17
I-REACT Project Overview Project Responsible: Fabrizio Dominici [email protected] ISMB – Torino - Italy

I-REACT Project Overview · Project Overview Project Responsible: Fabrizio Dominici [email protected] ISMB –Torino - Italy. ... @ISMB 2016 - Confidential content –All rigths reserved

  • Upload
    others

  • View
    6

  • Download
    0

Embed Size (px)

Citation preview

Page 1: I-REACT Project Overview · Project Overview Project Responsible: Fabrizio Dominici dominici@ismb.it ISMB –Torino - Italy. ... @ISMB 2016 - Confidential content –All rigths reserved

I-REACT

Project Overview

Project Responsible:

Fabrizio Dominici

[email protected]

ISMB – Torino - Italy

Page 2: I-REACT Project Overview · Project Overview Project Responsible: Fabrizio Dominici dominici@ismb.it ISMB –Torino - Italy. ... @ISMB 2016 - Confidential content –All rigths reserved

I-REACT | SEP-210293370 | H2020-DRS-1-2015

I-REACTAt a Glance

Total costs of 6,65 M€

36 months

5 in-field demonstrations

5/17/2016@ISMB 2016 - Confidential content – All rigths reserved 2

20 partners from 9 states12 SMEs, 3 Research Centers, 2

Universities, 2 public

company/institute, 1 UN body

Page 3: I-REACT Project Overview · Project Overview Project Responsible: Fabrizio Dominici dominici@ismb.it ISMB –Torino - Italy. ... @ISMB 2016 - Confidential content –All rigths reserved

I-REACT | SEP-210293370 | H2020-DRS-1-2015

I-REACTMotivation

The surface temperature is projected to rise over the 21st century under all emission

scenarios.

Climate change increases the frequency of extreme weather events.

5/17/2016@ISMB 2016 - Confidential content – All rigths reserved 3

Projected river discharge (100 years return)

in 2020 (left), 2050 (center), 2080

Projected change in surface air

temperature under three different

scenarios: RCP 4.5 (top) and 8.5

(bottom) and three time span: annual

(left), summer (center), winter (right)

Projected Seasonal Severity Rating

change in 2071-2100 compared to

1961-1990 (left), annual average

SSR in 2071-2100 (right)

Page 4: I-REACT Project Overview · Project Overview Project Responsible: Fabrizio Dominici dominici@ismb.it ISMB –Torino - Italy. ... @ISMB 2016 - Confidential content –All rigths reserved

I-REACT | SEP-210293370 | H2020-DRS-1-2015

I-REACTGoals

I-REACT: Improving Resilience to Emergencies through Advanced Cyber

Technologies.

Help society in becoming more resilient to crises arising before, during and after

emergency events.

Provide increased resilience to natural disasters though better analysis and anticipation,

effective and fast emergency response, increased awareness and citizen engagement.

Integrate existing Emergency Management Systems and multiple data sources.

Enable new business opportunities around natural disasters triggered by extreme

weather conditions.

45/17/2016@ISMB 2016 - Confidential content – All rigths reserved

Page 5: I-REACT Project Overview · Project Overview Project Responsible: Fabrizio Dominici dominici@ismb.it ISMB –Torino - Italy. ... @ISMB 2016 - Confidential content –All rigths reserved

I-REACT | SEP-210293370 | H2020-DRS-1-2015

I-REACTConcept Description: Workflow

55/17/2016@ISMB 2016 - Confidential content – All rigths reserved

Page 6: I-REACT Project Overview · Project Overview Project Responsible: Fabrizio Dominici dominici@ismb.it ISMB –Torino - Italy. ... @ISMB 2016 - Confidential content –All rigths reserved

I-REACT | SEP-210293370 | H2020-DRS-1-2015

I-REACTConcept Description: Architecture

65/17/2016@ISMB 2016 - Confidential content – All rigths reserved

Page 7: I-REACT Project Overview · Project Overview Project Responsible: Fabrizio Dominici dominici@ismb.it ISMB –Torino - Italy. ... @ISMB 2016 - Confidential content –All rigths reserved

I-REACT | SEP-210293370 | H2020-DRS-1-2015

I-REACTOverall Approach

75/17/2016@ISMB 2016 - Confidential content – All rigths reserved

Page 8: I-REACT Project Overview · Project Overview Project Responsible: Fabrizio Dominici dominici@ismb.it ISMB –Torino - Italy. ... @ISMB 2016 - Confidential content –All rigths reserved

I-REACT | SEP-210293370 | H2020-DRS-1-2015

I-REACTAmbition

85/17/2016@ISMB 2016 - Confidential content – All rigths reserved

Citizens

•Crowdsourcing

•Gamification

• Social Media

First Responders

•Wearable device

•Augmented Positioning

•Augmented Reality

•UAVs

•GNSS Reflectometry

Decision Makers

•Decision Support System

Models

• Climate change

• Weather Forecast

• Risk

• Hazard Nowcast and Forecasts

Big Data

• Big-Data architecture

• Real-time EO Mapping

• Architecture

• Linked Data

• Semantic

Wireless Comm.

• Performance under emergency scenarios

• 5G

SystemsUsers

Page 9: I-REACT Project Overview · Project Overview Project Responsible: Fabrizio Dominici dominici@ismb.it ISMB –Torino - Italy. ... @ISMB 2016 - Confidential content –All rigths reserved

I-REACT | SEP-210293370 | H2020-DRS-1-2015

I-REACTImpacts

5/17/2016@ISMB 2016 - Confidential content – All rigths reserved 9

1. Faster analysis of risk and anticipation

2. Online nowcasting and forecasting systems

3. Reduction of human losses, environmental and

economic impact of natural hazards

4. Reduction of emergency management costs by using

adapted cyber technologies

5. Increase citizens involvement and awareness

6. Faster and more effective emergency response

Page 10: I-REACT Project Overview · Project Overview Project Responsible: Fabrizio Dominici dominici@ismb.it ISMB –Torino - Italy. ... @ISMB 2016 - Confidential content –All rigths reserved

I-REACT | SEP-210293370 | H2020-DRS-1-2015

I-REACTStakeholders Identification

5/17/2016@ISMB 2016 - Confidential content – All rigths reserved 10

Page 11: I-REACT Project Overview · Project Overview Project Responsible: Fabrizio Dominici dominici@ismb.it ISMB –Torino - Italy. ... @ISMB 2016 - Confidential content –All rigths reserved

I-REACT | SEP-210293370 | H2020-DRS-1-2015

I-REACTBusiness Model

5/17/2016@ISMB 2016 - Confidential content – All rigths reserved 11

B2B Products

I-EP: IREACT Emergency Planning

I-INS: IREACT Insurance

I-DATA: TREACT Data

Wholesale Product

I-THIRD: all I-REACT

componenets

Page 12: I-REACT Project Overview · Project Overview Project Responsible: Fabrizio Dominici dominici@ismb.it ISMB –Torino - Italy. ... @ISMB 2016 - Confidential content –All rigths reserved

I-REACT | SEP-210293370 | H2020-DRS-1-2015

I-REACTCommunication Timeline

5/17/2016@ISMB 2016 - Confidential content – All rigths reserved 12

Page 13: I-REACT Project Overview · Project Overview Project Responsible: Fabrizio Dominici dominici@ismb.it ISMB –Torino - Italy. ... @ISMB 2016 - Confidential content –All rigths reserved

I-REACT | SEP-210293370 | H2020-DRS-1-2015

I-REACTWork Plan

5/17/2016@ISMB 2016 - Confidential content – All rigths reserved 13

Page 14: I-REACT Project Overview · Project Overview Project Responsible: Fabrizio Dominici dominici@ismb.it ISMB –Torino - Italy. ... @ISMB 2016 - Confidential content –All rigths reserved

I-REACT | SEP-210293370 | H2020-DRS-1-2015

I-REACTMacro Gantt

5/17/2016@ISMB 2016 - Confidential content – All rigths reserved 14

6 7 8 9 10 11 12 1 2 3 4 5 6 7 8 9 10 11 12 1 2 3 4 5 6 7 8 9 10 11 12 1 2 3 4 5

Milestsones and Meetings

MS1 Kick-Off meeting

MS2 International User Requirements Workshop (URW)

Advisory Board Streering Meeting (ABM1)

MS3 Design Review (DR)

Pleanary Call Conference (PCC1)

Advisory Board Steering Call (ABC1)

MS4 Mid-Term Review (MTR)

MS5 Implementation Review (IR)

Advisory Board Steering Call (ABC2)

IF1 In-field Demo and User Feedback Workshop (IFD1)

IF2 In-field Demo and User Feedback Workshop (IFD2)

IF3 In-field Demo and User Feedback Workshop (IFD3)

IF4 In-field Demo and User Feedback Workshop (IFD4)

IF5 In-field Demo and User Feedback Workshop (IFD5)

MS6 Intermediate Demonstration Review (IDR)

Final Conference

MS7 Final Review (FR)

WP1 Management 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1

WP2 Innovation Design 1 1 1 1 1 1

WP3 External Services and Data Integration 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1

WP4 Modelling and Engines 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1

WP5 Service Oriented Architecture 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1

WP6 Validation and Demonstration 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1

WP7 Businness Assessment and Exploitation 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1

WP8 Dissemination for Impact Maximization 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1

2017 2018 2019Month

2016

Page 15: I-REACT Project Overview · Project Overview Project Responsible: Fabrizio Dominici dominici@ismb.it ISMB –Torino - Italy. ... @ISMB 2016 - Confidential content –All rigths reserved

I-REACT | SEP-210293370 | H2020-DRS-1-2015

I-REACTManagement Structure

5/17/2016@ISMB 2016 - Confidential content – All rigths reserved 15

Page 16: I-REACT Project Overview · Project Overview Project Responsible: Fabrizio Dominici dominici@ismb.it ISMB –Torino - Italy. ... @ISMB 2016 - Confidential content –All rigths reserved

I-REACT | SEP-210293370 | H2020-DRS-1-2015

I-REACTEnd-User & Advisory Board

5/17/2016@ISMB 2016 - Confidential content – All rigths reserved 16

End-Users

Coast Guard

Häme

Advisors

Remote

Sensing

Applications

Center

Page 17: I-REACT Project Overview · Project Overview Project Responsible: Fabrizio Dominici dominici@ismb.it ISMB –Torino - Italy. ... @ISMB 2016 - Confidential content –All rigths reserved

I-REACT | SEP-210293370 | H2020-DRS-1-2015

I-REACT

THANK YOUANY QUESTIONS?

I-REACT• Improving Resilience to Emergencies through Advanced Cyber Technologies

I-REACT Project Overview

@fabrydominici

Fabrizio_dominici

[email protected]

Via Pier Carlo Boggio 61,

10138 Torino

http://www.ismb.it/fabrizio.

dominici