ALMA Integrated Computing Team

Coordination & Planning Meeting #1Santiago, 17-19 April 2013

ICT infrastructure changes

Erik Allaert

Page 2: ICT infrastructure changes Erik Allaert

Mailing lists: centralize in one place

Repository: CVS → SVN newer, still actively maintained technology

TWiki: almaw.hq.eso.org → ictwiki.alma.cl new location new structure new version

JIRA: new server new version new project heavily customized workflow

Overview

April 2013 ICT planning meeting #1 / SCO 2

Page 3: ICT infrastructure changes Erik Allaert

17 common ICT mailing lists, hosted centrally at SCO All lists configured same, same policy:

per default no monthly password reminder a limit of 3MB per message lists are archived list-membership is restricted, i.e. (un)subscription requires the

approval of a moderator lists are administered by SE-QM only …

For details: see

https://ictwiki.alma.cl/twiki/bin/view/SEQM/IctMailingLists

(requires account on ictwiki)

Mailing lists

April 2013 ICT planning meeting #1 / SCO 3

Page 4: ICT infrastructure changes Erik Allaert

Note: only for project2 – other projects remain under CVS at cvssrv.hq.eso.org

Decided at September 2012 planning meeting – subject to conditions for using replication software (WANdisco)

Initially planned for January 2013, but postponed due to acceptance activities and other JAO priorities.

Scheduled for 18-22 March, ready on 20 March

CVS → SVN …

April 2013 ICT planning meeting #1 / SCO 4

Page 5: ICT infrastructure changes Erik Allaert

Test-server (without replication) available well in advance to exercise normal operation by developers, NRI, build-farm, … allowed to identify more suitable directory structure tested fixes for code referring explicitly to CVS administrative files some Makefiles assumed particular file-permissions on binary

files, while SVN deals with that in a different way

After migration and enabling replication few WANdisco cases (talk-back script, logs, address already in

use) SVN client version

Pending: branching strategy / use of trunk

… CVS → SVN

April 2013 ICT planning meeting #1 / SCO 5

Page 6: ICT infrastructure changes Erik Allaert

almasw.hq.eso.org: TWiki 4.3.1 (Apr 2009) Organized in webs corresponding to CIPT-subsystems In use in its current form since ~2004 Accumulated ~450 users (in spite of being open for almost all

webs)

ictwiki.alma.cl: Twiki 5.1.3 (Dec 2012) Organized in webs according to ICT-groups Subject to JAO access policy: user account needed (130 at start) Available for testing since ~Jan 2013, to users since Apr 2013 With read-only snapshot of almasw (as it was when frozen) Option to move old topics to new webs for limited time

TWiki

April 2013 ICT planning meeting #1 / SCO 6

Page 7: ICT infrastructure changes Erik Allaert

Decided during Sept 2012 CIPT leads-meeting to go for new ICT “project” within JIRA

Opted for separate, independent server as JIRA host All ICT standard activities should have an ICT ticket (to

which other projects/tickets can link) Access to ICT-project: all ICT-members, TBD list of

scientists, operators, engineers (to be agreed with DSO/SIST/ASG)

Clear initial involvement of group-lead to decide on the priority of the issue

JIRA …

April 2013 ICT planning meeting #1 / SCO 7

Page 8: ICT infrastructure changes Erik Allaert

jira.alma.cl: JIRA 4.4 > 130 projects, 40 issue-types, >1350 users, … several system-wide settings not optimal for ICT (e.g. resolution,

priority, time tracking, issue statuses, …)

New server: JIRA 5.2.9 9 issue types, with clear definition specific workflow for typical ICT software development process

… JIRA

April 2013 ICT planning meeting #1 / SCO 8