiler, Gas Turbine/Gas Engine, LNG Terminal, Process Plant, Nuclear Equipment,
etc.)
Aero, Enginesand Space
Development
Resources, Energy and
Environment
Social Infrastructureand
Offshore Facilities
Industrial Systemsand
General-PurposeMachinery
Aero Engines and Space (Jet Engine, Rocket)
1. IHI Business Areas
Copyright © 2014 IHI Corporation All Rights Reserved. 5Copyright © 2013 IHI Corporation All Rights Reserved.
BoilerAQCS
(Air Quality Control System)
Energy & Plant Operations
• PC Boiler• Oil / Gas Firing Boiler• DeNOx/DeSOx System• CCS System
GAS Turbine
• Gas Turbine (for base load & peak cut)
HRSG(Heat Recovery Steam
Generator)
• HRSG (for wide range of Gas Turbine Output)
Gas Process/Storage Plant
• LNG Receiving Terminal (EPC Service)•Storage Tank (LPG, LNG, Helium)
2. Overview of IHI Energy & Plant Business
IHI supplies the world with state-of-the-art coal-fired boilers, utilizing Clean Coal Technology (CCT), which we developed through years of extensive research. This technology enables us to use coal, a cheap and widely available resource, more efficiently and economically, resulting in lower CO2 emissions and a better utilization of the world’s limited natural resources. IHI’s accumulated technology is also used in other coal-fired power plant applications, such as De-NOx and De-SOx.
IHI’s Proven Boiler Design
Oxy-fuel Demo. Project
Low Nox System
DeSOx DeNOx
Hekinan No.3(First USC Boiler in Japan)
Over 95% Availability,over 20 years operation
CCTF(Test Facility)
IHI USC/SC Boiler World’s Highest Reheat Temp.(623 ) USC Boiler℃
Sub-bitu. fired boiler
IHI Clean Coal
Technology
High PlantEfficiency
Clean & Low
Emission
HighAvailability
Low Rank Coal
Applica-tion
CO2 Reduction
Copyright © 2014 IHI Corporation All Rights Reserved.
2. IHI Clean Coal Technology
6
Photo is provided by J-POWER(EPDC)
Copyright © 2014 IHI Corporation All Rights Reserved. 7
Callide CNo.3 & 4
Tomato AtsumaNo.2
HekinanNo.3
TachibanawanNo.1
New-IsogoNo.1
Lünen
Capacity 420MW 600MW 700MW 1,050MW 600MW 813MW
Steam Condition
25.0MPa566/566oC
24.1MPa538/566oC
24.1MPa538/593oC
25.0MPa600/610oC
27.5MPa600/610oC
28.8MPa600/610oC
Completion 2001 1985 1993 2000 2002 2013
RHSHEVAPECO
Proven DesignIHI’s expertise in supercritical boiler have been accumulated over the last 30 years since the first supercritical-unit entered into commercial operation in 1980.
Design Options ready for Customer’s PreferenceIHI is ready to offer for optimum supercritical boiler design options according to the customer’s preference and needs, i.e. 2 pass or 1 pass (tower type), 400MW to 1,100MW class, various kinds of fuels, operation and emission requirements.
2. IHI USC/Super-critical Boilers
Copyright © 2014 IHI Corporation All Rights Reserved.
2. References of IHI USC/SC Boilers
8
Plant Electricity Output
Steam Capacity Steam Conditions COD USC
Hekinan No.3 700 MW 2,250 t/h 25.0MPa /543/596C 1993 ○ Noshiro No.2 600 MW 1,860 t/h 25.0MPa /570/596C 1994 ○ Reihoku No.1 700 MW 2,260 t/h 25.0MPa /570/568C 1995 - Nanao Ohta No.2 700 MW 2,120 t/h 25.0MPa /597/595C 1998 ○ Tachibanawan No.1 1,050 MW 3,000 t/h 25.9MPa /605/613C 2000 ○ Hekinan No.4 1,000 MW 3,050 t/h 25.0MPa /571/596C 2001 ○ Callide No.3 420 MW 1,281 t/h 25.9MPa /569/568C 2001 - Callide No.4 420 MW 1,281 t/h 25.9MPa /569/568C 2001 - Hekinan No.5 1,000 MW 3,050 t/h 25.0MPa /571/596C 2002 ○ Tomato Atsuma No.4 700 MW 2,040 t/h 25.9MPa /603/602C 2002 ○ Isogo new No.1 600 MW 1,710 t/h 27.5MPa /605/613C 2002 ○ Tarong North No.1 450 MW 1,370 t/h 25.9MPa /569/568C 2003 - Shinko Kobe No.2 700 MW 2,340 t/h 25.0MPa /541/568C 2004 - Sumitomo Kashima 507 MW 1,590 t/h 25.0MPa /542/568C 2007 - Isogo new No.2 600 MW 1,670 t/h 27.2MPa /605/623C 2009 ○ Maizuru No.2 900 MW 2,570 t/h 25.4MPa /600/598C 2010 ○ Sandy Creek No.1 998.5 MW 2,852 t/h 26.9MPa /585/583C 2013 - TPK Lünen 813 MW 2,225 t/h 28.8MPa /600/610C 2013 ○ Talin 800MW 2,369 t/h 25.9MPa /602/601C Under
construction ○Jimah East Power 1,000MW Under
Engineering ○
USC Steam Condition >593 ℃
IHI has delivered a large number of Ultra Super Critical (USC) boilers since the first delivery of a USC coal-fired boiler in 1993. IHI has consolidated this extensive experience in our latest USC technology which powers our reliable, highly efficient boilers.
Copyright © 2014 IHI Corporation All Rights Reserved. 9
Point of Asia
IHI HQ (Tokyo, Japan) IHI Inc. PPED(Kansas, USA)
IHI Engineering Australia(Sydney, Australia)
IHI HQ
PT.Cilegon Fabricators
Malaysia:IHI Power System Malaysia (Maintenance)
Singapore : Jurong Engineering Ltd.(JEL)
Indonesia : PT.JEL
Vietnam:IHI Infrastructure Asia Co.,LTD.(Bridge / Steel Structure Manufacturing)
Engineering
Manufacturing
Maintenance
JAPAN IHI Aioi Works (Boiler pressure Parts)
Philippine:IHI Philippine Inc. (Engineering)
Indonesia:PT.Cilegon Fabricators(PTCF)(Boiler/Steel Structure Manufacturing)
IHI Asia Pacific (IHIAP) (Singapore)
Aioi Works
In Indonesia projects, IHI can optimize the contribution of Indonesian resources, especially PT. JEL for construction work and PT Cilegon Fabricators for manufacturing.
2. Resources in South East Asia
Copyright © 2013 IHI Corporation All Rights Reserved.
Copyright © 2014 IHI Corporation All Rights Reserved.
10
Ground: Approx. 250,000m2
Floor Space: Approx. 40,000m2
Employees: Approx. 1,300Product Line up: Boiler Pressure Parts, HRSG Pressure Parts, Piping & Structural Steels incl. Ducting, Casing, Backstay
Private Jetty & 150tons Ringer CraneCapability
ShareholdersIHI 89%JEL(a member of IHI group) 11%
CertificationISO9001 / Quality Management System American Society of Mechanical Engineers (ASME) / S, U & PP Stamp
IHI manufactures Boiler & HRSG Pressure parts with world class quality in INDONESIA.
Copyright © 2013 IHI Corporation All Rights Reserved.
2. PT Cilegon Fabricator
11Copyright © 2014 IHI Corporation All Rights Reserved.
2. Outline of PT. JEL
Power Plant DivisionIn the Power Plant Sector, aside from conventional Coal or Gas Fired Plants, JEL is also an expert in Combined Cycle, Cogeneration, Hydroelectric and Diesel Generator and Waste to Energy Power Plants.
Board of DirectorsMr. Yap Chee Lung, President Director
The composition of stockholders100% subsidiary of JEL, who is 95% subsidiary of IHI
IHI
JEL
PT JEL
95%
100%
PT.JEL are a certified construction company holding construction licenses.
SBU GapeksindoSIUJK SKT Migas SBU Aklindo SKT Geothermal
Copyright © 2014 IHI Corporation All Rights Reserved. 12
【 Steal Structure(S/S)】Since PTCF is professional for S/S work, most of S/S is fabricated in PTCF.
Raw material for the S/S is becoming available gradually in Indonesia.IHI are planning to fully utilize local material to maximize local contents.
【 Installation work】In the case IHI work on as EPC contractor, we utilize our group company, PT JEL, and more local contents will be expected.
only IHI group can maximize the target.
For the large scale 1000MW class projects, We are confident only IHI can achieve higher target.
Maximization of Local Contents
Copyright © 2014 IHI Corporation All Rights Reserved. 13
2. References of IHI Sub-Bitu. Coal fired Boilers
- BEST of the BEST -IHI’s steam generator was praised as one of the six innovative top coal fired plants by “POWER” and was featured on the October 2009 cover.
Client : Nebraska City Power Partners (JV of Black&Veatch, Zachry & Kiewit), USAUnit : OPPD Nebraska City No.2Turbine Output : 660MWnetBoiler Capacity : 2,155 t/hSteam Conditions: 18.0MPa, 569/567 oC (IHI Natural Circulation Single Drum Reheat Type, Indoor)Fuel : Pulverized Coal (100% Sub-bituminous Coal)Commercial Operation : 2009
Typ. Coal Spec. CV(a.r.) : 4,500~4,800kcal/kgTotal Moisture : 27%~32%Ash : 6%Sulfur : 0.5wt%HGI : 58
Actual Operating Situation
・ Successful Operation over 97% Availability with Full Load in 2011. (Actual Result)
Copyright © 2014 IHI Corporation All Rights Reserved. 14
Client : Sandy Creek Energy Associates, L.P., USAUnit : Sandy CreekTurbine Output : 900MWnetBoiler Capacity : 2,852 t/hSteam Conditions: 26.9MPa, 585/583 oC Fuel : Pulverized Coal (100% Sub-bituminous Coal)Commercial Operation : 2013
2. References of IHI Sub-Bitu. Coal fired Boilers
15Copyright © 2014 IHI Corporation All Rights Reserved.
Client : Taiwan Power Company, TaiwanUnit : TALIN POWER PLANT RENEWAL PROJECT
Turbine Output : 2 x 800MW (Gross) Commercial Operation : 2017(#1) 2018 (#2)
Boiler Capacity : 2 x 2,369 t/h Steam Conditions: 25.9MPa, 602/601 oC (Ultra Super Critical)
Under Construction
as of 24th June 2014
Confidential
2. References of IHI Sub-Bitu. Coal fired Boilers
16
SSAA Power Station (Kapar)* 300MW x 2 (1989) B: IHI, TG: MHI* 500MW x 2 (1998) B: IHI, TG: GE
Jimah Power Station* 700MW x 2 (2009) B: IHI, TG: TSB
Tanjung Bin Power Station700MW x 3 (2007) B: IHI, TG: TSB
IHI / TSB40%
IHI / GE16%
IHI / MHI10%
Alstom34%
Coal Fired Power Plant in OperationBTG Market Share (MW)
IHI’s Share(66%) will be 73%.
Jimah East Power1,000MW x 2 (2018,2019)
B: IHI, TG: Toshiba
Boiler Market share in Malaysia
Copyright © 2014 IHI Corporation All Rights Reserved.
Malaysia Jimah East Power
Type :Capacity :Fuel :
USC / Once Through, Variable Pressure, Reheat type2 x 1,000 MW (Net)100% Sub-bituminous Coal
2. References of IHI Sub-Bitu. Coal fired Boilers
3. IHI Gasification Technology
“TIGAR” (Twin IHI GAsifieR)
~ Application to Low Rank Coal~
18
Syngas
CTL
DME
MeOH
Shift
Reforming
Synthesis
H2
CH4
H251%
CO18%
CO219%
CH49%
Other HC3%
Fuel cellNH3
SNG
Multi product application
3. Characteristics of TIGAR
Combust char with air
Circulation
Steam gasification,Bubbling Fluidized bed
Basis of TIGAR
Combustor
Gasifier
Fuel/materials
SteamAir
(heat emission)
Operation condition・ Atmospheric・ Low temp.
(heat absorption)Syngas component
at gasifier outlet
IHI has been developing TIGAR both for Low rank coal and Biomass gasification based on in-house Circulating Fluidized Bed (CFB) technology.
Chemical raw material
Automobile fuel
Supply the required heat for gasification reaction with hot bed material
Circulate remaining char after gasification with bed material
19
① Lower CAPEX and simple Operation & Maintenance - Lower pressure and lower temperature in operating condition② Simple Fuel preparation - Coarse size and higher moisture are acceptable
③ No N2 contamination in Syn-gas, because of Steam gasification
IHI-TIGAR-
Type A Type B Type C
Gasifier type Fluidized bed Entrained bed Moving bed
Pressure Atmospheric >3MPa >3MPa 1-3MPa
Temperature 800-1,000℃ >1,400℃ >1,400℃ >1,200℃
Gasification agent Steam Oxygen Oxygen Oxygen
Fuel particle size <10mm <0.1mm <0.1mm 4~5mm
Fuel configuration Bulk, powder Powder Slurry Bulk
Residue Dry Ash Slag Slag Dry Ash
2. Characteristics of TIGAR
20
6TPD@Yokohama, JAPAN Commercial plant image
TIGAR×4units (1reserve)
Coal feed : 3000 TPD( Substantially NH3 : 1000 TPD)
2004~
2009 2010 2011 2012 2013 2014 2015 2016 2017
Basic Test 6TPD Pilot Plant
50TPD Prototype Plant EPC
Demonstration Test
CommercialPlant
at present
Japanese Government (METI*) Support*Ministry of Economy, Trade and Industry
3. TIGAR Development schedule
50TPD@Kujang, INDONESIA
21
Organization chart
METIMinistry of Economy,
Trade and Industry
IHI Corporation
MEMRMinistry of Energy
and Mineral Resources
Ministry of Industry
Ministry of state-owned enterprises
ARDEMRAgency of Research and Development of Energy and Mineral Resource
PT. Pupuk Indonesia
(PIHC)
tekMIRAPT. Pupuk Kujang
Cooperation
Government Talk
Support
3 . 50t/d prototype plant PJ at Indonesia
22
< Plant site >
< 50t/d 3D bird’s view >
3 . 50t/d prototype plant PJ at Indonesia
【 Purpose】
< 50t/d plant spec >
①Check the maintenance durability in long operation ( Total 4,000 hr operation ) using Indonesia lignite.
②Confirmation of TIGAR performance and reliability, and reflect in commercial plant engineering.
③Demonstration of TIGAR gasification technology for future clients.
Coal feed rate50ton/day ( as received, 43% moisture )
Syngas output 1,800m3N/h-dry
Steam generation
4.5t/h(2.0MPaG,513deg.C)
Site area 100m×80m
Jakarta
IHI Cilegon factory
PT Pupuk Kujang(About 75km from Jakarta)
Java, INDONESIA
Easy accessfor site visit
Easy accessfor maintenance
23
Schedule
Year 2011 2012 2013 2014 2015 2016
Month 7-12 1-3 4-6 7-9 10-12 1-3 4-6 7-9 10-12 1-3 4-6 7-9 10-12 1-12 1-12
50TPD
Design
Operation / Test
at present
Procurement / Fabrication
Site Mobilization
Civil / Building
Erection / Installation
Pre-Commissioning
Procurement / Construction
Operation
3 . 50t/d prototype plant PJ at Indonesia
Progress July 2014
Copyright © 2014 IHI Corporation All Rights Reserved.
KIKC Gate
KIK
C M
ain
Road
KujangPlant
Waste Water area
Gasifier structure area
Gas Purification area
TIGAR Control Center TIGAR Site
3 . 50t/d prototype plant PJ at Indonesia
25
3 . Summary
Twin IHI Gasifier (TIGAR) is being developed for lignite gasification
TIGAR is suitable for Indonesia market needs & Expectations
This year, we will start the demonstration operation with 50TPD in Indonesia
TIG
AR
26Copyright © 2014 IHI Corporation All Rights Reserved.
Terima kasih atas perhatian Anda