7
Ministry of Information Technology Government of Pakistan National Grassroots ICT Research Initiative – (2012-13) Final Year Project (FYP) Nomination Form University/Institute Detail: Name of University/Ins titution Bahria University Physical Address: BU Karachi Campus 13- National stadium road. Telephone & Fax No: 021-99240002 021-99240351 Departmen t Name: Electrical Engineering City: Karachi Province: Sindh Nominated Project Details:- Project Supervisor Name and Designation: Engr. Masood Usman Lecturer Contact Details: Email: Cell No Off No: Project Supervisor Qualification: MS (Automation) No of Publicati ons of Superviso rs: Students Name(s): 1._Muhammad Umar 2._Faryal Mughal ___ 3._Mirza Waqas Baig _ Students Mobile No: 1._0315-0261216 ___ 2._0332-2604586 3._0342-8181324 Students CGPA 1.__3.18 _________ _ 2.__3.19 _________ __ 3.__3.38 _________ __ Students Email: 1.jimi.umar@yahoo. com 2.fmughalsays@gmai l.com 3. [email protected]

ICT R&D

Embed Size (px)

Citation preview

Page 1: ICT R&D

Ministry of Information TechnologyGovernment of Pakistan

National Grassroots ICT Research Initiative – (2012-13)

Final Year Project (FYP) Nomination Form

University/Institute Detail:Name of University/Institution

Bahria University Physical Address:

BU Karachi Campus 13- National stadium road.

Telephone & Fax No: 021-99240002021-99240351

Department Name:

Electrical Engineering

City: Karachi Province: Sindh

Nominated Project Details:-

Project Supervisor Name and Designation:

Engr. Masood Usman

Lecturer

Contact Details:

Email:Cell NoOff No:

Project Supervisor Qualification:

MS (Automation)No of Publications of Supervisors:

Students Name(s):1._Muhammad Umar2._Faryal Mughal___3._Mirza Waqas Baig_

Students Mobile No:

1._0315-0261216___2._0332-26045863._0342-8181324

Students CGPA1.__3.18__________2.__3.19___________3.__3.38___________

Students Email:

[email protected]@gmail.com3. [email protected]

Degree Programme/ Title:

Bachelors in Electrical Engineering

Area of Specialization:

Electronics

Page 2: ICT R&D

Ministry of Information TechnologyGovernment of Pakistan

Final Year Project Details:

A. Project Title: PLC BASED AUTOMATIC FEED SYSTEM VIA HMI B. Project Start Date: January 3, 2013C. Project Finish Date: May, 2013D. Project Summary (less than 200

words)

To make a system in which we can measure and control the feed of the two different solid (crushed form) materials according to the desired ratio. Monitoring the temperature and level of the material in the hopper (storage area) before feeding. To sense & feed the different proportion of different raw

materials to the any plant. Also using HMI to set the proportion of feed. Load sensors which sense the weight of the raw material in the

main hoper. Temperature will be measured before the material moves on

under the uncertain conditions feed will be stopped.

E. Project Objectives:

Page 3: ICT R&D

Ministry of Information TechnologyGovernment of Pakistan

To sense & feed the different proportion of different raw materials to the any plant.

Also using HMI to set the proportion of feed. Load sensors which sense the weight of the raw material in the

main hoper. Temperature will be measured before the material moves on

under the uncertain conditions feed will be stopped

F. Project Implementation Method

The project is based on PLC once we acquire PLC we implement all the sensor and logics to get all the required output. We’ll be using the HMI compatible to our PLC to monitor the temperature and level of storage. And also set the desired rate of feed. When temperature and level is undesirable than this automatic system should stop the feed to the main hopper.

G. Key Milestones of the Project with dates

Page 4: ICT R&D

Ministry of Information TechnologyGovernment of Pakistan

S.NoElapsed time since start of the project

Milestone Deliverable

1. Testing Equipments 15 Jan 2013

2. Design Algorithm 5 March 2013

3. Program Developing/Designing (Coding)

30 March 2013

4. Mechanical Assembling 20 April 2013

5. Burning Program and Testing May 2013

H. Final Deliverable of the Project: (Please tick one of the following) Hardware System Software System HW/SW integrated system Software Simulation results Comparative Study Theoretical Design/Architecture Simulator Design Other Please specify

I. Please Specify Technical Details of Final Deliverable

There are no such Technical details at this date.

J. Equipment required for making prototype/working model:

(Please indicate in tabular form the required equipments along with estimated cost)

1. PLC 20000 Rs2. Temperature sensor (PT-100)*2 5000 Rs 3. IR sensor * 6 1000 Rs4. DC gear Motor 3000 Rs5. Motor Driver (LM298) 3000 Rs 6. HMI 10000 Rs 7. Load Cells * 3 9000 Rs8. Conveyor Belt and Mechanical structure 15000 Rs9. Actuators *3 20000 Rs10. Others 4000 Rs

Page 5: ICT R&D

Ministry of Information TechnologyGovernment of Pakistan

Total cost 90000 Rs

K. Benefits of the Project (Please specify Direct/Indirect beneficiaries)

It is widely used in different process industries. In industries the proportion of the different raw materials is very important for the

quality product.

It is certified that the FYP titled “PLC BASED AUTOMATIC FEED SYSTEM VIA HMI” has been approved and is being undertaken by the above mentioned students as their Final Year Project.

It is undertaken that the undersigned have understood the “terms & conditions” of the program, and further reiterate that, if the subject FYP is approved for funding, the disbursed funds shall be utilized as per “terms & conditions” and the undersigned will be liable to reimburse/refund the unutilized amount and other cost not approved by the National ICT R&D Fund, if any.

It is further undertaken that after utilization of funds, the said “Fund Utilization Report” shall be furnished along with the other required deliverables as and when required by the National ICT R&D Fund.

[1.] Name, Designation & Signature of Supervisor: Engr.Masood Usman (Lecturer)

1.[2.] Name & Signatures of HOD:

Dr.Haroon Rashid