16
IFAD MONITORING AND EVALUATION WORKSHOP @ALISA HOTEL, ACCRA 12-14 DEC. 2011 June 27, 2022 1

IFAD MONITORING AND EVALUATION WORKSHOP @ALISA HOTEL, ACCRA 12-14 DEC. 2011 August 7, 2015 1

Embed Size (px)

Citation preview

Page 1: IFAD MONITORING AND EVALUATION WORKSHOP @ALISA HOTEL, ACCRA 12-14 DEC. 2011 August 7, 2015 1

IFAD MONITORING AND EVALUATION WORKSHOP

@ALISA HOTEL, ACCRA 12-14 DEC. 2011

April 19, 2023

1

Page 2: IFAD MONITORING AND EVALUATION WORKSHOP @ALISA HOTEL, ACCRA 12-14 DEC. 2011 August 7, 2015 1

INTRODUCTION PURPOSE OF THE M&E PLANM&E SYSTEM UNDER THE METASIPCAADP/METASIP M&E FRAMEWORKHOW IS REPORTING ORGANIZED? MAJOR BOTTLENECKS IN THE M&E SYSTEMCHALLENGES FACING THE SECTOR M&E SYSTEM

19. April 2023

2

Page 3: IFAD MONITORING AND EVALUATION WORKSHOP @ALISA HOTEL, ACCRA 12-14 DEC. 2011 August 7, 2015 1

The Ministry of Food and Agriculture (MOFA) is the lead ministry responsible for policy, planning, monitoring and evaluation of policy and programmes in the agriculture sector

MOFA responds to the national development initiatives with policies and strategies that address the national goals

Next step towards the realisation of the policy objectives is the development of a sector plan (METASIP)for the implementation of the broad strategies specified in the policy.

19. April 2023

3

Page 4: IFAD MONITORING AND EVALUATION WORKSHOP @ALISA HOTEL, ACCRA 12-14 DEC. 2011 August 7, 2015 1

The METASIP is a sector wide investment plan and includes activities of agriculture related Ministries, Departments and Agencies (MDAs) based on the classification of functions for the sector

Extensive consultations with all stakeholders were undertaken at central and decentralized levels for the preparation of the investment plan

19. April 2023

4

Page 5: IFAD MONITORING AND EVALUATION WORKSHOP @ALISA HOTEL, ACCRA 12-14 DEC. 2011 August 7, 2015 1

Increase effectiveness increase accountability and

transparency The overall goal of the sector M&E

system is to facilitate the tracking of progress effectiveness of service delivery as well as identify implementation

challenges associated with the sector plan

19. April 2023

5

Page 6: IFAD MONITORING AND EVALUATION WORKSHOP @ALISA HOTEL, ACCRA 12-14 DEC. 2011 August 7, 2015 1

The principal actors in the sector M&E are The farming community

policy makers

donor community

Other MDAs

19. April 2023

6

Page 7: IFAD MONITORING AND EVALUATION WORKSHOP @ALISA HOTEL, ACCRA 12-14 DEC. 2011 August 7, 2015 1

The M&E system was designed to respond to the results framework of the METASIP

Preparation and dissemination of Annual reports

Support of programmes and projects implementation and policy formulation

Serves as inputs for NDPC’s Annual Progress Report (APR)

19. April 2023

7

Page 8: IFAD MONITORING AND EVALUATION WORKSHOP @ALISA HOTEL, ACCRA 12-14 DEC. 2011 August 7, 2015 1

Monitoring and evaluation of the implementation of METASIP is essential to provide managerial support, assuring accountability and learning and knowledge creation.

METASIP implementation taking place within a regional context known as CAADP.

Need to report on achievement of CAADP pillars, hence the CAADP M&E Framework.

The METASIP M&E framework was subsequently aligned with the CAADP M&E framework

19. April 2023

8

Page 9: IFAD MONITORING AND EVALUATION WORKSHOP @ALISA HOTEL, ACCRA 12-14 DEC. 2011 August 7, 2015 1

MoFA is responsible for providing data on the input, process, outcome and some input indicators

Impact indicators are sourced from other MDAs. Eg. GDP, Poverty Incidence Ratio from GSS

matrix of some indicators, corresponding issues and source of data.

19. April 2023

9

Page 10: IFAD MONITORING AND EVALUATION WORKSHOP @ALISA HOTEL, ACCRA 12-14 DEC. 2011 August 7, 2015 1

To report on indicators at the decentralized levels, excel software is used

The excel reporting formats were developed for the districts, regions and national (PPMED)

these excel files can be linked up at the regional and national levels automatically to eliminate human errors and hasten the report writing process

19. April 2023

10

Page 11: IFAD MONITORING AND EVALUATION WORKSHOP @ALISA HOTEL, ACCRA 12-14 DEC. 2011 August 7, 2015 1

HOW IS REPORTING ORGANIZED ? (1/3)

The monitoring and evaluation system of MOFA is progressively institutionalized and operated in a decentralized and participatory manner.

Regular data collection is implemented at the district level through District Agricultural Development Units (DADU) offices, under the technical guidance and backstopping by PPMED, SRID and technical directorates.

In each district, Special Duty Extension Officers, specialized AEAs (livestock, perennial crops, etc.), and sometimes zonal officers and other AEAs, collect a series of data that are reported on monthly, quarterly, seasonal or annual basis depending on the data.

19. April 2023

11

Page 12: IFAD MONITORING AND EVALUATION WORKSHOP @ALISA HOTEL, ACCRA 12-14 DEC. 2011 August 7, 2015 1

Some data are reported within decentralized MOFA system, while others are reported to agricultural programmes and projects

Within decentralized MOFA, data are consolidated and sometimes analysed by the district MIS officer (DMISO), and submitted to the DDA for review

The DDA sends the district report through the Regional Director of Agriculture to the Regional M&E officer at RADU

The Regional M&E officer consolidates all district reports into a regional report, incorporating data from decentralized directorates, special studies and agriculture projects and programmes.

19. April 2023

12

Page 13: IFAD MONITORING AND EVALUATION WORKSHOP @ALISA HOTEL, ACCRA 12-14 DEC. 2011 August 7, 2015 1

This report is sent quarterly and annually through the RDA to Chief Director of MOFA and Director, PPMED

At the national level, PPMED prepares the overall MOFA report by gathering reports from each region and from each directorate, agriculture related boards and authorities, and by incorporating data from agricultural project and programme reports and from special studies.

MOFA report is then validated by the Chief Director and distributed within decentralized MOFA, and sent to stakeholders, other MDA’s, Development Partners involved in Multi-Donors Budget Support.

19. April 2023

13

Page 14: IFAD MONITORING AND EVALUATION WORKSHOP @ALISA HOTEL, ACCRA 12-14 DEC. 2011 August 7, 2015 1

Poor understanding and awareness of M&E objectives and dimensions in the context of FASDEP and national frameworks by AEAs;

Poor awareness of METASIP and national objectives and targets, and implication for data collection by AEAs;

Poor mobility and incentive for data collectors (AEAs) limiting scope and coverage of data collection;

19. April 2023

14

Page 15: IFAD MONITORING AND EVALUATION WORKSHOP @ALISA HOTEL, ACCRA 12-14 DEC. 2011 August 7, 2015 1

Inadequate skilled staff in implementing the M&E system at the district

The M&E system is based on technology which is sometimes unreliable (poor internet connectivity)

High staff attrition at district, regional and national levels

Inadequate computers and software for data capture

19. April 2023

15

Page 16: IFAD MONITORING AND EVALUATION WORKSHOP @ALISA HOTEL, ACCRA 12-14 DEC. 2011 August 7, 2015 1

Most impact Indicators not collected annually. Eg. Malnutrition status, Poverty levels, Income

Collection of indicators by MDAs not synchronized with MoFA needs/requirements

Some directorates want their activities to be more be visible in the report (collation instead of attribution)

Lack of consistency in some data collected at the district level

Annual reporting on 55 indicators is difficult, cumbersome and sometimes boring