IEEE/WGOTDecember 9-10, 2014, Orlando FL
1
PER Update &Compliance Lessons Learned
IEEE Working Group on Operator TrainingDecember 9-10, 2014, Orlando, FL
Margaret StambachSERC Reliability CorporationTraining Programs Manager
IEEE/WGOTDecember 9-10, 2014, Orlando FL
Learning ObjectivesAt the conclusion of this tutorial, you should be able to:
• Identify the NERC standard from the PER family that was historically among the top 10 most violated.
• State the PER training standard currently in effect, when it became fully enforceable and when it will be fully retired.
• List the major differences between the currently enforceable training standard and the new emerging standard.
2
IEEE/WGOTDecember 9-10, 2014, Orlando FL
Topics
3
• Audit Violations – “Then” and “Now”• Training Standards History
• PER-002-0 vs. PER-005-1 vs. PER-005-2• PER Family of Standards
• Enforcement & Inactive Dates• PER-005-1compared to emerging PER-005-2
IEEE/WGOTDecember 9-10, 2014, Orlando FL
Audit Violations – “THEN” (2009)
4
TOP 10 Most Violated Standards
PRC
CIPCIP
VARFAC
FACTOP
PERFAC
EOP
IEEE/WGOTDecember 9-10, 2014, Orlando FL
PER Violations – 2010 CAR
5
• In 2010, PER-002 Training Standard was ranked as one of the Top 10 Most Violated Standards.
• PER-002 CAR publicly provided information and guidance to facilitate compliance.
IEEE/WGOTDecember 9-10, 2014, Orlando FL
PER-002: “Operating Personnel Training”
6
PER-002 FULLY RETIRED 3/31/2013PER-005-1 R1 & R2 Enforceable 4/1/2013
IEEE/WGOTDecember 9-10, 2014, Orlando FL
PER-002 Violations - 2010
7
91 Total PER-002 Violations
52 Program Deficiency Violations!
R2 R3
R4 R1
Number of Violations
IEEE/WGOTDecember 9-10, 2014, Orlando FL
Audit Violations – “NOW” (2014)
8
TOP 10 Most Violated StandardsKey Compliance Enforcement Metrics and TrendsCompliance Committee Open SessionAugust 13, 2014
7 CIP1 PRC1 VAR1 FAC
PER-005-1 did not make the list!!!
IEEE/WGOTDecember 9-10, 2014, Orlando FL
We’ve Come a Long Way – Baby!
9
IEEE/WGOTDecember 9-10, 2014, Orlando FL
PER-005-1 Implementation
10
All 3 Rqmts now enforceable!
IEEE/WGOTDecember 9-10, 2014, Orlando FL
Other PER Standards Now Enforceable
11
www.nerc.com/Program Areas & Departments/Standards/US Enforcement Dates
To implement ALL actions necessary.
Assure all real-time operators are certified
RC entity must be staffed with trained, certified personnel with wide-area view
NO inactive date
NO inactive date
ENF. DATE
INACTIVE 6-30-2016Systematic approach, task verification, EOPs training with sim
NO inactive date
IEEE/WGOTDecember 9-10, 2014, Orlando FL
And How Are We Doing With PER?
12
NERC Searchable NOP Spreadsheet
www.nerc.com/Program Areas & Departments/Compliance & Enforcement/Enforcement & Mitigation
Searchable Enforcement Page 11-25-14
IEEE/WGOTDecember 9-10, 2014, Orlando FL
13
NOP Search Results for PERJune 2008-November 2014
• PER-005-1 (System Personnel Training)• 2 violations: R1. 1.1, 1.2, R2. (List of RR Tasks, Task Updates, Design
& Development of Program, Verification)• Previous version: PER-002 had many – in top 10 most violated.
• PER-004-2 (RC Staffing)• None for current version. 5 violations of previous version (V1), relating
to lack of credentials & wide-area understanding.
• PER-003-1 (Operating Personnel Credentials)• None for current version. Many for the Version 0.
• PER-001-0.2 (Operating Personnel Resp/Auth)• None for current version. 5 violations of previous version (V0)
*** Higher Fines!!
*** Higher Fines!!
IEEE/WGOTDecember 9-10, 2014, Orlando FL
Transition to PER-005-2
14
IEEE/WGOTDecember 9-10, 2014, Orlando FL
FERC Order Approving PER-005-2
15
IEEE/WGOTDecember 9-10, 2014, Orlando FL
PER Inactive Date – Version 1PER Enforcement Date – Version 2
16
6/30/2016 PER-005-2
All PER-005-1 Requirements Become Inactive 6-30-2016Per-005-2 Becomes Enforceable 7-1-2016
IEEE/WGOTDecember 9-10, 2014, Orlando FL
PER-005-1, “System Personnel Training”
Purpose/Applicability
17
Reliability-related tasks on the BES
Reliability Coordinator
Balancing Authority
Transmission Operator
Purpose: To ensure that System Operators performing real-time, reliability-related tasks on the North American Bulk Electric System (BES) are competent to perform those reliability-related tasks.
RC
BATOP
IEEE/WGOTDecember 9-10, 2014, Orlando FL
PER-005-2, “Operations Personnel Training”
Purpose/Applicability
18
Reliability-related tasks on the BES
Reliability Coordinator
Balancing Authority
Transmission Operator
Transmission Owner
Generator Operator
Purpose: To ensure that personnel performing or supporting Real-time operations on the Bulk Electric System (BES) are trained using a systematic approach.
ENFORCEMENT7/1/2016
“Certain”
GOP
“Certain”TO
IEEE/WGOTDecember 9-10, 2014, Orlando FL
PER-005-2 (Enforceable 7-1-2016)
• Expansion of “Applicable Entities”
19
Recognizes that personnel OTHER than System Operators need formal Systematic Approach to Training (SAT) if they perform RR tasks!
IEEE/WGOTDecember 9-10, 2014, Orlando FL
“Other” Personnel - TO• Expanded list of “Applicable Entities”
• RC, BA, TOP (as before), but added
4.1.4 Transmission Owner that has:
4.1.4.1 Personnel, excluding field switching personnel, who can act independently to operate or direct the operation of the Transmission Owner’s Bulk Electric System transmission Facilities in Real-time.
20
Addresses FERC Directive about “Local Transmission Control Center (LTCC)” Personnel. Under direction of TOP, but exercise control over a significant portion of the BES. Example?
IEEE/WGOTDecember 9-10, 2014, Orlando FL
• Expanded list of “Applicable Entities”• RC, BA, TOP (as before), but added:
4.1.5 Generator Operator that has:
4.1.5.1 Dispatch personnel at a centrally located dispatch center who receive direction from the Generator Operator’s Reliability Coordinator, Balancing Authority, Transmission Operator, or Transmission Owner, and may develop specific dispatch instructions for plant operators under their control.
These personnel do not include plant operators located at a generator plant site or personnel at a centrally located dispatch center who relay dispatch instructions without making any modifications.
21
Addresses FERC directive about including “generator operators”. NOT plant operators of individual units! Example: BA directs GOP to deliver 300 MW to grid and GOP’s central dispatch determines best way to deliver from its portfolio of units . . .the key is – does GOP have decision-making duties?
“Other” Personnel - GOP
IEEE/WGOTDecember 9-10, 2014, Orlando FL
22
New NERC Glossary Definition:Operations Support Personnel
Individuals who perform current day or next day outage coordination or assessments, or who determine SOLs, IROLs, or operating nomograms, in direct support of Real-time operations of the Bulk Electric System.
IEEE/WGOTDecember 9-10, 2014, Orlando FL
23
Revised NERC Glossary Definition:System Operator
An Individual at a Control Center of a Balancing Authority, Transmission Operator, or Reliability Coordinator, who operates or directs the operation of the Bulk Electric System (BES) in Real-time.
IEEE/WGOTDecember 9-10, 2014, Orlando FL
24
Comparison HighlightsPER-005-1
3 Requirements• R1: SAT for RC, BA, TOP• R2: Verify RR Tasks• R3: 32 hours emergency
ops training per year– R3.1: Simulation technology
for emergency training if entity meets IROL/SOL criteria
PER-005-2
6 Requirements• R1: SAT for RC, BA, TOP• R2: SAT for applicable TOs• R3: Verify RR Tasks• R4: Simulation technology for
emergency training if entity meets IROL/SOL criteria
• R5: SAT for Operations Support Personnel
• R6: SAT for applicable GOPs
IEEE/WGOTDecember 9-10, 2014, Orlando FL
25
PER-005-2: FERC Directives Addressed• Includes Local Transmission Control Center
Personnel (TO) – Order 742
• Includes applicable GOPs Order 693
• Includes outage coordination & assessment personnel and those who determine SOL/IROLs and operating nomograms. Order 693
• Considers an implementation plan for entities gaining IROL control/authority and thus becoming subject to R4. The implementation plan is that the entity has 12 months to comply with R4.
Order 742
IEEE/WGOTDecember 9-10, 2014, Orlando FL
26
PER-005-2: 32 EOPs Hours Eliminated
• To mandate a pre-set number of hours is inconsistent with a systematic approach to training (SAT).
• The number of emergency training hours should be dictated by the RR tasks that need to be trained upon.
• The removal of 32 hours is also considered to qualify for paragraph 81 because it is redundant to SAT process.
IEEE/WGOTDecember 9-10, 2014, Orlando FL
Summary
27
• The original PER Training Standard, “Operating Personnel Training” (PER-002-0) was among the top 10 most violated standards.• PER-005-1 has a much better compliance “track record”
• PER-005-1, “System Personnel Training” is currently in effect. Fully enforceable on April 1, 2014, will be retired June 30, 2016.
• PER-005-2, the emerging standard, has broader applicability and more requirements than the currently enforceable standard. It also eliminates the 32 EOPs hours per year.