12
- - - - - - - - - - -- - - - - - - - - - - - - - - - - -- 20/3 30/3 EXISTING MCCI0-1 EXISTING 480V PANEL -- EXISTING CAPACITY: 400 A I l 2 EXISTING CAPACITY• 225A 2 I EXISTING CONNECTED LOAD: G7 FLA I EXISTING CONNECTED LOAD: 103 FLA EXIST GOOA, 480V, '------ - - 2'C-3•2/0+•G GND I'C.O. SPARE - 0 - NEW CONNECTED LOAD: 123 FLA NEW CONNECTED LOAD:IIFLA TOTAL CONNECTED LOAD: 190 FLA TOTAL CONNECTED LOAD:II4 FLA PHASE, 3 W, G5KAIC I Il-m- CD I ® I l t1 LI'C-3•10+•10 GND 0 DISTRIBUTION PANEL DP-1 G:F•s••IO GND __LO c_ GND TRANSFORMER D , rr '"Y"\ 15KVA 480V-240V 3-PHASE, JW I'C-J•G+•IO GND ----L :C. NOTES: 0 REPLACE EXISTING STARTER AND MCP FOR OTI-BLV-02 WITH A 225AF, 175AT, 480V, G5KAIC, 3-POLE MOLDED CASE CIRCUIT BREAKER. ® REPLACE EXISTING STARTER AND MCP FOR OTI-CPS-01 WITH A 20AF, 20AT, 480V, G5KAIC, 3-POLE MOLDED CASE CIRCUIT BREAKER. 0 FUTURE RELOCATED FEED. REFERENCE ELECTRICAL SITE PLAN FOR RELOCATION. CD PROVIDE 3-POLE CIRCUIT BREAKER. ® PROVIDED BY OTHERS. ® PROVIDE HOA SWITCH AND RUN LIGHT. 0 PROVIDED BY EQUIPMENT MANUFACTURER. -=- E 16262 "Jta: -=- WARNING 0 v. I IF THIS BAR DOES NOT MEASURE I" THEN DRAWING IS NOT TO SCALE. BROWN AND CALDWELL O&OrmDo .. ,., __ .. ,., - -"""'""""- .. ,., """"""' I HORIZONTAL NONE SCALE I VERTICAL NONE - l ='>--I'C-3•10+•10 GND NEMA 3R NEMA 3R NEMA 3R NEMA 3R DENSADEG BIOFOR-C BIOFOR-N BIOSTYR I'C-3•10+•10 GND \ ,----------1 MCP j VSKID MOUNTED i PUMP/STARTER I j NEMA 3R : ® I i i i i 7.5 i __________ ] NEMA 3R 1 I _j cp,..._I'C-2•12+•12 GND £ ='>--I'C-3•12+•12 GND u..w 8 MINI POWER ZONE 7.5 KVA 480V-120/240V I-PHASE NEMA 3R SUMP PUMP CONTROL PANEL .-:p__MANUFACTURER SUPPLIED CABLE V2 METROPOLITAN WASTEWATER DEPARTMENT Cify San DieJO D Tt: IREQ. NO. VA NO USAGE QTY PHASE A PHASE B PHASE C A/PLS NO USAGE QTY PHASE A PHASE B PHASE C A/PLS I TRANSFORMER D 5000 30/3 2 BIOSTYR 11085 50/3 3 I 5000 - 4 I 11085 - 5 I 5000 - G I 11085 - 7 BIOFOR UNIT-C G928 30/3 8 BIOFOR UNIT-N G928 30/3 12GO 13188 VA PHASE A 540 540 VA G928 540 124G8 VA PHASE B 540 540 PANELBOARD SCHEDULE VA G928 11928 BRKR CKT - 10 - 12 20/2 14 - IG 20/3 18 - 20 - 22 24 PANEL NO: EQUIPMENT TAG: LOCATION: VOLTAGE: MAIN BREAKER: BUS SIZE: I I SUMP PUMP PANEL I I SPARE I I PHASE VA SUBTOTALS PHASE VA TOTALS PANELBOARD VA TOTALS PANELBOARD AMPS TOTALS DP-1 480 VAC 225A 225A PANELBOARD SCHEDULE VA 333 1834G 31534 VA G928 333 1834G 30814 VA G928 333 1834G 30274 92G22 111.4 A BRKR - - - - - - CKT 9 II 13 15 17 19 21 23 CKT NO I 3 5 7 I I MINI POWER ZONE XFMR SPARE ' I I SPACE PHASE VA SUBTOTALS USAGE RECEPTACLES RECEPTACLES SPARE PHASE VA SUBTOTALS QTY BRKR CKT A/PLS NO 20/1 GFCI 2 20/1 GFCI 4 20/1 G 8 PANEL NO EQUIPMENT TAG LOCATION VOLTAGE MAIN BREAKER BUS SIZE USAGE QTY PHASE A PHASE B RECEPTACLES 720 SPARE 20/1 SPARE 20/1 PHASE VA SUBTOTALS 720 PHASE VA TOTALS 12GO 540 PANELBOARD VA PANELBOARD AMPS TOTALS PNL P 120/240 VAC 40A 40A CMINl DRAWI NG NO. E-02 SHEET NO. TOTALS MOUNTING TYPE PHASE WIRE SHORT CIRCUIT VA VA MOUNTING TYPE PHASE WIRE SHORT CIRCUIT NEMA 3R 3 PHASE 3 G5 KAIC BRKR A/PLS 20/1 GFCI 1800 7.5 A NEMA 3R I PHASE 22 KAIC DRAWING STATUS REVI SION DESCRIPTI ON RAIIN CKD APD 20 PE: EM A/QC POINT LOMA WASTE WATER TREATMENT PLANT BIOLOGICAL AERATED FILTER PILOT STUDY ELECTRICAL SINGLE LINE DIAGRAM AND PANELBOARD SCHEDULES CITY OF SAN DIEGO, CALIFORNIA SHEET 20 OF 22 SHEETS D ATE APPROVED DESCRIPTION BY DATE CQMTRACTDA ll,l,lE STARTEO INSPO:CTOR OATE eowt..Etal FILMED WAT£R W.O. NA SEWER NA W.O. DlSiGH bJtitili cOHtROL dRTi icA fiOiJ 188 - 1692 l..J\MIERT COORDINATES 00000 20-0

I03422 Final BAF Pilot Study Rpt - sandiego.gov · apd . filmed . design engineer . control certification lambert coordinates . 00000-08-d . pe em . piping to biofor-c pilot system

Embed Size (px)

Citation preview

Page 1: I03422 Final BAF Pilot Study Rpt - sandiego.gov · apd . filmed . design engineer . control certification lambert coordinates . 00000-08-d . pe em . piping to biofor-c pilot system

- - - - - -

- -

- - -- -

- - - - - - - -

- - - - - - -

--

20/3

30/3

EXISTING MCCI0-1 EXISTING 480V PANEL -- EXISTING CAPACITY: 400 A I l2 EXISTING CAPACITY• 225A2 I EXISTING CONNECTED LOAD: G7 FLA I EXISTING CONNECTED LOAD: 103 FLA

EXIST GOOA, 480V,

Il~

'------ ­ -2'C-3•2/0+•G GND I'C.O. SPARE

-

0

-

NEW CONNECTED LOAD: 123 FLA NEW CONNECTED LOAD:IIFLA TOTAL CONNECTED LOAD: 190 FLA TOTAL CONNECTED LOAD:II4 FLA

PHASE, 3 W, G5KAIC I Il~Il-m- CD I

® Il t1

LI'C-3•10+•10 GND 0

DISTRIBUTION PANEL DP-1

I'C-:.~-:-G:F•s••IO GND __LO c_ ~I'C-3•10+•10 GND

~ TRANSFORMER D ,rr '"Y"\ 15KVA 480V-240V 3-PHASE, JWI'C-J•G+•IO GND ----L :C.

NOTES:

0 REPLACE EXISTING STARTER AND MCP FOR OTI-BLV-02 WITH A 225AF, 175AT, 480V, G5KAIC, 3-POLE MOLDED CASE CIRCUIT BREAKER.

® REPLACE EXISTING STARTER AND MCP FOR OTI-CPS-01 WITH A 20AF, 20AT, 480V, G5KAIC, 3-POLE MOLDED CASE CIRCUIT BREAKER.

0 FUTURE RELOCATED FEED. REFERENCE ELECTRICAL SITE PLAN FOR RELOCATION.

CD PROVIDE 3-POLE CIRCUIT BREAKER.

® PROVIDED BY OTHERS.

® PROVIDE HOA SWITCH AND RUN LIGHT.

0 PROVIDED BY EQUIPMENT MANUFACTURER.

-=­

~~~ !!I~ E 16262 ~ ~ ~ ~~))~ ~.1H1-il4

~~~ "Jta: -=-

WARNING

0 v. I

IF THIS BAR DOES NOT MEASURE I" THEN DRAWING IS NOT TO SCALE.

BROWN AND CALDWELL

O&OrmDo ..,., __ ..,.,- -"""'""""- ..,.,""""""' I HORIZONTAL NONESCALE I VERTICAL NONE

-

l ='>--I'C-3•10+•10 GND

@~GOA, ~GOA, ~30A, ~30A,NEMA 3R NEMA 3R NEMA 3R NEMA 3R

DENSADEG BIOFOR-C BIOFOR-NBIOSTYR

I'C-3•10+•10 GND

\,----------1

MCP j ~ VSKID MOUNTEDi PUMP/STARTER I j NEMA 3R

: ® I~ i i i i

7.5 i __________ ]

NEMA 3R

1

I

_j cp,..._I'C-2•12+•12 GND £ ='>--I'C-3•12+•12 GND

u..w

8 MINI POWER ZONE 7.5 KVA 480V-120/240V I-PHASE NEMA 3R

SUMP PUMP CONTROL PANEL

.-:p__MANUFACTURER SUPPLIED CABLE

V2

METROPOLITAN WASTEWATER DEPARTMENT Cify o£ San DieJO

D Tt: IREQ.NO.

VA

NO USAGE QTY PHASE A PHASE B PHASE C A/PLS NO USAGE QTY PHASE A PHASE B PHASE C A/PLS I TRANSFORMER D 5000 30/3 2 BIOSTYR 11085 50/3 3 I 5000 - 4 I 11085 -5 I 5000 - G I 11085 -7 BIOFOR UNIT-C G928 30/3 8 BIOFOR UNIT-N G928 30/3

12GO

13188

VA

PHASE A 540

540

VA

G928

540

124G8

VA

PHASE B

540

540

PANELBOARD SCHEDULE VA

G928

11928

BRKR CKT

- 10 - 12

20/2 14 - IG

20/3 18 - 20 - 22

24

PANEL NO: EQUIPMENT TAG:

LOCATION: VOLTAGE:

MAIN BREAKER: BUS SIZE:

I I

SUMP PUMP PANEL I I

SPARE

I I

PHASE VA SUBTOTALS PHASE VA TOTALS PANELBOARD VA TOTALS PANELBOARD AMPS TOTALS DP-1

480 VAC 225A 225A

PANELBOARD SCHEDULE

VA

333

1834G 31534

VA

G928

333

1834G 30814

VA

G928

333

1834G 30274 92G22

111.4 A

BRKR

--

--

--

CKT

9 II 13 15 17 19 21 23

CKT

NO I 3 5 7

I I

MINI POWER ZONE XFMR

SPARE ' I I

SPACE PHASE VA SUBTOTALS

USAGE RECEPTACLES RECEPTACLES SPARE

PHASE VA SUBTOTALS

QTY BRKR CKT A/PLS NO 20/1 GFCI 2 20/1 GFCI 4 20/1 G

8

PANEL NO EQUIPMENT TAG

LOCATION VOLTAGE

MAIN BREAKER BUS SIZE

USAGE QTY PHASE A PHASE B RECEPTACLES 720 SPARE 20/1 SPARE 20/1

PHASE VA SUBTOTALS 720 PHASE VA TOTALS 12GO 540 PANELBOARD VA PANELBOARD AMPS TOTALS PNL P

120/240 VAC 40A 40A CMINl

DRAWING NO. E-02

SHEET NO.

TOTALS

MOUNTING TYPE

PHASE WIRE

SHORT CIRCUIT

VA VA

MOUNTING TYPE

PHASE WIRE

SHORT CIRCUIT

NEMA 3R 3 PHASE 3 G5 KAIC

BRKR A/PLS 20/1 GFCI

1800

7.5 A

NEMA 3R I PHASE

22 KAIC

DRAWING STATUS REVISION DESCRIPTION RAIIN CKD APD

20

PE: EM A/QC

POINT LOMA WASTE WATER TREATMENT PLANT BIOLOGICAL AERATED FILTER PILOT STUDY

ELECTRICAL SINGLE LINE DIAGRAM AND PANELBOARD SCHEDULES

CITY OF SAN DIEGO, CALIFORNIA SHEET 20 OF 22 SHEETS

DATE

APPROVEDDESCRIPTION BY DATE

CQMTRACTDA ll,l,lE STARTEO INSPO:CTOR OATE eowt..Etal

FILMED

WAT£R W.O. NA

SEWER NAW.O.

DlSiGH bJtitili

cOHtROL dRTiicA fiOiJ

188-1692 l..J\MIERT COORDINATES

00000 20-0

Page 2: I03422 Final BAF Pilot Study Rpt - sandiego.gov · apd . filmed . design engineer . control certification lambert coordinates . 00000-08-d . pe em . piping to biofor-c pilot system

__

, c

"' :;! :IE J

~ l c "' :i!

t:C;~ c .. t5~ ;:~

rSEE NOTE II

(0 MANUFACTURER SHALL CONNECT BIOSTYR PILOT SYSTEM EFFLUENT PIPING TO

3' BAF PILOT FEED CLEARWELL TANK. FROM PLWWTP ® MANUFACTURER SHALL CONNECT BIOFOR

4' INF, WI WI WI r4· BW SEE DWG C-Ol, r4· DEFF 1 L.M:Q?J ~ PILOT SYSTEMS EFFLUENT PIPING TO CLEARWELL TANK.

\ r~---~---------~\---+---------+------~-+--~;- 4'-B-FN-B-W/-BF-C-BW-------+----~+-----------------~--------~~~~==~~-~r \~~~========~==t=7=~-----+~ 0 MANUFACTURER SHALL CONNECT INFLUENT

-'-----+--+-11---r--- -H -------~I~tt______ t- B~Eg+Rl 1 SYSirEM

,.,.,__-.--v-f-\' ' i i 4'1N~- i 1

6' PVC DRAIN 3' BSBIW--,...~ '\ i PIPE, SEE - - '----~:#1 I

DWG C-01\ ® iI '---r-r------,4-''B_,$.1----EFF________,

I ~ I1\ 4' BSCEFF/BSBW \.V

\ I I I I I I I I

--h .--------""=F'--,1,----, r---3' BSBW

BIOS!TYR ~: CLEA~WELL I 1

SP-OIA

'\ 4'Bw~ " ~'L! ~4·~T·" ~---~~------------~~---~~

M;N B4F ~ ACKWASH INFLl)JENT

STORAGE TANK TANK

.>--·+-11ilj~Qoet-;----------I-t~---------- -1----- -----1 ___________Ii-~-----------1-i

i i

\.!: ~!

. . • J" • i 1-I'WI 3'BSBW

R4CICW4SI-I • TANK Y T-7

I,' I 12' WIDE TRENCH DRAIN SYSTEM

ZURN MODEL Z-812 OR APPROVED EQUAL

r-------------$~~~~;:::::::::::::::::::::::::~~~Jmmmalll[::::::::::::::::::::::::::::::::::::::::::::::::::llllli::::::::::::::::::::::::::::~~il~~ ~

ii

i

I I \

I I I

3' BFNEFF/BFNBW

4~ ' BW --------4' DEFF t ENS~DEG +------4' BW NFL~ENT ~ TA~K

- l----------It?__________ I i-:::~:~

: ' ---- IAli I' Wl-b[" / ~ i ...:t:<. POST MOUNTED

L------:lTf:-____..J UTILITY STATION

® ~SEE FOUNDATION _ !' PLAN DWG S-03 ~

~ I ~ 3' BFCEFF/BFCBW 3' BFCEFF- <j? 3' BFNEFF_j ~3' rs EQUIPMENT I ~ \ _

3' BFNBW\ ® ! PAD <TYP.l <;V/3' BFCBW ~ ~ ~ "-@ i i i

;:BIO~OR BIO~R t BIOF~R-C BIOF~R-N ~ t~ DENS~DEG EARWELL CLEARWELL PILOT PIL~H o < PILOT TANK TANK SYS!rEM SYS1rEM ill 25 SYS!rEM T46 T+s !

,-----+-1-+------­ --J------------+-----------+-------J------------1----------®»+-~-Iu~• i i I

\}' WI ; IJ' \}' WI i \ I \:V \ ®I

,. \'1 ,. ,. ,. ,. \1'

* 1 i ·* ~ * li

DATE

BY APPROVED DATE

DATE STARTED DATE COMPLETED

\ \ []["]

. ~SS STEEL

IRS

11'-0'

\_3'BFNEFF/BFNBW

10'-0'

T 1 \ I IT i

L4'1NF l4'1NF

L_PORTABLE EYEWASH AND DRENCH HOSE

BFNEFF/BFNBWM-06

11'-6' 11'-8'7'-0'

60'-0'

WARNING BROWN AND CALDWELL METROPOLITAN WASTEWATER0 v.

---......-......--- ..,.. - ­--..,.,....."'""',---- ..,.. -- DEPARTMENT

l~o~HI~E~~~R~o~~ 1---~~::::r=====-~"'"'~--=--=-=-=----1 Cify o£ San DiegoTHEN DRAWING IS HORIZONTAL %" = 1'-0"

NOT TO SCALE. SCALE VERTICAL NONE

DRAWING STATUS NO. DATE REQ.

1

_.------4'BW

t /

~4'1NF

/

,),....._

\ \

\_4'BW

SEE NOTE II\ 8'-10' \

DRAWING NO.

M-03 SHEET NO.

8

REVISION DESCRIPTION DRAW

CITY OF SAN DIEGO, CALIFORNIA NA SHEET 8 OF 22 SHEETS s:w~R --'-N"-"A'----

CKD APD FILMED

DESIGN ENGINEER

CONTROL CERTIFICATION

LAMBERT COORDINATES

00000-08-D

PE EM

PIPING TO BIOFOR-C PILOT SYSTEM.

~MANUFACTURER SHALL CONNECT INFLUENT PIPING TO BIOSTYR INFLUENT INLET.

® MANUFACTURER SHALL CONNECT 4-INCH BACKWASH PIPING TO DENSADEG PILOT SYSTEM.

® MANUFACTURER SHALL CONNECT 4-INCH BACKWASH PIPING TO BIOFOR-C PILOT SYSTEM•

CD MANUFACTURER SHALL CONNECT 4-INCH BACKWASH PIPING TO BIOSTYR PILOT SYSTEM.

® FILANC SHALL PROVIDE 3-INCH TANK OVERFLOW AND TANK DRAIN PER DETAIL 'F', DWG. M-07.

® FILANC SHALL COORDINATE SIZING OF CONCRETE PAD WITH MANUFACTURER.

@ CENTER LINES DISTANCES ARE APPROXIMATE PER NOTE 10, DWG G-02

® FILANC TO FURNISH PORTABLE EYEWASH AND SHOWER.

@ FILANC SHALL PROVIDE AND INSTALL SAMPLE TAP. LOCATIONS AND QUANTITIES SHALL BE COORDINATED WITH DWG M-Ol AND FIELD ENGINEER.

@ FILANC SHALL INSTALL PIPE SUPPORTS PER DETAILS D AND E, DWG M-07 AND SPECIFICATION SECTION 15020.

PIPING SHOWN IS SCHEMATIC ONLY. FILANC SHALL COORDINATE ACTUAL ROUTING AND QUANTITIES IN ACCORDANCE WITH DRAWING M-Ol AND BROWN AND CALDWELL'S FIELD ENGINEER

POINT LOMA WASTE WATER TREATMENT PLANT BIOLOGICAL AERATED FILTER PILOT STUDY

MECHANICAL PLAN

"=

PROJECT MANAGER

A/QC DESCRIPTION

CONTRACTOR INSPECTOR

~~~-I _______________ -.----------.-----------------------------.---------------------------------------------------------------------.---------------------------------------l_--------~----~~~~~~~~------~•-o~---~~---1

188-1692

Page 3: I03422 Final BAF Pilot Study Rpt - sandiego.gov · apd . filmed . design engineer . control certification lambert coordinates . 00000-08-d . pe em . piping to biofor-c pilot system

--

STUB-UP

r-----------~--:-:~-------~­ ---------· --------~---------------------------:=~:~J--~~~~~-J'~·'·~·~CD-~ DP-1, NEMA 3R I

Bl )S YR B CKNASH T NK

.. ..,._.....

'"-"""· ••n ,.,n _J, !"t;-.3•1~+·1~ uNU · ~u·R~ .u•.., 17?\

I 17\ CONTROL PANEL \2.1 ..;;6,.lJ.......L..I''"~'"'·Pr--'!.IR- IY.------+·_,(6)~ .." ----'~=----'"i..L-t--+----------,

' ,...J L...J

I ~I·BIOSTYiR PILOT ! I MAIN BA :~WASH SYSTE~~ I STORAGE ANK

'r' I-I - ·

:

i . ! MAIN FLUENT ii

TANK

------------r- -- ------------r ­

i ~ I I I'C-3•8+ 10 G __,.¢ I

I I'C-3"10 "10 GN I I I'C-3"10 "10 GND l f

~-----+----------------t----__j I'C-3"8+"10 GND -qi"'\

' r ---

BIOFOR-C

I @[

IOFOR BIOF LEARWELL CLEAR ELL t~ANK TANK

t- t I

I

-- --- __- - __- ~ ~ c-~-~T~--___--______-_--_-__--_~-~~-----_-____~-~~~~

I 0 -f!-...l--.....t:, REFERENCEI Q_J I DRAWING E-03 i LJ L__2'C-3"210+"6 GND l ,t. I'C-2"12+"12 GND

: ~! - MINI POWER ZONE· 1 ®

i DE• SADEG 'f-:-- 'I NEMA 3R . _,. ! FF LUENT I I i M K £b....__I'C-6"12+"12 GNDi

I II f----r--~

--------------~~NSADEG

JNEMA 3R

1 I I I I III

BIOFOR-N

C~t]~--NEMA Rl

I tI I I III

I l II I I I .L I

®Will ~!¥=

~~---~=~~-~-- ~~;-~-_____~--===-­---~~~ ---__~ -=~--=~=_____~~~­~- - ~

DRAWING NO.

E-04 SHEET NO.

22

NOTES:

CD PROVIDE ALUMINUM SUPPORTS AND ALL NECESSARY HARDWARE FOR MOUNTING DISTRIBUTION PANEL.

® PROVIDE ALUMINUM SUPPORTS AND ALL NECESSARY HARDWARE FOR MOUNTING MINI POWER ZONE TRANSFORMER AND PANEL.

0 PROVIDED BY OTHERS.

0 MANUFACTURER SUPPLIED CABLE•

® PROVIDE ALUMINUM SUPPORTS AND ALL NECESSARY HARDWARE FOR MOUNTING NEMA 4X FIBERGLASS SUMP PUMP CONTROL PANEL•

® PROVIDED BY EQUIPMENT MANUFACTURER.

POINT LOMA WASTE WATER TREATMENT PLANT BIOLOGICAL AERATED FILTER PILOT STUDY

ELECTRICAL POWER PLAN

DATEBROWN AND NO. D TE REQ. REVISION DESCRIPTION RAW CK APD PE Et.l BY APPROVED DATE FILMEDA/CC DESCRIPTIONCALDWELL

...,rmo, "'"'--- ­..... cONTROL ctRtficAfuH- -"""""""" .....- 188-1692I HORIZONTAL %" 1'-0 UMBERT COORDIHATES'f?JfCI' NOT TO SCALE. SCALE

DAlE STARTEDI VERTICAL NONE--=-­ 00000-22-0DAlE COWPL£TED

Page 4: I03422 Final BAF Pilot Study Rpt - sandiego.gov · apd . filmed . design engineer . control certification lambert coordinates . 00000-08-d . pe em . piping to biofor-c pilot system

EXHIBIT B

PILOT TEST UNIT SPECIFICATIONS

Page 5: I03422 Final BAF Pilot Study Rpt - sandiego.gov · apd . filmed . design engineer . control certification lambert coordinates . 00000-08-d . pe em . piping to biofor-c pilot system

Kruger Products 401 Harrison Oaks Blvd. TELEPHONE 919-677-8310 Ste. 100 FACSIMILE 919-677-0082 Cary, NC 27513

Technical Addendum to Proposal

USFilter/Kruger Products is pleased to provide an equipment list and technical specifications for the Biostyr® pilot test unit to be used at the referenced site.

BIOSTYR® Pilot Unit

Equipment

The Biostyr® pilot unit contains the following equipment: One (1) 36” OD tank Media (4.5 mm polystyrene beads) One (1) pH meter and transmitter One (1) dissolved oxygen meter and transmitter Two (2) flow meters and transmitters One (1) temperature sensor and transmitter One (1) 1700 gallon fiberglass backwash tank One (1) 0.75 HP/1725 RPM motor powering an agitator for backwash tank mixing One (1) 8.6 SCFM @ 100 PSIG air compressor with 60-gallon horizontal receiver One (1) compressed air dryer One (1) process air flow controller All necessary air distribution piping both for air grid and valves Two (2) air actuated butterfly valves with actuator and solenoid Two (2) manual butterfly valves for manual flow adjustments Two (2) submersible non-clog centrifugal pumps Two (2) check valves ensuring forward flow One (1) SCADA system to control and monitor process

Technical Specifications

Dimensions Biostyr® tower’s assembled height is 28’6” in height by 8’ wide by 8’ in

Length. Biostyr® tower’s shipping height is 18’6”. Biostyr® tower weighs approximately 10,000 LBS without water and

13,245 LBS loaded with water. Control Building is 8’2” in height by 7’7” wide by 12’3” in length Backwash drain tank is 6’6” OD fiberglass tank and weighs approximately

240 LBS without water and 15,000 LBS with water

Point Loma CA Biostyr Pilot Technical Addendum.doc 1 of 2

Page 6: I03422 Final BAF Pilot Study Rpt - sandiego.gov · apd . filmed . design engineer . control certification lambert coordinates . 00000-08-d . pe em . piping to biofor-c pilot system

Kruger Products 401 Harrison Oaks Blvd. TELEPHONE 919-677-8310 Ste. 100 FACSIMILE 919-677-0082 Cary, NC 27513

Capacity Water: Nominal Flow: 16 GPM Minimum Flow: 7 GPM

Air: Forward flow: 2 CFM @ < 10 psi Backflush: 5 CFM @ < 10 psi

Hydraulic Connections: Influent: Customer supplies feed tank. Pre-wired, pre-piped pump is placed in feed tank. US Filter provides approximately 10’ of flex hose for immersion in feed tank. Customer provides a standard ¾” hose bib and sufficient garden hose to reach Biostyr® tower.

Effluent: One (1) 3”, 150 LB flange connection for backwash drain tank overflow One (1) 3” NPT valve to drain 1700 gallon backwash drain tank One (1) 4”, 150 LB flange connection for water back flush discharge

One (1) ¾” nipple connection for compressed air dryer discharge

Electrical Customer provides 480 volt, 100 Amp service.

Foundation Customer provides level paved surface to support the Biostyr® tower, the backwash drain tank, and field office.

Protocol, Data and Visitation Pilot study protocol must be agreed upon by both the client/engineer and US Filter prior to the start of treatment. US Filter reserves the right to all data collected (including Biostyr® running conditions and laboratory samples) by the client/engineer or US Filter. All data shall be shared between the client/engineer and US Filter at the time the data is collected or available. US Filter reserves the right to use any collected data. US Filter reserves the right to bring visitors to the pilot unit throughout the course of the study.

Point Loma CA Biostyr Pilot Technical Addendum.doc 2 of 2

Page 7: I03422 Final BAF Pilot Study Rpt - sandiego.gov · apd . filmed . design engineer . control certification lambert coordinates . 00000-08-d . pe em . piping to biofor-c pilot system

DRAWING 42809811-385F 14

M I

0.1

0.1 I

Co

.--+---r~----~===--.

DO

7'-7" THE PRESENCE OF A PROFESSIONAL ENGINEERS SEAL ON THIS DRAWING INDICATES THAT A SIGNED AND SEALED ORIGINAL IS ON FILE.

8'

I

~

~ I

Co

BACKWASH TANK DRAIN VALVE

BIOSTYR PILOT SYSTEM SYSTEM LAYOUT

DRAWING 428098ll-385Fl

FEED PUMP/HOSE TO TOWER PROVIDED BY US FILTER/KRUGER PRODUCTS

4", 150 LB BACKWASH CONNECTION CUSTOMER TO ROUTE TO APPROPRIATE LOCATION

Page 8: I03422 Final BAF Pilot Study Rpt - sandiego.gov · apd . filmed . design engineer . control certification lambert coordinates . 00000-08-d . pe em . piping to biofor-c pilot system

ONDEO Technical Data Sheet Degremont, Biofor™ Process

(2-Foot Column) Single Stage UnitInc.

Description: The Biofor™ Pilot Plant accurately simulates the Biofor™ process, a fixed-film aerobic biological treatment system. It operates on the principle of an upflow co-current flow of process and air. The media, Biolite, is an expanded clay material with a high specific area to provide a surface for the biomass to attach to and filter suspended solids.

Weight: - 10,000 lbs. (shipping) - 14,000 lbs. (operating)

Overall Plan Area: - 7’0” x 10’-0” (skid) - 8’0” diameter x 5’8” (clearwell)

Overall Height: - 22’-0”

Electrical Requirements: - 480V, 3 Phase, 25 amps - Raw Water Pump: 3.0 hp, 60 Hz - Backwash Pump: 1.5 hp, 60 Hz - Scour Air Compressor: 2 hp, 60 Hz - Process Air Compressor: 1 hp, 60 Hz

Connections: - Influent: 2” half coupling - Effluent: 4” male NPT - Service Water: 0.75” female connection

Page 1 of 2 April, 2002

Page 9: I03422 Final BAF Pilot Study Rpt - sandiego.gov · apd . filmed . design engineer . control certification lambert coordinates . 00000-08-d . pe em . piping to biofor-c pilot system

ONDEO Technical Data Sheet Degremont, Biofor™ Process

(2-Foot Column) Single Stage UnitInc.

Process Data: - Column Area: 3.1 ft2

Parameters Process Carboneous Pollution

Nitrification Denitirification Removal Raw Water m/h (USGPM/ft2) Minimum 4 (1.64) 4 (1.64) --

Maximum 20 (8.20) 20 (8.20) 30 (12.26) Process Air m/h Minimum 4 4 --

Maximum 15-20 35 --Loadingskg/m3/d

(Maximum) COD

Suspended Solids Total BOD5

N-NH4

15 5 6 --

8 3 3

1.6

--------

NO3-N -- -- 4 Filter Run hours Maximum 48 48 24 Head Loss (Maximum) (per meter of media) 0.4 (16) 0.4 (16) --height m WC (in WC)

Page 2 of 2 April, 2002

Page 10: I03422 Final BAF Pilot Study Rpt - sandiego.gov · apd . filmed . design engineer . control certification lambert coordinates . 00000-08-d . pe em . piping to biofor-c pilot system

ONDEO Technical Data Sheet Degremont, Biofor™ Process

(1-Foot Column) Single Stage UnitInc.

Description: The Biofor™ ”DN” Pilot Plant accurately simulates the Biofor™ “denitrification” process, a fixed-film anoxic biological treatment system. It operates on the principle of an upflow flow. The media, Biolite, is an expanded clay material with a high specific area to provide a surface for the biomass to attach to and filter suspended solids.

Weight: - 10,000 lbs. (shipping) - 12,000 lbs. (operating)

Overall Plan Area: - 7’0” x 10’-0” (skid) - 8’0” diameter x 5’8” (clearwell)

Overall Height: - 22’-0”

Electrical Requirements: - 480V, 3 Phase, 25 amps - Raw Water Pump: 3.0 hp, 60 Hz - Backwash Pump: 1.5 hp, 60 Hz

Connections: - Influent: 2” half coupling - Effluent: 4” male NPT - Service water: 0.75” female connection

Page 1 of 2 April, 2002

Page 11: I03422 Final BAF Pilot Study Rpt - sandiego.gov · apd . filmed . design engineer . control certification lambert coordinates . 00000-08-d . pe em . piping to biofor-c pilot system

ONDEO Technical Data Sheet Degremont, Biofor™ “DN” Process

(1-Foot Column) Single Stage UnitInc.

Process Data: - Column Area: 0.78 ft2

Parameters Process Carboneous Pollution

Nitrification Denitirification Removal Raw Water m/h (USGPM/ft2) Minimum

Maximum 4 (1.64) 20 (8.20)

4 (1.64) 20 (8.20)

--30 (12.26)

Process Air SCFM Minimum

Maximum 4 15-20

4 35

----

Loading (Maximum) kg/m3/d COD

Suspended Solids Total BOD5

N-NH4

NO3-N

15 5 6 ----

8 3 3 1.6 --

--------4

Filter Run hours Maximum 48 48 24 Head Loss (Maximum) (per meter of media) height m WC (in WC)

0.4 (16) 0.4 (16) --

Page 2 of 2 April, 2002

Page 12: I03422 Final BAF Pilot Study Rpt - sandiego.gov · apd . filmed . design engineer . control certification lambert coordinates . 00000-08-d . pe em . piping to biofor-c pilot system

~

=

v

! I

I

I I

I I

I I

I I

I

: I I

I I

I I

I

I

I I I

! I I

I I

I I

I I

I

l' '(!

~

I; II •

0

I I

I

e

II Jv;

II=====// !)_

/f

I li

..J O..J a:w 1-Z zc OIL. u

SCREEN

0\', ' '

~--------------··11'1'--lw~---------------~

THIS DRAWING CONTAINS INFORMATION PROPRIETARY TD ONDEO DE&REMONT, INCORPORATED! IT IS SUBMITTED IN CONFIDENCE AND IS TO BE USED SOLELY FOR THE PURPOSE FOR WHICH IT JS FURNISHED AND RETURNED UPON REQUEST, THIS DRAWING AND SUCH INFORMATION IS NOT TO BE REPRODUCED. TRANSMITTED,

SECTIONAL ELEVATION REV

-· IEIICIII'1ICIII DAlE

DISCLOSED. OR USED OTHERWISE JN WHOLE t--t-------------------t--t--+--+----1 ~ IN PART WITHOUT THE ~ITTEN AUTHORIZATION OF ONOEO OEGREMONT, INCORPORATED.

REV

2'" INFLUENT IWT

,..----------------... .....-----------------.

; • •

...,....-- -- .......... ------------~-~~

AIR SCOUR

I I

.L...-_________ L._ __ ~~

PROCESS AIR BLOWER LADDER

-~~r-----~F===~·

I 2. HOSE ~-----~-------------------

------....... ,......._

:t='-----~

.. ,

" •, '\\

\

\ \ - ~ I

-----------------------~ I

-_.J -------------- ..c:::::j::=::::!!!!l'!l'

INFLUENT PUMP

CLEf\RWELL

PLAN VIEW

CLEARWELL

-· IEIICIII'1ICIII DAlE PROJECT INFORMATION

ORIGINAL ISSUE

Q 0

ONDEO De1remont, Inc. IWL OffDI Boz 718110 Blpbmorul, Vlq:m1& 1!112111YIIIID PH! (100) 448-11110

IY DAlE

~- L.LR GLOIS 0*'*' 11 J.LE ICKI _. J.LE ICKI

ori ONDEO "\ra Deeremont DO NOT SCALE

BIOFOR PILOT PLANT LAYOUT

IIZE

D !i1

I 032097-1427 ' -0 s:.u NONE ~~------------L--L-------------------L--L-~-~--~-~------------------~-~-~-~~-~--------------~~-----------~-~~---~-~~----------------L~~