35
Gabriela Llosá VIII CPAN Days, Zaragoza, 28-30 November 2016 1 IFIMED status and results of a Compton Telescope for hadron therapy Gabriela Llosá, Enrique Muñoz, John Barrio, José Bernabéu, Ane Etxebeste, Carlos Lacasta, Josep F. Oliver, Pablo G. Ortega*, Carles Solaz. Instituto de Física Corpuscular – IFIC/IFIMED (CSIC-UV) Valencia, Spain * and CERN, Geneva, Switzerland IRIS group: Image Reconstruction, Instrumentation and Simulations in medical applications. http://ific.uv.es/iris

IFIMED status and results of a Compton Telescope for … · 2016-12-02 · Completada la Fase I. Visita de inspección técnica: ... E0=E1+ 1 2 (E2+√ E2 2+4 E2mec 2 1 ... User-friendly

Embed Size (px)

Citation preview

Page 1: IFIMED status and results of a Compton Telescope for … · 2016-12-02 · Completada la Fase I. Visita de inspección técnica: ... E0=E1+ 1 2 (E2+√ E2 2+4 E2mec 2 1 ... User-friendly

Gabriela Llosá VIII CPAN Days, Zaragoza, 28-30 November 2016 1

IFIMED status and results of a Compton Telescope for hadron therapy

Gabriela Llosá, Enrique Muñoz, John Barrio, José Bernabéu, Ane Etxebeste, Carlos Lacasta, Josep F. Oliver, Pablo G. Ortega*, Carles Solaz.

Instituto de Física Corpuscular – IFIC/IFIMED (CSIC-UV) Valencia, Spain

* and CERN, Geneva, Switzerland

IRIS group: Image Reconstruction, Instrumentation and Simulations in medical applications.

http://ific.uv.es/iris

Page 2: IFIMED status and results of a Compton Telescope for … · 2016-12-02 · Completada la Fase I. Visita de inspección técnica: ... E0=E1+ 1 2 (E2+√ E2 2+4 E2mec 2 1 ... User-friendly

Gabriela Llosá VIII CPAN Days, Zaragoza, 28-30 November 2016 2

IFIMED

● Completada la Fase I. Visita de inspección técnica: Abril 2016.

● Instalación asociada orgánicamente al IFIC.

● Dependencias situadas en el parque científico de la UV.

● Pendientes de comenzar la Fase II: acelerador de protones.

Page 3: IFIMED status and results of a Compton Telescope for … · 2016-12-02 · Completada la Fase I. Visita de inspección técnica: ... E0=E1+ 1 2 (E2+√ E2 2+4 E2mec 2 1 ... User-friendly

Gabriela Llosá VIII CPAN Days, Zaragoza, 28-30 November 2016 3

IFIMED● Fase I:

● Obra civil.

● Equipamiento laboratorios de instrumentación para imagen, radiofrecuencia y microPET.

Laboratorio instrumentación

Laboratorio radiofrecuencia

Micro PET

Page 4: IFIMED status and results of a Compton Telescope for … · 2016-12-02 · Completada la Fase I. Visita de inspección técnica: ... E0=E1+ 1 2 (E2+√ E2 2+4 E2mec 2 1 ... User-friendly

Gabriela Llosá VIII CPAN Days, Zaragoza, 28-30 November 2016 4

IFIMED● MicroPET/CT: SuperArgus de Sedecal.

● SCSIE - Servei Central Suport a Investigacio Experimental.

● Servicios:

● Usuarios finales (investigación biomédica con ratas y ratones, imagenes TAC).

● Usuarios investigación: desarrollo de detectores y algoritmos de imagen.

Sample preparation room

Super Argus PET/CT

Page 5: IFIMED status and results of a Compton Telescope for … · 2016-12-02 · Completada la Fase I. Visita de inspección técnica: ... E0=E1+ 1 2 (E2+√ E2 2+4 E2mec 2 1 ... User-friendly

Gabriela Llosá VIII CPAN Days, Zaragoza, 28-30 November 2016 5

IFIMED● Laboratorio de instrumentación:

● Equipamiento de propósito general (fuentes calibración, cámara climática).

● Investigación en PET, Cámaras Compton y sondas.

Page 6: IFIMED status and results of a Compton Telescope for … · 2016-12-02 · Completada la Fase I. Visita de inspección técnica: ... E0=E1+ 1 2 (E2+√ E2 2+4 E2mec 2 1 ... User-friendly

Gabriela Llosá VIII CPAN Days, Zaragoza, 28-30 November 2016 6

X-rays progressively deposit energy as they advance Protons penetrate the tissue with reduced

energy deposition as they advance Deposit the maximum energy before

stopping, defining a peak also known as Bragg peak Almost no energy deposition beyond the

Bragg peak.

HT presents an improved sparing of normal tissue

Monitoring of the dose delivery is also more difficult since the beam is fully absorbed

X-rays

protonsIMRT protons carbons

Hadron therapy● Hadron therapy uses ionizing radiation to treat cancer.

● It is based on the special properties of heavy charged particles such as protons or light ions.

Page 7: IFIMED status and results of a Compton Telescope for … · 2016-12-02 · Completada la Fase I. Visita de inspección técnica: ... E0=E1+ 1 2 (E2+√ E2 2+4 E2mec 2 1 ... User-friendly

Gabriela Llosá VIII CPAN Days, Zaragoza, 28-30 November 2016 7

Hadron therapy● Large benefit over conventional radiation therapies in some

cases (ocular tumours, children, organs at risk, radioresistant tumours).

● Higher relative biological effectiveness (RBE) than photons.

● Precise delivery to tumour area => increase of cure rates and reduction of side and long term effects and secondary cancer.

L. Widesott et al. Intensity-modulated proton therapy versus helical tomotherapy in nasopharynx cancer: planning comparison and NTCP evaluation.IJROBP 72(2):589, Oct. 2008

photons Protons

Page 8: IFIMED status and results of a Compton Telescope for … · 2016-12-02 · Completada la Fase I. Visita de inspección técnica: ... E0=E1+ 1 2 (E2+√ E2 2+4 E2mec 2 1 ... User-friendly

Gabriela Llosá VIII CPAN Days, Zaragoza, 28-30 November 2016 8

Treatment monitoring● PROBLEM: the dose administered can not be directly measured

(as done in conventional radiotherapy).

● Secondary particles emitted during treatment can be used for monitoring the dose delivery. Essential:

● To verify dose delivery and correct for treatment deviations.

● To reduce safety margins and better exploit hadron therapy.

● Positron Emission Tomography (PET) + MC currently employed. + emission is correlated with the dose.

Page 9: IFIMED status and results of a Compton Telescope for … · 2016-12-02 · Completada la Fase I. Visita de inspección técnica: ... E0=E1+ 1 2 (E2+√ E2 2+4 E2mec 2 1 ... User-friendly

Gabriela Llosá VIII CPAN Days, Zaragoza, 28-30 November 2016 9

Treatment monitoring● Dose verification

with PET:

Comparison of dose planned and estimated from detected + activity.

● PET Limitations:● Positron production does not follow irradiation immediately.● Biological washout- activity carried away by metabolic processes.● Low amount of + activity induced- low efficiency.● Difficult online studies – partial ring.● Photons produce significant background.

Page 10: IFIMED status and results of a Compton Telescope for … · 2016-12-02 · Completada la Fase I. Visita de inspección técnica: ... E0=E1+ 1 2 (E2+√ E2 2+4 E2mec 2 1 ... User-friendly

Gabriela Llosá VIII CPAN Days, Zaragoza, 28-30 November 2016 10

Treatment monitoring in hadron therapy● Prompt gammas emitted from nuclei excited during therapy and

can be used for treatment monitoring.

● Emission correlated with dose.

● Emission ~ns after irradiation.

● Emitted in a continuous energy spectrum with energies of MeVs.

Research on collimated and Compton cameras for gamma detection

Energy (MeV)

protons

Teles

copePG

Image PG creation map

Page 11: IFIMED status and results of a Compton Telescope for … · 2016-12-02 · Completada la Fase I. Visita de inspección técnica: ... E0=E1+ 1 2 (E2+√ E2 2+4 E2mec 2 1 ... User-friendly

Gabriela Llosá VIII CPAN Days, Zaragoza, 28-30 November 2016 11

Compton camera configuration

Problems if the photon energy is unknown or if it can escape (MeV)

Scatterer + absorber: 2 interactions.

● Energy determined

● lower efficiency

Multilayer: 3 interactions in 3 detectors (+ correct ordering):

E0=E1+12(E2+√E2

2+4

E2m ec2

1−cos θ2

)

cos (θ)=1−E1m ec

2

E0(E0−E1)

Page 12: IFIMED status and results of a Compton Telescope for … · 2016-12-02 · Completada la Fase I. Visita de inspección técnica: ... E0=E1+ 1 2 (E2+√ E2 2+4 E2mec 2 1 ... User-friendly

Gabriela Llosá VIII CPAN Days, Zaragoza, 28-30 November 2016 12

Compton telescope @ IFIC/IFIMED● Three detector layers:

● Continuous LaBr3 crystals.

– High Compton probability.

– High light yield => good energy and timing resolution.● SiPM arrays.

● Aim at combination of:

● 2 int events (high efficiency) +

● 3 int events (high resolution).

NO ABSORPTION REQUIRED

Page 13: IFIMED status and results of a Compton Telescope for … · 2016-12-02 · Completada la Fase I. Visita de inspección técnica: ... E0=E1+ 1 2 (E2+√ E2 2+4 E2mec 2 1 ... User-friendly

Gabriela Llosá VIII CPAN Days, Zaragoza, 28-30 November 2016 13

Image reconstruction The cone surface is projected to the reconstruction volume

The intersection of several cone surfaces yields the position of the source

5 events1000 events

List mode ML-EM

Images shown: 15 iterations, number of events (~5k), Voxel = 1 mm3

Reconstruction of point sources allows performance comparison in different configurations

Page 14: IFIMED status and results of a Compton Telescope for … · 2016-12-02 · Completada la Fase I. Visita de inspección técnica: ... E0=E1+ 1 2 (E2+√ E2 2+4 E2mec 2 1 ... User-friendly

Gabriela Llosá VIII CPAN Days, Zaragoza, 28-30 November 2016 14

Three-layer prototype

Detector 1

Detectors 2 and 3

System can measure2/3 coincidence

events simultaneously

26.8x27.2x5 mm3

32.4x36.0x5 mm3

32.4x36.0x10 mm3

Page 15: IFIMED status and results of a Compton Telescope for … · 2016-12-02 · Completada la Fase I. Visita de inspección técnica: ... E0=E1+ 1 2 (E2+√ E2 2+4 E2mec 2 1 ... User-friendly

Gabriela Llosá VIII CPAN Days, Zaragoza, 28-30 November 2016 15

DetectorsDetector 1 Detectors 2 and 3

36 mm

32.4 mm

27.2 mm

26.8 mm

Page 16: IFIMED status and results of a Compton Telescope for … · 2016-12-02 · Completada la Fase I. Visita de inspección técnica: ... E0=E1+ 1 2 (E2+√ E2 2+4 E2mec 2 1 ... User-friendly

Gabriela Llosá VIII CPAN Days, Zaragoza, 28-30 November 2016 16

Crystals● LaBr

3 crystals:

● 27.2 x 26.8 x 5 mm3.

● 32.5 x 35 x 5 mm3.

● 32.5 x 35 x 10mm3.

● Tests with a PMT+ MCA: Energy resolution 3.5% FWHM @ 511 keV

Page 17: IFIMED status and results of a Compton Telescope for … · 2016-12-02 · Completada la Fase I. Visita de inspección técnica: ... E0=E1+ 1 2 (E2+√ E2 2+4 E2mec 2 1 ... User-friendly

Gabriela Llosá VIII CPAN Days, Zaragoza, 28-30 November 2016 17

Readout● VATA64HDR16 ASIC from IDEAS – 64 channels.

● Connected to a DAQ system made at IFIC- Valencia.

● Compact and portable system.

Page 18: IFIMED status and results of a Compton Telescope for … · 2016-12-02 · Completada la Fase I. Visita de inspección técnica: ... E0=E1+ 1 2 (E2+√ E2 2+4 E2mec 2 1 ... User-friendly

Gabriela Llosá VIII CPAN Days, Zaragoza, 28-30 November 2016 18

Coincidences board● Coincidence board based on Xilinx Virtex® FPGA.

● Coincidences between any two or all three planes - still independent image reconstruction.

Page 19: IFIMED status and results of a Compton Telescope for … · 2016-12-02 · Completada la Fase I. Visita de inspección técnica: ... E0=E1+ 1 2 (E2+√ E2 2+4 E2mec 2 1 ... User-friendly

Gabriela Llosá VIII CPAN Days, Zaragoza, 28-30 November 2016 19

Prototype● User-friendly DAQ software also developed at IFIC-Valencia.

Page 20: IFIMED status and results of a Compton Telescope for … · 2016-12-02 · Completada la Fase I. Visita de inspección técnica: ... E0=E1+ 1 2 (E2+√ E2 2+4 E2mec 2 1 ... User-friendly

Gabriela Llosá VIII CPAN Days, Zaragoza, 28-30 November 2016 20

Detector characterization

Energy resolution: 7 % FWHM @ 511 keV

Spatial resolution close to 1 mm FWHM

Temperature calibration

1.25 mm FWHM

Na-22 and Y-88

Page 21: IFIMED status and results of a Compton Telescope for … · 2016-12-02 · Completada la Fase I. Visita de inspección técnica: ... E0=E1+ 1 2 (E2+√ E2 2+4 E2mec 2 1 ... User-friendly

Gabriela Llosá VIII CPAN Days, Zaragoza, 28-30 November 2016 21

Laboratory tests: radioactive sources

Na-22 Y-88

511 keV

1275 keV

1836 keV

898 keV

● Tests in laboratory performed with two radioactive sources:

● Na-22: 511 and 1275 keV

● Y-88: 898 and 1836 keV

● Imaging capabilities tested in the range [0.5, 1.8] MeV.

Page 22: IFIMED status and results of a Compton Telescope for … · 2016-12-02 · Completada la Fase I. Visita de inspección técnica: ... E0=E1+ 1 2 (E2+√ E2 2+4 E2mec 2 1 ... User-friendly

Gabriela Llosá VIII CPAN Days, Zaragoza, 28-30 November 2016 22

Simulations - Measurements● Experimental measurements reproduced by simulations with

GATE 7.0

3.9 mm FWHM

Simulation

4.2 mm FWHM

Experimental

Very good agreement

Na-22 with two planes

Page 23: IFIMED status and results of a Compton Telescope for … · 2016-12-02 · Completada la Fase I. Visita de inspección técnica: ... E0=E1+ 1 2 (E2+√ E2 2+4 E2mec 2 1 ... User-friendly

Gabriela Llosá VIII CPAN Days, Zaragoza, 28-30 November 2016 23

Two planes: different configurations

Measurements with Na-22 selecting 1275 keV peak

4.2 mm FWHM 4.8 mm FWHM 2.6 mm FWHM

Page 24: IFIMED status and results of a Compton Telescope for … · 2016-12-02 · Completada la Fase I. Visita de inspección técnica: ... E0=E1+ 1 2 (E2+√ E2 2+4 E2mec 2 1 ... User-friendly

Gabriela Llosá VIII CPAN Days, Zaragoza, 28-30 November 2016 24

4.2 mm FWHM 2.6 mm FWHM

● Increasing distance between planes improves spatial resolution

● Detection efficiency decreases

● Balance efficiency and resolution

Efficiency = 6.3 * 10-4 Efficiency = 2.1 * 10-3

Two planes: different configurations

Page 25: IFIMED status and results of a Compton Telescope for … · 2016-12-02 · Completada la Fase I. Visita de inspección técnica: ... E0=E1+ 1 2 (E2+√ E2 2+4 E2mec 2 1 ... User-friendly

Gabriela Llosá VIII CPAN Days, Zaragoza, 28-30 November 2016 25

Two planes: images with different energies

4.1 mm FWHM5.7 mm FWHM

4.1 mm FWHM 2.9 mm FWHM

511 keV 1275 keV

1836 keV898 keV

Na-22

Y-88

Sum Spectrum

Page 26: IFIMED status and results of a Compton Telescope for … · 2016-12-02 · Completada la Fase I. Visita de inspección técnica: ... E0=E1+ 1 2 (E2+√ E2 2+4 E2mec 2 1 ... User-friendly

Gabriela Llosá VIII CPAN Days, Zaragoza, 28-30 November 2016 26

Two planes: source at different positions

● Sources placed in different positions, separated 20 mm.

● Points reconstructed separately.

Na-22 selecting 1275 keV peak Y-88 selecting 1836 keV peak

20 mm

Page 27: IFIMED status and results of a Compton Telescope for … · 2016-12-02 · Completada la Fase I. Visita de inspección técnica: ... E0=E1+ 1 2 (E2+√ E2 2+4 E2mec 2 1 ... User-friendly

Gabriela Llosá VIII CPAN Days, Zaragoza, 28-30 November 2016 27

Two planes: two sources imaged together● Sum of energies in both detectors:

898 keV

1836 keV

1275 keV

511 keV

● Selecting 1275 and 1836 keV peaks.● Sources separated 40 mm.● Data from both sources reconstructed together.

Sum energy spectrum

Y-88

Na-22

40 mm

Page 28: IFIMED status and results of a Compton Telescope for … · 2016-12-02 · Completada la Fase I. Visita de inspección técnica: ... E0=E1+ 1 2 (E2+√ E2 2+4 E2mec 2 1 ... User-friendly

Gabriela Llosá VIII CPAN Days, Zaragoza, 28-30 November 2016 28

Three planes: Na-22

36 mm

40 mm

32 mm

4.1 mm FWHM5.5 mm FWHM

511 keV1275 keV

Page 29: IFIMED status and results of a Compton Telescope for … · 2016-12-02 · Completada la Fase I. Visita de inspección técnica: ... E0=E1+ 1 2 (E2+√ E2 2+4 E2mec 2 1 ... User-friendly

Gabriela Llosá VIII CPAN Days, Zaragoza, 28-30 November 2016 29

Three planes: Y-88

898 keV

1836 keV

Sum energy spectrum

4.3 mm FWHM

898 keV1836 keV

2.5 mm FWHM

Page 30: IFIMED status and results of a Compton Telescope for … · 2016-12-02 · Completada la Fase I. Visita de inspección técnica: ... E0=E1+ 1 2 (E2+√ E2 2+4 E2mec 2 1 ... User-friendly

Gabriela Llosá VIII CPAN Days, Zaragoza, 28-30 November 2016 30

Tests with protons at KVI-CART● Tests at KVI-CART, AGOR cyclotron (Groningen).

● Proton beam, 150 MeV, ~ 10 prot/sec.⁸

● Graphite and PMMA targets.

Page 31: IFIMED status and results of a Compton Telescope for … · 2016-12-02 · Completada la Fase I. Visita de inspección técnica: ... E0=E1+ 1 2 (E2+√ E2 2+4 E2mec 2 1 ... User-friendly

Gabriela Llosá VIII CPAN Days, Zaragoza, 28-30 November 2016 31

Tests with protons at KVI-CART● Data with two layers in coincidence.

● PMMA target shifted to simulate Bragg peak variations.

● Shift observed in the Bragg peak position.

P. Solevi et al. Phys. Med. Biol. vol 61, num 14, p5149-5165, 2016.

Page 32: IFIMED status and results of a Compton Telescope for … · 2016-12-02 · Completada la Fase I. Visita de inspección técnica: ... E0=E1+ 1 2 (E2+√ E2 2+4 E2mec 2 1 ... User-friendly

Gabriela Llosá VIII CPAN Days, Zaragoza, 28-30 November 2016 32

In-Beam Tests with high energy gammas

Tests at HZDR 3MV Tandetron (Dresden).

Daniel Bemmerer1, Fine Fiedler1, Fernando Hueso1, Katja Römer1, Louis Wagner1,2 1 Helmholtz-Zentrum Dresden-Rossendorf (HZDR) , Dresden, Germany. 2 TU Dresden, Dresden, Germany.

Enrique Muñoz, John Barrio, José Bernabéu, Ane Etxebeste, Carlos Lacasta, Josep F. Oliver, Pablo G. Ortega*, Carles Solaz and Gabriela Llosá.

Instituto de Física Corpuscular - IFIC and IFIMED (CSIC-UV) Valencia, Spain* and CERN, Geneva, Switzerland

Page 33: IFIMED status and results of a Compton Telescope for … · 2016-12-02 · Completada la Fase I. Visita de inspección técnica: ... E0=E1+ 1 2 (E2+√ E2 2+4 E2mec 2 1 ... User-friendly

Gabriela Llosá VIII CPAN Days, Zaragoza, 28-30 November 2016 33

Tests with high energy gammas

● Coincidences with 2/3 layers. Too low rate for three layers.

● Results with layers 1-3 (target at 43 mm, distance between planes 55 mm).

● Telescope placed in three positions wrt target.

Nominal: -10, 0, +10 mmReconstructed: -13.7, 0, +10.1 mm

PRELIMINARY RESULTS

Page 34: IFIMED status and results of a Compton Telescope for … · 2016-12-02 · Completada la Fase I. Visita de inspección técnica: ... E0=E1+ 1 2 (E2+√ E2 2+4 E2mec 2 1 ... User-friendly

Gabriela Llosá VIII CPAN Days, Zaragoza, 28-30 November 2016 34

Summary and conclusions ● Three-layer Compton prototype based on continuous

LaBr3 crystals and SiPMs constructed at IFIC-Valencia.

● Studies of detector performance have been carried out with very good agreement with simulations.

● Successfully reconstructed images from sources in the range [0.5 – 4.4] MeV.

● First tests in accelerator facilities carried out.

● Ongoing work is focused on combination of two and three interaction events and prototype performance improvement.

Page 35: IFIMED status and results of a Compton Telescope for … · 2016-12-02 · Completada la Fase I. Visita de inspección técnica: ... E0=E1+ 1 2 (E2+√ E2 2+4 E2mec 2 1 ... User-friendly

Gabriela Llosá VIII CPAN Days, Zaragoza, 28-30 November 2016 35

Acknowledgements● This work was supported in part by the European

Commission-FP7 through ENVISION project (G.A. num 241851).

● This work was supported in part through the Spanish Ministerio de Economía y competitividad/Plan Nacional de I+D+i (FPA2014-53599-R) and IFIC's Center of Excellence Severo Ochoa (SEV-2014-0398).

● Group members are supported through Ramón y Cajal, Atracció de Talent (UV), Generalitat Valenciana and CPAN contracts.

Thank you! Related publications:● P. Solevi et al. Phys. Med. Biol., 2016, volume 61, num 14, 5149-5165● G. Llosá et al. Front. Oncol., 2016, volume 6: 14

http://ific.uv.es/iris